ML18192C070: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18192C070 | | number = ML18192C070 | ||
| issue date = 07/21/1975 | | issue date = 07/21/1975 | ||
| title = | | title = Figure 13.2-1, Amendment 9 Staff and Training Program. Sheet 1 of 2 | ||
| author name = | | author name = | ||
| author affiliation = Arizona Nuclear Power Project | | author affiliation = Arizona Nuclear Power Project | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR | {{#Wiki_filter:YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR YEAR YEAR 2 YEAR 3 YEAR 4 1 1 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 CONSTRUCTION SUBMIT COLD OPEeATING FUEL COMNIERC AL COLD FUEL COMMERCIAL COLD FUEL PERMIT CDMMERCIAL FEAR HYDRO pERMIT LOADING OPERATION HYDRO LOADING OPERATION HYDRO LOADING OPERATION UNIT I UNIT I UNIT I UNIT 2 UNIT 2 UNIT 2 UNIT 3 UN IT 3 UNIT 3 NUMBER OF PERSONNEL IN NUMBER QF PERSONNEL IN NUMBER OF PERSONNEL IN NUCLEAR I CLASSIFICATIONS FOR TING CLASSIFIC4TIONS FOR THREE CL 55 F C TIDNS FOR INITIAL PLANT OBSER UNITS OPERATION UNITS OPER ATION STAFF AND UN T STARTUP VATION CE TECH I PERSONNEL CQUISITION ESTABLISH ADMINISTRATIVE 2 DESIGN FOLLOIN NUCLEAR FUND 8 PFIOCEOURE SYSTEM 3 NUCLEAR PLANT 8 THEORY 2 STARTUP AND TESTING OBSERVATION 2. DESIGN IL CONSTR PLANT MANAGER 3. ASSUMES NORMAL FUNCTION UCTION FOLLOIN I. PERSONNEL ACQUISITION 5 M TRNG | ||
: 2. DESIGN 8 CONSTRUCTION FOLLOW | |||
: i. PERSONNEL ACQUISITION 8 TRAINING STARTUP AND TESTING 2 F NAL MANUAL6 PROCEDURE INTENSIVE ONSITE TRAINING NOTES | |||
: 3. ESTABLISH TRAiNING REQUIRE FINAL MANUALPREP4RATION NUMBER OF PERSONNEL IN CLASSIFICATION I PREPARATION MENTS & SCHEDULES ASSUME NORMAL FUNCTION ASSISTANT PLANT MANAGER SL 3. STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION A NUMBER OF ASSISTANTS IN CLASSIFICATION SAME AS ABOVE SAME AS ABOVE 5 EASABO E CL I SIM TECHNICAL SUPERVISOR SL TRNGI SL SENIOR REACTOR OPERATOR LICENSE SAME AS ABOVE SAME AS ABDVE SAME AS A6OVE CL RO REACTOR OPERATOR LICENSE OPERATIONS SUPERVISOR SL | |||
~ 5IM TRNG CL HL COLD LICENSE HOT LICENSE sAME as aeovE SAME AS A6OUE 5 E 5 MAINTENANCE SUPERVISOR 1A FEAR & TECHNICAL SPECIFICATION PREPARATION 2 DESIGN & CONSTRUCTION saME as Aeovc E AS 48OVE 1 | |||
TECHNICAL ASSISTANT SL FOLLOFI 5 M I | |||
: 3. PERSONNEL ACQUISITION TANG I PEASONNEL ACQUISITION | |||
: 2. FSAe 8 TEC NICAL SPECIFICATION HEALTH, SAFETY AND CHEMIST R Y 3 ESTABLIS TRAINING REQUIREMENT5 SAME AS A6OVE I B SCHEDULES SUPERVISOR ORIENT FUEL MANAGEMENT TRA NING 2 COMPUTER TRAINING NUCLEAR ENGINEER 3 CONSTRUCTION FOLLOIN 5 M I | |||
TRNG ~ sAME As &BOYE IA IA I INSERVICE INSPECTION 2 STARTUPS TESTING | |||
: 3. FINAL MANUALPREPARATION MECHANICALENGINEER 4. ASSUME NORMAL FUNCTION IA I PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION | |||
: 3. STARTUP& TESTING ELECTRICAL ENGINEER 4 ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS 5 ME AS A6QVE ENGINEER MULATOR RAINING I PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST 5 E 6 OPERATING PROCEDURES SHIFT SUPERVISOR SL 5A I OA 3 CONSTRUCTION FOLLOW PREPARE OPERATIONAL MANUAL 2 ASSUME NORMAL FUNCTION QUALITYASSURANCE ENGINEER 8 I. EMERGENCY PLANPREPARATION 2 PREPARATION OF TESTS OPERATI NG PROCEDURES HEALTH PHYSICS SUPERVISOR 3 FINAL MANUALPREPARATION | |||
: 4. ASSUME NORMAL FUNCTIDN PREPARATION OF TESTS OPERATI PROCEDURES I 2. STARTUP6 TESTING CHEMISTRY SUPERVISOR 3 FINAL MANUALPREPARATION | |||
~ | |||
: 4. ASSUME NORMAL FUNCTION NUCLEAR PLANT QBSERVA TION C E TECH IEIM NUCLEAR FUND TRNG I INTENSIVE QNSITE TRAINING I I 5 | |||
* THEORY PREPARATION OF TEST 6 OPERATING PFIQCEDURES 4 2 STARTUP 8, TESTING F NAL MANUALPFIEPARATION CL 10 14 Arizona Nuclear Power Project SENIOR CONTROL OPERATOR RD I ORIENT I j 2 DESIGN 6 CONSTRUCTION I 3 FOLLOW 2 CONSTRUCTION FOLLOW I 4 ASSUME NORMAL FUNCTION Palo Verde Nuclear Generating Station I ESTABLIS ADMINISTRATIVEPROCEDURES Units 1, 2 & 3 I 2 ASSISTANT SUPERVISION ADMINISTRATIVESUPERVISOR 3 ASSUME NORMAL FUNCTIONS STAFFING AND TRAINING PROGRAIII COMPUTER TRAIN NG (Stseet 1 of 2) 2 STARTUP 8 TESTING CHANGE COMPUTER ENGINEER I 3 ASSUME NORMAL FUNCTION Figure 13.2-1 10407 I IA July 21, 1975 Amendment 9 TQJLB 216}} |
Latest revision as of 20:34, 20 October 2019
ML18192C070 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/21/1975 |
From: | Arizona Nuclear Power Project |
To: | Office of Nuclear Reactor Regulation |
References | |
13.2-1 | |
Download: ML18192C070 (1) | |
Text
YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR YEAR YEAR 2 YEAR 3 YEAR 4 1 1 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 CONSTRUCTION SUBMIT COLD OPEeATING FUEL COMNIERC AL COLD FUEL COMMERCIAL COLD FUEL PERMIT CDMMERCIAL FEAR HYDRO pERMIT LOADING OPERATION HYDRO LOADING OPERATION HYDRO LOADING OPERATION UNIT I UNIT I UNIT I UNIT 2 UNIT 2 UNIT 2 UNIT 3 UN IT 3 UNIT 3 NUMBER OF PERSONNEL IN NUMBER QF PERSONNEL IN NUMBER OF PERSONNEL IN NUCLEAR I CLASSIFICATIONS FOR TING CLASSIFIC4TIONS FOR THREE CL 55 F C TIDNS FOR INITIAL PLANT OBSER UNITS OPERATION UNITS OPER ATION STAFF AND UN T STARTUP VATION CE TECH I PERSONNEL CQUISITION ESTABLISH ADMINISTRATIVE 2 DESIGN FOLLOIN NUCLEAR FUND 8 PFIOCEOURE SYSTEM 3 NUCLEAR PLANT 8 THEORY 2 STARTUP AND TESTING OBSERVATION 2. DESIGN IL CONSTR PLANT MANAGER 3. ASSUMES NORMAL FUNCTION UCTION FOLLOIN I. PERSONNEL ACQUISITION 5 M TRNG
- 2. DESIGN 8 CONSTRUCTION FOLLOW
- i. PERSONNEL ACQUISITION 8 TRAINING STARTUP AND TESTING 2 F NAL MANUAL6 PROCEDURE INTENSIVE ONSITE TRAINING NOTES
- 3. ESTABLISH TRAiNING REQUIRE FINAL MANUALPREP4RATION NUMBER OF PERSONNEL IN CLASSIFICATION I PREPARATION MENTS & SCHEDULES ASSUME NORMAL FUNCTION ASSISTANT PLANT MANAGER SL 3. STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION A NUMBER OF ASSISTANTS IN CLASSIFICATION SAME AS ABOVE SAME AS ABOVE 5 EASABO E CL I SIM TECHNICAL SUPERVISOR SL TRNGI SL SENIOR REACTOR OPERATOR LICENSE SAME AS ABOVE SAME AS ABDVE SAME AS A6OVE CL RO REACTOR OPERATOR LICENSE OPERATIONS SUPERVISOR SL
~ 5IM TRNG CL HL COLD LICENSE HOT LICENSE sAME as aeovE SAME AS A6OUE 5 E 5 MAINTENANCE SUPERVISOR 1A FEAR & TECHNICAL SPECIFICATION PREPARATION 2 DESIGN & CONSTRUCTION saME as Aeovc E AS 48OVE 1
TECHNICAL ASSISTANT SL FOLLOFI 5 M I
- 3. PERSONNEL ACQUISITION TANG I PEASONNEL ACQUISITION
- 2. FSAe 8 TEC NICAL SPECIFICATION HEALTH, SAFETY AND CHEMIST R Y 3 ESTABLIS TRAINING REQUIREMENT5 SAME AS A6OVE I B SCHEDULES SUPERVISOR ORIENT FUEL MANAGEMENT TRA NING 2 COMPUTER TRAINING NUCLEAR ENGINEER 3 CONSTRUCTION FOLLOIN 5 M I
TRNG ~ sAME As &BOYE IA IA I INSERVICE INSPECTION 2 STARTUPS TESTING
- 3. FINAL MANUALPREPARATION MECHANICALENGINEER 4. ASSUME NORMAL FUNCTION IA I PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION
- 3. STARTUP& TESTING ELECTRICAL ENGINEER 4 ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS 5 ME AS A6QVE ENGINEER MULATOR RAINING I PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST 5 E 6 OPERATING PROCEDURES SHIFT SUPERVISOR SL 5A I OA 3 CONSTRUCTION FOLLOW PREPARE OPERATIONAL MANUAL 2 ASSUME NORMAL FUNCTION QUALITYASSURANCE ENGINEER 8 I. EMERGENCY PLANPREPARATION 2 PREPARATION OF TESTS OPERATI NG PROCEDURES HEALTH PHYSICS SUPERVISOR 3 FINAL MANUALPREPARATION
- 4. ASSUME NORMAL FUNCTIDN PREPARATION OF TESTS OPERATI PROCEDURES I 2. STARTUP6 TESTING CHEMISTRY SUPERVISOR 3 FINAL MANUALPREPARATION
~
- 4. ASSUME NORMAL FUNCTION NUCLEAR PLANT QBSERVA TION C E TECH IEIM NUCLEAR FUND TRNG I INTENSIVE QNSITE TRAINING I I 5
- THEORY PREPARATION OF TEST 6 OPERATING PFIQCEDURES 4 2 STARTUP 8, TESTING F NAL MANUALPFIEPARATION CL 10 14 Arizona Nuclear Power Project SENIOR CONTROL OPERATOR RD I ORIENT I j 2 DESIGN 6 CONSTRUCTION I 3 FOLLOW 2 CONSTRUCTION FOLLOW I 4 ASSUME NORMAL FUNCTION Palo Verde Nuclear Generating Station I ESTABLIS ADMINISTRATIVEPROCEDURES Units 1, 2 & 3 I 2 ASSISTANT SUPERVISION ADMINISTRATIVESUPERVISOR 3 ASSUME NORMAL FUNCTIONS STAFFING AND TRAINING PROGRAIII COMPUTER TRAIN NG (Stseet 1 of 2) 2 STARTUP 8 TESTING CHANGE COMPUTER ENGINEER I 3 ASSUME NORMAL FUNCTION Figure 13.2-1 10407 I IA July 21, 1975 Amendment 9 TQJLB 216