ML053550391: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 12/22/2005
| issue date = 12/22/2005
| title = Request for Additional Information, Steam Generator Tube Plugging Inservice Inspection Report
| title = Request for Additional Information, Steam Generator Tube Plugging Inservice Inspection Report
| author name = Moroney B T
| author name = Moroney B
| author affiliation = NRC/NRR/ADRO/DORL/LPLD
| author affiliation = NRC/NRR/ADRO/DORL/LPLD
| addressee name = Stall J A
| addressee name = Stall J
| addressee affiliation = Florida Power & Light Co
| addressee affiliation = Florida Power & Light Co
| docket = 05000250
| docket = 05000250
| license number = DPR-031
| license number = DPR-031
| contact person = Moroney B T, NRR/DLPM, 415-3974
| contact person = Moroney B, NRR/DLPM, 415-3974
| case reference number = TAC MC8112
| case reference number = TAC MC8112
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 22, 2005Mr. J. A. Stall Senior Vice President, Nuclear andChief Nuclear OfficerFlorida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
{{#Wiki_filter:December 22, 2005 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420


==SUBJECT:==
==SUBJECT:==
TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONALINFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)
TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)


==Dear Mr. Stall:==
==Dear Mr. Stall:==


By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generatortube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that aresponse to the enclosed Request for Additional Information is needed before we can complete the review.This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005,and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.Sincerely, /RA/Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-250
By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generator tube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.
The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.
This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005, and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.
Sincerely,
                                          /RA/
Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250


==Enclosure:==
==Enclosure:==
As stated cc w/encl: See next page Mr. J. A. StallDecember 22, 2005Senior Vice President, Nuclear andChief Nuclear OfficerFlorida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420
As stated cc w/encl: See next page
 
Mr. J. A. Stall                                                            December 22, 2005 Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420


==SUBJECT:==
==SUBJECT:==
TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONALINFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)
TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)


==Dear Mr. Stall:==
==Dear Mr. Stall:==


By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generatortube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that aresponse to the enclosed Request for Additional Information is needed before we can complete the review.This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005,and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.Sincerely, /RA/Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-250
By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generator tube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.
The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.
This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005, and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.
Sincerely,
                                            /RA/
Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250


==Enclosure:==
==Enclosure:==
As stated cc w/encl: See next pageDistribution:PUBLICLPL II-2 R/FRidsNrrPMBMoroneyRidsNrrDorlLpldAHiser BClayton(paper copy)RidsOgcRpYDiaz-CastilloBSingalsRidsRgn2MailCenter(SBinoy) RidsAcrsAcnwMailCenterADAMS ACCESSION No.:   ML053550391       NRR-088OFFICELPL II-2/PMLPL II-2/LACSGB/CLPL II-2/SCNAMEBMoroneyRSola forBClaytonEMurphy (acting)by memo datedMMarshallDATE  12/22/05 12/22/059/28/05 12/22/05OFFICIAL RECORD COPY REQUEST FOR ADDITIONAL INFORMATION FOR FLORIDA POWER & LIGHT COMPANY TURKEY POINT UNIT 3STEAM GENERATOR TUBE INSPECTION REPORTDOCKET NO. 50-2501.Attachment 1 of the inservice inspection report indicated that mechanical wear damage wasidentified in locations other than anti-vibration bars (e.g., tube supports, top of tubesheet) insteam generator (SG) A, B, and C. Please explain the cause of these indications. If the indications are attributed to possible loose parts, please discuss whether a foreign object search and retrieval was performed in each SG and whether the loose parts were removed from the SGs. If the parts were not removed or the locations were not visually inspected, please discuss the results of any evaluations performed to ensure these parts (or suspected parts) would not result in a loss of tube integrity for the period of time between inspections.ENCLOSURE Mr. J. A. StallTURKEY POINT PLANT Florida Power and Light Company cc:M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL  33408-0420
As stated cc w/encl: See next page Distribution:
PUBLIC          LPL II-2 R/F RidsNrrPMBMoroney            RidsNrrDorlLpld        AHiser BClayton(paper copy)         RidsOgcRp                    YDiaz-Castillo        BSingals RidsRgn2MailCenter(SBinoy)                                 RidsAcrsAcnwMailCenter ADAMS ACCESSION No.: ML053550391                                               NRR-088 OFFICE          LPL II-2/PM    LPL II-2/LA      CSGB/C                LPL II-2/SC NAME            BMoroney      RSola for        EMurphy (acting)     MMarshall BClayton        by memo dated DATE              12/22/05       12/22/05        9/28/05               12/22/05 OFFICIAL RECORD COPY
 
REQUEST FOR ADDITIONAL INFORMATION FOR FLORIDA POWER & LIGHT COMPANY TURKEY POINT UNIT 3 STEAM GENERATOR TUBE INSPECTION REPORT DOCKET NO. 50-250
: 1. Attachment 1 of the inservice inspection report indicated that mechanical wear damage was identified in locations other than anti-vibration bars (e.g., tube supports, top of tubesheet) in steam generator (SG) A, B, and C. Please explain the cause of these indications. If the indications are attributed to possible loose parts, please discuss whether a foreign object search and retrieval was performed in each SG and whether the loose parts were removed from the SGs. If the parts were not removed or the locations were not visually inspected, please discuss the results of any evaluations performed to ensure these parts (or suspected parts) would not result in a loss of tube integrity for the period of time between inspections.
ENCLOSURE


Marjan Mashhadi, Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW.
Mr. J. A. Stall                    TURKEY POINT PLANT Florida Power and Light Company cc:
Suite 220 Washington, DC 20004T. O. Jones, Site Vice PresidentTurkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL 33035   County Manager Miami-Dade County 111 Northwest 1 Street, 29th Floor Miami, Florida 33128       Senior Resident InspectorTurkey Point Nuclear Plant U.S. Nuclear Regulatory Commission 9762 SW. 344 th StreetFlorida City, Florida 33035Mr. William A. Passetti, ChiefDepartment of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741Mr. Craig Fugate, DirectorDivision of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100Attorney General        Department of Legal Affairs The Capitol Tallahassee, Florida 32304Michael O. PearcePlant General Manager Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW. 344th Street Florida City, FL  33035Walter ParkerLicensing Manager Turkey Point Nuclear Plant 9760 SW 344th Street Florida City, FL  33035Mark Warner, Vice PresidentNuclear Operations Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420Mr. Rajiv S. KundalkarVice President - Nuclear Engineering Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420}}
M. S. Ross, Managing Attorney      Attorney General Florida Power & Light Company      Department of Legal Affairs P.O. Box 14000                    The Capitol Juno Beach, FL 33408-0420          Tallahassee, Florida 32304 Marjan Mashhadi, Senior Attorney   Michael O. Pearce Florida Power & Light Company     Plant General Manager 801 Pennsylvania Avenue, NW.       Turkey Point Nuclear Plant Suite 220                         Florida Power and Light Company Washington, DC 20004              9760 SW. 344th Street Florida City, FL 33035 T. O. Jones, Site Vice President Turkey Point Nuclear Plant         Walter Parker Florida Power and Light Company   Licensing Manager 9760 SW. 344th Street              Turkey Point Nuclear Plant Florida City, FL 33035            9760 SW 344th Street Florida City, FL 33035 County Manager Miami-Dade County                 Mark Warner, Vice President 111 Northwest 1 Street, 29th Floor Nuclear Operations Support Miami, Florida 33128               Florida Power and Light Company P.O. Box 14000 Senior Resident Inspector          Juno Beach, FL 33408-0420 Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 9762 SW. 344th Street              Vice President - Nuclear Engineering Florida City, Florida 33035        Florida Power & Light Company P.O. Box 14000 Mr. William A. Passetti, Chief    Juno Beach, FL 33408-0420 Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100}}

Latest revision as of 00:40, 24 November 2019

Request for Additional Information, Steam Generator Tube Plugging Inservice Inspection Report
ML053550391
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 12/22/2005
From: Moroney B
NRC/NRR/ADRO/DORL/LPLD
To: Stall J
Florida Power & Light Co
Moroney B, NRR/DLPM, 415-3974
References
TAC MC8112
Download: ML053550391 (4)


Text

December 22, 2005 Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)

Dear Mr. Stall:

By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generator tube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.

The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.

This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005, and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.

Sincerely,

/RA/

Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250

Enclosure:

As stated cc w/encl: See next page

Mr. J. A. Stall December 22, 2005 Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power and Light Company P.O. Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

TURKEY POINT PLANT, UNIT 3 - REQUEST FOR ADDITIONAL INFORMATION REGARDING STEAM GENERATOR TUBE PLUGGING INSERVICE INSPECTION REPORT (TAC NO. MC8112)

Dear Mr. Stall:

By letter dated June 17, 2005, Florida Power & Light Company submitted the steam generator tube plugging inservice inspection 12-month special report for the fall 2004 refueling outage at Turkey Point Unit 3.

The U.S. Nuclear Regulatory Commission staff has reviewed your submittal and finds that a response to the enclosed Request for Additional Information is needed before we can complete the review.

This request was discussed with Ms. Stavroula Mihalakea of your staff on December 15, 2005, and it was agreed that a response would be provided by March 1, 2006. If you have any questions, please contact me at (301) 415-3974.

Sincerely,

/RA/

Brendan T. Moroney, Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-250

Enclosure:

As stated cc w/encl: See next page Distribution:

PUBLIC LPL II-2 R/F RidsNrrPMBMoroney RidsNrrDorlLpld AHiser BClayton(paper copy) RidsOgcRp YDiaz-Castillo BSingals RidsRgn2MailCenter(SBinoy) RidsAcrsAcnwMailCenter ADAMS ACCESSION No.: ML053550391 NRR-088 OFFICE LPL II-2/PM LPL II-2/LA CSGB/C LPL II-2/SC NAME BMoroney RSola for EMurphy (acting) MMarshall BClayton by memo dated DATE 12/22/05 12/22/05 9/28/05 12/22/05 OFFICIAL RECORD COPY

REQUEST FOR ADDITIONAL INFORMATION FOR FLORIDA POWER & LIGHT COMPANY TURKEY POINT UNIT 3 STEAM GENERATOR TUBE INSPECTION REPORT DOCKET NO. 50-250

1. Attachment 1 of the inservice inspection report indicated that mechanical wear damage was identified in locations other than anti-vibration bars (e.g., tube supports, top of tubesheet) in steam generator (SG) A, B, and C. Please explain the cause of these indications. If the indications are attributed to possible loose parts, please discuss whether a foreign object search and retrieval was performed in each SG and whether the loose parts were removed from the SGs. If the parts were not removed or the locations were not visually inspected, please discuss the results of any evaluations performed to ensure these parts (or suspected parts) would not result in a loss of tube integrity for the period of time between inspections.

ENCLOSURE

Mr. J. A. Stall TURKEY POINT PLANT Florida Power and Light Company cc:

M. S. Ross, Managing Attorney Attorney General Florida Power & Light Company Department of Legal Affairs P.O. Box 14000 The Capitol Juno Beach, FL 33408-0420 Tallahassee, Florida 32304 Marjan Mashhadi, Senior Attorney Michael O. Pearce Florida Power & Light Company Plant General Manager 801 Pennsylvania Avenue, NW. Turkey Point Nuclear Plant Suite 220 Florida Power and Light Company Washington, DC 20004 9760 SW. 344th Street Florida City, FL 33035 T. O. Jones, Site Vice President Turkey Point Nuclear Plant Walter Parker Florida Power and Light Company Licensing Manager 9760 SW. 344th Street Turkey Point Nuclear Plant Florida City, FL 33035 9760 SW 344th Street Florida City, FL 33035 County Manager Miami-Dade County Mark Warner, Vice President 111 Northwest 1 Street, 29th Floor Nuclear Operations Support Miami, Florida 33128 Florida Power and Light Company P.O. Box 14000 Senior Resident Inspector Juno Beach, FL 33408-0420 Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission Mr. Rajiv S. Kundalkar 9762 SW. 344th Street Vice President - Nuclear Engineering Florida City, Florida 33035 Florida Power & Light Company P.O. Box 14000 Mr. William A. Passetti, Chief Juno Beach, FL 33408-0420 Department of Health Bureau of Radiation Control 2020 Capital Circle, SE, Bin #C21 Tallahassee, Florida 32399-1741 Mr. Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100