| issue date = 10/31/1984
| issue date = 10/31/1984
| title = Fire & Hose Stream Tests of Cable Tray Seals - Dow Test Number 4.
| title = Fire & Hose Stream Tests of Cable Tray Seals - Dow Test Number 4.
| author name = GILLEN M
| author name = Gillen M
| author affiliation = CONSTRUCTION TECHNOLOGY LABORATORIES, INC.
| author affiliation = CONSTRUCTION TECHNOLOGY LABORATORIES, INC.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:' I l ' e *. ATTACHMENT TO . ' ' ~' ~GINEERING EVALUATION 4 Report to DOW CORNING U.S.A. Midland. Michigan t8640 FIRE AND*HOSE STREAM TESTS OF CABLE TRAY SEALS -DOW TEST NO. 4 by Michael Gillen '*I'._',,.  
{{#Wiki_filter:. '
;.i. ; .* I :*'..._,j  
I
-_..,;,..
        ~'
_l Submitted by CONSTRUCTION TECHNOLOGY LABORATORIES A Division of Portland cement Association 5420 Old Orchard Road CR5502-4324 Doc. ID ttl209E Skokie, Illinois 60077 October 1984 ( 8604170299 860410 PDR ADOCK 05000280 F PDR
l   '
., ' . .J 'I e e FIRE AND HOSE STEEAM TESTS OF PENETRATION SEALS -DOW TEST NO. t by Michael Gillen* INTRODUCTION At the request of Dow Corning U.S.A. (DOW) and as authorized by Purchase Order No. 17262-N, Construction Technology tories (CTL) performed a series of five fire and hose stream tests on penetration seal systems. This report describes results of the fourth test in the program, performed on two cable tray penetration seals. The penetration seal systems consisted of Dow Corning 3-6548 .. Silicone RTV Foam. The 12-in. thick foam seal systems were cast around two cable tray assemblies installed in a 30x30-in.
e                                                 *.           ATTACHMENT TO
opening within a 48x4Sxl2-in.
                                                                                ~GINEERING EVALUATION 4 Report to DOW CORNING U.S.A.
concrete slab. The 30x30-in.
Midland. Michigan t8640 FIRE AND*HOSE STREAM TESTS OF CABLE TRAY SEALS -
opening was divided into two 14-l/2x30-in.
DOW TEST NO. 4 by Michael Gillen
areas by a 1-in. thick piece of.insulation board, as shown in Fig. 1. Slabs were constructed by CTL personnel.
                                        '*I'._',,. ;.i.     ; .* I :*'..._,j -_..,;,.. _l Submitted by CONSTRUCTION TECHNOLOGY LABORATORIES A Division of Portland cement Association 5420 Old Orchard Road Skokie, Illinois 60077 October 1984 CR5502-4324 Doc. ID ttl209E
Seal systems and cable trays were installed by DOW personnel with construction tance provided by CTL. ' !\: J.~,. : . :. The fire and hose stream tests were performed at the fire research facilities of CTL on October 19, 1984. The slab con~ taining the two cable trays and penetratio~seals was subjected to a 3-hr fire exposure in accordance with the time temperature  
( 8604170299 860410 PDR ADOCK 05000280 F               PDR
*senior Research Engineer, Fire Research Section, Construction Technology Laboratories, a Division of the Portland Cement Association, Skokie. IL 60077. construction technology laboratorl.es I '' , I e Approx Um1t of Fire Exposed Area~**\ .. *.":.*~*:  
 
]a" ** /I> * *
  ' . .J 'I eFIRE AND HOSE STEEAM TESTSeOF PENETRATION SEALS - DOW TEST NO. t by Michael Gillen*
* r;:-------
INTRODUCTION At the request of Dow Corning U.S.A. (DOW) and as authorized by Purchase Order No. 17262-N, Construction Technology Labora-tories (CTL) performed a series of five fire and hose stream tests on penetration seal systems. This report describes results of the fourth test in the program, performed on two cable tray penetration seals.
:;, . . . ,** I 1:~*:*~~ r ! 1~1 I 15 11 I Silicone I ~m . /4 11 1.18 11 Cable Tray .... I . ,~, .r.=: *.*.:.~*I I .**: . p,.*.**.L.::
The penetration seal systems consisted of Dow Corning 3-6548 Silicone RTV Foam. The 12-in. thick foam seal systems were cast around two cable tray assemblies installed in a 30x30-in.
________ ::.J*. *:::;j .. *
opening within a 48x4Sxl2-in. concrete slab.               The 30x30-in.
* A *
opening was divided into two 14-l/2x30-in. areas by a 1-in.
* I>. . ,,,., * * * . . . . . . . . . . . . . . . . .:.~ -~*---~.
thick piece of.insulation board, as shown in Fig. 1.                   Slabs were constructed by CTL personnel. Seal systems and cable trays were installed by DOW personnel with construction assis-tance provided by CTL.
* A * * # * ;, . . . . . . . . . . 15 11 1" . . . . ... ---* t::>'.'*A.  
                                                        ' !\: J.~,. : .:.
* * (J . . : ,,*, *, t *: *.: *: '-1 ;:::. -PLAN VIEW FIG.-I LAYOUT OF CONCRETE SLAB WITH TWO SILICONE FOAM SEALS AND PENETRATING CABLE TRAY ASSEMBLIES fl ,, e r*elationship and procedures specified in ASTM Designations:
The fire and hose stream tests were performed at the fire research facilities of CTL on October 19, 1984.               The slab con~
Ell9(l)* and E814.<2> Immediately after the fire test. the specimen was removed from the furnace and subjected to two hose stream tests in accordance with provisions of IEEE 634<3> and ASTM Designation:
taining the two cable trays and penetratio~seals was subjected to a 3-hr fire exposure in accordance with the time temperature
Ell9.  
                *senior Research Engineer, Fire Research Section, Construction Technology Laboratories, a Division of the Portland Cement Association, Skokie. IL 60077.
construction technology laboratorl.es
 
I I
      ''                                                                             e Approx   Um1t of Fire Exposed Area~**\.. *.":.*~*:
r;:-------
                                                                                              ** /I> * * *
                                                                                                                    ]a",**
I                                                                 1:~*:*~~
r
                            ! 1~1 I 11 15 I                                                                         Silicone
                                                                                                        ~m
                            .I 11          11
                                      / 4 1.18 Cable Tray
                .... I . , ~ ,                                                                         .r.=:       15 11
                *.*.:.~*I                                                                     I .**:
                . p,.*.**.L.:: ________ ::.J*. *:::;j ..                                                             1"
                    . . . I>. .
* A
                                                                                .:.~ -~*---~.
* t::>'.'*A.
                  *         * (J                                             * ;A, *    *            #    *
: ,,*, * , t * : *.: *: '- 1 ;:::. -
PLAN VIEW FIG.- I     LAYOUT OF CONCRETE SLAB WITH TWO SILICONE FOAM SEALS AND PENETRATING CABLE TRAY ASSEMBLIES fl ,,
e r*elationship and procedures specified in ASTM Designations:
Ell9(l)* and E814.< 2 > Immediately after the fire test. the specimen was removed from the furnace and subjected to two hose stream tests in accordance with provisions of IEEE 634< 3 > and ASTM Designation:           Ell9.


==SUMMARY==
==SUMMARY==
OF RESULTS The test assembly.
OF RESULTS The test assembly. consisting of two cable trays and pene-tration seal systems slab, was subjected to a 3-hr fire test and subseguent hose stream tests. Seals were installed in two
consisting of two cable trays and tration seal systems slab, was subjected to a 3-hr fire test and subseguent hose stream tests. Seals were installed in two >_<,)** -.-; -~::???/~_~:r:i?1~?*Y/;!i~~i:(!*X?J,&;:~5:;:;;:{:~3  
                                                >_<,)** - .-; -~::???/~_~:r:i?1~?*Y/;!i~~i:(!*X?J,&;:~5:;:;;:{:~3 \: --* :.
\: --* :. 14-l/2x30-in.
14-l/2x30-in. openings penetrating through the 12-in. thick con-crete slab. The openings were separated by a 1-in. thick piece of insulation board.                       The seals consisted of 12-in. thicknesses of Dow Corning 3-6548 Silicone RTV Foam.
openings penetrating through the 12-in. thick con-crete slab. The openings were separated by a 1-in. thick piece of insulation board. The seals consisted of 12-in. thicknesses of Dow Corning 3-6548 Silicone RTV Foam. The following are significant test results: 1. No passage of flame occurred through either of the two seal systems during the 3-hr fire test. 2. Limiting end point temperature criterion defined by ASTM Designation:
The following are significant test results:
E814 was not exceeded on the unexposed surface of either of the two seal systems ' .
: 1. No passage of flame occurred through either of the two seal systems during the 3-hr fire test.
* i !**~ t ::::?, . ; * ~"'*; *
: 2. Limiting end point temperature criterion defined by ASTM Designation:                                   E814 was not exceeded on the unexposed surface of either of the two seal systems
* r~ r*s ;",-, during the 3-hr fire test. Limiting end point temperature rise defined by ASTM Designation:E814 was exceeded at seve-ral measuring points on cables in both Tray Nos. 1 and 2. Limiting end point temperature criterion defined by IEEE 634 was exceeded at one measuring point on a power cable in Tray No. 1. *Numbers in parentheses designate References on Page 18. construction technology laboratories
                      ' . * ~ ~ i !**~ t ::::?, . ; * ~"'*; *
., 1 * '* _:r.. e 3. No water projected beyond the unexposed surface of either of the two penetration seals during the 14 second IEEE 634 hose stream test. ,. No water projected beyond the unexposed aurface of the penetration seal containing Tray No. 1 during the 2C second ASTM Designation:
* r~ r*s ;",-,
Ell9 hose stream test. Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation:
during the 3-hr fire test.                                             Limiting end point temperature rise defined by ASTM Designation:E814 was exceeded at seve-ral measuring points on cables in both Tray Nos. 1 and 2.                                     Limiting end point temperature criterion defined by IEEE 634                                               was     exceeded at one measuring point on a power cable in Tray No. 1.
Ell9 hose stream test. TEST ASS8MBLY A 48x48xl2-in.
      *Numbers in parentheses designate References on Page 18.
thick concrete slab specimen containing a 30x30-in.
construction technology laboratories
sguare opening was fabricated by CTL personnel.
 
The opening was located in a nominal 32x32-in.
1 * '* _:r..
area in the central area of the slab. The slab was allowed to cure for mately one week following casting and subsequently force-dried at elevated temperature to reduce internal moisture content of the concrete.
3.
Seal materials installed in the slab openings were provided ~Y Dow Corning, U.S.A. Seal materials consisted of Dow Corning 3-6548 Silicone RTV Foam. INSTALLATION PROCEDURES Installation of cable tray assemblies and seal systems are described in the following sections. construction technology laboratories
e No water projected beyond the unexposed surface of either of the two penetration seals during the 14 second IEEE 634 hose stream test.
',, . ' _:( .. e e Cable Trays Assemblies Two cable tray assemblies were installed in the concrete test slab. as thown in Fig~ 1. Cable trays were nominal 18-in. wide z 4-in. high 16 ga. galvanized steel ladder-back trays. Trays were Model No. PLMS-SS12-1800-t-12 manufactured by U.S. Gypsum Company. Certification for trays is provided in Appendix A. Trays were cut to 5-ft lengths. Two types of cables were installed in each cable tray: 600v single conductor MCM350 copper power cable with insulation Type XHHW and 600v AWG10/3C cable with XLP neoprene jacket. Cables were cut into 5-ft lengths prior to installation in the cable** trays. Cable fill in ~ach tray consisted of 14 lengths of MCM350 power cable and 40 lengths of AWG10/3C cable. Cables were secured to trays with nylon tie-wraps.
                    ,. No water projected beyond the unexposed aurface of the penetration seal containing Tray No. 1 during the 2C second ASTM Designation:   Ell9 hose stream test.
Completed cable tray assemblies were installed so that ends of trays extended 12 in. below the exposed surface of the test slab and 3 ft above the unexposed surface of the test slab. Trays were bolted at two locations to a steel angle framework on the unexposed side of. the concrete slab to provide rigid support and minimize tray movement during, seal construction and testing. Seals Seals were installed in openings in the concrete slab by DOW personnel with construction assi~tance provided by CTL. The concrete test assembly was placed in a horizontal position and 1-in. thick pieces of ceramic fiber damming board were attached construction technology laboratories
Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation: Ell9 hose stream test.
-** -*-'-..r:1 ' e e to the unexposed surface of the slab. The ceramic fiber board was N-Board manufactured by Johns-Manville.
TEST ASS8MBLY A 48x48xl2-in. thick concrete slab specimen containing a 30x30-in. sguare opening was fabricated by CTL personnel.         The opening was located in a nominal 32x32-in. area in the central area of the slab. The slab was allowed to cure for approxi-mately one week following casting and subsequently force-dried at elevated temperature to reduce internal moisture content of the concrete.
The damming board was cut to fit tightly nround projecting cable tray assemblies.
Seal materials installed in the slab openings were provided
                ~Y Dow Corning, U.S.A. Seal materials consisted of Dow Corning 3-6548 Silicone RTV Foam.
INSTALLATION PROCEDURES Installation of cable tray assemblies and seal systems are described in the following sections.
construction technology laboratories
 
_:( ..                 e                           e Cable Trays Assemblies Two cable tray assemblies were installed in the concrete test slab. as thown in Fig~ 1. Cable trays were nominal 18-in.
wide z 4-in. high 16 ga. galvanized steel ladder-back trays.
Trays were Model No. PLMS-SS12-1800-t-12 manufactured by U.S.
Gypsum Company. Certification for trays is provided in Appendix A. Trays were cut to 5-ft lengths.
Two types of cables were installed in each cable tray:         600v single conductor MCM350 copper power cable with insulation Type XHHW and 600v AWG10/3C cable with XLP neoprene jacket.       Cables were cut into 5-ft lengths prior to installation in the cable**
trays. Cable fill in ~ach tray consisted of 14 lengths of MCM350 power cable and 40 lengths of AWG10/3C cable.     Cables were secured to trays with nylon tie-wraps.
Completed cable tray assemblies were installed so that ends of trays extended 12 in. below the exposed surface of the test slab and 3 ft above the unexposed surface of the test slab.
Trays were bolted at two locations to a steel angle framework on the unexposed side of. the concrete slab to provide rigid support and minimize tray movement during, seal construction and testing.
Seals Seals were installed in openings in the concrete slab       by DOW personnel with construction assi~tance provided by CTL.       The concrete test assembly was placed in a horizontal position and 1-in. thick pieces of ceramic fiber damming board were attached construction technology laboratories
 
    '-..r:1 '                 e                           e to the unexposed surface of the slab. The ceramic fiber board was N-Board manufactured by Johns-Manville. The damming board was cut to fit tightly nround projecting cable tray assemblies.
Small gaps between the ceramic fiber board and cables were filled with pieces of CeraFiber ceramic fiber blanket manufactured by Johns-Manville.
Small gaps between the ceramic fiber board and cables were filled with pieces of CeraFiber ceramic fiber blanket manufactured by Johns-Manville.
The 30x30-in.
The 30x30-in. opening was subdivided into two 14-l/2x30-in.
opening was subdivided into two 14-l/2x30-in.
openings using a 12-in. wide z 30-in. long piece of 1-in. thick insulation board. The insulation board was M-Board.       The board was installed in the opening as shown in Fig. 1.
openings using a 12-in. wide z 30-in. long piece of 1-in. thick insulation board. The insulation board was M-Board. The board was installed in the opening as shown in Fig. 1. Silicone foam materials were mixed and placed both by hand and machine in approximately 1-1/2 to 2-in. lifts to a thickness of 12 in. in each opening. Lot numbers. densities.
Silicone foam materials were mixed and placed both by hand and machine in approximately 1-1/2 to 2-in. lifts to a thickness of 12 in. in each opening. Lot numbers. densities.
and snap times of foam materials installed in both penetrations are given in Appendix A. After foam had set. damming boards were removed from the exposed side of the slab. The foam in each opening was trimmed flush with the unexposed concrete slab surfaces.
and snap times of foam materials installed in both penetrations are given in Appendix A.
Foam was allowed to cure for approximately 9 days prior to fire testing. TEST EQUIPMENT  
After foam had set. damming boards were removed from the exposed side of the slab. The foam in each opening was trimmed flush with the unexposed concrete slab surfaces.
& PROCEDURES The following sections briefly describe eguipment and cedures used to conduct fire and hose stream tests of the assembly containing the cable tray penetration seal systems. Furnace The test assembly containing the two cable tray penetration con1trucl/on technolOflY laboratories L...;-*. JI r I 'I
Foam was allowed to cure for approximately   9 days prior to fire testing.
* e seal systems was subjected to a 3-hr fire exposure utilizing the small slab furnace at CTL's Fire Research Laboratory.
TEST EQUIPMENT   & PROCEDURES The following sections briefly describe eguipment and pro-cedures used to conduct fire and hose stream tests of the assembly containing the cable tray penetration seal systems.
This furnace provides for testing of amall-scale apecimens in a zontal position.  
Furnace The test assembly containing the two cable tray penetration con1trucl/on technolOflY laboratories
-A'ppr*o-xtmate area of fire-exposure-ia -32x32 in .* as shown in Fig. 1. Furnace atmosphere temperatures were mo~itored by three Type K, Chromel-Alumel, protected thermocouples located 12 in. below the exposed face of the test assembly.
 
The fire exposure was controlled according to the time-temperature relationship cribed by ASTM Designation:
L...;-*. JI r I 'I
Ell9, and is tabulated in Appendix B. Furnace atmosphere pressure was maintained close to ambient laboratory air pressur.e or slightly negative (-0.02 to -0.08 inches of water). For this te-st, the* average draft was -0. de inches of water. Specimen Instr*urnentation A total of 30 thermocouples were used for measuring tures on the unexposed side of the test specimen at locations shown in Fig. 2. Six thermocouples were used for measuring temperatures of electrical cables and cable trays at a distance of 1-in. above the unexposed surface of the test assembly during the fire test. Twenty-two thermocouples were used to measure temperatures on seal surfaces, concrete/seal interfaces, cable/ seal and tray/seal interfaces, and concrete surfaces on*the unexposed side of the test assembly.
* e seal systems was subjected to a 3-hr fire exposure utilizing the small slab furnace at CTL's Fire Research Laboratory.         This furnace provides for testing of amall-scale apecimens in a hori-zontal position. -A'ppr*o-xtmate area of fire-exposure- ia -
Two construction technology labor1tories
32x32 in .* as shown in Fig. 1.
:.__ * ._>. ll I ' e . * . * . * * ' . * . . * . * * * *
Furnace atmosphere temperatures were mo~itored by three Type K, Chromel-Alumel, protected thermocouples located 12 in. below the exposed face of the test assembly.     The fire exposure was controlled according to the time-temperature relationship pres-cribed by ASTM Designation:     Ell9, and is tabulated in Appendix B.
* V * , * . * * * . . . . . . .. '> . . . . * * * * * * . . . . 4. . . . . . . .. * . ,,. . 25 *
Furnace atmosphere pressure was maintained close to ambient laboratory air pressur.e or slightly negative (-0.02 to -0.08 inches of water). For this te-st, the* average draft was -0. de inches of water.
* A * * *
Specimen Instr*urnentation A total of 30 thermocouples were used for measuring tempera-tures on the unexposed side of the test specimen at locations shown in Fig. 2. Six thermocouples were used for measuring temperatures of electrical cables and cable trays at a distance of 1-in. above the unexposed surface of the test assembly during the fire test. Twenty-two thermocouples were used to measure temperatures on seal surfaces, concrete/seal interfaces, cable/
* V * ** P*------------------------~  
seal and tray/seal interfaces, and concrete surfaces on*the unexposed side of the test assembly. Two construction technology labor1tories
* * . . . . 4 . X30 29 X26 . . . X 28X X27 x1 xe X6 X ,~ : 1 .. ~-3 __ ___.. ___ _ 5 X 13 X **
:.__ * ._>. ll I '
* X12 .. .. XIO * * . . I . .. . . .* X24 . . . t:~ 11:,: 9 x2,~ I ~"-x,1 X20 XIB .A ** ** . X22 23 . *** ". __________
e
_::.;:;.a~~  
                                                                                                                                                                                    .N
* "" *. <l . . * * . . * . . . . . . . . " . . . . . --* ... *-*~---. _ ..... *' -*-';; -, . ., ,*:';"-* 30" X-Thermoc:c>ug)~
                              .* * . * .               ~                                                                                            *               *
* LOCQ:tlons'~>':_:.  
                    ~                                                                                                                      *
-:.. _j~ -!:I:*":-. .,-"t; ....... --* ---....... . -.:-. ' -,*. :'***:. . . -~-*. .--: ____ :_ ~-%t .* ,-. . . . . . . .. ~-... . . . . . . * * : I> . . . .1 FIG. 2 UNEXPOSED SURFACE ANO, INTERFACE THERMOCOUPLE LOCATIONS
                                                                                                                                                                        ~
_.-;,-. :. *"' .... *. ->~.' ;.:;;;*. *". .N = 0 ' ' ft)
                    .. .. . .. .4. . .
* I '
                              ~
I ,._:.~ ,--4~ I ' e e thermocouples were used to measure foam temperatures at a depth of 2 in. below the unexposed surface of the seals. A list of thermocouple locations is provided in Appendix B.
V
* pata Acquisition Furnace atmosphere and specimen thermocouple temperatures were monitored at 5-minute intervals throughout the 3-hr fire test. The automated data acquisition system consisted of a Hewlett-Packard HP3455A digital voltmeter and a series of HP3495A data scanners.
                      *A
The data acquisition system controller was an HP9845T desktop computer.
* V P*------------------------~                                                                        25
Hose Stream Tests .. . -__ : ;_;. .J:""._;-.;*!,'r~
                                                                                                                                                                    ~
-.;;.,.~ _.;_ ... ---.. -.. --.u-..,... Two hose stream tests were conducted after fire testing of the test assembly.
                    . . . .4 .                                                         X30                                 X26                                 *      *
Hose stream test procedures were those cribed in the IEEE 634 and ASTM Designation:
                            ...                                     X ,~                               29 X
Ell9 Test dards. Equipment and procedures for these tests are as follows: IEEE 634 -A 75 psi hose stream was delivered through a 1-1/2 in. diameter hose equipped with a fog nozzle set at~ ~ischarge an~le of 30&deg; from~~ distance; of 10 .ft;. The: spray-:-:was deli.vered over an exposed a*rea of 36~3.6 in. for a .duration of 14 seconds. ASTM !119-A 30 psi solid stream was delivered throug-h a 2-1/2 in. diameter hose equipped with a National Standard PlaypJp,-with_~-1-1/8 __ in. di~meter charge tip from a distance of 20 ft. The stream was delivered over an exposed area of 48x48 in. for a duration of 24 seconds. construction technology laboratories e TEST RESULTS The test assembly containing the two cable tray penetration seal systems was subjected to a 3-hr fire exposure at the fire research facilities of CTL on October 19. 1984. A listing of furnace atmosphere temperature measurements and variations from the standard are given in Appendix B. Variation of the measured furnace temperatures from the standard was approximately 0.03\, based on comparison of total area under the time-temperature curves. This was well within the 5.00\ tion permitted by the Test Standard.Cl)
: 1.
Average furnace draft pressure was -0.08 inches of water. A listing of measured unexposed concrete.
5
interfaces.
                                                                          ~-3_____..____        x1 X6 28X X27 xe                I X
cable. and seal temperatures is also given in Appendix B. The maximum allowable temperature rise of 325&deg;F+ ambient as defined by ASTM Designation:
                                                                                                                                                                                  =0 13 X                   **           *                                                     .. .. ..           .     ..   .*   X24             ' ' ft)
E814(2} was not exceeded on the unexpo$ed surface of either penetration seal during the 3-hr fire test. Limiting end point temperature rise defined by ASTM Designtaion:
X12 XIO
E814 was exceeded at several measuring points on cables in both seals. Limiting end point tempertu_~:8 criterion.detined by IEEE 634 was exceeded at one measuri.ng, *point on a power cable in Tray "No. 1. :*.:. -. ~*** No passage of flame occurred through either penetration seal during the 3-hr fire test. After the 3-hr fire exposure.
                    .A ** ~ **
the test assembly was removed from the furnace. as shown in Fig. 3. and subjected to the IEEE 634 and ASTM Designation:
                              . ~                                    tx,1:~               11 X20 9
Ell9 hose stream tests. Views;-: of exposed and unexposed s*urf aces of test assembly before -hose stream testing are shown in Figs. 4 and 5. Views of hose stream tests are shown in Figs. 6 and 7. construction technology laboratories e e No water projected beyond the unexposed surface of either of the two penetration seal during the IEEE 634 hose stream test. No water projected beyond the unexposed surfa~e of the penetration seal containing Tray No. 1 during the ASTM Designation:
x2,~ I~"-
Ell9 hose stream test. Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation:  
* I XIB                                       X22
!119 hose stream test. Views of exposed and unexposed surfaces of the test assembly after hose stream testing are shown in Figs. 8 and 9. Following the hose stream tests. measurements were made of the thickness of remaining silicone seal material from each opening, as shown in Fig. 10. Remaining thicknesses of unburned materials are listed in Table 1. TABLE l -THICKNESS OF UNBURNED SILICONE FOAM Measurement Location*
_ _ _ _ _ _ _ _ _ __::.;:;.a~~                                                                   23              . ~ *** " *.
West end of seal West leg of tray Mid-point of seal East leg of tray East end of seal *See Fig. l for orientation. Thickness.
                    "" *. <l . .             *         *                                                                                                   . . .. .
inches Tray No. l Tray No. 2 6 ".';~ . . 3-3/4?";.
                            . .                                                                                                                 .   ~    .. ~- ...
4 3-1/2 5 , 5 3-3/4 3-3/4 2-3/4 .. 5 construction technology laboratories 
                                    ~
'-,*. I( -Fig. 3 Specimen Removed from Furnace After Fire Testing construction technology laboratories r .._,_*, '':' .. Fig. 4 Fig. 5 e Exposed Surface of Test Assembly Prior to Hose Stream Testing 'I . .. \ ~t !a,-.. , .. ... P:,'. ~--~-.... ,. '. Unexposed Surface of Test Assembly Prior to H~se Stream Testing ;, -construction technology laboratories
                    .. . . . .                                                                                                                 ..     ~
't ..... !V,,_ '. e Fig. 6 IEEE 634 Hose Stream Test Fig. 7 ASTM Ell9 Hose Stream Test conatructlon technology laboratories 1~--" I * -';.,"--~-., ~,;* ***' e a --~;~:r,~:i**
                                                                                                                                                          * *     : I> .
.. * .. . ... _.......,_,.
                                ... ~
.. . . *-. Fig. 8 Fig. 9 Exposed Surface of Test Assembly After Hose Stream Testing Unexposed surface of Test Assembly After Hose Stream Testing construction technology laboratories e (a) r 4-8 L __ Fig. 10 Unburned Silicone Foam Material from Penetration Seals A c: B "' Tray No. Tray No. 2 1 (b) construction technology laboratories e e LABORATORY RESPONSIBJLITY The Construction Technology Laboratories is a Division of the Portland Cement Association and was not involved in the desiqn of the Penetration Seal System. Personnel of the struction Technology Laboratories make no judgment of the ability of the materials or seal systems for particular end point uses. Acceptance of the test results for guidance for field installation is the prerogative of the authority having jurisdiction.
                                                                    --* *-*~---
30"
                                                                                                                                                          .1 X- Thermoc:c>ug)~ *LOCQ:tlons'~>':_:. -:.. _j~
                                              -!:I:*":- . .,-"t;           ....... -                         - * -- -         .......
                                                                                    . . - ~- *.   .- -             : ____:_ ~-%t FIG. 2              UNEXPOSED SURFACE ANO, INTERFACE THERMOCOUPLE LOCATIONS
                                                                                                *"' ....*. ->~.'            ;.:;;;*. *".
I
,._:.~ ,--4~ I '
e                                                        e thermocouples were used to measure foam temperatures at a depth of 2 in. below the unexposed surface of the seals.                                                     A list of thermocouple locations is provided in Appendix B.
* pata Acquisition Furnace atmosphere and specimen thermocouple temperatures were monitored at 5-minute intervals throughout the 3-hr fire test. The automated data acquisition system consisted of a Hewlett-Packard HP3455A digital voltmeter and a series of HP3495A data scanners. The data acquisition system controller was an HP9845T desktop computer.
Hose Stream Tests                    -
                                                        ..__ : ;_;. .J:""._;-.;*!,'r~ - .;;.,.~
                                                                                                            - ..--.u- ..,...
Two hose stream tests were conducted after fire testing of the test assembly. Hose stream test procedures were those des-cribed in the IEEE 634 and ASTM Designation:                                          Ell9 Test Stan-dards. Equipment and procedures for these tests are as follows:
IEEE 634 - A 75 psi hose stream was delivered through a 1-1/2 in. diameter hose equipped with a fog nozzle set at~ ~ischarge an~le of 30&deg; from~~
distance; of 10 .ft;. The: spray-:-:was deli.vered over an exposed a*rea of 36~3.6 in. for a .duration of 14 seconds.
ASTM !119- A 30 psi solid stream was delivered throug-h a 2-1/2 in. diameter hose equipped with a National Standard PlaypJp,- with_~- 1-1/8__                                    in. di~meter ~Js-charge tip from a distance of 20 ft.                                                         The stream was delivered over an exposed area of 48x48 in.
for a duration of 24 seconds.
construction technology laboratories
 
e TEST RESULTS The test assembly containing the two cable tray penetration seal systems was subjected to a 3-hr fire exposure at the fire research facilities of CTL on October 19. 1984.
A listing of furnace atmosphere temperature measurements and variations from the standard are given in Appendix B.               Variation of the measured furnace temperatures from the standard was approximately 0.03\, based on comparison of total area under the time-temperature curves. This was well within the 5.00\ varia-tion permitted by the Test Standard.Cl)         Average furnace draft pressure was -0.08 inches of water.
A listing of measured unexposed concrete. interfaces. cable.
and seal temperatures is also given in Appendix B.         The maximum allowable temperature rise of 325&deg;F+ ambient as defined by ASTM Designation: E814( 2 } was not exceeded on the unexpo$ed surface of either penetration seal during the 3-hr fire test.               Limiting end point temperature rise defined by ASTM Designtaion: E814 was exceeded at several measuring points on cables in both seals.
Limiting end point tempertu_~:8 criterion.detined by IEEE 634 was exceeded at one measuri.ng, :*.:.
                            *point- on a power cable in Tray . ~***
                                                                    "No. 1.
No passage of flame occurred through either penetration seal during the 3-hr fire test.
After the 3-hr fire exposure. the test assembly was removed from the furnace. as shown in Fig. 3. and subjected to the IEEE 634 and ASTM Designation:       Ell9 hose stream tests. Views;-: of exposed and unexposed s*urf aces of test assembly before -hose stream testing are shown in Figs. 4 and 5.         Views of hose stream tests are shown in Figs. 6 and 7.
construction technology laboratories
 
e                           e No water projected beyond the unexposed surface of either of the two penetration seal during the IEEE 634 hose stream test. No water projected beyond the unexposed surfa~e of the penetration seal containing Tray No. 1 during the ASTM Designation: Ell9 hose stream test. Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation: !119 hose stream test.
Views of exposed and unexposed surfaces of the test assembly after hose stream testing are shown in Figs. 8 and 9.
Following the hose stream tests. measurements were made of the thickness of remaining silicone seal material from each opening, as shown in Fig. 10. Remaining thicknesses of unburned materials are listed in Table 1.
TABLE l - THICKNESS OF UNBURNED SILICONE FOAM Thickness. inches Measurement Location*       Tray No. l        Tray No. 2 West end of seal             6  ".';~ . .      5 West leg of tray             3-3/4?";.          3-3/4 Mid-point of seal             4                  3-3/4 East leg of tray             3-1/2              2-3/4 East end of seal             5      ,        .. 5
        *See Fig. l for orientation.
construction technology laboratories
 
'-,*. I(
Fig. 3 Specimen Removed from Furnace After Fire Testing construction technology laboratories
 
.._,_*, '':' ..                                   e Fig. 4 Exposed Surface of Test Assembly Prior to Hose Stream Testing
                                                    'I
                                                                      ~-
                                                      ~t                    ....,.
                                                        -~-
                                                        !a,-
                                                  \
P:,'.
Fig. 5  Unexposed Surface of Test Assembly Prior to H~se Stream Testing construction technology laboratories
 
't ..... !V,,_ '.                           e Fig. 6  IEEE 634 Hose Stream Test Fig. 7 ASTM Ell9 Hose Stream Test conatructlon technology laboratories
 
1~--" I * -';.,"--
e a
                    ~-
                    ***' ~---
                          .,  ~,;*
                    ....-~;~:r,~:i**
Fig. 8                Exposed Surface of Test Assembly After Hose Stream Testing Fig. 9              Unexposed surface of Test Assembly After Hose Stream Testing construction technology laboratories
 
e (a) r 4-8 L__
(b)
Fig. 10 Unburned Silicone Foam Material from Penetration Seals A c: Tray No. 2 B "' Tray No. 1 construction technology laboratories
 
e                            e LABORATORY RESPONSIBJLITY The Construction Technology Laboratories is a Division of the Portland Cement Association and was not involved in the desiqn of the Penetration Seal System. Personnel of the Con-struction Technology Laboratories make no judgment of the suit-ability of the materials or seal systems for particular end point uses. Acceptance of the test results for guidance for field installation is the prerogative of the authority having jurisdiction.
CONCLUDING REMARKS This report described fire and hose stream tests conducted on two silicone penetration seal systems. Significant test results are presented in the section entitled  
CONCLUDING REMARKS This report described fire and hose stream tests conducted on two silicone penetration seal systems. Significant test results are presented in the section entitled  


==SUMMARY==
==SUMMARY==
OF RESULTS at the beginning of this report. con1trucl/on technology laboratories
OF RESULTS at the beginning of this report.
. ... ll. "-.. >....._, ..
con1trucl/on technology laboratories
* REFERENCES  
 
: 1. ASTM Designation:
    .ll. "-.. >....._, ..
Ell9. "Standard Methods of Fire Tests of Building Construction and Materials." American Society for Testing and Materials.
1.
Philadelphia.
* REFERENCES ASTM Designation: Ell9. "Standard Methods of Fire Tests of Building Construction and Materials." American Society for Testing and Materials. Philadelphia. PA. 1983.
PA. 1983. 2. ASTM Designation:
: 2. ASTM Designation: E814. "Standard Method of Fire Tests of Through-Penetration Fire Stops.* American Society for Testing and Materials. Philadelphia. PA. 1983.
E814. "Standard Method of Fire Tests of Through-Penetration Fire Stops.* American Society for Testing and Materials.
: 3. Standard IEEE 634-1978. "IEEE Standard Cable Penetration Fire-Stop Qualification Test,* The Institute of Electrical and Electronic Engineers. Inc .* New York. NY.
Philadelphia.
conatructlon technology laboratories}}
PA. 1983. 3. Standard IEEE 634-1978. "IEEE Standard Cable Penetration Fire-Stop Qualification Test,* The Institute of Electrical and Electronic Engineers.
Inc .* New York. NY. -conatructlon technology laboratories}}

Latest revision as of 04:50, 23 February 2020

Fire & Hose Stream Tests of Cable Tray Seals - Dow Test Number 4.
ML18149A084
Person / Time
Site: Surry Dominion icon.png
Issue date: 10/31/1984
From: Gillen M
CONSTRUCTION TECHNOLOGY LABORATORIES, INC.
To:
Shared Package
ML18130A415 List:
References
1209E, NUDOCS 8604170299
Download: ML18149A084 (19)


Text

. '

I

~'

l '

e *. ATTACHMENT TO

~GINEERING EVALUATION 4 Report to DOW CORNING U.S.A.

Midland. Michigan t8640 FIRE AND*HOSE STREAM TESTS OF CABLE TRAY SEALS -

DOW TEST NO. 4 by Michael Gillen

'*I'._',,. ;.i.  ; .* I :*'..._,j -_..,;,.. _l Submitted by CONSTRUCTION TECHNOLOGY LABORATORIES A Division of Portland cement Association 5420 Old Orchard Road Skokie, Illinois 60077 October 1984 CR5502-4324 Doc. ID ttl209E

( 8604170299 860410 PDR ADOCK 05000280 F PDR

' . .J 'I eFIRE AND HOSE STEEAM TESTSeOF PENETRATION SEALS - DOW TEST NO. t by Michael Gillen*

INTRODUCTION At the request of Dow Corning U.S.A. (DOW) and as authorized by Purchase Order No. 17262-N, Construction Technology Labora-tories (CTL) performed a series of five fire and hose stream tests on penetration seal systems. This report describes results of the fourth test in the program, performed on two cable tray penetration seals.

The penetration seal systems consisted of Dow Corning 3-6548 Silicone RTV Foam. The 12-in. thick foam seal systems were cast around two cable tray assemblies installed in a 30x30-in.

opening within a 48x4Sxl2-in. concrete slab. The 30x30-in.

opening was divided into two 14-l/2x30-in. areas by a 1-in.

thick piece of.insulation board, as shown in Fig. 1. Slabs were constructed by CTL personnel. Seal systems and cable trays were installed by DOW personnel with construction assis-tance provided by CTL.

' !\: J.~,. : .:.

The fire and hose stream tests were performed at the fire research facilities of CTL on October 19, 1984. The slab con~

taining the two cable trays and penetratio~seals was subjected to a 3-hr fire exposure in accordance with the time temperature

  • senior Research Engineer, Fire Research Section, Construction Technology Laboratories, a Division of the Portland Cement Association, Skokie. IL 60077.

construction technology laboratorl.es

I I

e Approx Um1t of Fire Exposed Area~**\.. *.":.*~*:

r;:-------

    • /I> * * *

]a",**

I 1:~*:*~~

r

! 1~1 I 11 15 I Silicone

~m

.I 11 11

/ 4 1.18 Cable Tray

.... I . , ~ , .r.=: 15 11

  • .*.:.~*I I .**:

. p,.*.**.L.:: ________ ::.J*. *:::;j .. 1"

. . . I>. .

  • A

.:.~ -~*---~.

  • t::>'.'*A.
  • * (J * ;A, * * # *
,,*, * , t * : *.: *: '- 1 ;:::. -

PLAN VIEW FIG.- I LAYOUT OF CONCRETE SLAB WITH TWO SILICONE FOAM SEALS AND PENETRATING CABLE TRAY ASSEMBLIES fl ,,

e r*elationship and procedures specified in ASTM Designations:

Ell9(l)* and E814.< 2 > Immediately after the fire test. the specimen was removed from the furnace and subjected to two hose stream tests in accordance with provisions of IEEE 634< 3 > and ASTM Designation: Ell9.

SUMMARY

OF RESULTS The test assembly. consisting of two cable trays and pene-tration seal systems slab, was subjected to a 3-hr fire test and subseguent hose stream tests. Seals were installed in two

>_<,)** - .-; -~::???/~_~:r:i?1~?*Y/;!i~~i:(!*X?J,&;:~5:;:;;:{:~3 \: --* :.

14-l/2x30-in. openings penetrating through the 12-in. thick con-crete slab. The openings were separated by a 1-in. thick piece of insulation board. The seals consisted of 12-in. thicknesses of Dow Corning 3-6548 Silicone RTV Foam.

The following are significant test results:

1. No passage of flame occurred through either of the two seal systems during the 3-hr fire test.
2. Limiting end point temperature criterion defined by ASTM Designation: E814 was not exceeded on the unexposed surface of either of the two seal systems

' . * ~ ~ i !**~ t ::::?, .  ; * ~"'*; *

  • r~ r*s ;",-,

during the 3-hr fire test. Limiting end point temperature rise defined by ASTM Designation:E814 was exceeded at seve-ral measuring points on cables in both Tray Nos. 1 and 2. Limiting end point temperature criterion defined by IEEE 634 was exceeded at one measuring point on a power cable in Tray No. 1.

  • Numbers in parentheses designate References on Page 18.

construction technology laboratories

1 * '* _:r..

3.

e No water projected beyond the unexposed surface of either of the two penetration seals during the 14 second IEEE 634 hose stream test.

,. No water projected beyond the unexposed aurface of the penetration seal containing Tray No. 1 during the 2C second ASTM Designation: Ell9 hose stream test.

Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation: Ell9 hose stream test.

TEST ASS8MBLY A 48x48xl2-in. thick concrete slab specimen containing a 30x30-in. sguare opening was fabricated by CTL personnel. The opening was located in a nominal 32x32-in. area in the central area of the slab. The slab was allowed to cure for approxi-mately one week following casting and subsequently force-dried at elevated temperature to reduce internal moisture content of the concrete.

Seal materials installed in the slab openings were provided

~Y Dow Corning, U.S.A. Seal materials consisted of Dow Corning 3-6548 Silicone RTV Foam.

INSTALLATION PROCEDURES Installation of cable tray assemblies and seal systems are described in the following sections.

construction technology laboratories

_:( .. e e Cable Trays Assemblies Two cable tray assemblies were installed in the concrete test slab. as thown in Fig~ 1. Cable trays were nominal 18-in.

wide z 4-in. high 16 ga. galvanized steel ladder-back trays.

Trays were Model No. PLMS-SS12-1800-t-12 manufactured by U.S.

Gypsum Company. Certification for trays is provided in Appendix A. Trays were cut to 5-ft lengths.

Two types of cables were installed in each cable tray: 600v single conductor MCM350 copper power cable with insulation Type XHHW and 600v AWG10/3C cable with XLP neoprene jacket. Cables were cut into 5-ft lengths prior to installation in the cable**

trays. Cable fill in ~ach tray consisted of 14 lengths of MCM350 power cable and 40 lengths of AWG10/3C cable. Cables were secured to trays with nylon tie-wraps.

Completed cable tray assemblies were installed so that ends of trays extended 12 in. below the exposed surface of the test slab and 3 ft above the unexposed surface of the test slab.

Trays were bolted at two locations to a steel angle framework on the unexposed side of. the concrete slab to provide rigid support and minimize tray movement during, seal construction and testing.

Seals Seals were installed in openings in the concrete slab by DOW personnel with construction assi~tance provided by CTL. The concrete test assembly was placed in a horizontal position and 1-in. thick pieces of ceramic fiber damming board were attached construction technology laboratories

'-..r:1 ' e e to the unexposed surface of the slab. The ceramic fiber board was N-Board manufactured by Johns-Manville. The damming board was cut to fit tightly nround projecting cable tray assemblies.

Small gaps between the ceramic fiber board and cables were filled with pieces of CeraFiber ceramic fiber blanket manufactured by Johns-Manville.

The 30x30-in. opening was subdivided into two 14-l/2x30-in.

openings using a 12-in. wide z 30-in. long piece of 1-in. thick insulation board. The insulation board was M-Board. The board was installed in the opening as shown in Fig. 1.

Silicone foam materials were mixed and placed both by hand and machine in approximately 1-1/2 to 2-in. lifts to a thickness of 12 in. in each opening. Lot numbers. densities.

and snap times of foam materials installed in both penetrations are given in Appendix A.

After foam had set. damming boards were removed from the exposed side of the slab. The foam in each opening was trimmed flush with the unexposed concrete slab surfaces.

Foam was allowed to cure for approximately 9 days prior to fire testing.

TEST EQUIPMENT & PROCEDURES The following sections briefly describe eguipment and pro-cedures used to conduct fire and hose stream tests of the assembly containing the cable tray penetration seal systems.

Furnace The test assembly containing the two cable tray penetration con1trucl/on technolOflY laboratories

L...;-*. JI r I 'I

  • e seal systems was subjected to a 3-hr fire exposure utilizing the small slab furnace at CTL's Fire Research Laboratory. This furnace provides for testing of amall-scale apecimens in a hori-zontal position. -A'ppr*o-xtmate area of fire-exposure- ia -

32x32 in .* as shown in Fig. 1.

Furnace atmosphere temperatures were mo~itored by three Type K, Chromel-Alumel, protected thermocouples located 12 in. below the exposed face of the test assembly. The fire exposure was controlled according to the time-temperature relationship pres-cribed by ASTM Designation: Ell9, and is tabulated in Appendix B.

Furnace atmosphere pressure was maintained close to ambient laboratory air pressur.e or slightly negative (-0.02 to -0.08 inches of water). For this te-st, the* average draft was -0. de inches of water.

Specimen Instr*urnentation A total of 30 thermocouples were used for measuring tempera-tures on the unexposed side of the test specimen at locations shown in Fig. 2. Six thermocouples were used for measuring temperatures of electrical cables and cable trays at a distance of 1-in. above the unexposed surface of the test assembly during the fire test. Twenty-two thermocouples were used to measure temperatures on seal surfaces, concrete/seal interfaces, cable/

seal and tray/seal interfaces, and concrete surfaces on*the unexposed side of the test assembly. Two construction technology labor1tories

.__ * ._>. ll I '

e

.N

.* * . * . ~ * *

~ *

~

.. .. . .. .4. . .

~

V

  • A
  • V P*------------------------~ 25

~

. . . .4 . X30 X26 * *

... X ,~ 29 X

1.

5

~-3_____..____ x1 X6 28X X27 xe I X

=0 13 X ** * .. .. .. . .. .* X24 ' ' ft)

X12 XIO

.A ** ~ **

. ~ tx,1:~ 11 X20 9

x2,~ I~"-

  • I XIB X22

_ _ _ _ _ _ _ _ _ __::.;:;.a~~ 23 . ~ *** " *.

"" *. <l . . * * . . .. .

. . . ~ .. ~- ...

~

.. . . . . .. ~

  • *  : I> .

... ~

--* *-*~---

30"

.1 X- Thermoc:c>ug)~ *LOCQ:tlons'~>':_:. -:.. _j~

-!:I:*":- . .,-"t; ....... - - * -- - .......

. . - ~- *. .- -  : ____:_ ~-%t FIG. 2 UNEXPOSED SURFACE ANO, INTERFACE THERMOCOUPLE LOCATIONS

  • "' ....*. ->~.'  ;.:;;;*. *".

I

,._:.~ ,--4~ I '

e e thermocouples were used to measure foam temperatures at a depth of 2 in. below the unexposed surface of the seals. A list of thermocouple locations is provided in Appendix B.

  • pata Acquisition Furnace atmosphere and specimen thermocouple temperatures were monitored at 5-minute intervals throughout the 3-hr fire test. The automated data acquisition system consisted of a Hewlett-Packard HP3455A digital voltmeter and a series of HP3495A data scanners. The data acquisition system controller was an HP9845T desktop computer.

Hose Stream Tests -

..__ : ;_;. .J:""._;-.;*!,'r~ - .;;.,.~

- ..--.u- ..,...

Two hose stream tests were conducted after fire testing of the test assembly. Hose stream test procedures were those des-cribed in the IEEE 634 and ASTM Designation: Ell9 Test Stan-dards. Equipment and procedures for these tests are as follows:

IEEE 634 - A 75 psi hose stream was delivered through a 1-1/2 in. diameter hose equipped with a fog nozzle set at~ ~ischarge an~le of 30° from~~

distance; of 10 .ft;. The: spray-:-:was deli.vered over an exposed a*rea of 36~3.6 in. for a .duration of 14 seconds.

ASTM !119- A 30 psi solid stream was delivered throug-h a 2-1/2 in. diameter hose equipped with a National Standard PlaypJp,- with_~- 1-1/8__ in. di~meter ~Js-charge tip from a distance of 20 ft. The stream was delivered over an exposed area of 48x48 in.

for a duration of 24 seconds.

construction technology laboratories

e TEST RESULTS The test assembly containing the two cable tray penetration seal systems was subjected to a 3-hr fire exposure at the fire research facilities of CTL on October 19. 1984.

A listing of furnace atmosphere temperature measurements and variations from the standard are given in Appendix B. Variation of the measured furnace temperatures from the standard was approximately 0.03\, based on comparison of total area under the time-temperature curves. This was well within the 5.00\ varia-tion permitted by the Test Standard.Cl) Average furnace draft pressure was -0.08 inches of water.

A listing of measured unexposed concrete. interfaces. cable.

and seal temperatures is also given in Appendix B. The maximum allowable temperature rise of 325°F+ ambient as defined by ASTM Designation: E814( 2 } was not exceeded on the unexpo$ed surface of either penetration seal during the 3-hr fire test. Limiting end point temperature rise defined by ASTM Designtaion: E814 was exceeded at several measuring points on cables in both seals.

Limiting end point tempertu_~:8 criterion.detined by IEEE 634 was exceeded at one measuri.ng, :*.:.

  • point- on a power cable in Tray . ~***

"No. 1.

No passage of flame occurred through either penetration seal during the 3-hr fire test.

After the 3-hr fire exposure. the test assembly was removed from the furnace. as shown in Fig. 3. and subjected to the IEEE 634 and ASTM Designation: Ell9 hose stream tests. Views;-: of exposed and unexposed s*urf aces of test assembly before -hose stream testing are shown in Figs. 4 and 5. Views of hose stream tests are shown in Figs. 6 and 7.

construction technology laboratories

e e No water projected beyond the unexposed surface of either of the two penetration seal during the IEEE 634 hose stream test. No water projected beyond the unexposed surfa~e of the penetration seal containing Tray No. 1 during the ASTM Designation: Ell9 hose stream test. Water did project beyond the unexposed surface of the penetration seal containing Tray No. 2 during the ASTM Designation: !119 hose stream test.

Views of exposed and unexposed surfaces of the test assembly after hose stream testing are shown in Figs. 8 and 9.

Following the hose stream tests. measurements were made of the thickness of remaining silicone seal material from each opening, as shown in Fig. 10. Remaining thicknesses of unburned materials are listed in Table 1.

TABLE l - THICKNESS OF UNBURNED SILICONE FOAM Thickness. inches Measurement Location* Tray No. l Tray No. 2 West end of seal 6 ".';~ . . 5 West leg of tray 3-3/4?";. 3-3/4 Mid-point of seal 4 3-3/4 East leg of tray 3-1/2 2-3/4 East end of seal 5 , .. 5

  • See Fig. l for orientation.

construction technology laboratories

'-,*. I(

Fig. 3 Specimen Removed from Furnace After Fire Testing construction technology laboratories

.._,_*, :' .. e Fig. 4 Exposed Surface of Test Assembly Prior to Hose Stream Testing

'I

~-

~t ....,.

-~-

!a,-

\

P:,'.

Fig. 5 Unexposed Surface of Test Assembly Prior to H~se Stream Testing construction technology laboratories

't ..... !V,,_ '. e Fig. 6 IEEE 634 Hose Stream Test Fig. 7 ASTM Ell9 Hose Stream Test conatructlon technology laboratories

1~--" I * -';.,"--

e a

~-

      • ' ~---

., ~,;*

....-~;~:r,~:i**

Fig. 8 Exposed Surface of Test Assembly After Hose Stream Testing Fig. 9 Unexposed surface of Test Assembly After Hose Stream Testing construction technology laboratories

e (a) r 4-8 L__

(b)

Fig. 10 Unburned Silicone Foam Material from Penetration Seals A c: Tray No. 2 B "' Tray No. 1 construction technology laboratories

e e LABORATORY RESPONSIBJLITY The Construction Technology Laboratories is a Division of the Portland Cement Association and was not involved in the desiqn of the Penetration Seal System. Personnel of the Con-struction Technology Laboratories make no judgment of the suit-ability of the materials or seal systems for particular end point uses. Acceptance of the test results for guidance for field installation is the prerogative of the authority having jurisdiction.

CONCLUDING REMARKS This report described fire and hose stream tests conducted on two silicone penetration seal systems. Significant test results are presented in the section entitled

SUMMARY

OF RESULTS at the beginning of this report.

con1trucl/on technology laboratories

.ll. "-.. >....._, ..

1.

  • REFERENCES ASTM Designation: Ell9. "Standard Methods of Fire Tests of Building Construction and Materials." American Society for Testing and Materials. Philadelphia. PA. 1983.
2. ASTM Designation: E814. "Standard Method of Fire Tests of Through-Penetration Fire Stops.* American Society for Testing and Materials. Philadelphia. PA. 1983.
3. Standard IEEE 634-1978. "IEEE Standard Cable Penetration Fire-Stop Qualification Test,* The Institute of Electrical and Electronic Engineers. Inc .* New York. NY.

conatructlon technology laboratories