Letter Sequence Response to RAI |
---|
TAC:MF2942, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) TAC:MF2943, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B (Approved, Closed) |
|
MONTHYEARL-13-319, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b2013-10-18018 October 2013 License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b Project stage: Request ML13326A7512013-11-22022 November 2013 Acceptance of Requested Licensing Action Adoption of TSTF-425 Project stage: Acceptance Review ML14133A0882014-05-13013 May 2014 Draft Request for Additional Information Re Adoption of TSTF-425 Project stage: Draft RAI ML14133A0692014-06-0303 June 2014 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler 425 Project stage: RAI L-14-209, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 4252014-06-26026 June 2014 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 Project stage: Response to RAI ML14232A6742014-08-20020 August 2014 Draft 2nd Round of RAIs for TSTF-425 LAR for BVPS Units 1 and 2 Project stage: Draft RAI ML14232A6732014-08-20020 August 2014 E-mail from J. Whited to P. Lashley 2nd Round Draft RAIs for TSTF-425 LAR for BVPS Units 1 and 2 Project stage: Draft RAI ML14232A6572014-08-28028 August 2014 Request for Additional Information License Amendment Request to Adopt Technical Specifications Task Force Traveler 425 (Tac MF2942 and MF2943) Project stage: RAI L-14-300, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 4252014-09-21021 September 2014 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 Project stage: Response to RAI ML15016A4392015-01-20020 January 2015 Draft Request for Additional Information Project stage: Draft RAI L-15-024, Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 4252015-02-0404 February 2015 Response to Request for Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 Project stage: Response to RAI ML14322A4612015-03-0606 March 2015 Issuance of Amendments Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force Initiative 5b. Project stage: Approval 2014-08-20
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] |
Text
FENOCTM ........
Beaver Valley Power Station P.O. Box4 FirstEnergy Nuclear Operating Company Sh~pmgpo~PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 February 4, 2015 L-15-024 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Response to Request For Additional Information Regarding License Amendment to Adopt Technical Specification Task Force Traveler 425 (TAC Nos. MF2942 and MF2943)
By correspondence dated October 18, 2013 (Accession No. ML13295A006), as supplemented by letters dated June 26, 2014 (Accession No. ML14177A514) and September 21, 2014 (Accession No. ML14265A158), FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request for the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS). The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies." The proposed amendment is consistent with Nuclear Regulatory Commission (NRC)-approved Technical Specifications Task Force (TSTF) Traveler TSTF-425, Revision 3, "Relocate Surveillance Frequencies to Licensee Control- Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b," with certain proposed deviations.
The NRC staff submitted a draft request for additional information on January 20, 2015 (Accession No. ML15016A439). FENOC's response to this request is attached.
There are no regulatory commitments established in this submittal. If there are any questions or additional information is required, please contact Mr. Thomas A. Lentz, Manager- Fleet Licensing, at (330) 315-6810.
Beaver Valley Power Station, Unit Nos. 1 and 2 L-15-024 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on February __:j_, 2015.
Sincerely, Z:t;;1~
Eric A. Larson
Attachment:
Response to Request for Additional Information cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative
Attachment L-15-024 Response to Request for Additional Information Page 1 of 2 By letter dated October 18, 2013, as supplemented by letters dated June 26, 2014, and September 21, 2014, FirstEnergy Nuclear Operating Company (FENOC) submitted a license amendment request for Beaver Valley Power Station (BVPS) Units 1 and 2.
The proposed amendment would modify the BVPS Technical Specifications by relocating specific surveillance frequencies to a licensee controlled program with the implementation of Nuclear Energy Institute (NEI) 04-10, "Risk-Informed Technical Specifications Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," (TSTF-425). To complete its review, the Nuclear Regulatory Commission (NRC) staff requested a response to the question in bold below.
BACKGROUND The licensee's current TS SR 3.3.2.6 is associated with the Engineered Safety Features Actuation System (ESFAS) instrumentation. The surveillance requires that Slave Relay Test shall be performed once every 18 months for Unit 1 and once every 92 days for Unit 2 operations, OR for Unit 2 only once every 12 months per a NOTE in the surveillance frequency which states, "Only applicable to Unit 2 provided a satisfactory contact loading analysis has been completed, and a satisfactory slave relay service life has been established, for the slave relay being tested."
The licensee's proposed change as shown on TS page 3.3.2-6 in Attachment 2 of the application relocates the SR 3.3.2.6 frequency to the licensee's SFCP.
DISCUSSION The staff noticed that NOTE in SR 3.3.2.6 frequency is a specific condition to BVPS Unit 2 operations only. It is a frequency that is related to specific conditions or conditions for the performance of the surveillance requirement. As such, it is an exception to the SFCP. Therefore, the surveillance frequencies and associated NOTE for Unit 2 operations need to be retained in TSs.
RAIB:
Please submit revised TS page for SR 3.3.2.6 change, otherwise submit a request for NRC permission to remove the condition with applicable justification for the NRC staff's review and approval.
Regulatory Basis The regulations under 10 CFR 50.36 (c)(2)(i) state that Limiting Conditions for Operation are the lowest functional capability or performance levels of equipment required for safe operation of the facility (emphasis added). When a limiting condition for operation of a nuclear reactor is not met, the licensee shall shut down the reactor or follow any remedial action permitted by the TSs until the condition can be met.
Attachment L-15-024 Page 2 of 2
Response
The NOTE provided in Technical Specification (TS) Surveillance Requirement (SR) 3.3.2.6 was inserted from Beaver Valley Power Station (BVPS) Unit 2 Amendment 141 as approved on May 14, 2004 (reference ML041030082). Amendment 141 increased the Unit 2 engineered safety feature actuation system (ESFAS) instrumentation slave relay surveillance test interval from 92 days to 12 months provided that a contact loading analysis is completed, which confirms that the slave relay's contact loading is satisfactory and a satisfactory slave relay service life is established for the slave relays being tested.
The BVPS Unit 2 slave relay surveillance test interval is at 12 months because the supporting contact loading analysis that determined the solid state protection system (SSPS) slave relays contacts are adequate for the applied loads has been completed.
The contact loading analysis concluded that the slave relay contacts are adequate for the application with the exception of two relays (one from each train). In 2004, a condition report (CR) was initiated to address those exceptions and the CR's corrective action has been completed, which added contacts in series to the applicable circuits to increase the effective contact rating via a design modification. A satisfactory service life has been established for the Unit 2 relays at 19 years for the energized slave relays and 40 years for the de-energized slave relays. This replacement schedule is the same for the Unit 2 Westinghouse AR440 type slave relays as well as the Potter Brumfield MDR type slave relays and is consistent with WCAP-13877 and WCAP-13878, which has been accepted by the NRC (reference ML003731486). Based on the above, a satisfactory contact loading analyses has been completed for the Unit 2 slave relays.
With the proposed amendment request to adopt TSTF-425, FENOC requests the NOTE within SR 3.3.2.6 be removed, since a satisfactory contact loading analysis and a satisfactory slave relay service life has been established for the Unit 2 slave relays.
With the removal of the NOTE, the SR frequency is no longer conditional and the SR can be relocated to the Surveillance Frequency Control Program (SFCP) consistent with TSTF-425. When relocated to the SFCP, the SR frequency for the slave relays will be established within the SFCP as 18 months for Unit 1 relays and 12 months for Unit 2 relays. A more detailed description of slave relay testing is contained in the BVPS Unit 2 UFSAR, Section 7.3.2.2.5.
As documented in the NRC Safety Evaluation for BVPS Unit 2 Amendment 141, the probability of a relay failing to actuate on demand is not significantly influenced by the surveillance interval. Also, the performance and reliability of the relays is controlled via the Maintenance Rule per the requirements of 10 CFR 50.65 and a change to a new relay type would be implemented by the design change process, which would require evaluation per the requirements of 10 CFR 50.59. Therefore, it is justified to remove the NOTE within TS SR 3.3.2.6, since it has been satisfied to establish the Unit 2 slave relay frequency at 12 months and the proposed revision toTS SR 3.3.2.6 for the BVPS license amendment request to adopt TSTF-425 SR is acceptable to relocate the Unit 1 and 2 slave relay testing frequencies to the SFCP.