{{#Wiki_filter:NIS-1 OWNER'RATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2.
{{#Wiki_filter:~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICElsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
* Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
NIA 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2.
Component or Appurtenance  
* Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
#11 Steam Generator  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
#12 Steam Generator  
: 4. Owner's Certificate of Authorization (if Required) NIA
#13 Steam Generator  
: 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
#14 Steam Generator Reactor Coolant System Safety Injection System Residual Heat Removal System Boiler Feed System Main Steam System Chemical Volume and Control System Auxiliary Feedwater System Containment Spray System Service Water System Component Cooling System Sampling System Manufacturer or Installer Westinghouse Tampa Div. P.O. Box 19218 Tampa, FL 33616 " " " " United Engineers  
: 7. Components inspected (see page 1)
& Constructors (UE&C) UE&C UE&C UE&C UE&C UE&C UE&C UE&C UE&C UE&C Manufacturer or Installer Serial No. 2174 2173 2171 2172 NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA 9807220295 980713 PDR ADOCK 05000272 ---...,, I Page 1 Q . ____ __ I State or Province No. NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA National Board No. NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA 
: 8. Exam Dates March 7. 1995 to March 17. 1998
*:, .... ,, ;ORM NIS-1 REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. Ownyr Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
NIA 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17, 1998 9. Inspection Interval from February 27. 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
An inservice examination (ISI) of selected Class 1, Class 2 and Class 3 components of Public Service Electric and Gas Company's (PSE&G) Salem Generating Station, Unit 1, was performed by Public Service Electric & Gas* (PSE&G), Magnaflux Quality Services (MQS), Southwest Research Institute (SwRI), Virginia Corporation of Richmond (VCR) and AEA Technology Engineering Services (AEA) personnel during the April 1995 -April 1998. These examinations constituted the twelfth (2nd Period, 3rd Outage) at Salem 1 during the Second 10-year Inspection Interval of operation.
: 11. Abstract of Examinations:
Exams were performed in accordance with the 1983 Edition through Summer 1983 Addenda of ASME Section XI and the Salem Inservice Inspection Program Long Term Plan. ISI was performed utilizing visual (VT), magnetic particle (MT), liquid penetrant (PT), manual ultrasonic (UT), mechanized ultrasonic (M-UT) and radiography (RT) nondestructive examination techniques.
Manufacturer Component or             Manufacturer          or Installer      State or      National Appurtenance             or Installer          Serial No.        Province No. Board No.
  #11 Steam Generator Westinghouse                2174              NIA          NIA Tampa Div. P.O.
Box 19218 Tampa, FL 33616
  #12 Steam Generator               "            2173              NIA          NIA
  #13 Steam Generator               "            2171              NIA          NIA
  #14 Steam Generator               "            2172              NIA          NIA Reactor Coolant                   "            NIA              NIA          NIA System Safety Injection         United Engineers & NIA                  NIA          NIA System                  Constructors (UE&C)
Residual Heat            UE&C                   NIA              NIA          NIA Removal System Boiler Feed System      UE&C                   NIA              NIA          NIA Main Steam System        UE&C                   NIA              NIA          NIA Chemical Volume and UE&C                       NIA              NIA          NIA Control System Auxiliary Feedwater      UE&C                   NIA              NIA          NIA System Containment Spray        UE&C                   NIA              NIA          NIA System Service Water System UE&C                       NIA              NIA          NIA Component Cooling        UE&C                   NIA              NIA          NIA System Sampling System          UE&C                   NIA               NIA           NIA 9807220295 980713
                                    ---...,, Page 1 PDR Q     ADOCK
          .     05000272                    I
____                 PD~  __               I
 
        ;ORM NIS-1   OWNER'~ATA          REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 1. Ownyr Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ. 07101
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 4. Owner's Certificate of Authorization (if Required) NIA
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17, 1998
: 9. Inspection Interval from February 27. 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
An inservice examination (ISI) of selected Class 1, Class 2 and Class 3 components of Public Service Electric and Gas Company's (PSE&G) Salem Generating Station, Unit 1, was performed by Public Service Electric & Gas* (PSE&G), Magnaflux Quality Services (MQS),
Southwest Research Institute (SwRI), Virginia Corporation of Richmond (VCR) and AEA Technology Engineering Services (AEA) personnel during the April 1995 - April 1998.
These examinations constituted the twelfth (2nd Period, 3rd Outage) at Salem 1 during the Second 10-year Inspection Interval of operation.
Exams were performed in accordance with the 1983 Edition through Summer 1983 Addenda of ASME Section XI and the Salem Inservice Inspection Program Long Term Plan.
ISI was performed utilizing visual (VT), magnetic particle (MT), liquid penetrant (PT),
manual ultrasonic (UT), mechanized ultrasonic (M-UT) and radiography (RT) nondestructive examination techniques.
This report also contains augmented examinations required by the Salem Technical Specifications, Regulatory Guides, Circulars and Bulletins issued by the United States Nuclear Regulatory Commission.
This report also contains augmented examinations required by the Salem Technical Specifications, Regulatory Guides, Circulars and Bulletins issued by the United States Nuclear Regulatory Commission.
Page 2
Page   2
..
 
NIS-1 OWNER'RATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
  ~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ, 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r  Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ, 07101
NIA 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from February 27, 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038
11.1 MQS, SwRI and VCR under the direction of the PSE&G ISI Group, conducted 13 manual ultrasonic, five liquid penetrant and two magnetic particle examinations.
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 4. Owner's Certificate of Authorization (if Required) NIA
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 9. Inspection Interval from February 27, 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.1   MQS, SwRI and VCR under the direction of the PSE&G ISI Group, conducted 13 manual ultrasonic, five liquid penetrant and two magnetic particle examinations.
There were no unacceptable indications identified.
There were no unacceptable indications identified.
Class 1 => Vessels => Steam Generator  
Class 1
=> Piping => Reactor Coolant => Safety Injection  
                    => Vessels
=> Residual Heat Removal Class 2 => Vessels => Steam Generator  
                        => Steam Generator
=> Piping => Boiler Feed => Main Steam => Chemical Volume Control Page 3
                    => Piping
. ,.
                        => Reactor Coolant
NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
                        => Safety Injection
Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
                        => Residual Heat Removal Class 2
N/ A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
                    => Vessels
11.2 ISI Section XI Visual examinations on valves and bolting PSE&G's ISI Group conducted eight Class 1 bolting exams and one Class 1 valve internal exam. ISI Section XI examinations were conducted on the following systems: => Safety Injection  
                        => Steam Generator
=> Residual Heat Removal The following was identified during the course of these examinations:
                    => Piping
Valve 1RH26 (WinISI Sum# 193800) had a visual VT-3 internal examination, which revealed seating surface wear. The valve interior was resurfaced and an acceptable post rework VT-3 valve internal examination was performed.
                        => Boiler Feed
An additional sample was not required, since the valve is the only one identified in that valve group. There were no other unacceptable indications identified.  
                        => Main Steam
: 11. 3 ISl Section XI Visual examination of components supports PSE&G conducted four Class 1, 2 & 3 component support visual VT-3 and VT-3/ 4 examinations.
                        => Chemical Volume Control Page   3
ISI Section XI examinations were conducted on the following systems: => Main Steam => Safety Injection  
 
=> Reactor Coolant => Chemical and Volume Control There were no unacceptable indications identified.
    ~ORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Page 4
: 1. Own~r    Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
. -
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
NIS-1 OWNER'AATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ. 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 4. Owner's Certificate of Authorization (if Required) N/ A
NIA 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
11.4 ISI Section XI System Leakage Examinations PSE&G' s ISI Group conducted four System Pressure Tests during a System Functional or Inservice Test, on Nuclear Class 1, 2 and 3, in accordance with ASME Section XL A system Leakage exam was performed in accordance with ASME Section XI on all Class 1 Systems. The system leakage test was performed with the Reactor Coolant System in Mode 3 (normal operating temperature and pressure) with the insulation installed.
: 7. Components inspected (see page 1)
No pressure boundary leakage was detected.
: 8. Exam Dates March 7. 1995 to March 17. 1998
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.2   ISI Section XI Visual examinations on valves and bolting PSE&G's ISI Group conducted eight Class 1 bolting exams and one Class 1 valve internal exam.
ISI Section XI examinations were conducted on the following systems:
                => Safety Injection
                => Residual Heat Removal The following was identified during the course of these examinations:
Valve 1RH26 (WinISI Sum# 193800) had a visual VT-3 internal examination, which revealed seating surface wear. The valve interior was resurfaced and an acceptable post rework VT-3 valve internal examination was performed. An additional sample was not required, since the valve is the only one identified in that valve group.
There were no other unacceptable indications identified.
: 11. 3   ISl Section XI Visual examination of components supports PSE&G conducted four Class 1, 2 & 3 component support visual VT-3 and VT-3/4 examinations.
ISI Section XI examinations were conducted on the following systems:
                => Main Steam
                => Safety Injection
                => Reactor Coolant
                => Chemical and Volume Control There were no unacceptable indications identified.
Page     4
 
  ~ORM NIS-1 OWNER'AATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 1. Own~r    Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ. 07101
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 4. Owner's Certificate of Authorization (if Required) NIA
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 9. Inspection Interval from February 27. 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.4   ISI Section XI System Leakage Examinations PSE&G' s ISI Group conducted four System Pressure Tests during a System Functional or Inservice Test, on Nuclear Class 1, 2 and 3, in accordance with ASME Section XL A system Leakage exam was performed in accordance with ASME Section XI on all Class 1 Systems. The system leakage test was performed with the Reactor Coolant System in Mode 3 (normal operating temperature and pressure) with the insulation installed. No pressure boundary leakage was detected.
Work requests were initiated to correct minor mechanical leakage that was not corrected during the system walkdowns.
Work requests were initiated to correct minor mechanical leakage that was not corrected during the system walkdowns.
Class 2 and 3 System Pressure Tests were conducted on the following systems: :::::> Auxiliary Feedwater  
Class 2 and 3 System Pressure Tests were conducted on the following systems:
:::::> Sampling 11.5 RCP Flywheel Augmented Examinations per USNRC Regulatory Guide 1.14 SwRI under the direction of the ISI Group performed a Ten year exam (with the Flywheels removed from the motors) on all Salem Unit 1 & 2's RCP Flywheels at the Westinghouse Cheswick, PA facility as identified below by the Flywheel serial number: 2S-76P917 3S-75P790 4S-75P790 3S-76P917 1S-88P318 2S-75P790 1S-75P790 1S-D003 1S-76P917 There were no unacceptable indications identified.
:::::> Auxiliary Feedwater
Page 5
:::::> Sampling 11.5   RCP Flywheel Augmented Examinations per USNRC Regulatory Guide 1.14 SwRI under the direction of the ISI Group performed a Ten year exam (with the Flywheels removed from the motors) on all Salem Unit 1 & 2's RCP Flywheels at the Westinghouse Cheswick, PA facility as identified below by the Flywheel serial number:
. '
2S-76P917         3S-76P917    1S-75P790 3S-75P790          1S-88P318   1S-D003 4S-75P790         2S-75P790   1S-76P917 There were no unacceptable indications identified.
NIS-1 OWNER'"ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
Page   5
Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
 
NI A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from Februar:y  
  ~ORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 1. Own~r Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101
11.6 NRC Bulletin 88-08 "Thermal Stresses in Piping Connected to the Reactor Coolant System" Augmented Examinations VCR under the direction of PSE&G's ISi Group performed augmented ultrasonic and dye penetrant examinations on a total of 20 components, broken down as follows: => 15 -1.5 inch Safety Injection piping welds => Two -2 inch Chemical and Volume Control piping welds => Two -3 inch Chemical and Volume Control piping welds There are no unacceptable indications identified.
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge. NJ 08038
11.7 Augmented Exams per Branch Technical Position MEB 3-1 30 welds were volumetrically examined, to comply with the augmented requirements of NUREG 0800 Standard Review Plan, Section 3.6.2, Branch Technical Position MEB 3-1. The UT was performed by VCR with no unacceptable indications identified.  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 11. 8 NRC Bulletin 88-11 "Pressurizer Surge Line Thermal Stratification" Augmented Examinations PSE&G's ISi Group performed visual examinations on all existing surge line pipe supports I HEBA restraints and their associated insulation interfaces.
: 4. Owner's Certificate of Authorization (if Required) NI A
A total of ten supports were examined.
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 9. Inspection Interval from Februar:y 27. 1988 to July 7. 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.6   NRC Bulletin 88-08 "Thermal Stresses in Piping Connected to the Reactor Coolant System" Augmented Examinations VCR under the direction of PSE&G's ISi Group performed augmented ultrasonic and dye penetrant examinations on a total of 20 components, broken down as follows:
              => 15 - 1.5 inch Safety Injection piping welds
              => Two - 2 inch Chemical and Volume Control piping welds
              => Two - 3 inch Chemical and Volume Control piping welds There are no unacceptable indications identified.
11.7   Augmented Exams per Branch Technical Position MEB 3-1 30 welds were volumetrically examined, to comply with the augmented requirements of NUREG 0800 Standard Review Plan, Section 3.6.2, Branch Technical Position MEB 3-1.
The UT was performed by VCR with no unacceptable indications identified.
: 11. 8   NRC Bulletin 88-11 "Pressurizer Surge Line Thermal Stratification" Augmented Examinations PSE&G's ISi Group performed visual examinations on all existing surge line pipe supports I HEBA restraints and their associated insulation interfaces. A total of ten supports were examined.
There were no unacceptable indications identified.
There were no unacceptable indications identified.
Page 6
Page   6


NIS-1 REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r    Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
NI A 5. Commercial Service Date 07/01177 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
11.9 Augmented System Leakage tests per NUREG 0578 "TMI Lessons Learned" PSE&G's ISI Group conducted 27 System Leakage Tests in accordance with NUREG 0578 on the following systems: Safety Injection Chemical and Volume Control Sampling Waste Gas Residual Heat Removal Containment Spray Liquid Radwaste Waste Liquid There were no unacceptable indications identified.
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
11.10 PSE&G's Supplemental Ultrasonic Examinations on the old Steam Generator Feedwater Nozzle to Forging Expanders AEA ultrasonically examined the four Steam Generator Feedwater Nozzle inner radius and the barrel of the nozzle including the Feedwater thermal sleeves. There were no unacceptable indications identified.
: 4. Owner's Certificate of Authorization (if Required) NI A
11.11 PSE&G Augmented Visual Examinations on the Reactor Coolant Pump Main Flange connection (R/T# 290049) PSE&G's ISI Group performed a visual examination of the Reactor Coolant Pumps Main Flange connection for evidence of leakage in accordance with R/T# 290049. Each of the four RCP' s showed evidence of RCS leakage (dried boron on the main flange connection area and the bolting).
: 5. Commercial Service Date 07/01177 6. National Board Number for Unit 20757
All the RCP main flange studs were removed, several at a time, and visually VT-1 examined for damage and reinstalled and re-torqued.
: 7. Components inspected (see page 1)
Several studs were found with unacceptable conditions and were replaced as required (See the following preservice examination descriptions for specific details) Page 7
: 8. Exam Dates March 7. 1995 to March 17. 1998
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.9   Augmented System Leakage tests per NUREG 0578 "TMI Lessons Learned" PSE&G's ISI Group conducted 27 System Leakage Tests in accordance with NUREG 0578 on the following systems:
Safety Injection                   Residual Heat Removal Chemical and Volume Control         Containment Spray Sampling                            Liquid Radwaste Waste Gas                          Waste Liquid There were no unacceptable indications identified.
11.10 PSE&G's Supplemental Ultrasonic Examinations on the old Steam Generator Feedwater Nozzle to Forging Expanders AEA ultrasonically examined the four Steam Generator Feedwater Nozzle inner radius and the barrel of the nozzle including the Feedwater thermal sleeves.
There were no unacceptable indications identified.
11.11 PSE&G Augmented Visual Examinations on the Reactor Coolant Pump Main Flange connection (R/T# 290049)
PSE&G's ISI Group performed a visual examination of the Reactor Coolant Pumps Main Flange connection for evidence of leakage in accordance with R/T# 290049.
Each of the four RCP' s showed evidence of RCS leakage (dried boron on the main flange connection area and the bolting). All the RCP main flange studs were removed, several at a time, and visually VT-1 examined for damage and reinstalled and re-torqued. Several studs were found with unacceptable conditions and were replaced as required (See the following preservice examination descriptions for specific details)
Page   7


NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
~ORM  NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
NI A 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
11.12 Preservice Examinations on Various Bolting Material Replacements Several bolted connections were replaced as identified below: ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION  
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
: 1. NIA S-93-036 920804179 Valve lPRl Bonnet Bolting 2. NIA S-94-048 950527023 Valve 1PR4 Flange Bolting 3. NIA S-94-052 940425148 Valve 1PR5 Flange Bolting 4. NIA S-94-051 940425145 Valve 1PR3 Flange Bolting 5. NIA S-94-073 940520130 Valve 1PR3 Flange Bolting 6. NIA S-95-288 950325019 Valve 13MS167 7. NIA S-95-287 950325019 Valve 1CV78 8. NIA S-95-254 950527006 Valve 1CV80 9. NIA S-95-180 950505099 Valve 1CV75 10. NIA S-95-176 950520006 Valve 1SJ150 11. NIA S-95-026 941112125 Valve 1CV75 12. NIA S-96-072 950811370 13 RCP Main Flange 13. NIA S-96-071 950811362 11 RCP Main Flange 14. NIA S-96-062 950811372 14 RCP Main Flange 15. NIA S-96-059 950811368 12 RCP Main Flange 16. NIA S-97-031 960921041 Valve 14MS167 17. NIA S-97-077 960921040 Valve 12MS167 18. NIA S-97-232 950527035 Valve 1PR3 Inlet Flange 19. NIA S-97-233 951104046 Valve 1PR4 Inlet Flange 20. NIA S-97-234 950608024 Valve 1PR5 Inlet Flange 21. NIA S-97-263 971107115 Valve 2PS25 22. NIA NIA NIA Valve 1PR3, 4, & 5 (P.O.# P3-0933105-0630)  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 23. NIA S-97-263 971107115 Valve 2PS25 The applicable (PSI) examinations were performed with no unacceptable indications identified.
: 4. Owner's Certificate of Authorization (if Required) NI A
Page 8
: 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7. 1995 to March 17. 1998
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.12 Preservice Examinations on Various Bolting Material Replacements Several bolted connections were replaced as identified below:
ITEM     PSE&G       PSE&G       PSE&G             COMPONENT NO.       DCPNO.       CJPNO.       W.0.#             DESCRIPTION
: 1.     NIA         S-93-036     920804179         Valve lPRl Bonnet Bolting
: 2.     NIA         S-94-048     950527023         Valve 1PR4 Flange Bolting
: 3.     NIA         S-94-052     940425148         Valve 1PR5 Flange Bolting
: 4.     NIA         S-94-051     940425145         Valve 1PR3 Flange Bolting
: 5.     NIA         S-94-073     940520130         Valve 1PR3 Flange Bolting
: 6.     NIA         S-95-288     950325019         Valve 13MS167
: 7.     NIA         S-95-287     950325019         Valve 1CV78
: 8.     NIA         S-95-254     950527006         Valve 1CV80
: 9.     NIA         S-95-180     950505099         Valve 1CV75
: 10. NIA         S-95-176     950520006         Valve 1SJ150
: 11.     NIA         S-95-026     941112125         Valve 1CV75
: 12.     NIA         S-96-072     950811370         13 RCP Main Flange
: 13.     NIA         S-96-071     950811362         11 RCP Main Flange
: 14.     NIA         S-96-062     950811372         14 RCP Main Flange
: 15.     NIA         S-96-059     950811368         12 RCP Main Flange
: 16.     NIA         S-97-031     960921041         Valve 14MS167
: 17.     NIA         S-97-077     960921040         Valve 12MS167
: 18.     NIA         S-97-232     950527035         Valve 1PR3 Inlet Flange
: 19. NIA         S-97-233     951104046         Valve 1PR4 Inlet Flange
: 20.     NIA         S-97-234     950608024         Valve 1PR5 Inlet Flange
: 21.     NIA         S-97-263     971107115         Valve 2PS25
: 22.     NIA         NIA         NIA               Valve 1PR3, 4, & 5 (P.O.# P3-0933105-0630)
: 23. NIA         S-97-263     971107115         Valve 2PS25 The applicable (PSI) examinations were performed with no unacceptable indications identified.
Page   8


NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUJRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
~ORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUJRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ, 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038 3. Piant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r    Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ, 07101
NIA 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038
11.13 Preservice Examinations on Various Component Supports and their Associated Integral Attachments due to Repair/Replacement/Modifications Several component supports and their associated integral attachments were repaired/replaced or modified as identified below: ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION  
: 3. Piant Unit Unit 1 (Facility Operating License DPR-70)
: 1. lEC-3323-2 PS-94-036 940811077 MSWG-30 2. lEC-3323-3 PS-95-033 950913228 Sl-SWPG-49  
: 4. Owner's Certificate of Authorization (if Required) NIA
: 3. lEC-3396-4 PS-95-070 951114131 Various Aux. Feedwater supports 4. lEC-3412-1 PS-95-037 950823379 Various PZR Relief supports 5. NIA S-95-210 950809300 MSWG-36A 6. NIA S-95-171 950803107 MSWG-25 7. lEC-3396-1 PS-95-028 950606218 Various SJ, RHR, & CS supports 8. NIA S-95-105 950519222 13-FWLS-11  
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 9. NIA S-95-040 950215277 lM-SWPS-029  
: 7. Components inspected (see page 1)
: 10. lEE-0102 PS-95-012 950206127 lC-PRH-155  
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 11. lEC-3322-1 PS-95-033 940811073 Various Service Water supports 12. lEC-3323-1 PS-94-035 950914127 Various Service Water supports 13. lEC-3404-1 PS-95-010 950206095 1-PRG-2552  
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 14. lEC-3322-4 PS-95-035 940811075 Various Service Water supports 15. lEC-3322-2 PS-94-034 940811076 Various Service Water supports 16. lEC-3323-3 PS-95-032 950913288 Various Service Water supports 17. lEC-3323-3 PS-95-050 950914129 Various Service Water supports 18. lEC-3476-1 PS-95-078 951001130 1C-13SIH-136  
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
& lC-llSIA-39  
: 11. Abstract of Examinations:
: 19. lEE-0282-1 PS-96-142 960523251 Various Service Water supports 20. lEC-3525-1 PS-96-001 951212220 Various CVCS supports 21. lEC-3668-8 PS-97-070 970318111 lP-1 lSWG-005 & lP-1 lSWS-2 22. lEC-3668-9 PS-97-071 970318121 Various Service Water supports Page 9
11.13 Preservice Examinations on Various Component Supports and their Associated Integral Attachments due to Repair/Replacement/Modifications Several component supports and their associated integral attachments were repaired/replaced or modified as identified below:
...
ITEM PSE&G             PSE&G         PSE&G         COMPONENT NO.     DCPNO.       CJPNO.       W.0.#         DESCRIPTION
NIS-1 REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. Ownyr Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. lEC-3323-2   PS-94-036 940811077         MSWG-30
NI A 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. lEC-3323-3   PS-95-033 950913228         Sl-SWPG-49
ITEM PSE&G PSE&G PSE&G NO. DCP NO. CJP NO. W.0.# 23. lEC-3668-3 PS-97-085 970318099
: 3. lEC-3396-4   PS-95-070 951114131         Various Aux. Feedwater supports
: 24. lE0-2600-1 PS-97-039 961011186
: 4. lEC-3412-1   PS-95-037 950823379         Various PZR Relief supports
: 25. lEC-3668-4 PS-97-090 970318103
: 5. NIA           S-95-210     950809300     MSWG-36A
: 26. lEC-2668-15 PS-97-092 970318133
: 6. NIA           S-95-171     950803107     MSWG-25
: 27. lEC-3715-3 PS-97-125 970815174
: 7. lEC-3396-1   PS-95-028 950606218         Various SJ, RHR, & CS supports
: 28. lEC-3668-5 PS-97-091 970318104
: 8. NIA           S-95-105     950519222     13-FWLS-11
: 29. lEC-3668-3 PS-97-084 970318099
: 9. NIA           S-95-040     950215277     lM-SWPS-029
: 30. lEC-3715-2 PS-97-116 970818173
: 10. lEE-0102     PS-95-012     950206127     lC-PRH-155
: 31. lEC-3668-7 PS-97-129 970318108
: 11. lEC-3322-1   PS-95-033     940811073     Various Service Water supports
: 32. lEA-1240-1 PS-98-001 970620208
: 12. lEC-3323-1   PS-94-035     950914127     Various Service Water supports
: 33. lEA-1240-1 PS-98-002 970525116 970525067
: 13. lEC-3404-1   PS-95-010     950206095     1-PRG-2552
: 34. lEA-1240-1 PS-98-003 970526071 970526068
: 14. lEC-3322-4   PS-95-035     940811075     Various Service Water supports
: 35. lEC-3343-1 PS-97-049 950218096 PS-97-050 950609102 PS-97-051 PS-97-052
: 15. lEC-3322-2   PS-94-034     940811076     Various Service Water supports
: 36. NIA S-94-074 940426177
: 16. lEC-3323-3   PS-95-032     950913288     Various Service Water supports
: 37. NIA S-94-049 940413245
: 17. lEC-3323-3   PS-95-050     950914129     Various Service Water supports
: 18. lEC-3476-1   PS-95-078     951001130     1C-13SIH-136 & lC-llSIA-39
: 19. lEE-0282-1   PS-96-142     960523251     Various Service Water supports
: 20. lEC-3525-1   PS-96-001     951212220     Various CVCS supports
: 21. lEC-3668-8   PS-97-070     970318111     lP-1 lSWG-005 & lP-1 lSWS-2
: 22. lEC-3668-9   PS-97-071     970318121     Various Service Water supports Page     9


940424126
    ~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 38. NIA S-97-224 970811072
: 1. Ownyr Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
: 39. NIA S-95-161 950523016
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
: 40. NIA S-95-220 950523016
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 41. NIA S-95-157 950523016
: 4. Owner's Certificate of Authorization (if Required) NI A
: 42. NIA S-95-159 950523016
: 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
: 43. NIA S-95-248 950523016
: 7. Components inspected (see page 1)
: 44. NIA S-95-221 950523016 Page 10 COMPONENT DESCRIPTION Various SW (CFCU) supports lCCH-8 Various SW (CFCU) supports 1C-13SWG-3A  
: 8. Exam Dates March 7. 1995 to March 17. 1998
& 3B Various CVCS supports Various SW (CFCU) supports Various SW (CFCU) supports Various CS supports Various SW (CFCU) supports FWH-14-24 FWG-11-3065  
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
& FWG-12-3066 Various SIG Feedwater supports SIG platform to SIG lower vertical support attachment welds 1A-CVCH-408A and 1A-CVCH-407A lC-PRH-145 and lC-PRH-149 1PRSN29 lC-PRSN-401 lC-CC-SNOOl lA-CC-SNlOOB 1C-CVCSN900 lC-SISN-501 lC-PRSN-023
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
ITEM PSE&G            PSE&G        PSE&G        COMPONENT NO.      DCP NO.      CJP NO.      W.0.#        DESCRIPTION
: 23. lEC-3668-3    PS-97-085    970318099    Various SW (CFCU) supports
: 24. lE0-2600-1    PS-97-039    961011186    lCCH-8
: 25. lEC-3668-4    PS-97-090    970318103    Various SW (CFCU) supports
: 26. lEC-2668-15  PS-97-092    970318133    1C-13SWG-3A & 3B
: 27. lEC-3715-3    PS-97-125    970815174    Various CVCS supports
: 28. lEC-3668-5    PS-97-091    970318104    Various SW (CFCU) supports
: 29. lEC-3668-3    PS-97-084    970318099    Various SW (CFCU) supports
: 30. lEC-3715-2    PS-97-116    970818173    Various CS supports
: 31. lEC-3668-7    PS-97-129    970318108    Various SW (CFCU) supports
: 32. lEA-1240-1    PS-98-001    970620208    FWH-14-24
: 33. lEA-1240-1    PS-98-002    970525116    FWG-11-3065 &
970525067    FWG-12-3066
: 34. lEA-1240-1    PS-98-003    970526071    Various SIG Feedwater 970526068    supports
: 35. lEC-3343-1    PS-97-049    950218096    SIG platform to SIG lower PS-97-050    950609102    vertical support attachment welds PS-97-051 PS-97-052
: 36. NIA          S-94-074    940426177    1A-CVCH-408A and 1A-CVCH-407A
: 37. NIA          S-94-049    940413245    lC-PRH-145 and 940424126    lC-PRH-149
: 38. NIA          S-97-224    970811072    1PRSN29
: 39. NIA          S-95-161    950523016    lC-PRSN-401
: 40. NIA          S-95-220    950523016    lC-CC-SNOOl
: 41. NIA          S-95-157    950523016    lA-CC-SNlOOB
: 42. NIA          S-95-159    950523016    1C-CVCSN900
: 43. NIA          S-95-248    950523016    lC-SISN-501
: 44. NIA          S-95-221    950523016    lC-PRSN-023 Page  10


NIS-1 REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r    Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ. 07101
NI A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
11.14 ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCP NO. CJP NO. W.0.# DESCRIPTION  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 45. NIA 46. NIA 47. NIA 48. NIA S-95-158 S-97-239 S-95-160 S-95-195 950523016 950815548 950523016 950523016 lA-SISN-lOlA lC-SISN-500 1A-MSASN-147A lA-MSASN-147 A The applicable (PSI) examinations were performed with no unacceptable indications identified.
: 4. Owner's Certificate of Authorization (if Required) NI A
Preservice Examinations on Various Piping welds due to Repair/Replacement/Modifications Several piping welds were repaired/replaced or modified as identified below: ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION  
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 1. NIA S-95-292 931002072 l 1SJ139 associated piping welds 2. NIA S-95-349 950623083 11 RHR Pump piping replacement  
: 7. Components inspected (see page 1)
: 3. lEE-0152-1 PS-95-093 951120163 Valve 1CV55 replacement welds 4. lEC-3530 PS-96-029 960116178 Safety Injection System orifice addition, socket welds 5. NIA S-96-084 960111096 Valve 13SJ143 replacement welds 6. NIA S-96-398 960506124 Valve 1 lRHlO replacement welds 7. lEC-3525-1 PS-96-001 951212220 Valves 1CV63 & 1CV141 relocation associated welds Page 11
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
ITEM PSE&G             PSE&G         PSE&G         COMPONENT NO. DCP NO.           CJP NO. W.0.#               DESCRIPTION
: 45. NIA           S-95-158     950523016    lA-SISN-lOlA
: 46. NIA          S-97-239     950815548    lC-SISN-500
: 47. NIA          S-95-160     950523016    1A-MSASN-147A
: 48. NIA          S-95-195     950523016     lA-MSASN-147A The applicable (PSI) examinations were performed with no unacceptable indications identified.
11.14 Preservice Examinations on Various Piping welds due to Repair/Replacement/Modifications Several piping welds were repaired/replaced or modified as identified below:
ITEM PSE&G             PSE&G         PSE&G         COMPONENT NO. DCPNO.             CJPNO.       W.0.#         DESCRIPTION
: 1. NIA           S-95-292     931002072     l 1SJ139 associated piping welds
: 2. NIA           S-95-349     950623083     11 RHR Pump piping replacement
: 3.     lEE-0152-1   PS-95-093     951120163     Valve 1CV55 replacement welds
: 4.     lEC-3530     PS-96-029 960116178         Safety Injection System orifice addition, socket welds
: 5. NIA           S-96-084     960111096     Valve 13SJ143 replacement welds
: 6. NIA           S-96-398     960506124     Valve 1lRHlO replacement welds
: 7.     lEC-3525-1   PS-96-001     951212220     Valves 1CV63 & 1CV141 relocation associated welds Page   11


NIS-1 OWNER'RATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza, Newark, NJ, 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza, Newark, NJ, 07101
NI A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17, 1998 9. Inspection Interval from February 27, 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
ITEM PSE&G NO. DCPNO. PSE&G CJPNO. PSE&G W.0.# 8. 9. NIA S-96-049 951004102 lEC-3530-2 PS-97-029 970623168 COMPONENT DESCRIPTION Valve 1CV137 associated welds Safety Injection System orifice addition, socket welds near valves 11-14SJ16 The applicable (PSI) examinations were performed with no unacceptable indications identified.
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
11.15 Preservice Examinations per, DCP# MM-97-099, CJP# S-97-156, Work Order# 970613277 Replacement of the 11 Charging Pump Casing (1 CVE20). The applicable (PSI) examinations were performed with no unacceptable indications identified.
: 4. Owner's Certificate of Authorization (if Required) NI A
11.16 Preservice Examinations per, CJP# S-97-257, Work Order# 971108157 Weld repairs to the 100' personnel airlock door seal knife edges. The (PSI) examinations were performed with no unacceptable indications identified.
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17, 1998
: 9. Inspection Interval from February 27, 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
ITEM PSE&G             PSE&G        PSE&G          COMPONENT NO.     DCPNO.         CJPNO.       W.0.#           DESCRIPTION
: 8. NIA           S-96-049       951004102     Valve 1CV137 associated welds
: 9.      lEC-3530-2   PS-97-029     970623168     Safety Injection System orifice addition, socket welds near valves 11-14SJ16 The applicable (PSI) examinations were performed with no unacceptable indications identified.
11.15 Preservice Examinations per, DCP# MM-97-099, CJP# S-97-156, Work Order#
970613277 Replacement of the 11 Charging Pump Casing (1 CVE20).
The applicable (PSI) examinations were performed with no unacceptable indications identified.
11.16 Preservice Examinations per, CJP# S-97-257, Work Order# 971108157 Weld repairs to the 100' personnel airlock door seal knife edges.
The (PSI) examinations were performed with no unacceptable indications identified.
11.17 Preservice Examinations per, Work Order# 971129120 The 100' personnel airlock inside and outside door (inner and outer) rubber 0-ring seal replacement.
11.17 Preservice Examinations per, Work Order# 971129120 The 100' personnel airlock inside and outside door (inner and outer) rubber 0-ring seal replacement.
The (PSI) examinations were performed with no unacceptable indications identified.
The (PSI) examinations were performed with no unacceptable indications identified.
Page 12   
Page     12
 
~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 1. Owner Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 4. Owner's Certificate of Authorization (if Required) N/ A
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17, 1998
: 9. Inspection Interval from February 27, 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
11.18 Preservice Examinations on four Replacement Steam Generators and their Associated Feedwater, Main Steam and Reactor Coolant piping welds and component supports I integral attachments The Steam Generator Vessel welds, Steam Generator Primary Manway bolting, Reactor Coolant, Feedwater, and Main Steam piping welds and their associated component supports/integral attachments were replaced/repaired and/or modified as identified below:
ITEM PSE&G            PSE&G          REPAIR/REPLACEMENT/
NO.      DCPNO.        P.O. NO ..      MODIFICATION DESCRIPTION
: 1.      NIA          P3-0879959      #11 - 14 Steam Generator (S/G) vessel welds were preservice (PSI) examined at the Sea Brook Facility by SwRI after the construction hydro was satisfactorily completed.
: 2.      EWP#              NIA        #11 - 14 new Steam Generators Primary SLM-MOD-04                    Manway bolts were replaced with studs and nuts.
: 3.      EWP#              NIA        #11 - 14 new Steam Generator Reactor SLM-MOD-07                    Coolant hot and cold leg tie in welds.
: 4.        lEA-1240-11      NIA        #11 SIG Feedwater piping and component support/integral attachment modifications.
: 5.        lEA-1240-12      NIA        #12 SIG Feedwater piping and component support/integral attachment modifications.
: 6.        lEA-1240-13        NIA        #13 SIG Feedwater piping and component support/integral attachment modifications.
: 7.        lEA-1240-14      NIA        #14 SIG Feedwater piping and component support/integral attachment modifications.
: 8.        lEA-1241-11      NIA        #11 SIG Main Steam piping and component support/integral attachment modifications.
Page 13


NIS-1 REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1. Owner Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICElsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
N/ A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17, 1998 9. Inspection Interval from February 27, 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 1. Own~r    Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
11.18 Preservice Examinations on four Replacement Steam Generators and their Associated Feedwater, Main Steam and Reactor Coolant piping welds and component supports I integral attachments The Steam Generator Vessel welds, Steam Generator Primary Manway bolting, Reactor Coolant, Feedwater, and Main Steam piping welds and their associated component supports/integral attachments were replaced/repaired and/or modified as identified below: ITEM PSE&G PSE&G REPAIR/REPLACEMENT/
: 2. Plant Salein Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
NO. DCPNO. P.O. NO .. MODIFICATION DESCRIPTION  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 1. NIA P3-0879959
: 4. Owner's Certificate of Authorization (if Required) NI A
#11 -14 Steam Generator (S/G) vessel welds were preservice (PSI) examined at the Sea Brook Facility by SwRI after the construction hydro was satisfactorily completed.
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 2. EWP# NIA #11 -14 new Steam Generators Primary SLM-MOD-04 Manway bolts were replaced with studs and nuts. 3. EWP# NIA #11 -14 new Steam Generator Reactor SLM-MOD-07 Coolant hot and cold leg tie in welds. 4. lEA-1240-11 NIA #11 SIG Feedwater piping and component support/integral attachment modifications.
: 7. Components inspected (see page 1)
: 5. lEA-1240-12 NIA #12 SIG Feedwater piping and component support/integral attachment modifications.  
: 8. Exam Dates March 7. 1995 to March 17. 1998
: 6. lEA-1240-13 NIA #13 SIG Feedwater piping and component support/integral attachment modifications.  
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
: 7. lEA-1240-14 NIA #14 SIG Feedwater piping and component support/integral attachment modifications.  
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 8. lEA-1241-11 NIA #11 SIG Main Steam piping and component support/integral attachment modifications.
: 11. Abstract of Examinations:
Page 13  
ITEM PSE&G               PSE&G         REPAIR/REPLACEMENT/
NO. DCPNO.               P.O. NO .. MODIFICATION DESCRIPTION
: 9.       lEA-1241-12         NIA       #12 SIG Main Steam piping and component support/integral attachment modifications.
: 10.     lEA-1241-13         NIA       #13 SIG Main Steam piping and component support/integral attachment modifications.
: 11.     lEA-1241-14         NIA       #14 SIG Main Steam piping and component support/integral attachment modifications.
: 12.     EWP# SLM-01        NIA       #11 - 14 new Steam Generator Lower Vertical support modifications SwRI found a rejectable PSI indication on the #14 Steam Generator (S/N 2172)
Transition Cone to Shell C weld. The rejectable indication was located at the inside surface, approximately 301 inches clock wise from ISI vessel zero. The rejectable indication was reduced in size by mechanical blending to within acceptable limits.
There were no other unacceptable indications identified.
Page  14


NIS-1 OWNER'RATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
  .FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101 2. Plant Salein Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 1. Own~r    Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101
NI A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7. 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
ITEM PSE&G PSE&G REPAIR/REPLACEMENT/
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
NO. DCPNO. P.O. NO .. MODIFICATION DESCRIPTION
: 4. Owner's Certificate of Authorization (if Required) NI A
: 9. lEA-1241-12 NIA #12 SIG Main Steam piping and component support/integral attachment modifications.
: 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
: 10. lEA-1241-13 NIA #13 SIG Main Steam piping and component support/integral attachment modifications.
: 7. Components inspected (see page 1)
: 11. lEA-1241-14 NIA #14 SIG Main Steam piping and component support/integral attachment modifications.
: 8. Exam Dates March 7, 1995 to March 17. 1998
: 12. EWP# SLM-01 NIA #11 -14 new Steam Generator Lower Vertical support modifications SwRI found a rejectable PSI indication on the #14 Steam Generator (S/N 2172) Transition Cone to Shell C weld. The rejectable indication was located at the inside surface, approximately 301 inches clock wise from ISI vessel zero. The rejectable indication was reduced in size by mechanical blending to within acceptable limits. There were no other unacceptable indications identified.
: 9. Inspection Interval from February 27. 1988 to July 7. 2001
Page 14 
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
. -.FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
: 11. Abstract of Examinations:
Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101 2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
NI A 5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17. 1998 9. Inspection Interval from February 27. 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
11.19 Erosion/Corrosion UT Thickness Program In response to NRC Bulletin 87-01 and Engineering Directive MEC-94-1071, 130 components were scheduled for UT thickness examinations The following Components were replaced, due to the results of the erosion/corrosion UT examinations performed.
11.19 Erosion/Corrosion UT Thickness Program In response to NRC Bulletin 87-01 and Engineering Directive MEC-94-1071, 130 components were scheduled for UT thickness examinations The following Components were replaced, due to the results of the erosion/corrosion UT examinations performed.
ITEM COMPONENT COMPONENT NO. SYSTEM ID DESCRIPTION  
ITEM                                 COMPONENT               COMPONENT NO.       SYSTEM                     ID                     DESCRIPTION
: 1. Heater Drain A3 18" Orifice 2. Heater Drain A29 18" X 16" X 12" Tee 3. MSR (Reheat Drains) Cl7 3" Tee 4. MSR (Reheat Drains) C18 3" Tee 5. MSR (Reheat Drains) C20 3" Tee 6. MSR (Reheat Drains) C30 3" Tee 7. Misc. Drains H9 3" Orifice 8. Condensate Ml 20" Orifice 9. Condensate M12 24" Elbow As a result of these repairs/replacements, and procedural requirements for readings less than 70 % of nominal wall, an examination expansion of 35 components was performed.
: 1.       Heater Drain               A3                     18" Orifice
This increased the total number of examinations to 165 components.
: 2.       Heater Drain               A29                     18" X 16" X 12" Tee
The following is a break down of these examinations.  
: 3.       MSR (Reheat Drains)         Cl7                     3" Tee
: a. Nine components were replaced.  
: 4.       MSR (Reheat Drains)         C18                     3" Tee
: b. 156 were acceptable for continued service, based on minimum wall design requirements  
: 5.       MSR (Reheat Drains)         C20                     3" Tee
: 6.       MSR (Reheat Drains)         C30                     3" Tee
: 7.       Misc. Drains               H9                     3" Orifice
: 8.       Condensate                 Ml                     20" Orifice
: 9.       Condensate                 M12                     24" Elbow As a result of these repairs/replacements, and procedural requirements for readings less than 70 % of nominal wall, an examination expansion of 35 components was performed. This increased the total number of examinations to 165 components. The following is a break down of these examinations.
: a. Nine components were replaced.
: b. 156 were acceptable for continued service, based on minimum wall design requirements
: c. No components required a weld build-up.
: c. No components required a weld build-up.
There were no other unacceptable indications identified.
There were no other unacceptable indications identified.
Page 15
Page   15
.FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
 
Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ, 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
.FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
NI A 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17, 1998 9. Inspection Interval from February 27, 1988 to July 7. 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 1. Own~r Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ, 07101
11.20 Technical Specification 4.7.9 (c) Functional Testing of Selected Hydraulic and Mechanical Snubbers HYDRAULIC SNUBBERS (FIRST TEST SAMPLE) Hydraulic snubbers were tested using the Technical Specification 4.7.9(c), 10% sample plan by Wyle Laboratories using the API in-place snubber test machine and the Wyle Laboratories model 150 snubber test machine as follows: => Two SIG 1,000 Kip Rexnords => One MSN 200 Kip Paul Monroe => One Lisega small hydraulic snubber All hydraulic snubbers tested satisfactorily, except for the one Lisega small snubber. MECHANICAL SNUBBERS (FIRST TEST SAMPLE) Mechanical snubbers were tested using the Technical Specification 4.7.9(c), 10% sample plan using the Wyle Laboratories model 150 snubber test machine as follows: => Two Mechanical large (PSA-35) => 11 mechanical medium (PSA-1, 3 and 10) => Four mechanical small (PSA-114 and 112) All mechanical snubbers tested satisfactorily, except for the two mechanical medium (PSA-1, 3 and 10) snubbers.
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
HYDRAULIC AND MECHANICAL EXPANDED SNUBBER TEST SAMPLES Due to Hydraulic and Mechanical snubbers test failures the following expanded snubber test samples were tested using the Wyle Laboratories model 150 snubber test machine. => Four snubbers (100% of the Lisega hydraulic snubbers)  
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
=> Two expanded samples totaling 22 mechanical medium (PSA-1, 3 and 10) PSE&G Engineering performed a stress evaluation on all failed snubber locations and concluded that the piping and components to which the snubbers were attached were not impaired due to in-operability of the snubbers.
: 4. Owner's Certificate of Authorization (if Required) NI A
Page 16
: 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
.. FORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES 1.
: 7. Components inspected (see page 1)
Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038 3. Plant Unit Unit 1 (Facility Operating License DPR-70) 4. Owner's Certificate of Authorization (if Required)
: 8. Exam Dates March 7, 1995 to March 17, 1998
NI A 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757 7. Components inspected (see page 1) 8. Exam Dates March 7, 1995 to March 17, 1998 9. Inspection Interval from February 27, 1988 to July 7, 2001 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda 11. Abstract of Examinations:
: 9. Inspection Interval from February 27, 1988 to July 7. 2001
STEAM GENERATOR REPLACEMENT, MSIV REFURBISHMENT  
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
& MISC. Six SIG snubbers were removed during the SIG replacement and were returned to their position, two SIG snubbers were retested satisfactorily, eight MSIV snubbers were removed for MSIV rebuild and were restored and one retested satisfactorily.
: 11. Abstract of Examinations:
11.20 Technical Specification 4.7.9 (c) Functional Testing of Selected Hydraulic and Mechanical Snubbers HYDRAULIC SNUBBERS (FIRST TEST SAMPLE)
Hydraulic snubbers were tested using the Technical Specification 4.7.9(c), 10%
sample plan by Wyle Laboratories using the API in-place snubber test machine and the Wyle Laboratories model 150 snubber test machine as follows:
            => Two SIG 1,000 Kip Rexnords
            => One MSN 200 Kip Paul Monroe
            => One Lisega small hydraulic snubber All hydraulic snubbers tested satisfactorily, except for the one Lisega small snubber.
MECHANICAL SNUBBERS (FIRST TEST SAMPLE)
Mechanical snubbers were tested using the Technical Specification 4.7.9(c), 10%
sample plan using the Wyle Laboratories model 150 snubber test machine as follows:
            => Two Mechanical large (PSA-35)
            => 11 mechanical medium (PSA-1, 3 and 10)
            => Four mechanical small (PSA-114 and 112)
All mechanical snubbers tested satisfactorily, except for the two mechanical medium (PSA-1, 3 and 10) snubbers.
HYDRAULIC AND MECHANICAL EXPANDED SNUBBER TEST SAMPLES Due to Hydraulic and Mechanical snubbers test failures the following expanded snubber test samples were tested using the Wyle Laboratories model 150 snubber test machine.
            => Four snubbers (100% of the Lisega hydraulic snubbers)
            => Two expanded samples totaling 22 mechanical medium (PSA-1, 3 and 10)
PSE&G Engineering performed a stress evaluation on all failed snubber locations and concluded that the piping and components to which the snubbers were attached were not impaired due to in-operability of the snubbers.
Page   16
 
FORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
: 1. Own~r Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101
: 2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
: 3. Plant Unit Unit 1 (Facility Operating License DPR-70)
: 4. Owner's Certificate of Authorization (if Required) NI A
: 5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
: 7. Components inspected (see page 1)
: 8. Exam Dates March 7, 1995 to March 17, 1998
: 9. Inspection Interval from February 27, 1988 to July 7, 2001
: 10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
: 11. Abstract of Examinations:
STEAM GENERATOR REPLACEMENT, MSIV REFURBISHMENT & MISC.
Six SIG snubbers were removed during the SIG replacement and were returned to their position, two SIG snubbers were retested satisfactorily, eight MSIV snubbers were removed for MSIV rebuild and were restored and one retested satisfactorily.
Five none Code pre-NF snubbers were found in the Turbine area and tested and were replaced with new snubbers.
Five none Code pre-NF snubbers were found in the Turbine area and tested and were replaced with new snubbers.
HYDRAULIC AND MECHANICAL SNUBBER EXTENDED OUTAGE SAMPLE Due to the extended outage greater than 18 months, the following hydraulic and mechanical snubbers were tested to comply with Technical Specification 4.7.9 (c) (10% sample): => One 1, 000 Kip Paul Monroe => One 1,000 Kip Rexnord => One 200 Kip Paul Monroe snubbers => One mechanical large (PSA-35) => 11 mechanical medium (PSA-1, 3 and 10) => 100% mechanical small (PSA-114 and 1/2) under a new random sample were previously tested satisfactorily.
HYDRAULIC AND MECHANICAL SNUBBER EXTENDED OUTAGE SAMPLE Due to the extended outage greater than 18 months, the following hydraulic and mechanical snubbers were tested to comply with Technical Specification 4.7.9 (c)
Thus, no additional testing was required.
(10% sample):
Page 17
              => One 1, 000 Kip Paul Monroe
* 11. Abstract of Examinations (see pages 2 -17) 12. ** Abstract of Conditions Notes (see pages 2-17) 13. Abstract of Corrective Measures Recommended and Taken (see pages 2-17) We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI. Certificate of Authorization No. (if applicable) 19 9J' Signed PSE&G, Owner CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Protection Mutual Insurance Company, DBA Factory Mutual Engineering Association, have inspected the components described in this Owner's Report during the period March 7, 1995 to March 17. 1998, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI. By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
              => One 1,000 Kip Rexnord
Commissions  
              => One 200 Kip Paul Monroe snubbers
/</l:T/CJ 20 National Board, State, Province and Endorsements 19 9'8 Page 18}}
              => One mechanical large (PSA-35)
              => 11 mechanical medium (PSA-1, 3 and 10)
              => 100% mechanical small (PSA-114 and 1/2) under a new random sample were previously tested satisfactorily. Thus, no additional testing was required.
Page   17
: 11. Abstract of Examinations (see pages 2 -17)
: 12.
* Abstract of Conditions Notes (see pages 2-17)
: 13. Abstract of Corrective Measures Recommended and Taken (see pages 2-17)
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.
Certificate of Authorization No. (if applicable)   ==A/'~/14=
Date~ 19 9J'             Signed PSE&G, Owner     By~~~~~~~~~~..=
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Protection Mutual Insurance Company, DBA Factory Mutual Engineering Association, have inspected the components described in this Owner's Report during the period March 7, 1995 to March 17. 1998, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions     /</l:T/CJ 20 National Board, State, Province and Endorsements nate=b=J=*=i..c...===;G~=*    19   9'8 Page 18}}

Latest revision as of 04:53, 3 February 2020

Form NIS-1 Owner'S Data Rept for ISIs as Required by Provisions of ASME Code Rules.
ML18106A721
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/17/1998
From:
Public Service Enterprise Group
To:
Shared Package
ML18106A720 List:
References
NUDOCS 9807220295
Download: ML18106A721 (18)


Text

~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICElsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2.
  • Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NIA
5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

Manufacturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No. Province No. Board No.

  1. 11 Steam Generator Westinghouse 2174 NIA NIA Tampa Div. P.O.

Box 19218 Tampa, FL 33616

  1. 12 Steam Generator " 2173 NIA NIA
  1. 13 Steam Generator " 2171 NIA NIA
  1. 14 Steam Generator " 2172 NIA NIA Reactor Coolant " NIA NIA NIA System Safety Injection United Engineers & NIA NIA NIA System Constructors (UE&C)

Residual Heat UE&C NIA NIA NIA Removal System Boiler Feed System UE&C NIA NIA NIA Main Steam System UE&C NIA NIA NIA Chemical Volume and UE&C NIA NIA NIA Control System Auxiliary Feedwater UE&C NIA NIA NIA System Containment Spray UE&C NIA NIA NIA System Service Water System UE&C NIA NIA NIA Component Cooling UE&C NIA NIA NIA System Sampling System UE&C NIA NIA NIA 9807220295 980713

---...,, Page 1 PDR Q ADOCK

. 05000272 I

____ PD~ __ I

ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES
1. Ownyr Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NIA
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17, 1998
9. Inspection Interval from February 27. 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

An inservice examination (ISI) of selected Class 1, Class 2 and Class 3 components of Public Service Electric and Gas Company's (PSE&G) Salem Generating Station, Unit 1, was performed by Public Service Electric & Gas* (PSE&G), Magnaflux Quality Services (MQS),

Southwest Research Institute (SwRI), Virginia Corporation of Richmond (VCR) and AEA Technology Engineering Services (AEA) personnel during the April 1995 - April 1998.

These examinations constituted the twelfth (2nd Period, 3rd Outage) at Salem 1 during the Second 10-year Inspection Interval of operation.

Exams were performed in accordance with the 1983 Edition through Summer 1983 Addenda of ASME Section XI and the Salem Inservice Inspection Program Long Term Plan.

ISI was performed utilizing visual (VT), magnetic particle (MT), liquid penetrant (PT),

manual ultrasonic (UT), mechanized ultrasonic (M-UT) and radiography (RT) nondestructive examination techniques.

This report also contains augmented examinations required by the Salem Technical Specifications, Regulatory Guides, Circulars and Bulletins issued by the United States Nuclear Regulatory Commission.

Page 2

~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ, 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NIA
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from February 27, 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.1 MQS, SwRI and VCR under the direction of the PSE&G ISI Group, conducted 13 manual ultrasonic, five liquid penetrant and two magnetic particle examinations.

There were no unacceptable indications identified.

Class 1

=> Vessels

=> Steam Generator

=> Piping

=> Reactor Coolant

=> Safety Injection

=> Residual Heat Removal Class 2

=> Vessels

=> Steam Generator

=> Piping

=> Boiler Feed

=> Main Steam

=> Chemical Volume Control Page 3

~ORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) N/ A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.2 ISI Section XI Visual examinations on valves and bolting PSE&G's ISI Group conducted eight Class 1 bolting exams and one Class 1 valve internal exam.

ISI Section XI examinations were conducted on the following systems:

=> Safety Injection

=> Residual Heat Removal The following was identified during the course of these examinations:

Valve 1RH26 (WinISI Sum# 193800) had a visual VT-3 internal examination, which revealed seating surface wear. The valve interior was resurfaced and an acceptable post rework VT-3 valve internal examination was performed. An additional sample was not required, since the valve is the only one identified in that valve group.

There were no other unacceptable indications identified.

11. 3 ISl Section XI Visual examination of components supports PSE&G conducted four Class 1, 2 & 3 component support visual VT-3 and VT-3/4 examinations.

ISI Section XI examinations were conducted on the following systems:

=> Main Steam

=> Safety Injection

=> Reactor Coolant

=> Chemical and Volume Control There were no unacceptable indications identified.

Page 4

~ORM NIS-1 OWNER'AATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ. 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NIA
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.4 ISI Section XI System Leakage Examinations PSE&G' s ISI Group conducted four System Pressure Tests during a System Functional or Inservice Test, on Nuclear Class 1, 2 and 3, in accordance with ASME Section XL A system Leakage exam was performed in accordance with ASME Section XI on all Class 1 Systems. The system leakage test was performed with the Reactor Coolant System in Mode 3 (normal operating temperature and pressure) with the insulation installed. No pressure boundary leakage was detected.

Work requests were initiated to correct minor mechanical leakage that was not corrected during the system walkdowns.

Class 2 and 3 System Pressure Tests were conducted on the following systems:

> Auxiliary Feedwater
> Sampling 11.5 RCP Flywheel Augmented Examinations per USNRC Regulatory Guide 1.14 SwRI under the direction of the ISI Group performed a Ten year exam (with the Flywheels removed from the motors) on all Salem Unit 1 & 2's RCP Flywheels at the Westinghouse Cheswick, PA facility as identified below by the Flywheel serial number:

2S-76P917 3S-76P917 1S-75P790 3S-75P790 1S-88P318 1S-D003 4S-75P790 2S-75P790 1S-76P917 There were no unacceptable indications identified.

Page 5

~ORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from Februar:y 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.6 NRC Bulletin 88-08 "Thermal Stresses in Piping Connected to the Reactor Coolant System" Augmented Examinations VCR under the direction of PSE&G's ISi Group performed augmented ultrasonic and dye penetrant examinations on a total of 20 components, broken down as follows:

=> 15 - 1.5 inch Safety Injection piping welds

=> Two - 2 inch Chemical and Volume Control piping welds

=> Two - 3 inch Chemical and Volume Control piping welds There are no unacceptable indications identified.

11.7 Augmented Exams per Branch Technical Position MEB 3-1 30 welds were volumetrically examined, to comply with the augmented requirements of NUREG 0800 Standard Review Plan, Section 3.6.2, Branch Technical Position MEB 3-1.

The UT was performed by VCR with no unacceptable indications identified.

11. 8 NRC Bulletin 88-11 "Pressurizer Surge Line Thermal Stratification" Augmented Examinations PSE&G's ISi Group performed visual examinations on all existing surge line pipe supports I HEBA restraints and their associated insulation interfaces. A total of ten supports were examined.

There were no unacceptable indications identified.

Page 6

~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01177 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.9 Augmented System Leakage tests per NUREG 0578 "TMI Lessons Learned" PSE&G's ISI Group conducted 27 System Leakage Tests in accordance with NUREG 0578 on the following systems:

Safety Injection Residual Heat Removal Chemical and Volume Control Containment Spray Sampling Liquid Radwaste Waste Gas Waste Liquid There were no unacceptable indications identified.

11.10 PSE&G's Supplemental Ultrasonic Examinations on the old Steam Generator Feedwater Nozzle to Forging Expanders AEA ultrasonically examined the four Steam Generator Feedwater Nozzle inner radius and the barrel of the nozzle including the Feedwater thermal sleeves.

There were no unacceptable indications identified.

11.11 PSE&G Augmented Visual Examinations on the Reactor Coolant Pump Main Flange connection (R/T# 290049)

PSE&G's ISI Group performed a visual examination of the Reactor Coolant Pumps Main Flange connection for evidence of leakage in accordance with R/T# 290049.

Each of the four RCP' s showed evidence of RCS leakage (dried boron on the main flange connection area and the bolting). All the RCP main flange studs were removed, several at a time, and visually VT-1 examined for damage and reinstalled and re-torqued. Several studs were found with unacceptable conditions and were replaced as required (See the following preservice examination descriptions for specific details)

Page 7

~ORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.12 Preservice Examinations on Various Bolting Material Replacements Several bolted connections were replaced as identified below:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION

1. NIA S-93-036 920804179 Valve lPRl Bonnet Bolting
2. NIA S-94-048 950527023 Valve 1PR4 Flange Bolting
3. NIA S-94-052 940425148 Valve 1PR5 Flange Bolting
4. NIA S-94-051 940425145 Valve 1PR3 Flange Bolting
5. NIA S-94-073 940520130 Valve 1PR3 Flange Bolting
6. NIA S-95-288 950325019 Valve 13MS167
7. NIA S-95-287 950325019 Valve 1CV78
8. NIA S-95-254 950527006 Valve 1CV80
9. NIA S-95-180 950505099 Valve 1CV75
10. NIA S-95-176 950520006 Valve 1SJ150
11. NIA S-95-026 941112125 Valve 1CV75
12. NIA S-96-072 950811370 13 RCP Main Flange
13. NIA S-96-071 950811362 11 RCP Main Flange
14. NIA S-96-062 950811372 14 RCP Main Flange
15. NIA S-96-059 950811368 12 RCP Main Flange
16. NIA S-97-031 960921041 Valve 14MS167
17. NIA S-97-077 960921040 Valve 12MS167
18. NIA S-97-232 950527035 Valve 1PR3 Inlet Flange
19. NIA S-97-233 951104046 Valve 1PR4 Inlet Flange
20. NIA S-97-234 950608024 Valve 1PR5 Inlet Flange
21. NIA S-97-263 971107115 Valve 2PS25
22. NIA NIA NIA Valve 1PR3, 4, & 5 (P.O.# P3-0933105-0630)
23. NIA S-97-263 971107115 Valve 2PS25 The applicable (PSI) examinations were performed with no unacceptable indications identified.

Page 8

~ORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUJRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ, 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge, NJ 08038
3. Piant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NIA
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.13 Preservice Examinations on Various Component Supports and their Associated Integral Attachments due to Repair/Replacement/Modifications Several component supports and their associated integral attachments were repaired/replaced or modified as identified below:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION

1. lEC-3323-2 PS-94-036 940811077 MSWG-30
2. lEC-3323-3 PS-95-033 950913228 Sl-SWPG-49
3. lEC-3396-4 PS-95-070 951114131 Various Aux. Feedwater supports
4. lEC-3412-1 PS-95-037 950823379 Various PZR Relief supports
5. NIA S-95-210 950809300 MSWG-36A
6. NIA S-95-171 950803107 MSWG-25
7. lEC-3396-1 PS-95-028 950606218 Various SJ, RHR, & CS supports
8. NIA S-95-105 950519222 13-FWLS-11
9. NIA S-95-040 950215277 lM-SWPS-029
10. lEE-0102 PS-95-012 950206127 lC-PRH-155
11. lEC-3322-1 PS-95-033 940811073 Various Service Water supports
12. lEC-3323-1 PS-94-035 950914127 Various Service Water supports
13. lEC-3404-1 PS-95-010 950206095 1-PRG-2552
14. lEC-3322-4 PS-95-035 940811075 Various Service Water supports
15. lEC-3322-2 PS-94-034 940811076 Various Service Water supports
16. lEC-3323-3 PS-95-032 950913288 Various Service Water supports
17. lEC-3323-3 PS-95-050 950914129 Various Service Water supports
18. lEC-3476-1 PS-95-078 951001130 1C-13SIH-136 & lC-llSIA-39
19. lEE-0282-1 PS-96-142 960523251 Various Service Water supports
20. lEC-3525-1 PS-96-001 951212220 Various CVCS supports
21. lEC-3668-8 PS-97-070 970318111 lP-1 lSWG-005 & lP-1 lSWS-2
22. lEC-3668-9 PS-97-071 970318121 Various Service Water supports Page 9

~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Ownyr Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCP NO. CJP NO. W.0.# DESCRIPTION

23. lEC-3668-3 PS-97-085 970318099 Various SW (CFCU) supports
24. lE0-2600-1 PS-97-039 961011186 lCCH-8
25. lEC-3668-4 PS-97-090 970318103 Various SW (CFCU) supports
26. lEC-2668-15 PS-97-092 970318133 1C-13SWG-3A & 3B
27. lEC-3715-3 PS-97-125 970815174 Various CVCS supports
28. lEC-3668-5 PS-97-091 970318104 Various SW (CFCU) supports
29. lEC-3668-3 PS-97-084 970318099 Various SW (CFCU) supports
30. lEC-3715-2 PS-97-116 970818173 Various CS supports
31. lEC-3668-7 PS-97-129 970318108 Various SW (CFCU) supports
32. lEA-1240-1 PS-98-001 970620208 FWH-14-24
33. lEA-1240-1 PS-98-002 970525116 FWG-11-3065 &

970525067 FWG-12-3066

34. lEA-1240-1 PS-98-003 970526071 Various SIG Feedwater 970526068 supports
35. lEC-3343-1 PS-97-049 950218096 SIG platform to SIG lower PS-97-050 950609102 vertical support attachment welds PS-97-051 PS-97-052
36. NIA S-94-074 940426177 1A-CVCH-408A and 1A-CVCH-407A
37. NIA S-94-049 940413245 lC-PRH-145 and 940424126 lC-PRH-149
38. NIA S-97-224 970811072 1PRSN29
39. NIA S-95-161 950523016 lC-PRSN-401
40. NIA S-95-220 950523016 lC-CC-SNOOl
41. NIA S-95-157 950523016 lA-CC-SNlOOB
42. NIA S-95-159 950523016 1C-CVCSN900
43. NIA S-95-248 950523016 lC-SISN-501
44. NIA S-95-221 950523016 lC-PRSN-023 Page 10

~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza, Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCP NO. CJP NO. W.0.# DESCRIPTION

45. NIA S-95-158 950523016 lA-SISN-lOlA
46. NIA S-97-239 950815548 lC-SISN-500
47. NIA S-95-160 950523016 1A-MSASN-147A
48. NIA S-95-195 950523016 lA-MSASN-147A The applicable (PSI) examinations were performed with no unacceptable indications identified.

11.14 Preservice Examinations on Various Piping welds due to Repair/Replacement/Modifications Several piping welds were repaired/replaced or modified as identified below:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION

1. NIA S-95-292 931002072 l 1SJ139 associated piping welds
2. NIA S-95-349 950623083 11 RHR Pump piping replacement
3. lEE-0152-1 PS-95-093 951120163 Valve 1CV55 replacement welds
4. lEC-3530 PS-96-029 960116178 Safety Injection System orifice addition, socket welds
5. NIA S-96-084 960111096 Valve 13SJ143 replacement welds
6. NIA S-96-398 960506124 Valve 1lRHlO replacement welds
7. lEC-3525-1 PS-96-001 951212220 Valves 1CV63 & 1CV141 relocation associated welds Page 11

~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza, Newark, NJ, 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17, 1998
9. Inspection Interval from February 27, 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

ITEM PSE&G PSE&G PSE&G COMPONENT NO. DCPNO. CJPNO. W.0.# DESCRIPTION

8. NIA S-96-049 951004102 Valve 1CV137 associated welds
9. lEC-3530-2 PS-97-029 970623168 Safety Injection System orifice addition, socket welds near valves 11-14SJ16 The applicable (PSI) examinations were performed with no unacceptable indications identified.

11.15 Preservice Examinations per, DCP# MM-97-099, CJP# S-97-156, Work Order# 970613277 Replacement of the 11 Charging Pump Casing (1 CVE20).

The applicable (PSI) examinations were performed with no unacceptable indications identified.

11.16 Preservice Examinations per, CJP# S-97-257, Work Order# 971108157 Weld repairs to the 100' personnel airlock door seal knife edges.

The (PSI) examinations were performed with no unacceptable indications identified.

11.17 Preservice Examinations per, Work Order# 971129120 The 100' personnel airlock inside and outside door (inner and outer) rubber 0-ring seal replacement.

The (PSI) examinations were performed with no unacceptable indications identified.

Page 12

~ORM NIS-1 OWNER'~ATA REPORT FOR INSERVICE IPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Owner Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) N/ A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17, 1998
9. Inspection Interval from February 27, 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.18 Preservice Examinations on four Replacement Steam Generators and their Associated Feedwater, Main Steam and Reactor Coolant piping welds and component supports I integral attachments The Steam Generator Vessel welds, Steam Generator Primary Manway bolting, Reactor Coolant, Feedwater, and Main Steam piping welds and their associated component supports/integral attachments were replaced/repaired and/or modified as identified below:

ITEM PSE&G PSE&G REPAIR/REPLACEMENT/

NO. DCPNO. P.O. NO .. MODIFICATION DESCRIPTION

1. NIA P3-0879959 #11 - 14 Steam Generator (S/G) vessel welds were preservice (PSI) examined at the Sea Brook Facility by SwRI after the construction hydro was satisfactorily completed.
2. EWP# NIA #11 - 14 new Steam Generators Primary SLM-MOD-04 Manway bolts were replaced with studs and nuts.
3. EWP# NIA #11 - 14 new Steam Generator Reactor SLM-MOD-07 Coolant hot and cold leg tie in welds.
4. lEA-1240-11 NIA #11 SIG Feedwater piping and component support/integral attachment modifications.
5. lEA-1240-12 NIA #12 SIG Feedwater piping and component support/integral attachment modifications.
6. lEA-1240-13 NIA #13 SIG Feedwater piping and component support/integral attachment modifications.
7. lEA-1240-14 NIA #14 SIG Feedwater piping and component support/integral attachment modifications.
8. lEA-1241-11 NIA #11 SIG Main Steam piping and component support/integral attachment modifications.

Page 13

~ORM NIS-1 OWNER'RATA REPORT FOR INSERVICElsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co .. 80 Park Plaza. Newark. NJ. 07101
2. Plant Salein Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7. 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

ITEM PSE&G PSE&G REPAIR/REPLACEMENT/

NO. DCPNO. P.O. NO .. MODIFICATION DESCRIPTION

9. lEA-1241-12 NIA #12 SIG Main Steam piping and component support/integral attachment modifications.
10. lEA-1241-13 NIA #13 SIG Main Steam piping and component support/integral attachment modifications.
11. lEA-1241-14 NIA #14 SIG Main Steam piping and component support/integral attachment modifications.
12. EWP# SLM-01 NIA #11 - 14 new Steam Generator Lower Vertical support modifications SwRI found a rejectable PSI indication on the #14 Steam Generator (S/N 2172)

Transition Cone to Shell C weld. The rejectable indication was located at the inside surface, approximately 301 inches clock wise from ISI vessel zero. The rejectable indication was reduced in size by mechanical blending to within acceptable limits.

There were no other unacceptable indications identified.

Page 14

.FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE .PECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co., 80 Park Plaza. Newark. NJ. 07101
2. Plant Salem Generating Station P.O. Box E. Hancock's Bridge. NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07/01/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17. 1998
9. Inspection Interval from February 27. 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.19 Erosion/Corrosion UT Thickness Program In response to NRC Bulletin 87-01 and Engineering Directive MEC-94-1071, 130 components were scheduled for UT thickness examinations The following Components were replaced, due to the results of the erosion/corrosion UT examinations performed.

ITEM COMPONENT COMPONENT NO. SYSTEM ID DESCRIPTION

1. Heater Drain A3 18" Orifice
2. Heater Drain A29 18" X 16" X 12" Tee
3. MSR (Reheat Drains) Cl7 3" Tee
4. MSR (Reheat Drains) C18 3" Tee
5. MSR (Reheat Drains) C20 3" Tee
6. MSR (Reheat Drains) C30 3" Tee
7. Misc. Drains H9 3" Orifice
8. Condensate Ml 20" Orifice
9. Condensate M12 24" Elbow As a result of these repairs/replacements, and procedural requirements for readings less than 70 % of nominal wall, an examination expansion of 35 components was performed. This increased the total number of examinations to 165 components. The following is a break down of these examinations.
a. Nine components were replaced.
b. 156 were acceptable for continued service, based on minimum wall design requirements
c. No components required a weld build-up.

There were no other unacceptable indications identified.

Page 15

.FORM NIS-1 OWNER'IATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co., 80 Park Plaza, Newark. NJ, 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17, 1998
9. Inspection Interval from February 27, 1988 to July 7. 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

11.20 Technical Specification 4.7.9 (c) Functional Testing of Selected Hydraulic and Mechanical Snubbers HYDRAULIC SNUBBERS (FIRST TEST SAMPLE)

Hydraulic snubbers were tested using the Technical Specification 4.7.9(c), 10%

sample plan by Wyle Laboratories using the API in-place snubber test machine and the Wyle Laboratories model 150 snubber test machine as follows:

=> Two SIG 1,000 Kip Rexnords

=> One MSN 200 Kip Paul Monroe

=> One Lisega small hydraulic snubber All hydraulic snubbers tested satisfactorily, except for the one Lisega small snubber.

MECHANICAL SNUBBERS (FIRST TEST SAMPLE)

Mechanical snubbers were tested using the Technical Specification 4.7.9(c), 10%

sample plan using the Wyle Laboratories model 150 snubber test machine as follows:

=> Two Mechanical large (PSA-35)

=> 11 mechanical medium (PSA-1, 3 and 10)

=> Four mechanical small (PSA-114 and 112)

All mechanical snubbers tested satisfactorily, except for the two mechanical medium (PSA-1, 3 and 10) snubbers.

HYDRAULIC AND MECHANICAL EXPANDED SNUBBER TEST SAMPLES Due to Hydraulic and Mechanical snubbers test failures the following expanded snubber test samples were tested using the Wyle Laboratories model 150 snubber test machine.

=> Four snubbers (100% of the Lisega hydraulic snubbers)

=> Two expanded samples totaling 22 mechanical medium (PSA-1, 3 and 10)

PSE&G Engineering performed a stress evaluation on all failed snubber locations and concluded that the piping and components to which the snubbers were attached were not impaired due to in-operability of the snubbers.

Page 16

FORM NIS-1 OWNER'"ATA REPORT FOR INSERVICE lsPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1. Own~r Public Service Electric & Gas Co., 80 Park Plaza, Newark, NJ, 07101
2. Plant Salem Generating Station P.O. Box E, Hancock's Bridge, NJ 08038
3. Plant Unit Unit 1 (Facility Operating License DPR-70)
4. Owner's Certificate of Authorization (if Required) NI A
5. Commercial Service Date 07101/77 6. National Board Number for Unit 20757
7. Components inspected (see page 1)
8. Exam Dates March 7, 1995 to March 17, 1998
9. Inspection Interval from February 27, 1988 to July 7, 2001
10. Applicable Edition of ASME Section XI, 1983, through 1983 Summer Addenda
11. Abstract of Examinations:

STEAM GENERATOR REPLACEMENT, MSIV REFURBISHMENT & MISC.

Six SIG snubbers were removed during the SIG replacement and were returned to their position, two SIG snubbers were retested satisfactorily, eight MSIV snubbers were removed for MSIV rebuild and were restored and one retested satisfactorily.

Five none Code pre-NF snubbers were found in the Turbine area and tested and were replaced with new snubbers.

HYDRAULIC AND MECHANICAL SNUBBER EXTENDED OUTAGE SAMPLE Due to the extended outage greater than 18 months, the following hydraulic and mechanical snubbers were tested to comply with Technical Specification 4.7.9 (c)

(10% sample):

=> One 1, 000 Kip Paul Monroe

=> One 1,000 Kip Rexnord

=> One 200 Kip Paul Monroe snubbers

=> One mechanical large (PSA-35)

=> 11 mechanical medium (PSA-1, 3 and 10)

=> 100% mechanical small (PSA-114 and 1/2) under a new random sample were previously tested satisfactorily. Thus, no additional testing was required.

Page 17

11. Abstract of Examinations (see pages 2 -17)
12.
  • Abstract of Conditions Notes (see pages 2-17)
13. Abstract of Corrective Measures Recommended and Taken (see pages 2-17)

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Certificate of Authorization No. (if applicable) ==A/'~/14=

Date~ 19 9J' Signed PSE&G, Owner By~~~~~~~~~~..=

CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New Jersey and employed by Protection Mutual Insurance Company, DBA Factory Mutual Engineering Association, have inspected the components described in this Owner's Report during the period March 7, 1995 to March 17. 1998, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Commissions /</l:T/CJ 20 National Board, State, Province and Endorsements nate=b=J=*=i..c...===;G~=* 19 9'8 Page 18