ML15251A217: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15251A217
| number = ML15251A217
| issue date = 04/16/2015
| issue date = 04/16/2015
| title = Acceptance Review for: Saint Lucie 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (MF5835 and MF5836)
| title = NRR E-mail Capture - Acceptance Review for: Saint Lucie 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (MF5835 and MF5836)
| author name = Saba F E
| author name = Saba F
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2
| addressee name = Frehafer K
| addressee name = Frehafer K
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 16, 2015 3:55 PM To: ken.frehafer@fpl.com; Lewis, Atanya Cc: eric.katzman@fpl.com
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Saba, Farideh Sent:                       Thursday, April 16, 2015 3:55 PM To:                         ken.frehafer@fpl.com; Lewis, Atanya Cc:                         eric.katzman@fpl.com


==Subject:==
==Subject:==
Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)
Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)
Ken and Atanya,  
Ken and Atanya, By letter dated March 10, 2015 (Agencywide Documents Access and Management System Accession No. ML15084A141), Florida Power & Light Company, et al. (the licensee), requested a license amendment for the St. Lucie Nuclear Plant, Units 1 and 2. The proposed amendments would remove Technical Specifications (TS) Limiting Condition for Operation (LCO) 3/4.9.5, "Communications," from the St. Lucie Unit I TS and the St.
Lucie Unit 2 TS; LCO 3/4.9.6, "Manipulator Crane Operability," from the St. Lucie Unit 1 TS; and LCO 3/4.9.6, "Manipulator Crane," from the St. Lucie Unit 2 TS and relocate the TS requirements to the Updated Final Safety Analysis Report for St. Lucie Unit 1 and the UFSAR for St. Lucie Unit 2.
The NRC performed an acceptance review of the application to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff concluded that the licensees submittal provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC staff needs additional information, it will notify the licensee by separate correspondence.
If you have any questions, please contact me at (301) 415-1447 or via email Farideh.saba@nrc.gov.
Farideh E. Saba, P.E.
Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1


By letter dated March 10, 2015 (Agencywide Documents Access and Management System Accession No. ML15084A141), Florida Power & Light Company, et al. (the licensee), requested a license amendment for the St. Lucie Nuclear Plant, Units 1 and 2. The proposed amendments would remove Technical Specifications (TS) Limiting Condition for Operation (LCO) 3/4.9.5, "Communications," from the St. Lucie Unit I TS and the St. Lucie Unit 2 TS; LCO 3/4.9.6, "Manipulator Crane Operability," from the St. Lucie Unit 1 TS; and LCO 3/4.9.6, "Manipulator Crane," from the St. Lucie Unit 2 TS and relocate the TS requirements to the Updated Final Safety Analysis Report for St. Lucie Unit 1 and the UFSAR for St. Lucie Unit 2.
Hearing Identifier:   NRR_PMDA Email Number:         2364 Mail Envelope Properties     (308151458A298A44A2B1B8E880882DE10119E2085B9A)
The NRC performed an acceptance review of the applicat ion to determine if the scope and depth of technical information is sufficient for the NRC staff to complete it s detailed technical review. The acceptance review also intends to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
 
The NRC staff concluded that the licensee's submittal provides technical information in sufficient detail to enable the NRC staff to complete its detailed te chnical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be in stances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC staff needs additional information, it will notify the licensee by separate correspondence.
 
If you have any questions, please contac t me at (301) 415-1447 or via email Farideh.saba@nrc.gov.
Farideh E. Saba, P.E. Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV
 
Hearing Identifier: NRR_PMDA Email Number: 2364   Mail Envelope Properties   (308151458A298A44A2B1B8E880882DE10119E2085B9A)


==Subject:==
==Subject:==
Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)
Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)
Sent Date:   4/16/2015 3:55:19 PM Received Date: 4/16/2015 3:55:00 PM From:   Saba, Farideh Created By:   Farideh.Saba@nrc.gov  
Sent Date:             4/16/2015 3:55:19 PM Received Date:         4/16/2015 3:55:00 PM From:                 Saba, Farideh Created By:           Farideh.Saba@nrc.gov Recipients:
 
"eric.katzman@fpl.com" <eric.katzman@fpl.com>
Recipients:     "eric.katzman@fpl.com" <eric.katzman@fpl.com> Tracking Status: None "ken.frehafer@fpl.com" <ken.frehafer@fpl.com> Tracking Status: None "Lewis, Atanya" <Atanya.Lewis@fpl.com> Tracking Status: None  
Tracking Status: None "ken.frehafer@fpl.com" <ken.frehafer@fpl.com>
 
Tracking Status: None "Lewis, Atanya" <Atanya.Lewis@fpl.com>
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   2220     4/16/2015 3:55:00 PM
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                         Size                   Date & Time MESSAGE                       2220                   4/16/2015 3:55:00 PM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
 
Recipients Received:}}
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}

Latest revision as of 09:13, 5 February 2020

NRR E-mail Capture - Acceptance Review for: Saint Lucie 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (MF5835 and MF5836)
ML15251A217
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 04/16/2015
From: Farideh Saba
Plant Licensing Branch II
To: Frehafer K
Florida Power & Light Co
References
Download: ML15251A217 (2)


Text

NRR-PMDAPEm Resource From: Saba, Farideh Sent: Thursday, April 16, 2015 3:55 PM To: ken.frehafer@fpl.com; Lewis, Atanya Cc: eric.katzman@fpl.com

Subject:

Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)

Ken and Atanya, By letter dated March 10, 2015 (Agencywide Documents Access and Management System Accession No. ML15084A141), Florida Power & Light Company, et al. (the licensee), requested a license amendment for the St. Lucie Nuclear Plant, Units 1 and 2. The proposed amendments would remove Technical Specifications (TS) Limiting Condition for Operation (LCO) 3/4.9.5, "Communications," from the St. Lucie Unit I TS and the St.

Lucie Unit 2 TS; LCO 3/4.9.6, "Manipulator Crane Operability," from the St. Lucie Unit 1 TS; and LCO 3/4.9.6, "Manipulator Crane," from the St. Lucie Unit 2 TS and relocate the TS requirements to the Updated Final Safety Analysis Report for St. Lucie Unit 1 and the UFSAR for St. Lucie Unit 2.

The NRC performed an acceptance review of the application to determine if the scope and depth of technical information is sufficient for the NRC staff to complete its detailed technical review. The acceptance review also intends to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff concluded that the licensees submittal provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which the NRC staff identifies issues that affect its ability to complete the detailed technical review despite completion of an adequate acceptance review. If the NRC staff needs additional information, it will notify the licensee by separate correspondence.

If you have any questions, please contact me at (301) 415-1447 or via email Farideh.saba@nrc.gov.

Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV 1

Hearing Identifier: NRR_PMDA Email Number: 2364 Mail Envelope Properties (308151458A298A44A2B1B8E880882DE10119E2085B9A)

Subject:

Acceptance review for: SAINT LUCIE 1 and 2 - TS Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled documents (MF5835 and MF5836)

Sent Date: 4/16/2015 3:55:19 PM Received Date: 4/16/2015 3:55:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

"eric.katzman@fpl.com" <eric.katzman@fpl.com>

Tracking Status: None "ken.frehafer@fpl.com" <ken.frehafer@fpl.com>

Tracking Status: None "Lewis, Atanya" <Atanya.Lewis@fpl.com>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 2220 4/16/2015 3:55:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: