ML14232A674: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14232A674
| number = ML14232A674
| issue date = 08/20/2014
| issue date = 08/20/2014
| title = Draft 2nd Round of RAIs for TSTF-425 LAR for BVPS Units 1 and 2 (TAC MF2942 and MF2943)
| title = Draft 2nd Round of RAIs for TSTF-425 LAR for BVPS Units 1 and 2
| author name = Whited J A
| author name = Whited J
| author affiliation = NRC/NRR/DORL/LPLI-2
| author affiliation = NRC/NRR/DORL/LPLI-2
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000334, 05000412
| docket = 05000334, 05000412
| license number = DPR-066, NPF-073
| license number = DPR-066, NPF-073
| contact person = Whited J A
| contact person = Whited J
| case reference number = TAC MF2942, TAC MF2943
| case reference number = TAC MF2942, TAC MF2943
| document type = E-Mail, Request for Additional Information (RAI)
| document type = E-Mail, Request for Additional Information (RAI)
| page count = 2
| page count = 2
| project = TAC:MF2942, TAC:MF2943
| project = TAC:MF2942, TAC:MF2943
| stage = Draft Other
| stage = Draft RAI
}}
}}


=Text=
=Text=
{{#Wiki_filter:DRAFT DRAFT REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF
{{#Wiki_filter:DRAFT REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-425 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM BEAVER VALLEY POWER STATION - UNITS 1 AND 2 DOCKET NO. 50-344 AND 50-412 By letter dated October 18, 2013, 1 as supplemented by letter dated June 26, 2014, 2 FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Beaver Valley Power Station (BVPS) Units 1 and 2. The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," (TSTF-425). To complete its review, the Nuclear Regulatory Commission staff requests a response to the questions below.
-425 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM BEAVER VALLEY POWER STATION  
In response to RAI 6, submitted by letter dated June 26, 2014, the licensee directed the staff to a Facts and Observations (F&O) table in their National Fire Protection Administration 805 Supplement dated on February 14, 2014. 3 The tables in the supplement included all F&Os from previous peer reviews, consistent with the information in the submittal, and some focused scope peer review F&Os for Human Reliability Analysis (HRA) and Internal Flooding (IF). During the review of the IF F&Os in Table 1-4, some F&Os appear to be resolved for the Internal Events PRA (in the column BVPS-1 Final Resolution), yet kept as open for the Fire PRA model.
- UNITS 1 AND 2 DOCKET NO. 50
RAI 7: Clarify if the BVPS Units 1 and 2 F&Os from the IF focused scope peer review are considered resolved for the TSTF-425 application.
-344 AND 50
RAI 8: In addition, indicate which IF F&Os from the focused scope peer review, if any, were considered to be at Capability Category I.
-412 By letter dated October 18, 2013
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13295A006.
, 1 as supplemented by letter dated June 26, 2014, 2 FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Beaver Valley Power Station (BVPS) Units 1 and 2.
2 ADAMS Accession No. ML14177A514.
The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04
-10, "Risk-Informed Technical Specifications Initiative 5b, Risk
-Informed Method for Control of Surveillance Frequencies
," (TSTF-425). To complete its review, the Nuclear Regulatory Commission staff requests a response to the questions below.
In response to RAI 6, submitted by letter dated June 26, 2014, the licensee directed the staff to a Facts and Observations (F&O) table in their National Fire Protection Administration 805 Supplement dated on February 14, 2014.
3 The tables in the supplement included all F&Os from previous peer reviews, consistent with the information in the submittal, and some focused scope peer review F&Os for Human Reliability Analysis (HRA) and Internal Flooding (IF). During the review of the IF F&Os in Table 1
-4, some F&Os appear to be resolved for the Internal Events PRA (in the column BVP S-1 Final Resolution), yet kept as open for the Fire PRA model.
 
RAI 7: Clarify if the BVPS Unit s 1 and 2 F&Os from the IF focused scope peer review are considered resolved for the TSTF
-425 application.
 
RAI 8: In addition, indicate which IF F&Os from the focused scope peer review, if any, were considered to be at Capability Category I
.
 
1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13295A006
. 2 ADAMS Accession No. ML14177A514.
3 ADAMS Accession Number ML14051A499.
3 ADAMS Accession Number ML14051A499.
DRAFT


F&O HR-PR-007 states, in part, that; Post-maintenance misalignments were excluded for normally operating system[s] based on the assumption that misalignments on normally operating systems would be quickly detected and corrected.
F&O HR-PR-007 states, in part, that; Post-maintenance misalignments were excluded for normally operating system[s]
RAI 9: Since the standby components are important for the TSTF
based on the assumption that misalignments on normally operating systems would be quickly detected and corrected.
-425 application, please explain how the likelihood of post
RAI 9: Since the standby components are important for the TSTF-425 application, please explain how the likelihood of post-maintenance misalignment for the standby components are modeled in the internal events PRA.}}
-maintenance misalignment for the standby components are modeled in the internal events PRA.}}

Latest revision as of 19:43, 19 March 2020

Draft 2nd Round of RAIs for TSTF-425 LAR for BVPS Units 1 and 2
ML14232A674
Person / Time
Site: Beaver Valley
Issue date: 08/20/2014
From: Jeffrey Whited
Plant Licensing Branch 1
To:
Whited J
References
TAC MF2942, TAC MF2943
Download: ML14232A674 (2)


Text

DRAFT REQUEST FOR ADDITIONAL INFORMATION OFFICE OF NUCLEAR REACTOR REGULATION REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-425 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM BEAVER VALLEY POWER STATION - UNITS 1 AND 2 DOCKET NO. 50-344 AND 50-412 By letter dated October 18, 2013, 1 as supplemented by letter dated June 26, 2014, 2 FirstEnergy Nuclear Operating Company (the licensee) submitted a license amendment request for Beaver Valley Power Station (BVPS) Units 1 and 2. The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," (TSTF-425). To complete its review, the Nuclear Regulatory Commission staff requests a response to the questions below.

In response to RAI 6, submitted by letter dated June 26, 2014, the licensee directed the staff to a Facts and Observations (F&O) table in their National Fire Protection Administration 805 Supplement dated on February 14, 2014. 3 The tables in the supplement included all F&Os from previous peer reviews, consistent with the information in the submittal, and some focused scope peer review F&Os for Human Reliability Analysis (HRA) and Internal Flooding (IF). During the review of the IF F&Os in Table 1-4, some F&Os appear to be resolved for the Internal Events PRA (in the column BVPS-1 Final Resolution), yet kept as open for the Fire PRA model.

RAI 7: Clarify if the BVPS Units 1 and 2 F&Os from the IF focused scope peer review are considered resolved for the TSTF-425 application.

RAI 8: In addition, indicate which IF F&Os from the focused scope peer review, if any, were considered to be at Capability Category I.

1 Agencywide Documents Access and Management System (ADAMS) Accession No. ML13295A006.

2 ADAMS Accession No. ML14177A514.

3 ADAMS Accession Number ML14051A499.

DRAFT

F&O HR-PR-007 states, in part, that; Post-maintenance misalignments were excluded for normally operating system[s]

based on the assumption that misalignments on normally operating systems would be quickly detected and corrected.

RAI 9: Since the standby components are important for the TSTF-425 application, please explain how the likelihood of post-maintenance misalignment for the standby components are modeled in the internal events PRA.