E-mail from J. Whited to P. Lashley 2nd Round Draft RAIs for TSTF-425 LAR for BVPS Units 1 and 2
ML14232A673
Person / Time
Site: Beaver Valley
Issue date: 08/20/2014
From: Jeffrey Whited
Plant Licensing Branch 1
To: Lashley P
FirstEnergy Nuclear Operating Co
Whited J
References
TAC MF2942, TAC MF2943
Download: ML14232A673 (1)


Text

Whited, Jeffrey From: Whited, Jeffrey Sent: Wednesday, August 20, 2014 2:42 PM To: phlashley@firstenergycorp.com

Subject:

DRAFT RAIs RE: ADOPTION OF TSTF-425 (TAC NOS. MF2942 AND MF2943)

Attachments: 2nd Round TSTF-425 DRAFT RAIs.pdf

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - DRAFT REQUEST FOR ADDITIONAL INFORMATION RE: ADOPTION OF TSTF-425 (TAC NOS. MF2942 AND MF2943)

Dear Mr. Lashley:

By letter dated October 18, 2013, (Agencywide Document Access and Management System Accession No. ML13295A006) as supplemented by letter dated June 26, 2014, (ADAMS Accession No. ML14177A514)

FirstEnergy Nuclear Operating Company submitted a license amendment request for Beaver Valley Power Station Units 1 and 2 (BVPS). The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies."

The NRC staff has reviewed the information submitted by the licensee, and based on this review, determined additional information is required to complete the assessment of the submitted information. Please find attached a DRAFT copy of the NRC staffs additional information request. These DRAFT RAIs are being sent to you to ensure that the questions are understandable, the regulatory basis for the questions are clear, and to determine if the information was previously docketed. Please notify me by Friday, August 22, 2014, if you desire to hold a teleconference to discuss the questions. The NRC staff will request a response to the RAIs within 30 days of the formal NRC RAI transmittal letter.

Thank you, Jeffrey Whited Project ManagerBeaver Valley and Susquehanna Plant Licensing Branch I2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission (301)4154090 jeffrey.whited@nrc.gov 1