| issue date = 05/25/2012
| issue date = 05/25/2012
| title = Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Cooling System Is Out of Service - Indian Point Nuclear Generating Unit No. 3
| title = Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Cooling System Is Out of Service - Indian Point Nuclear Generating Unit No. 3
| author name = Pickett D V
| author name = Pickett D
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000286
| docket = 05000286
| license number =  
| license number =  
| contact person = Pickett D V
| contact person = Pickett D
| case reference number = TAC ME8097
| case reference number = TAC ME8097
| document type = Acceptance Review Letter
| document type = Acceptance Review Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 25,2012 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 ACCEPTANCE REVIEW FOR PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHILE THE SPENT FUEL POOL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 (TAC NO. ME8097)  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 25,2012 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
 
==SUBJECT:==
ACCEPTANCE REVIEW FOR PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHILE THE SPENT FUEL POOL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 (TAC NO. ME8097)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By letter dated February 6,2012, Entergy Nuclear Operations, Inc., the licensee, submitted a license amendment request for Indian Point Nuclear Generating Unit NO.3. The proposed amendment would revise the Updated Final Safety Analysis Report to allow use of the backup spent fuel pool cooling system when the normal spent fuel pool cooling system is out of service. By letter dated April 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) provided the results of the staff's acceptance review of this amendment request. The staff found the amendment request unacceptable with the opportunity to supplement.
 
The staff's letter identified the information that would be necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
By letter dated February 6,2012, Entergy Nuclear Operations, Inc., the licensee, submitted a license amendment request for Indian Point Nuclear Generating Unit NO.3. The proposed amendment would revise the Updated Final Safety Analysis Report to allow use of the backup spent fuel pool cooling system when the normal spent fuel pool cooling system is out of service.
By letter dated May 2, 2012, the licensee provided supplemental information in support of the license amendment request. The NRC staff has reviewed your application as supplemented and concludes that it provides technical information in sufficient detail to enable the staff to begin its detailed technical review. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
By letter dated April 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) provided the results of the staff's acceptance review of this amendment request. The staff found the amendment request unacceptable with the opportunity to supplement. The staff's letter identified the information that would be necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. By letter dated May 2, 2012, the licensee provided supplemental information in support of the license amendment request.
VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Docket No. 50-286 cc: Distribution via Listserv Distribution:
The NRC staff has reviewed your application as supplemented and concludes that it provides technical information in sufficient detail to enable the staff to begin its detailed technical review.
PUBLIC RidsNrrDorlLpl1-1 Resource RidsNrrLASLittle Resource RidsOgcRp Resource ADAMS ACCESSION NO.: Sincerely, /raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL 1-1 rlf RidsNrrDorl Resource Ridsl\lrrDorlDpr Resource RidsNrrPrvllndianPoint Resource RidsNrrDssSbpb Resource RidsRgn1 MailCenter Resource MGray, Rgn1 RidsNrrLAKGoldstein Resource ML 12143A489 OFFICE NAME DATE LPL 1-1/PM DPickett 05/25/12 LPL 1-1/LA KGoldstein 05/24/12 SBPB/BC GCasto 05/25/12 LPL 1-1/BC GWilson (JKim) 05/25/12 OFFICIAL RECORD}}
Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
 
VP, Operations                               -2 If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc:   Distribution via Listserv
 
VP, Operations                                   -2 If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.
Sincerely,
                                              /raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc:  Distribution via Listserv Distribution:
PUBLIC                            LPL1-1 rlf                     RidsNrrDorl Resource RidsNrrDorlLpl1-1 Resource        Ridsl\lrrDorlDpr Resource     RidsNrrPrvllndianPoint Resource RidsNrrLASLittle Resource          RidsNrrDssSbpb Resource       RidsRgn1 MailCenter Resource RidsOgcRp Resource                MGray, Rgn1                   RidsNrrLAKGoldstein Resource ADAMS ACCESSION NO.: ML12143A489 OFFICE       LPL 1-1/PM     LPL 1-1/LA     SBPB/BC           LPL 1-1/BC NAME          DPickett      KGoldstein      GCasto            GWilson (JKim)
DATE          05/25/12      05/24/12        05/25/12          05/25/12 OFFICIAL RECORD COPY}}

Latest revision as of 04:16, 12 November 2019

Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Cooling System Is Out of Service - Indian Point Nuclear Generating Unit No. 3
ML12143A489
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/25/2012
From: Pickett D
Plant Licensing Branch 1
To:
Entergy Nuclear Operations
Pickett D
References
TAC ME8097
Download: ML12143A489 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 25,2012 Vice President, Operations Entergy Nuclear Operations, Inc.

Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249

SUBJECT:

ACCEPTANCE REVIEW FOR PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHILE THE SPENT FUEL POOL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 (TAC NO. ME8097)

Dear Sir or Madam:

By letter dated February 6,2012, Entergy Nuclear Operations, Inc., the licensee, submitted a license amendment request for Indian Point Nuclear Generating Unit NO.3. The proposed amendment would revise the Updated Final Safety Analysis Report to allow use of the backup spent fuel pool cooling system when the normal spent fuel pool cooling system is out of service.

By letter dated April 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) provided the results of the staff's acceptance review of this amendment request. The staff found the amendment request unacceptable with the opportunity to supplement. The staff's letter identified the information that would be necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. By letter dated May 2, 2012, the licensee provided supplemental information in support of the license amendment request.

The NRC staff has reviewed your application as supplemented and concludes that it provides technical information in sufficient detail to enable the staff to begin its detailed technical review.

Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.

VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.

Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv

VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Douglas.Pickett@nrc.gov.

Sincerely,

/raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv Distribution:

PUBLIC LPL1-1 rlf RidsNrrDorl Resource RidsNrrDorlLpl1-1 Resource Ridsl\lrrDorlDpr Resource RidsNrrPrvllndianPoint Resource RidsNrrLASLittle Resource RidsNrrDssSbpb Resource RidsRgn1 MailCenter Resource RidsOgcRp Resource MGray, Rgn1 RidsNrrLAKGoldstein Resource ADAMS ACCESSION NO.: ML12143A489 OFFICE LPL 1-1/PM LPL 1-1/LA SBPB/BC LPL 1-1/BC NAME DPickett KGoldstein GCasto GWilson (JKim)

DATE 05/25/12 05/24/12 05/25/12 05/25/12 OFFICIAL RECORD COPY