|
|
(One intermediate revision by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 06/11/2007 | | | issue date = 06/11/2007 |
| | title = Security Inspection 05000271/2007201 | | | title = Security Inspection 05000271/2007201 |
| | author name = Albert R J | | | author name = Albert R |
| | author affiliation = NRC/NSIR/DSO/DDSO/SPEB | | | author affiliation = NRC/NSIR/DSO/DDSO/SPEB |
| | addressee name = Sullivan T A | | | addressee name = Sullivan T |
| | addressee affiliation = Entergy Nuclear Operations, Inc | | | addressee affiliation = Entergy Nuclear Operations, Inc |
| | docket = 05000271 | | | docket = 05000271 |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Enclosure contains Safeguards Information. Upon removal, this letter is decontrolled. June 11, 2007Mr. Theodore Site Vice President Entergy Nuclear Operations Inc. | | {{#Wiki_filter:une 11, 2007 |
|
| |
|
| Vermont Yankee Nuclear Power Station P.O. Box 0500, 185 Old Ferry Road Brattleboro, VT 05302-0500
| | ==SUBJECT:== |
| | VERMONT YANKEE NUCLEAR POWER STATION - SECURITY INSPECTION 05000271/2007201 |
|
| |
|
| SUBJECT: VERMONT YANKEE NUCLEAR POWER STATION - SECURITY INSPECTION 05000271/2007201
| | ==Dear Mr. Sullivan:== |
| | On April 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Watts Bar Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. |
|
| |
|
| ==Dear Mr. Sullivan:==
| | The enclosed inspection report documents the inspection results, which were discussed on April 27, 2007, with you and other members of your staff. |
| On April 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at the Watts Bar Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process.
| |
|
| |
|
| The enclosed inspection report documents the inspection results, which were discussed on April 27, 2007, with you and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license.
| | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. |
|
| |
|
| The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained inthe enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. T. Sullivan-2 Should you have any questions concerning this letter, please contact us. Your cooperation isappreciated. | | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified. |
|
| |
|
| Sincerely,Ronald J. Albert, Chief /RA/Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-271License No.: DPR-28
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. |
|
| |
|
| ===Enclosure:===
| | Enclosure contains Safeguards Information. Upon removal, this letter is decontrolled. Should you have any questions concerning this letter, please contact us. Your cooperation is appreciated. |
| NRC Inspection Report No. 05000271/2007201 cc w/encl:Mr. Michael R. Kansler, PresidentEntergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601Mr. Pat RyanSecurity Manager Vermont Yankee Nuclear Power Plant 320 Governor Hunt Road Vernon, VT 05354cc w/o encl:MAJ. Kerry SleeperField Force Commander, VT State Police and Commissioner 103 South Main Street Waterbury, VT 05671-2101
| |
|
| |
|
| David O' Brain, Commissioner State of Vermont Department of Public Safety 112 State Street Drawer 20 Montpelier, VT 05620-2601 | | Sincerely, Ronald J. Albert, Chief /RA/ |
| | Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-271 License No.: DPR-28 Enclosure: NRC Inspection Report No. 05000271/2007201 cc w/encl: Mr. Michael R. Kansler, President Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Pat Ryan Security Manager Vermont Yankee Nuclear Power Plant 320 Governor Hunt Road Vernon, VT 05354 cc w/o encl: MAJ. Kerry Sleeper Field Force Commander, VT State Police and Commissioner 103 South Main Street Waterbury, VT 05671-2101 David O Brain, Commissioner State of Vermont Department of Public Safety 112 State Street Drawer 20 Montpelier, VT 05620-2601 |
| }} | | }} |
|
---|
Category:Inspection Report Correspondence
MONTHYEARIR 07200059/20184012018-11-20020 November 2018 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2018401 (Cover Letter Only - Public) ML1016502102010-06-14014 June 2010 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0806504492008-03-0505 March 2008 Notification of Inspection of the Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Using Temporary Instruction 2515/171 IR 05000271/20074022007-07-31031 July 2007 IR 05000271-07-402, on 07/09/2007 - 07/13/2007, Vermont Yankee Nuclear Power Station, Physical Protection IR 05000271/20072012007-06-11011 June 2007 Security Inspection 05000271/2007201 IR 05000271/20070082007-04-12012 April 2007 IR 05000271-07-008; 03/12/2007 - 03/29/2007; Entergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station; Triennial Fire Protection Team Inspection IR 05000271/20060042006-10-30030 October 2006 IR 05000271-06-004, on 07/01/2006 -09/30/2006, for Vermont Yankee, Event Followup IR 05000271/20060102006-10-26026 October 2006 IR 05000271-06-010 on 09/18/06 - 09/20/06 for Vermont Yankee Nuclear Power Station; Ti 2515/268 IR 05000271/20060082006-08-15015 August 2006 IR 05000271/2006-008; 07/10/2006 - 07/14/2006; Vermont Yankee Nuclear Power Station; Physical Protection IR 05000271/20050072005-07-11011 July 2005 IR 05000271-05-007; 05/23/2005-5/27/2005; Vermont Yankee Nuclear Power Station; Emergency Preparedness Exercise; Supplemental Inspection for the White Finding Associated with the Distribution and Maintenance of the Tone Alert Radios ML0500401312004-01-0404 January 2004 Letter to David O'Brien, Chairman, VT State Nuclear Advisory Panel 2018-11-20
[Table view] Category:Letter
MONTHYEARBVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report BVY 23-012, Pre-Notice of Disbursement from Decommissioning Trust2023-05-0202 May 2023 Pre-Notice of Disbursement from Decommissioning Trust ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment BVY 23-009, 2022 Individual Monitoring NRC Form 5 Report2023-04-24024 April 2023 2022 Individual Monitoring NRC Form 5 Report BVY 23-008, Pre-Notice of Disbursement from Decommissioning Trust2023-04-0606 April 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-03-29029 March 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-006, Status of Decommissioning and Spent Fuel Management Fund for Year Ending 20222023-03-29029 March 2023 Status of Decommissioning and Spent Fuel Management Fund for Year Ending 2022 BVY 23-005, Nuclear Onsite Property Damage Insurance2023-03-13013 March 2023 Nuclear Onsite Property Damage Insurance BVY 23-004, Pre-Notice of Disbursement from Decommissioning Trust2023-03-0202 March 2023 Pre-Notice of Disbursement from Decommissioning Trust ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000271/20220022023-02-22022 February 2023 Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station - NRC Inspection Report No. 05000271/2022002 BVY 23-003, Pre-Notice of Disbursement from Decommissioning Trust2023-01-31031 January 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-030, Documentary Evidence of Performance Bond2022-12-30030 December 2022 Documentary Evidence of Performance Bond ML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 IR 05000271/20224012022-12-15015 December 2022 NRC Inspection Report No. 05000271/2022401, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont (Letter Only) BVY 22-028, Re Proof of Financial Protection2022-11-28028 November 2022 Re Proof of Financial Protection BVY 22-027, Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station2022-11-11011 November 2022 Bvy 22-027; Pre-Notice of Disbursement from Decommissioning Trust for Vermont Yankee Nuclear Power Station BVY 22-026, Pre-Notice of Disbursement from Decommissioning Trust2022-10-31031 October 2022 Pre-Notice of Disbursement from Decommissioning Trust ML22273A1492022-10-0404 October 2022 Review of Decommissioning Funding Status 2022 BVY 22-025, Pre-Notice of Disbursement from Decommissioning Trust2022-10-0404 October 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-023, Pre-Notice of Disbursement from Decommissioning Trust2022-09-0101 September 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-022, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-22022 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2022-08-16016 August 2022 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 22-020, Pre-Notice of Disbursement from Decommissioning Trust2022-08-0101 August 2022 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20220012022-08-0101 August 2022 NRC Inspection Report No. 05000271/2022001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 22-019, Pre-Notice of Disbursement from Decommissioning Trust2022-07-0606 July 2022 Pre-Notice of Disbursement from Decommissioning Trust BVY 22-013, Notification of Revised Decommissioning Cost Estimate2022-06-17017 June 2022 Notification of Revised Decommissioning Cost Estimate 2024-01-04
[Table view] |
Text
une 11, 2007
SUBJECT:
VERMONT YANKEE NUCLEAR POWER STATION - SECURITY INSPECTION 05000271/2007201
Dear Mr. Sullivan:
On April 27, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Watts Bar Nuclear Power Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on April 27, 2007, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Enclosure contains Safeguards Information. Upon removal, this letter is decontrolled. Should you have any questions concerning this letter, please contact us. Your cooperation is appreciated.
Sincerely, Ronald J. Albert, Chief /RA/
Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-271 License No.: DPR-28 Enclosure: NRC Inspection Report No. 05000271/2007201 cc w/encl: Mr. Michael R. Kansler, President Entergy Nuclear Operations 440 Hamilton Avenue White Plains, NY 10601 Mr. Pat Ryan Security Manager Vermont Yankee Nuclear Power Plant 320 Governor Hunt Road Vernon, VT 05354 cc w/o encl: MAJ. Kerry Sleeper Field Force Commander, VT State Police and Commissioner 103 South Main Street Waterbury, VT 05671-2101 David O Brain, Commissioner State of Vermont Department of Public Safety 112 State Street Drawer 20 Montpelier, VT 05620-2601