IR 05000409/2017401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 10/12/2017
| issue date = 10/12/2017
| title = Boiling Water Reactor - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000409/2017401 (Drs); 07200046/2017401 (DRS) - Cover Letter (DRS-G.Bonano)
| title = Boiling Water Reactor - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000409/2017401 (Drs); 07200046/2017401 (DRS) - Cover Letter (DRS-G.Bonano)
| author name = Riemer K R
| author name = Riemer K
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Sauger J
| addressee name = Sauger J
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:October 12, 2017
{{#Wiki_filter:UNITED STATES ctober 12, 2017


SUBJECT: LA CROSSE BOILING WATER REACTORINDEPENDENT SPENT FUEL STORAGE INSTALLATIONNRC SECURITY INSPECTION REPORT 05000409/2017401(DRS), 07200046/2017401(DRS)
==SUBJECT:==
LA CROSSE BOILING WATER REACTORINDEPENDENT SPENT FUEL STORAGE INSTALLATIONNRC SECURITY INSPECTION REPORT 05000409/2017401(DRS), 07200046/2017401(DRS)


==Dear Mr. Sauger:==
==Dear Mr. Sauger:==
On September 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the Physical Security Program for the La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation located near Genoa, Wisconsin. In addition, the inspectors evaluated the implementation of the Material Control and Accounting Program in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 72.72(b). At the conclusion of the inspection on September 13, 2017, the inspectors discussed the results of the inspection with Mr. L. Peters and other Members of your staff. The inspection results are documented in the enclosed report. The NRC inspectors did not identify any finding or violation of more than minor significance. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire respo-Related InformationWithhold from public disclosure under 10 CFR in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
On September 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the Physical Security Program for the La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation located near Genoa, Wisconsin. In addition, the inspectors evaluated the implementation of the Material Control and Accounting Program in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 72.72(b). At the conclusion of the inspection on September 13, 2017, the inspectors discussed the results of the inspection with Mr. L. Peters and other Members of your staff. The inspection results are documented in the enclosed report.
 
The NRC inspectors did not identify any finding or violation of more than minor significance.
 
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
 
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.


Sincerely,
Sincerely,
/RA/ Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI) Enclosure: IR 05000409/2017401(DRS); 07200046/2017401(DRS) cc w/encl: C. Olson, ISFSI Plant Manager cc w/o encl: LaCrosseSolutions Service List
/RA/
Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)
Enclosure:
IR 05000409/2017401(DRS);
07200046/2017401(DRS)
cc w/encl: C. Olson, ISFSI Plant Manager cc w/o encl: LaCrosseSolutions Service List
}}
}}

Latest revision as of 13:24, 29 October 2019

Boiling Water Reactor - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000409/2017401 (Drs); 07200046/2017401 (DRS) - Cover Letter (DRS-G.Bonano)
ML17285B121
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 10/12/2017
From: Kenneth Riemer
Plant Support Branch II
To: Sauger J
Energy Solutions
References
IR 2017401
Download: ML17285B121 (3)


Text

UNITED STATES ctober 12, 2017

SUBJECT:

LA CROSSE BOILING WATER REACTORINDEPENDENT SPENT FUEL STORAGE INSTALLATIONNRC SECURITY INSPECTION REPORT 05000409/2017401(DRS), 07200046/2017401(DRS)

Dear Mr. Sauger:

On September 13, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the Physical Security Program for the La Crosse Boiling Water Reactor Independent Spent Fuel Storage Installation located near Genoa, Wisconsin. In addition, the inspectors evaluated the implementation of the Material Control and Accounting Program in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 72.72(b). At the conclusion of the inspection on September 13, 2017, the inspectors discussed the results of the inspection with Mr. L. Peters and other Members of your staff. The inspection results are documented in the enclosed report.

The NRC inspectors did not identify any finding or violation of more than minor significance.

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Kenneth R. Riemer, Chief Plant Support Branch Division of Reactor Safety Docket No. 050-00409, 072-00046 License No. DPR-45, General License (ISFSI)

Enclosure:

IR 05000409/2017401(DRS);

07200046/2017401(DRS)

cc w/encl: C. Olson, ISFSI Plant Manager cc w/o encl: LaCrosseSolutions Service List