I

  • SOUTHWEST RESEARCH INSTITUTE Post Office Drawer 28510 6220 Culebra Road San Antonio, Texas 78284 1984 INSERVICE EXAMINATION OF SELECTED CLASS 1 AND CLASS 2 COMPONENTS AND SYSTEMS OF SALEM GENERATING STATION, UNIT 1 Prepared by W. Mark Howell Project Engineer VOLUME I FINAL REPORT WITH APPENDICES SwRI Project 4166
  • Prepared for Public Service Electric and Gas Company 80 Park Place P.O. Box570 Newark, New Jersey 07101
  • September 1984 Wayne T Flach Director Inspection Engineering Section Department of Engineering Services*

Department of Engineering Services Quality Assurance Systems and Engineering Division 8501290002 -8501~22--

PDR ADOCK 05000272 G

PDR

ABSTRACT An inservice examination (ISI) of selected Class 1 and Class 2 components of Public Service Electric and Gas Company's (PSE&G) Salem Generating Sta-tion, Unit 1, was performed during the summer 1984 refueling outage.

These examinations constituted the sixth ISI performed at Salem, Unit 1, and the first ISI of the third 40-month period of commercial operation.

The compo-nents were examined in accordance with the "Examination Plan for the 1984 Inservice Examination of Salem Generating Station, Unit l," including any changes made during the ISI as approved by PSE&G.

The nondestructive examinations were performed using visual (VT), liquid penetrant (PT), magnetic particle (MT), and manual ultrasonic (UT) tech-niques.

These examination techniques revealed indications which were reported to and dispositioned by PSE&G personnel using Customer Notifica-tion Forms.

The UT examinations also revealed geometric reflectors

  • iii

TABLE OF CONTENTS VOLUME I--FINAL REPORT WITH APPENDICES LIST OF ILLUSTRATIONS

  • LIST OF ABBREVIATIONS
u.

INTRODUCTION A.

B.

c.

D.

Examination Areas Summary of Examination Results

  • Radiation Exposure Equipment

SUMMARY

OF THE INSERVICE EXAMINATION

  • A.
  • B.

Explanation of Field Data Records Summary of Nondestructive Examinations APPENDICES A.

Weld Identification Drawings and Weld Joint Cross-Reference Tables, Class 1 B.

Weld Identification Drawings and Weld Joint Cross-Reference Tables, Class 2 VOLUME II-APPENDICES (Cont'd)

B.

Weld Identification Drawings and Weld Joint Cross-Reference Tables, Class 2 (Cont'd)

c.

Southwest Research Institute Nuclear Projects Operating Procedures D.

Southwest Research Institute Nondestructive Testing Procedures E.

Ultrasonic Calibration Block Drawings F.

Certificates of Personnel Qualifications G.

Material and Equipment Certifications H.

Customer Notification Forms I.

Southwest Research Institute's Implementation of Regulatory Guide 1.150 Requirements Not included in submittal - available on site for review along with Volume II.

v viii ix 1

1 2

3 4

7 7

7

TABLE OF CONTENTS (Cont'd)

VOLUME III--FIELD DATA Class 1 Components and Systems Reactor Pressure Vessel Reactor Pressure Vessel Closure Head Pressurizer Steam Generator No. 13 Steam Generator No. 14 Chemical and Volume Control System Pressure Relief System Pressurizing System Reactor Coolant System VOLUME IV-FIELD DATA (Cont'd)

Class 1 Components and Systems (Cont'd)

Residual Heat Removal System Safety Injection System 10-In. Piping 8-In. Piping 6-In. Piping 4-In. Piping 3-In. Piping VOLUME V--FIELD DATA (Cont'd)

Class 1 Components and Systems (Cont'd)

Safety Injection System (Cont'd) 2-In. Piping 1-1/2-In. Piping Reactor Coolant Pumps Valves Class 2 Components and Systems Feedwater System Chemical and Volume Control System Safety Injection System vi

.l

LIST OF ILLUSTRATIONS Figure 1

Sonic FTS MK I and Pictorial Representation of Crown Indication

  • 5 2

Sonic FTS MK I and Pictorial Representation of Root Indication 5

3 Explanation of Summary Table Format 9

viii

TABLE OF CONTENTS (Cont'd)

VOLUME VI--FIELD DATA (Cont'd)

Calibration Records 190000 Series 250000 Series 360000 Series 370000 Serie-s vii I

I.

INTRODUCTION During the May through July 1984 refueling outage, Southwest Research Institute (SwRI) personnel performed nondestructive examinations (NDE) of selected components for Public Service Electric and Gas Company (PSE&G) at Salem Generating Station, Unit 1.

The examinations constituted the sixth such inservice examination (ISI) performed at Salem Unit 1 and the first ISI of the third 40-month period of commercial operation.

A.

Examination Areas The ISI was performed in accordance with the following documents:

Section XI of the American Society of Mechanical Engineers (ASME)

Boiler and Pressure Vessel Code; "Rules for Inservice Inspection of Nuclear Power Plant Components," 1974 Edition with Addenda through Summer 1975.

SwRI Document 84-PEG-SGS-1/2-1-0:

"Project Plan for the Nonde-structive Examination Activities to be Performed at Salem Generat-ing Station, Units 1 and 2," dated Hay 1984.

SwRI "Examination Plan for the 1984 Inservice Examination of Salem Generating Station, Unit l," dated April 1984

  • SwRI Nutlear Quality Assurance Program '.fanual (NQAPX), with all applicable changes.

U. S. NRC Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity," Revision 1, August 1975.

U. S. NRC Regulatory Guide 1. 65, "Materials and Inspections for Reactor Vessel Closure Studs," October 1973.

u. S. NRC Regulatory Guide 1.150, "Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservic~ Examination," Revi-sion 1, February 1983.

Representative samples of the following components and areas were examined with ~DE techniques.

Class 1 Reactor Pressure Vessel Reactor Pressure Vessel Closure Head Pressurizer Steam Genergtor No. 13 Steam Generator No. 14 Chemical and Volume Control System Pressure Relief System Pressurizing System 1

Reactor Coolant System Residual Heat Removal System Safety Injection System Reactor Coolant Pumps Valves Class 2 Feedwater System Chemical and Volume Control System Safety Injection System B.

Summary of Examination Results

.l The NDE activities were performed using visual (VT), liquid penetrant (PT), magnetic particle (MT), and manual ultrasonic (UT) techniques.

Each examination was conducted in accordance with standard SwRI nondestructive testing (NDT) procedures which were written to comply with the requirements of the pertinent sections of the ASME Boiler and Pressure Vessel Code and the SwRI NQAPM.

A c0py of each applicable SwRI NDT procedure is included in Appendix D.

SwRI operating procedures for weld joint identification marking on nuclear power plant piping, recording data during VT, PT, and MT examina-tions, and recording search unit location and maximum signal amplitude dur-ing UT examinations are included in Appendix C.

During the VT examinations, severe pitting and corrosion was observed on reactor pressure vessel studs numbered 23 through 27 and reported to PSE&G on Customer Notification Form (CNF) 84-1-015.

The studs were subse-quently rejected by PSE&G and replaced with studs numbered S6 through SlO.

Studs 37, 44, and 53 were also rejected by PSE&G after failing a tolerance check and were replaced with studs S2, S3, and S4.

Baseline ~ and UT examinations were performed on the replacement studs.

During the PT piping examinations, indications were observed on nine welds:

2-SJ-1118-17, 1-1/2-SJ-1132-23, 1-1/2-SJ-1122-3, l-1/2-SJ-1112-15, 2-SJ-1128-41, 2-SJ-1118-29, 2-SJ-1129-25, 2-RC-1114-8, and 2-SJ-1128-74.

These indications were reported to PSE&G on CNFs 84-1-001 through 84-1-009, respectively.

The indications in each examination area were dispositioned by PSE&G, and reexamination by SwRI personnel revealed no recordable indications.

A 10-year examination of reactor coolant pump (RCP) flywheels, as specified in U.S. NRC Regulatory Guide 1.14, Article C, was performed on RCP flywheels 11, 13, and 14.

The elements comprising this 10-year exami-nation incJuded a PT examination on the inner bore and the keyways of the flywheel and

~IT and UL examinations on the top surface, bottom surface, and outer perimeter of the flywheel.

During the PT examinations, indica-tions were recorded on the inner bores of No. 11 and No. 14 flywheels and reported to PSE&G on CNFs 84-1-012 and 84-1-011.

After the spot grinding of a one-square-inch section of each of the flywheels, the indications were 2

resolved as superficial chatter marks and accepted after evaluation by PSE&G.

MT indications were observed on the bottom surface of RCP flywheel No. 13 and the top surface of RCP flywheel N'os. 11, 13, and 14. *These were reported to PSE&G on CNFs 84-1-010, -013, and -014 (includes top surface of No. 13 and No. 14), respectively.

The indications were dispositioned by PSE&G, and reexamination by SwRI personnel revealed no recordable indica-tions.

No reportable indications were observed during the UT examination of the flywheels.

During the UT examinations, one reportable indication was observed on 14-BF-2131-23.

The indication was resolved by SwRI personnel as a Code-acceptable inclusion and was accepted after evaluation by PSE&G.

The remaining UT examinations revealed numerous insignificant and geometric indications; however, no additional reportable UT indications were observed.

No other reportable indications were observed during.the examinations.

In addition to the examinations performed by SwRI personnel, VT exami-nations of. selected Class 1, Class 2, and Class 3 hangers were performed and reported separately by PSE&G.

The SwRI Quality Assurance (QA) Section was represented on site by the SwRI QA Representative who was present for approximately 50 percent of the examination period.

The QA Representative performed the appropriate duties outlined in Paragraph 3.3.1(4), "Onsite SwRI Quality Assurance Activities,"

of the Project Plan.

The SwRI examiners were qualified and certified in accordance with SwRI Nuclear Quality Assurance Procedures 11-1 and 11-2 which incorporate the guidelines of SNT-TC-lA of the American Society for Nondestructive Test-ing.

A copy of each individual's certifications is included in Appendix F.

Included in Appendix G are copies of the certifications for the ultrasonic instruments, transducers, couplant, and marking pencils used during the examinations.

Drawings of the basic calibration blocks used during the ultrasonic system calibrations are located in Appe.ndix E.

c.

Radiation Exposure Radiation exposure encountered during the ISI was of fundamental con-cern to the SwRI personnel involved in the daily examination activities.

SwRI personnel took the necessary precautions to minimize overall exposure and consequently received the minimum dosage practicable while performing the selected examinations.

The following listing details the approximate radiation exposure levels associated with various examination areas.

3

Area CONTAINMENT Annulus Area Inside Bioshield Pressurizer Enclosure RPV Closure Head Inside Outside Refueling Deck Regenerative Heat Exchanger Room Steam Generator AUXILIARY BUILDING Boron Injection Tank Room Mechanical Penetration Area Charging Safety Injection Pump Rooms D..

Equipment

1.

Sonic FTS MK I (see Figures l and 2)

Exposure Level 0-50 mR/hr 20-2000 mR/hr 50-1500 mR/hr 3000-5000 mR/hr 10-50 mR/hr 0-20 mR/hr 100-1000 mR/hr 10-100 mR/hr 10-50 mR/hr 0-10 mR/hr 0-20 mR/hr Sonic FTS Mark I UT instruments were used to perform the manual ultrasonic examination of selected components.

They also served to deter-mine the characteristics and properties of the components by measuring the transmission and attenuation of ultrasound.

The Sonic FTS Mark I instru-ment is a lightweight portable unit powered by a rechargeable battery and utilizes transistorized circuits and a cathode-ray tube to give a video display representation of the test data.

Instrument calibration certifications for the Sonic FTS :1K I are located in Appendix G.

2.

Transducers Various brands, sizes, types, and fr.equencies of ultrasonic transducers (search units) were used to perform the examinations.

Trans-ducer frequencies of 1.5, 2.25, and 5.0 MHz were used.

The 2.25-and 5.0-MH.z transducers were used on carbon steels, and the 1.5~ and 2.25-MHz transducers were used on stainless steels, as specified in the >procedure.

For information on the actual transducer used for any specific examination, consult the data sheets and referenced calibration sheets in the field data volumes.

4

Figure 1. Sonic FTS Mark I and pictorial representation of crown indication 5

Figure 2. Sonic FTS Mark I and pictorial representation of root indication

II.

SUMMARY

OF THE INSERVICE EXAMINATION This section of the report provides a discussion of the field data records and a summary of the NDE activities performed.

A.

Explanation of Field Data Records The results of the NDE activities and calibrations performed by SwRI personnel were recorded on standard SwRI forms.

These completed documents constitute a portion of the Inservice Examination Report.

The original records are retained in the SwRI Data Storage Facility, and copies are pro-vided herein for completeness.

The field data records for each weld or area are assembled into a pack-age preceded by a summary sheet.

The examination areas and summary sheet numbers correspond to those listed in the Summary Table.

A general expla-nation of the individual field data forms follows.

The instruments used in performing UT examinations were calibrated prior to use, then verified _again at specified intervals during the examinations and upon completion of the examinations.

The calibration parameters were recorded on the appropriate calibra-tion record sheet as specified in the applicable NDT procedure.

The documented calibration and calibration verification provide immediate assurance that the examinations were performed using properly calibrated instruments.

The results of UT examinations were recorded on the applicable data record sheets as specified in the appropriate NDT procedure.

The information documented on these forms describes the parameters associated with those indications which were greater than the recording levels specified in the applicable NDT procedures.

When required, the size, location, and nature of reflectors were determined by analyzing the indication parameters recorded on the forms described above.

The analysis is documented on SwRI Indica-tion Resolution Record Sheets, which are included as a part of each data package.

VT, PT, and MT Examination Record Sheets were used to record the results of those examinations.

Both remote and direct VT examina-tion techniques utilize the same basic format for documenting indi-

  • cations.

The equipment and/or materials used in VT, PT, and "'.11' examinations are also identified on the record. sheets.

B.

Summary of Nondestructive Examinations The following section of this report is the Summary of Nondestructive 2xaminations Table (Summary Table).

The Summary Table provides information 7

and results for the NDE activities performed during this ISI.

See Fig-ure 3 for an explanation of the Summary Table format.

Weld identification figures for Class 1 and Class 2 systems are located in Appendices A and B, respectively.

8

A~rff

H Cl XI lllH NU A:iH[

Sl.C I XI CA IGY L'lf Lil lilJl'llll II At111111i1 fXAlllNATIUN Alll A llll.tll ll ll'Al IUN


~------

~ x All.

Hl lllllll SWll I SllHllAllY l'llllCll>lllll: Sllt:f I NII. /Ill-V.

Nllttlll 11 N I ll II N 1; I If !I f_ II f

I II I:.

c 1: " ll llfHAIHIJNt:.NTS

-!~£ACTOR Pt~t:iStlHI VE3Sll (SfL flGllllt A-1)

ASHE SECT x I llfM Nll ASML S[CI XI CA I 1;y l~tt I) NilMllUl Af'Hl/LIH LXAflli~AllllN AUlA ll>tNllFICAlllll~

fXAM.

Ht J tHIU SWk1 SUMMA HY PHUCtOURE Sltf.t l Nll./llEV.

MllMl1tH LIGAMLNTS llLhlt-lN TIHllADEIJ SJIJI) 11111 LS Hl.9 tl-G-1 l -RPV-Ll G H HlRll I VT II T 0

<100-1150 uo_nuo bOU-~/_55 UEV. 5 N I 0 N H s E I c G x -

- x G

E n

11 -

II T

ti

[

R - -

l'AGf

- II U1 EXAMINAJION WAS PtRFUkHEO llN LIGAMl:NT Allt-.A Bt TWHoN THE CENH:flllNF~ llf SHiil HOl E NO.

H At"O STUU Hlllf NO. 1.

A 1 -

JHI: lfflJlltS J Of PSI K.r. VI AMI> UT EXAHINATlllNS WERL PEkfUHMEU ijffWEEN THE LENTLRLJNlS OF

ft JI) HOLi
Nil. 22 At1ll S lllU tlOLE NO. lR.
      • BMHC CAI lHRA I IUtl f\\LOCK"'**

7-1.125-8-CS-bO-SA~

SALl'.ti l>l:NlllAlltH; SIATlllN lltlll 19Hll INSLHVICE EXAHINATIUN CLASS I CllttPIHH:NTS

~lACTO~ 1-'IUSSUIH: VfSSl:.L cu1su1u:: llt:All (S~:E fJf,lJHE A-2)

ASME St.CT XI I lt:M NU ASHE Stf T XI o 11;v WfLll NIJHB[ll ANLJ/UH f.XAMlrlATlllN AlltA ll>LIHif ICAl lUN t:X At1

  • Hf_ T HOO SWIH SllHMAHY PIWCl:l>UIHo Slll:E T l~O. /l<E V
  • NlltlBE.H

~------------------------------- -------- --------- -------

t:H.2 H-li IJ I

  • 2 11-11 Ul.3 u-c HtR llllONAI. Wt:U>S 11~ CU>SlJl<f Hl:AIJ l-RPV-104bC 11[HIOIUNAL Wl:Lll AT t.0 IJ[G.

1-1wv-1u*H1f MLl!IUlllNAL WELO Al l40 UEf, ClHCUMffll[NJIAL WH.llS l-Hl'V-bU4bA tll:AI> 10 fLAllGI:

llT OL UJOW UT45 UTllST lllbO UThOT llTOL urow lll 115 UT45T lJThO llTbOT llTOL UlOli u r 115 ll l '1':> T UTbO IJlbOT b00-15/511 0011700 DEV. 1 b00-15/511

()0~000 DEV. J b00-15/511 110'> I 00 OEV.

j N

0 0 N G T R S E II E I U t C Ii H H x

)(

x x

x -

)(

x x

x l(

x x

x x -

)(

x l(

x P Al;f t2 Hf11AHl<S.

104 (,., INCllESJ UF wfLI) Ll:N61H WAS EXAHINEO.

      • BASIC CAllR~ATIUN RLUCI<***

7-CSCL-50-SAH lOX (b INCllF.S) CH-Wfl(J LENGTli HAS EX AH l NlO.

      • IJASIC CALWHAlJ(JN flLOCK***

7-CSCl -'>11-SAH 33*1/3X (165.5 IHCHFS) OF WELD LENGTH WAS EkAHJNll>

tHU~ IHE CftHfkLINF (If :;run lllJlt tW. 37 Ill THf <:lNTfl<L lNt: OF sr11u ltOLf 1l0. I.

LIHIHIJ UCAHINArJUN FllUH Tllf lifAll !>llJf lllll Ill I HE.

P>>OXIHITY Uf A I.If 1 INr. UH:.

NII fXAHJNll I 111"1 FHllM J llt: fl.ANGE SIUE lllJE TU IHI: FLANGf CllNfJG-ll>>A 11 ON.

      • HASIC CALIHl<ATIUN ALOCK***

1-CSCI. -'lu-:; AM

SALEM GtN[RATING STAllON UNIT lqtlll WSIRVICt EXlllllllATIUN CLAS~ I COMPONl:NTS 11[ACfOR PRfSSUllE VESSEL CLllJlllH: Ill.AD (St£ FIGlll<t A-c!.)

ASME SFCT XI IIEM NO U I

  • IJ Ul.d U I. 1 ll 11 I
  • l :s ASME Sf_Cl XI CATGY tl-G-1 H-G-1 t1-G-I H-1-1 WI: Lil NUMUfR

/INIJ/01~

fXAMINAllLlN AllU IOl:rHIHCAllOtl CLll!;llHI: SlllllS, NUIS, AND WllSIH-kS 1-1-wv-s 11111s CLUSllf<t-_ S lllUS 1-HPV-IWl:l CL1JS1mE NIJ TS I -RP V-WASI If. I~ S CLllSllHE w ASllE llS CL Alli> ING 1-llPVCti-J>A TCH *':i b

lr~Cll 1\\Y b

lllCll PAICll EXAM.

Mlfllllll VT 11 I llTbO MT UTO u r 11c.

VT VT PT SWIH

SUMMARY

PIWCl:l>UH[ SHH T NO./REV.

NUMBER 900-1/50 0052uO jOO-U 35 l>fVS. 11,5 bOO-l/l/35 IJI-v.,..,

300-c!./JS 005310 LJEVS. 4,5 600-19/31 UL II. 4

'100-1/50 005400 900-1150 oo':iqoo 20u-l/':ib i>EV. 2 N I 0

0 N G T R S f:

H E I U E C G M R x

)(

)( -

)(

)(

x

)( -

- x l'flGf Rf.l1Al<KS SEE CNF H4-l-015.

Ill lNUILAl-TlUN:> UN STUuS ?5*27.

SlllUS 23-~7, 31, 44 ANll

~' Wl:Rt HE-JEUEI> llY PS[Kl; 11111:

lfl StVLRI:

1-'lllING ANU FAILll~I: 1ll PASS A lllLEHANCE CHECK ANu WfHf Pl:-

PLACt:Ll Wl Tll Slllll:> :>?-Sq AND Sb-RIO.

VT tXAMINATlllNS

~lHl PERFORMED UN STUUS 23-27, 38-54, S2-SQ, ANll Sb.

UA~FLIM UT ANU Ml [XANltlATJONS, WtRl PFRFllRMEI> UN HEPLACEM~Nl SlllUS S2-S4 ANO Sh-910.

      • UA~IC CALIRHATIUN HLOCK***

7-1.125-R-CS-60-SAM NI.ITS 31:1-54 WEHt: [XAMIMU>.

      • RASIC CALlRMAllUN HLOCK***

q.5b3-7-tt-cs-~q-sA~

WASHt:HS JR-5~ WfRE fXAMINEU.

CE!'4Tl::R OF b INCH SlJllAHl 1-'AICll 1 S

> 3 I NClllS At.WV~ Tltf UOT I OM E.f'Gf
llf J llE f-L MIGF A I I Ht c!.2~-(Jf.(;HU A/111ll1H llf I Ill HE Al>.

SALl-.M bENtRAJJNG !HAllllN ll"lJT 1911'1 JrlSf_l~VIU. tXAoilNAllllN C:LASS 1 t.:um'Ol'll:.MfS HEACTOR PIH*.SSllllt VESSLL CLllSlll!E. HEAD CSEE FIGllRI:.A-2)

Ct.:UNTO)

ASHE A:>Mt.

SECl XI Stet XI lltM Nll CAJGY 111. n 11-1-1 WELD NUHtll-1! ANU / llH EXAlllNATltlN At-<EA Jlll'.IHHJCATICJN CL Al>U I Nl.

((()NIU) 1-Ht'VC 11-P A f CH b h

INCll llY 6 INCll PATll1 EXAH.

Ml TIHIU VT Pl SWIH

>llHMARY PRUCEOURL &Hlf.T NO./l~fV.

MJMl.\\lR 90U-1/50 OObOOO 200-1/56 IJEV. 2 l'l 0

0 N G I R S f II E I 0 E C G H R x

x REMARKS (f,*ITtR Of b JNCti SIJllARI: PATCH lS 23 INLHES AUllVf THE. IHJllOM EOGf OF THI: FLANGF AT !HE 270-Ul-GIH:f AllMUlH flt llll*

Hf AO

  • SALEH GtNtHAllNG SlATJON UNIT lq64 lNStRVILE EXAMINATION Cl.ASS 1 CllMPOtH.Nl S PRESSIJHllEH CSH f IGIJl!E A-3)

ASHE SECT JI. I I H.r1 NO ASMf.

st: er x 1 CATGY Wf.LI)

NlJMllll~ ANll/lJll EXAMINATION Arif A llll:NTII JCATIUN EXAM.

HETHOO SWiii

SUMMARY

PIWCE.OUHE Sltt-.ET NU./REV.

NllNl:ll:H


~-------------------------------- -------- --------- -------

LUNG I l IJO I llAL l'lf LDS 112. 1 U-H l-PZH-2 UlOL t.00-15/57 OOblOO LUNGI Pill lNAL WELD SllELL A UTOW OEV. II 11145 IJT 115 T IJTbO Ult.OT H2. I B-H 1-PZR-ll llTOL b00-15157 00bl25

  • l.UNGITIJUINAL W[Ll> Slit LL IJ IJJOW UEV. II Ullt5 UTll5 l lJ T bO lJTbOT U2. I 11-11 1-1' ZH-1:1 Ill OL o00-15/57 Ollbl75 I. ONG IT UD I l~AL WELi> Sitt U. ()

IJTOW uEv. B llT45 llf 115 T lHl>O.

lJTbO T C Il{CIJMFERENT I AL Wt:LUS IJ 2. l B-H l-l'Lll-1 llIOL b00-15/57 OObhOll I. OWUl ttEAU T ll Sitt.LL A UT 01~

DF. v

  • 8 llT14~

UT45T llTbO lJTbUT N

0 0 N G T HSE.11 E I U E C 1; t1 R x x x x x - --

x

)(

)( -

x

)( -... -

x x x

)(

x x x x x

x x

x x

X*

PAGE 15 HEMAHKS 1ox ( 'i. 5 INCHf!>)

o~ WFLO LENGTH WAS EXAMINFU.

      • HASIC CALIHHAT IUN llLOCK***

~-CSCL-112-SAM I 0 7. (5.5 INCllES) Of WfLll 1.fNGTH WAS lXAMINEO.

    • 1111HASIC CALlllHAl JUN HLClLK*1111*

S*CSCL-4~-SAM 10~ (5.5 INCHfS) Of-WElO LENf.IH WAS EX A;1 I fH: ll.

. 1111111111111-lASIC CALIAHATIUN LILOCK***

5-CSCL-112-SAM 5Z C I'> INCttES) OF

~If LI) LE.Nt;Ttf

~I A !i tXAMlNl:.O.

    • illlHASIC CALIBHATTUN ALfJCK **1111 5-CSCL-112-SAM

SALlM Gl:NENAflNG STATION UNIT 1'11111 IWlEllVICE tXAtllNATllJN CLASS 1 LOMPUNtNTS PIH: SSIJR 1 ZEN

(::>U F 11;u11f A-n (COUTU)

ASME ASMF.

SHT Xl St CJ XI I Tf.M NU CA 11;y tJ 2. l H-11 t12. 1 B-H 1.12. 2 ll-D WtLU NUM~tP AN~/OR tXAHINATION AREA JUENTIFICATIUN CINCIHtflRt:NJIAL W[l US (CONTI>)

1-PZH-:S St II:. LL A TU SHELL I}

l-PLl~-7 SllE LL L fU SHELL ll NO/ ZU lNSIUE RALJllJSl-U SfClllltl 4-P1m-1100-1Hs l?f_LJ Ef NUZZLE EXAM.

ME THllD UJOL UTOW UTLIS UTLl51 IJTl>O IJTbOT IJTOL IJTOW UT 115 UTllST UlbO UT&OJ lJ T'd SWRI

SUMMARY

PRUCl:llUIH: 51-ll:ET tHI. /11£ V.

NllMAE H b00-15/57 00bb2S UEV. 6 b00-15/5"/ 00bb75 Uf: V. R 1100-55/12 007000 N I 0

U N G T R S l: H F J o F C G M R x

x x x x x x

x x

x x

x x - - -

PAGf lb HEMAIH<S


~---

5X (15 JNCUfS) (If wt Lil Ll:Nt; TH rlAS E.XAMIMEll.

111*1'iliASIC CALIHl~Al ION HLU(Kii01'!A 5-CSCL-112-SAH 5% ( 15 INf.llfS) OF WELD LHIGTl-1 HA3 EXAMINED.

"'"""'RASlf. CALIHHAllUN HLOCI< * "'"'

5-CSLL-*12-SAM

"""'liASIC CALJHl<Al IUN HLOCK*'""

IH-C SCl -tl4-~At1

SALEH 1;1:.MLHAT1NG STATION llNIT 1904 l~StRVICE EXAHINATIO~

CLASS 1 COMPUNl:.NT9 Pl<E SSlllll Zl:.K (Sf I. FI GUIH' A-5)

(CONTI>)

ASME SECT X 1 ITEM Nll H2

  • 2 112.2 IJ2. 2 112.2 ll2.11 ASM[

Sl:.Cr XI CAlGY U-D ll-D 11-IJ 11-ll 11-1;-2 Wtlll NlJMlltH ANll/lll<

EXAl1INAJJ1)N Al<f.A lllt:NflfJCATIUN NUULL JNSIUE HAUlllSED SECTlUM (CUf'ITD) b-l'HN-1105-IRS llELIU NUZZLE b-l'llN-1104-lilS Hf Liff NUZZLE b-PllN-1105-lllS tH_LH.F NOZZLE 4-l':lN-11~1-[H5 Sl'HAY NUZZLE tlllL 11 f\\iG I' lll llUL TING -

t-fANWll Y EXM1.

ME THOU U153 Ul'i3 lll55 lJ l bO Vl SWRI

SUMMARY

PIWf.t.DURl SHH T NO./HEV.

NllMllt_R IJ00-~5/12 007100 000-55/12 007200 000-55/li:' 007300 tJ00-~5/ 12 0074011 llE V. 2 900-1/50 00 7li20 N I 0

0 N G T R S E H E:

J (I

E::

C G M H x - - -

x - - -

)( -- -

)( - - -

x - - -

PAt;E 1 7 REMARKS

"'**HAS1C CALIAHAllCJN llLOCK***

rn-csu-1111-SAH

"'*"'BASIC CALJtlHAIJON HLllCK**"'

IH-CSCL -t111-SAM

      • llMllC CALI~HI\\ Tl ON ALOCK"'"'"'

I H-C sn-1111-:; AM

    • "liASJ C CALJllH/lllUM fllllCK**ll 111-c SLL -1111-s AM

SALE:.M 1;t1~LRATI1H; STAllUN UNll l9111l ltlSf-.IW}Cf f.XAl11NA1llltl CLASS 1 CUHPUNtNTS STEAM 1;fN[ktdU~ lj lSt.E Flt;1JHI: A-b)

ASMt:

SEr.r XI I rtH IHI 1n.1 1u.2 tB.2 ASM~.

SFCT XI lA 1 GY 11-1\\

11-D 11-D WELD NllMtll.ll ANO/UH f-. X A 11 IN A I Ill N A tl t A I ll [ N T IF I l A 1 llltl C 1 HCIJMF[tl[N TI Al. WEl OS l~-STG-11 LUWEH HEAU ru lUUE SHEET NUllLL INSIUE RADIUSEU SECTION

.H-HCN-11 rn-rns

>*J-llCN-1150- ltlS EXAM.

HE T liOI)

UTOL IJ 1 ll I>

UJL15 Uflf51 IJTbO UT60T lJJjO lll~~q SWH I

!H!t1MAHY

.PHUCtlllllH: SHI:. E 1 NO. /HE V.

NlJHllUl bOU-15/57 009700 OE V.

H uoo-ss11~ 009000 uou-55/12 uo'l*rno N

0 U r..

t; T R S I:. ti E I II f.

C G H R x

x x x

)(

)(

x - - -

x - - -

1(E tlAUK S SX (22 INCHES) Uf WELD LtN~TH WAS EXAHlNff>.

      • HASIC CALIBHAllUN BLOCK***

5-CSCL-42-SAM

    • tr HAS IC CAL ll:llU I JON RLOCK u
  • 11<-csu-1111-sAH
      • AASIC CALIRHATION HLOCK***

11<-LSCl -114-SAtl lH

SALEH G[NEHArlHG STATION UNl~

1911<4 HlSLl~VICE EXArllNArlllN CLASS l CtlMPUNEN IS

~HEAM GE.NEHATllH l'J (SH flGIJRE A-7>

ASHE

!!ECT XI ITEM NU ASME SH r XI CArGY WE.LI> NUHIH: ll ANU/IJll fXAMltJATION AHEA llJllHHICATlUN E.XAM.

Hf_ Ttlllll SWHI StltltlAHY PHllCflllJIH*. tHIEf 1 N0 0 /HEV.

NllHHLH t:IHCllMf-tHtNrlAL WE.LIJS u.s. l H-11 llJ-!.iJG-11 LUWFH llEf\\O rn 11111[ Slit.ET llTOL UTOW UTIJ5 lJft~5T Ult>O UlbOT bOU-l~/57 OlObOO llf \\I. II N

0 ll E c -

x x

x N

s I

G -

x* -

x 0

(, 1 l-. H

() E H

x - - -

HFMAHKS

~X C22 INCHES) hf

~E.LO LENGTH liA.S t XAMINEfl.

      • ~ASIC CAll~HATJON ~LOC~***

S-t:SCL-ll<!*SAM

SALEl-t b(llLRAJINl; !>IAllUtl llNil 19H4 INSEHVICE fXAMlHAlllJN CLAS:> l CllMPlltllNTS Ol[MICAL AND VUUJMI: CUtlllHIL SYSltM

'AStlt SECT X J JTlM NO 114.5 A:.iMI:

SLCT X J CAlGY ti-J 1)-J R-J H-J WELD NUMllt.H ANIJ/UH EXAl11NAfltJI~ AIH'A JIJlNTlf ICATILIN s-cv-114.S (SH r IGllllt A-6) 3-CV-1111.S-6 ELIHHi TO 1'11'1:

3-CV-11113-21 EUJIJW 10 l'll'f.

.s-cv-11111 (SEI: FIGUHE A-9) 3-CV-11111-6 P IPI: TO ELllUW

.:s-cv-11111-15 ELllOW TO llHANCH CUIHIEC I ION EXAM.

Hl:THllO UTOL

  • UT4S lHll5T UlbO UTOL ll fll5 UT115T lHbO UTOL UT 115 UT 115 T lJT bU IJTOL IJlUW IJ145 lJ T 4':i T lJTbO SWHI blJMMAHY PIWCt:OlJRI: SlltET Nll./HfV.

NUMIH:R b00-3/bl 012900 UEV. 12 b00-3161 Ul4200 DEV. 12 t-.oo-3101 OlblOO DI* V

  • l~

b00-3/bl OlbtlllO UEV. 12 N

0 0 N r.

T

" s f fl

f.

I n I:

C G M R

-x - x

)( - x x -

)(

)( -

x -- x

)(

x x -

)(

)( -

x x -

x - x I' AliE 20 lltMAllK S

      • HASIC C AL 1 H ll A I I UN II L 0 CK u
  • 3-SS-lbO-.ll':ii-30-SAM
      • AAS IC CAL Hil~A I JUN BLIJLKiu*

3-SS-lb0-.451-30-SAM

"111-.BASIC CAI. !£\\HA I JUN AUICK"*"

3-SS-lh0-.1151-30-SA~

Nil EXAMINATION flWH II-ft lJllWN-SltffAM SllH'. Ulll: r o f\\UANCH CON~I(( T JUN CUNfJGUHAI lllr.t.

"*"llASJC CALIHHAllUN ALllCK*"*

3-SS-lb0-.451-30-SAM II

SALlH G(NLHATING SlATlO~ UNll l 9811 INSUIVICE EXAHINAT ION CLASS l COMPONENTS CllEHJCAL AND VIJLUHE CUNflHll SYSTHI (COtHOI ASHE SECT XI ITEM NU llit.5 ll'l.6 ll'l. 6 lSll. H

~11.8 ASMI:

su: r x 1 CATGY tl-.1 ll-J H-J U-J tl-J Ii ELD NUMllt ll ANIJ/llR t:xAMlNAfl1)N Akl.A* ll>t:NTlflCATlUN 3-CV-1133 CSEE flGUHE A-10)


~---------------

s-cv-11 B-9 I' 1Pt:

JO Ellll)W 2-cv-111s (SH. FIGllHES A-11 1 A-12) 2-CV-1175-12 PIPE. TO ELBOW 2-i:V-1175-U fl HOW TO PIPE

. 2-Cv-1175-27 COlll'LlNG T Cl PIPE 2.-CV-l l 7S-2')

ElllllW l (l Pll'E EXAM.

.Ht.rHOll UTOL UTllS UT'l5T UlbO PT Pl PT PT SWH[

SUHHAHY PRUCEOURt Sl1EE T NU. /HE V.

NllMlllH 600-3/bl 0 l 7700 OEV. 12 200-1/Sb 019700 llEV. 2 200-1/Sb 019t100 Dfv. 2 200-1/Sb 021200 DEV. 2 200-l/5b 0211100 UEV. 2 N

0 0 N G 1 If S E H E I O E C: G H R x

x x -

- x x - - -

x..;. - -

x - - -

x -- -

l'Abl:

21 tU.MAHKS ur111BASIC CALlRHATIUN HLOCKH**

s-ss-1bo-.1Js1-10-s11~

SALEM GlN[RATlNG STATION UNil lqttll l~SLHVICE EXAHINATIUN CLASS l COHPUNtNTS PRESSUHt RELIEF SYSTEH ASHE SECI XI ITEH NU ASME SlCl XI.

Cl\\TGY WELn NUMUER ANO/OR EXAMINATION AREA IOtNTIFICATIUN EXAM.

H[ TllOO SWtH Sl'HHAflY PHUCtDUIU SllHT N0 0 /REV.

WHll:JER


~--------------------------------- -------- --------- -------

b-PH-llOS (SEl Flr.111~E A-131


~---

Uq.5 H-J 6-Pl!-1105-b UTOL bOO-Hbl 02l7*00 ELUllw 10 LLllOW llT 115 UEV. 12 IJl 115 T UTbO b-PH-1101! ( SEI:. FJGllHE A-111)

-~-------------------------

till.. I ll*f 6-PH-11011-l PT 200-l/5b *o2Jqoo NOZZLf TO SAFE-ENO DEV. 2 IJTOW

  • bOO-Hbl llTllST UEV. 12 tilt. 5 li-J t>-l'H-11011-7 IJJOL bOO-..S/61 02qOOO ELIHJW 10 Pl Pf u J 11'.J VEV. 12 1111151 llTbO b-t'l~-1103 ( SEt: flbllHE A-15)

Utt. l 11-f l>-t'U-110.~-1 PT 20U"l/'.ib 0211600 l~OllLE T ll SAf[-UllJ OfV. 2 II TOW bOU-3/fil UT115l UEV. 12 N I D

0 N G T R S E tt E l 0 E C G H R x x

)( -

)(

)(

x

)(

)( - - x -

)(

)(

)(

x -- -

)(

22 Hf HARKS

      • HASIC CAI. ltUU I' ION ALOCK*"'*

b-SS-lb0-.7611-2~-SAM Nll*UJ FROM HIE llPST!llAH UR OOHNSTREAH SIOES (JUE Ju ltll NOZZLE ANO SAF E-ltJU CllNf'lGU-HAllUNS.

1u*IUSIC CALlllRAllUN llLllCK***

b-Ss-xx-1.5-bll-SAH

      • llASIC Ci\\LJf'HAI JUN AUICK *"*
  • 6-SS-lh0*.7611-t5-SAH N(I UT fROM HIE UPSTREAM (JR UOr4NSTkEAM SIDES DUE 1 ti IHl NOZZLE ANO SAf E-f_NV CONFIGU-

~AllON:, *.

      • HASIC CALll\\f(AllUN BUICK***

h-Ss-xx-1.5-b4-SAM

SALEH GENEHAllNG STATION UNIT *1 t98q INSEHVICl EXAMINAllUN CLA5S I l:llMl'lltH::Nl S PHESSUHI: HFLIEF SYSlfM CCUNIU)

A!it'lt SECJ XI ITEM NO A!IMl-SI" CI XI CATGY W[LU NU11lll:H AtW/OH EXAMINATION AHlA IUl:.NTIFICATIUN EXAM.

Ml:. T llllO Svllll SllMMAHY l'tWCl:.OlJIH. SUH I t~U./HEV.

NllMHl:H b-l'H-llOi (SEE. FIGUnE A-151 (CONTI>)

N 0

0 N G 1 H S f H

F. l 0 E C G t1 R lffMAHKS PAGE 23

SALEH GfNl:RArlNG STATION UNll 1904 l~StHVICE EXAMINATION CLASS l CUHPONENJS PHf.SSIJlll:. llELIH SYSTt:r-1 C*C UN f LI)

ASME SEC I XI I HH Nll IJ4.5 IJ4.5 ASHI:.

Sl:.C I X l CATGY ll-J H-J lif LI> NUl111E II AtHl / lJU EXAMINAllUN. ARl:A IUENlltl(AflUH

---~--~--------------------------------

3-Pll-1107 (SEE flGUHt A-lb)

(CUNlU) i-l'H-!107-10 PIPE fl) VALVE S-PH-llOt. (SEE FIGIJHE A-17)


~----

S-PH-llOb-7 fLHUW lU l:LIHHI EXAM.

HE TllOO UTOL llTOW UJ!l'i UT4~T lllbO tJlOL IH45 Ul4~1 UlbO SWIH SIJMHARY t'RU(lOIJIH:. SUH T NO.IHl:V.

NUt1Hl:R b00-3/bl 027800 IJEV. 12 t.00-]/bl 028900 OE:V. 12 N

0.

0 N G T H S E ti E I 0 E C Ii M R

)(

x - - x -

x x

x

)( -

x - - x -

24 llE11At<KS NU EXAHINATlllN FIWI', TtlE l.IOWN-.

ST HE AH SIOE OUE TO VAL Vf CIJNF I GUHA T ION.

AU*HASI c CALI llHA T lON BLOCK***

3-SS-lb0-.451-]0-SAM U*llASlC CALllmATIUN RLOLI<***

3-SS-lb0- 0 451~10-SAH

SALEM t;tNLHAllNG MTATIUN UNII 198q IN~EHVICE tXAMINAllUN CLASS 1 COHPONlNTS PRESSUH l Z l Nt; SY :n t M ASHE A!JME SECT Xl* StCT Xl 1 TUI NO CAlhY WlLO NUMUER ANO/UH E.XAMINAllUN ARl:A IOENTIFICAJlON E.XAl1.

MF. 1 HOI>


~------------------------------- --------

B4.5 11-J 1\\-J B-J ti 4. l 11-f 4-PS-1131

(~EE FIGUHES A-19, A-20, A-21) 4-PS-I 131-1 l\\t<ANCll CUNNH Tl ON TU PIPE 4-Ps-1n1-12 PIPE 10 f..LBUW 11-Ps-1 n1-u ELllUW 10 VALVE ll-PS-1131-24 TH T 11 I' l PE q-PS-lUl-2'1 SAft-LNU TU NOZllt UTOL urqs lllll5T UTbO llTOL Ul115 lJT 115 T Ult>O UTOL UlOW UT45 UT45T Ulbll UTOL llTOW llT45 Ul W:i T UTbO Pl urow SWHI SUl1MAnY PROCEDURE SHU:T NO.lkEV.

UUM~f.R b00-3/bl 030100 DEV. 12 b00-3/bl 0317011 l>EV. I 2 bOO-.S/bl 03~900 OEV. 12 b00-3/bl o:nooo l>EV. 12 200-l/Sb 033'>00 l>E V. 2 t.00-.S/t>I llE V. 12 N I 0 N R s E t c G x x x

x x x x -

)(

x x x x x x x

)(

x

)( -

)(

x -

I.I G T E H 0 E M R PA!.E 25 HE MARKS

      • RASlC CALll\\HATIUN ~LOCK***

4-SS-lb0-.53b-13

      • RASlC CALIBHAllON BLOCK***

11-ss-1 t>o-. s.st.- u NO EXAMINATlllN fl.WM THE UOWN-srnEAM Sll>E IHlt lU VALVE

. CONF I GUH A Tl Otl.

  • u,BASlC CALlliRA 11 UN BLOCK***

ll-SS-lbll-.5.Sb-13 NO EXAMINATION FHUM lllt_ UP-STHEAM SIDE OUE TO Tt~ CONfIG-.

URAllON.

      • HASIC CALIHHATION HLlllK***

ll-SS-lbtt-.53b-l.S NO f.XAMINATIUN fHOM Tiit: UP-STHF.AM OR l>OWNSllffAll Sll>E.S llllf TO TllE NUZZLl ANO !iflf F-ENI>

lONflGURATIONS.

NU UT4~T SCAN 011[ IO.WHO CONfll;lJkATICIN.

  • ** ll AS l C l AL l fl II A I I UN H L II CK***.

n-ss-1t.u-.556-13

Si\\LlH GE.NlRATJNG STAflOll UNll I 96'-I IN SE.RV I CE E OllltlA Tl Otl CLASS 1 COMPUNENJS

~HESSUklZINL SYSTEM CCONTO)

ASHE SECT XI ITEM NO uq.s 114.~

AS Ht SECT XI WELi> NllttUl:.H ANll/OH EXAM.

CATGY fXAMINAJIUN AHEA lllENllflCAJIUN HETHOU H-K-l li-J H-.J ll-PS-1151 CSEE FIGllHES A-l'I, A-20, A-21)

CCONJLl) 4-l'S-llll-l4PL PIPE LlJG 11-P::i-l l l l (SH FI GIJUE A-22).

1.1-Ps-1111-1~

PJPE Ttl PIPE ll-l':i-1111-23 V~LVf TO JEE llTOL UTOW 11rqs UTll5T IJTOL UTOW Ulll~

UT'-151 llThll Pr UTOW UTllST SWIH 511Mt1ARY f'IWCtUIJHI: SHHT NO./HEV.

tlUMHtR bOO-~/bl U35bll0 OE V. 12 b00-3/bl 0361100 OE.V. 12

~OO-l/56 036500 l)E V. 2 b00-3/bl UEV.

12 N I 0 N H s E I c G x*-

x

  • x

)(

~

x x

)(

)(

)( -

)( -

)(

)(

G E

I)

H u

r H

f R

2b l<EMARKS NII 11Tlt5T SCAN OIJ WlLO UllE 10 HELO CONflGlllUJJON.

      • BASIC CALIRHATIUN ElLOCK***

lt-SS-1b0-.53b-l~

LIMI TEO l:XAMINA l ION f ROM TllE UPSTHEAH SIOE UUl Jfl TttE INNER RADIUS Of Tl-lf ut:t-H PIPE.

    • -.RASIC CALIRRATJON HLllCK"'u lt-SS-lb0-.53b-13 NO Ill FROM T tlf* UPS 1 Rt Ml OH OOio'INSTHEAM SJDE OllE 10 VALVE AND TEE CONFIGllRATlONS.

PT HAS PERFOHMEO AS A SUPPLE-MENTAL E><AMINATIUN.

      • HASIC CALIHRATIUN HLOCK***

lt-SS-lh0-.5~6-13

--1

SALl:M 6[NLHAJINC; SJATlllN IJt:lll 19Uq lNStRVICE EXAHINATJON CLASS 1 CllMPONl::NTS IH'.ACTOR CllULAIH SYS llr1 l

ASME SECT XI ITEM IHI A:lliE S[ CJ XI CATGY liELll NIJMUf.H AND/IJH EX At11 NAT I ON ARf.A ll>EtH It-JC Al llJN


~---------------------------

H-llC-11~0 CSH flGllllt A-7-q)

EX 1\\11.

ME Tltlll>

S:~tt I SlJNMAllY P~OCl:l>lJ~l SHE.fl N0 0 /UEV.

NUHHlH N

0 IJ N G 1 R S f H E I 0 E C G 11 R RF.MARKS P/lt>E 27

REACTOR COULANT SYSTEM (CONTUl ASHE SECl XI WlLll NUHH[H AN~/OH SALEM 1;LNUHllNG :iJATlON llNll J9tlll IJlS[H\\IICI: f:XAMlNAllllN CLASS 1 ClltWllNlf~ rs SWHI SllHHAHY EXAM.

PHUCl:.llUIH'. SH(El ASHE SHT Xl ITEH NO CAlGY

[XA11lNAllLIN AH[A lllEIHlflCATlllN M(Tllllll NO. llHoV.

Nllt1Hl H 29-HC-ll.\\O CSEI:. FIGURE A-281 13 4. 1 H-f 29-RC-1130-5 Pl 2110-1/56 050210 EL HOW TO NOlZLI:.

DEV. 2 UTOW t>00-3/ol UT45T OEV. 12 27-1/i!-RC-I no (SlE F lGURl: A-32)

U4 0 5 U-J 27.':>-RC-1 lJ0-2 llTOL t>00-3/ol 05l>b00 PIPt: TO PIPE UT 115 IJEV

  • 12 Ulll5T lJlbO 27-IU-RC-1110 (SE f F IGURI:'. A-314)

HQ. *1 u-J 21.s-Hc-1110-1111-PS-llll I' 1 200-l/5b 0'>9100 II IN. ORANCll CUNNLCIILIN l>EV. 2 3-IU,-11'13 <SH F { 1;111ff A-35) l)ll. 5 B-J 3-l~C-ll'l3-17.

UTOL b00-3/t>I Ut>llHIO lLIUW Ill VALVE llTOW 1.Jl v. 12 UPl5 u1q5f ll T,60 PAGE 28 N I u

0 N G T R s f H

  • E I u E

[

r. M R IUHAHKS x -

NCI ll T FHUH 1 HE UPS THI:. AM UR uu111rrnrntAl'1 SIDE OUl 10 ELllOW

)(

ACUll9TICAL PNOPf:.NTIES ANO

)(

NOZZLf CUNflGllRATION.

      • llASIC CALI BHAT ION HLOCl<u.-

2.312-SS-H-SAM x -- x

)( - - -

- x

  • UHA!HC CAL IllRA 1 IUN flllJ(Kili**

2.:Hc.>-SS-37-SAH x ---

x ---

tlO EXAMINATION flWM THE llUWN-x -

S l>>E AM Slfll 1.Jlll l ll VALVE.

- x x

~

CONFIGllHATION.

x -

- x

      • llASlC CALI IHIA I I UN HLO(K*"*

.\\*SS-lt>0-.1151-30-~AM

SALEM 1;[NfRAl!NG STAllON llNlT 19HQ INSfNVJCI: fXAMJNATJON llASS l LllMPllNENlS REAClOR LOOLANT SYSIEM (CUNJI))

ASHE SECT XI JTEH NII llll.S Ull.12 A~HI:

Sl:[l XI

~l:LU NUM~l:N ANLJ/LJN EXAM.

CATGY EXAMINAT11JN AREA (lll:NTiflCATION MEltlOU H-J H-J H-J 3-RC-113~ CSff flGUNE A-3bl 3-RC-I l B-b ELllOW TO PIPE:

3-RC-1133-11\\

VALVI: TO URANCh CONNECTION 3-RC-1123 (SEf FIGURE A-37) 3-HC-112:5-lll PIPI: 10 FLANGI:

S - ti C - l I ~ 3 - l 'It-ti f L AtlGl llOLT I NG UTOL UT45 UT1'~T Ul60 Pl llTOL lJ J Ow lllll5 11Tll51 llJ bO VT SWRI

SUMMARY

l'IWClllURI: SllEE 1 Nll 0 /Nl:V 0

NllMHLR 600-3/bl 062500 IJEV. 12 200-1156 Ob31\\00 OEV. 2 b00-3/bl DEV. 12 bOU-3/bl Ob5200 UI: V

  • 12 9011-l/50 Ob'i300 N

0 N R s E I c G x

- x x

)(

x

)(

x x

x x x -

x x

0 G T E It 0 E H R Hf HANKS

      • llASIC CALIAHArioN ~LOCK***

3-SS-lbO-.ll51-30-SAM

?9 NO Ul FRUM ltlf UPSlRl:AH UR OOWNSTtffAH SIDE Ullt JO VALVE ANO

~RANCH CONNECTION CONflGU-RATIUNS. PT WAS PERFORMED AS A SUPPLEMENfAL l:XAMINAllUN,

      • ~ASIC CALIHHATIUN ALOCK***

3-SS-lb0-.ll51-30-SAH NO EXAMINATION FHOH rHE UCIWN-SIRE AH S IOE Olli: TO FL ANGI:

CONflGUPATIUN.

      • BASIC CALIBNATIUN llLUCK***

3-SS-lb0-.451-30-SAH

SALLM 6ENLHA11NG STATION UNIT 1904 INSfHVICt EXAHINAJIUN CLASS l COMPONtNTS HEACJOH COOLANl SYSTEM (CONTIJ)

AS11E SECT XI IrE11 NII lill. 5 l}lj. 5 Hll. 1,?

Lill. 8 ASHE SECT XI CAJGY U-J H-J H-G-2 El-.J WLLO NUHUEH ANO/UH EXA11l~AJION AH~A IOENTIFICATIUN 3-RC-1123 C:iEE flGllHE A-37)

(CONJI))

3-Rl-112.S-15 FLAUGI: T ll l'IPE 3-Hl-111.S C SEE f I GllHf A-30)

~-RC-1113-14 I' I PE 10 FLAllGE

.S-RC-lll:S-14fH FLANf;t Ulll Tl NG

?-Ill:- I I 1111 CsH flGUllE A-39) 2-llt:-lllili-lS PI r1: llJ 11: ~-.

EXAM.

Ht TttllU UTOL UTOW UT45 UT45T llTbO llTOL UTOW U14S IJTll5T IJT60 VT Pl SWHI

HJllMAHY PR UC t r>URI:. !>ttt:f T NO. /Rt V.

NlHIBEll 600-3/61 01>5Li00 IJEV. 12 600-3/bl 01>7100 llE V. 12

<JOO-I/SO Ob7200 200-l/5b 01>/l'lOO l>f v. 2 N

0 0 N G l R S I: ti E I 0 E C G H H x

x

)(

x x -

)( -

)( -- )(

x - x x - - -

)( - - -

PAGE 30 HEMAHKS Nil fXAl'llNA T TON FROM HtE UP-S THE Al1 SIOE. l>llE 1 (I fLANGt CONFIGURATION.

      • HAS IC CALll:IHA J IUN FILOCK***

3-SS-lt>0-.451-30-SA~

NO EXAHINA TIUN FIWM THt UOWN-STHEAH SIDE UllE T fl fLANGt CONFIGURATION.

      • HASIC CALIHHAI IUN flLOU<***

3-SS-lb0-.1151-30-SAH

SALEH GENERATING STATION UNIT 19H4 INSEHVICE ll<AHINATION CLASS l COMPONENTS

~tAClOH CUULANI SYSTEM ASME ASHE SECT > NUMUEH AND/OR l:XA~INAllON AHEA !OENTJFICATIUN EXAM.

Hl H101l SHH I

~iUMMARY PHOflOUHl SHEi: 1 N0 0 /HEV.

NUMHER 11-J H-J Bll.5 H-J U4.8 u-.1 ll4,8 11-J 2-RC-11112 (SH flGllHE A-40) 2-RC-11112-20 I' IPE. rn EL ROH 2-l~C-11112-21 ELUOW 10 Pll'l 2-RC-1141 !SH FIGllllf A-117) 2-Rl-11111-1 TH TO PIPE 2-HC-11311 (SEE flGllllt A-Ill) 2-RC-11311-10 VALVI: Ill P ll'E.

2-HC-1132 (SEE f IGUHt A-Q2l 2-tH.:-l U2-I>*

l'lP( TO VALVI:

PT Pl Pl UIOL UT 115 lJ T 115 T Pr.

200-115<<>

071500 OEV. 2 200-l/Sb 07lb00 01:. v. 2 200-l/Sb ll7lll00 b00-39/2 DE. V. II 200-1/Sb OHlOO l>EV. 2 200-1/~b 0711~00 llE II. 2 N

(I 0 N G T R S f H

E I 0 E C G H R

)( - - -

x - - -

)(

)(

)( -

x -

x - - -

x - - -

l'A!.I:

31 HEMAHKS LIHIJEO UT fHOM IHI: UOWNSTllfAH.

SlOf OUE TO THE P~OXIHlTY Of HELD 2-RC*ll41-2, NO Ul fHOH THE u*PSlt<EAM SIDE Ollf. 10 TH CONFIGURATIO~.

PT WAS PLH-FORMEO AS A SUPPLfMENlAL EXAMINATION,

      • UASIC CALlR~AllON ~LUCK***

2-SS-lb0-.330-39-SAH

SALEM GENLHATIN~ :;TAllUN UNll I'll.Pl lllSlHVICf fXAlllNAllllN CLASS l CUHPUNfNlS HEAClUH COllLANl svsrEM (CONTU)

ASHE SECl X l IlE.M NU 1111. 6 A:;Mf SH T XI CATGY H-J 1:\\-J 0-J 13-J 11-J klELO Nll/111[1< AND/OR EXAtllNAllllN Al~EA ll>tNllflCATIUN


~-------

(CONTI>)

2-HC-l 132-15 IH Tll PIPE 2-RC-l 132-17N fLANGl TO PIPE 2-HC-1131 (:>EE flGllllE A-in) 2-RC-1131-5 rH lll HElllJCEH 2-HC-ll2q-tl l'(Pl Ill VALVt


~

2-1n:-1122-11 PIPE. Tll l:LIHlW EXAM.

Mt THOU PT PT PT 1'1

>Wt{l SllMMAHY l'llOClllUHt SIH:.f.1 tH1 0 /HEV.

NllMBl.H 200-1151>

01s1wil llEV. 2 bOO-H/2 -075605 UEV.

q 200-1/Sb 07b700 UEV. 2 200-1/Sb 076000 UEV

  • 2 200-l/Sb OHIOO llfV. 2 N l 0

n N G T fl s F H E I (I E.

c (,; H H x - -

)( - - -.

l(

)(

x - - -

x - - -

)( - - -

PAGF 32 Hfl1AHKS.

8ASELINF EXAHJNATIUN.

NU EXAl11NAIJON FHUM lHF UPSlRtAH SIUE llUE. TU FLAN~f CONFIGU-HA TIUN.

      • BA~JC CALIBRATION HLOCK***

2*SS-lb0-.330-39-SAH

SAU:H r.t.NlHA TING STAT lllN UNIT 1984 INSl:.RVICE EXAH(NAllON CLASS I CUMPUNENTS

~tACTUR COULANl SYSfEH (CONTI))


~--

ASME SECT XI ITEM NU

04. '2 U4.5 HLl.IJ 114.6 ASME SECT x I CAIGY H-G-2 6-J tl-J H-J WELi> NUMHE.H ANU/IJR EXAHWAllON AREA ll>ENflFlt;ATIUN 2-RC-1122 (SfE flGlll~E A-44)

CCCl1HL>)

2-HC-1122-tofB fLANl>E IHlL f ING 2-llC-1122-1 7N fLAtlGE JO. Pll'f.

2-wc-111a (SH FI1;111ff A-45) 2-fH>*l l l*l-I\\

11:.E TO PlPI:

2-llC-l I l'l-'I PJP[ ru VALVt:

  • f.XAM.

METHOD VT UlOL lJl45T PT PT Pl SWRI

SUMMARY

PtHJCElhmt. SllU T N0 0 /HEV.

NUHHER

'100-1/50 0110400 bOO-H/?

0801105 UEV. 4 200-l/Sb

.082200 DEV*. 2 20U-l/5b 082100 l>EV. 2 N I o

0 N G T H S t II f-I O E C G M R

)( - - -

x x

- x x

)( - - -

H REHAllKS BASFLINf EX~MJl~Al ION.

LlMllEO UTOL ANO-UT OW SCAN$ ANll NO Uf45 SCAN FRUM Till OUWNSJREAH SIUE.OUE TIJ THt PROXIMITY Of WELll 2-~C-112'?-18.

NO [XAHI-NA TIUN FROM HIE UPS TH~. AM Sll>E UllE TO THE f-LANGI:. CflNFIGUHA-f ION.

u11!1ASJC CAl.lHHATIUN HLUCK***

2-SS-160-.130-19-SAH SEE CNF 84-1-008.

llNF LINE.AR INl>ICATION.

HE-f.XAMlNAl (UN AF rm COSMETlf HUFF IUr. fj y PSEK.f; lff.VEALEO NO HECOIWAHLf lNDICAflONS.

SAU.H l*ENLH A q 111; S rA TION UN l T Jq8Q lNStHVICt EXAMINATION CLASS 1 COMPUNENIS llEACTOH COOLANT SYSllH CCONIU)

ASMf_

SECT XI 11[11 NO ASMI:.

S[l;T XI CAlGY WELD Nll~llt 1{ ANll/llH l:.XAMINATIOI~ AH[A IDtlHHICATION EXAM.

ME I tHILl

  • SWMI SUMMAHY l'IWCtOUHt SHffT WI. IHI: V.

NUMllE R 2-RC-1112 (SEf. fllillHE A-4b) i\\4. 6 ll-J 2-HC-1112-1 OH Al~Cll CllNNfCTlOfll TU PIPE U4. ll B-J 2-l{[-1112-4 I' 1 l't ro l:_Lfll)W UQ.12 tl-G-2 2-uc-1112-lbFli fLANG[ llULTING 114.5 U-J 2-HC-1112-1 fN fLAl~GE TO P ll'E PT I' 1 VT UTOL UT45 Uf '151 200-l/5b 06.BOO OEV. 2 200*:..1151>

083600 IJE V. 2 900-1/50 Otl4q0~

bOO-Jq/2 OH500~

OEV. 4 N I U

ll N G 1 RS t.H E I n f C G M R x

x x

x

)(

x PAGE 3Q HASELIHE EXAMINATIUN.

NU EXAMINATION fHUM TIU llf'STFH.AM SIOE l>UE TU FLANGE f.UNF IGll-HA II UN.

      • AASIC CALIHHATIUH BLOCK***

2-SS-1b0-.330-3q-SAM

SAL[H CLNtRATlN~ SlATION UNIJ IQ84 INSLHVICE EXAHINAllON CLASS l COr11'UiltNTS HESlOUAL HEAJ NLMOVAL 5YS1EM AS Ht SEl:T XI II EH NU 114. 7 H4.5 tt4.s*

. Hll. 5 114.5 ASHE Sff.T XI CA 11; Y Wllll N.UHllt II AND/OR EXAMINATIO~ AkEA IDLNTJFICATION


~------~---------~------------~---

H-J U-J B-J ll-.1 B-J 111-llll-llll (SEE F(GUHE A-52)

I 4-lm-l l l l - l / o-S.1-1 I 11 b

IN. HRANt:H CUIJNt.Cf JUii 111-1m-1111-11 I' I Pl-_

TO lLllllW 111-1111-1111-1 lLLlllW TO Pll'E 111-1111-1111-111 VAi.VE:

lll l'lPE 111-trn-1111-1'>

P 11'1:. 10 t LIHJW EXAM.

HE T lllllJ PT I

IJTOL lJT45 Ulll'il IJTbO UTOL llTOW UT45 lll45T IJJbO UTOL lJJ45 UJ45J UJbO Ill Ill UJ115 ll I 451 UTl>O SwRJ SIJMHAHY l'RUCELlUIH. SllLE I NU.11-:EV

  • tHJMHER 20U-1/5b 0'123110 DEV. 2 b00-3/bl 092600 OEV. 12 bOO-~lbl 092QOO l>fV. 12

.b00-3/bl 093600 l>EV. 12 bOO-Hbl 09.HOO lll'V. 12 N I 0

0 N G T R S I:

H E 1 0 E C G M k x

x

. - x x - x x

)( -

)(

)( -

- x x - )(

)( - )(

)( - )(

x x -

)(

)( -

JS REMAl<KS

      • RASIC CAL1RHA110N RLOCK***

14-SS-lt.0-1 0 400-78-SAM LIHIIEO EXAMINATION fHUM THE UPS rtif.AM SllJE l>IJE I 0 A WELOEU METAL RING.

  • Iii* li ASIC CAL lH I< AT I UN Ii L 0 l K "' "*

14-SS-lb0-1.1100-78-SA~

NO EX AM I NA J ION F IHIM !Ill UP-S THf.AM SIDE !JUE 111 VAL VE CONFJf;IJRATION.

NO llTOW UH UT451 SCAN ON

~lfll> UllE 10 WELD CONFIGURATION.

EXAMlNAllON SCHEl>ULEO lN ACCURUANll WllH If fHILLETINS 7b-Ob ANIJ 79-17.

      • RASIC fALJHHAllUH HLllCK***

1~-SS-lbO-l.1100-70-~AH E><AMlNATJllN SCtif[)llLEU IN ACCOIWANCI: WITll II: ttlllllllNS Th-Ob ANI> i<>-1 7.

_**llASIC (ALIHHA I IUN II.LOCK*"'*

l4-SS-lb0-l.400-7tt-SAM

SALLM GUH*.HATlllG STAllllN UNIT lQHQ.INStRVICE lXAMINAllUN CLASS 1

  • CUMPllNlNl S IU:SIUUAL ltt'Al Hl:.MUVAl SYSHM (CONTI>)

ASME SECT x I llEH NII AS Mt SECT XI CATGY A-J WELO NUHUEH ANO/ON EXAMINATION AREA lDl:.NJl~lCATIUN lQ-fW-1111 (SH fJl;uHE A-S2)

(CUNlll) l 1l-IH1-l l l l-ll>

ELl3UW fO PIPE EXAM.

M[ T 1 lllll LITOL UTQS UTQST lll bO SWNI SUHHAHY PRUC:tOURL :;ttLET l\\lO. /NL V

  • MIJllHl:.I~

b00-3/bl U93t10U

  • u1: v. 12 N

I)

R E c x

N s I

G

- x

)(

IJ G T

~

t1

() I'.

H R

- )(

)( -

lffMANl<S EXAMINATION SCHEllllLFO IN ACCOHOANCE WITH lf HllLLE IINS 7b-Ob ANll 79-17.

      • BASIC CALIHHATIUN ALIJCK***

14-SS-lbO-J.U00-7tl-SAM 3o

SALtM GtNl:NATlNt; STATlOtl ll"lll 198q IN9E:.NVICI: lXAHINATIUN CLASS 1 CllllPUllLNTS SAFETY INJECTlOH SYSTEM ASHE SECT XI 1 TE M NU AS Mt SLC l x I CATGY n-J ll-J H-t<-1 H-J wru>

NlJHUfl~ ANO/UR EXAtllNATlllN AlltA llll:NI H ICATllJN 10-SJ-llql CSEt FIGURE A-54) 10-SJ-1141-9 I' I PE TO F.:LIUIW 10-SJ-1141-10 ELBOW TO PIPE lO-SJ-1131 CSL[

~lGIJNE A-~5) 10-SJ-1131-SPS PtNETNAJION TU PIPE lO-SJ-1 LH-l>

P ll't T 0 t LllLJW EXAM.

Mt TllUIJ llfOL Ill OW UT45 Ulll5T llTbO IJTOL UTllS UTllST UToO UTOL llTOW UT45 UT45T lJTOL urqs llT45T UlOO SWIH Slll1HANY PRUCLOUNE SHl:f' T tHl./HfV.

NllMHt.R b00-3/bl 096200 llEV. 12 t>00-3/bl 09td00 DEV. 12

(,00-3/bl 098000 LIE V

  • 12 b00-3/bl 096100 DEV. 12 Ill I)

R E c -

)(

x -x -

x -x -

x x x x x -x 37 0

N G r s E:.

H l

(I f G M R REMARKS LIMllf.ll EXAMINATION f flUM THE UPSlHF.AH SIDE !HIE 10 Ttlf

)(

)( -

PROXIMITY llf AN ADJ AUNT WELDE() RIMG.

)(

)( -

11r11r111BASIC CALIHNATllJN hLOCK***

1U*SS*l60-1.11Q-?2-SAH x x -

)( x -

1H1'E\\ASIC CALIEIRA TION HLOCK***

IO-SS-160-1.119-?2-SAM NO F.XAHINATllJN flHIM Htt: UP-SH!EAM SJOE OllE:. 10 Pf_NlTHATlllN C(JNf I GURA l I IJN.

llr**BASIC CALl~HAllON HLUCK*llrllr lO-SS-lb0-1.119-?2-SAH x )( -

)( -

11t11ri1t6ASIC CALIUNAI JUN RLOCK***

10-SS-lbO-l.llQ-?2-SAM

SALIM GlNERATING STATION UNIT 19tlij INSLRVJCl EXAMINATION CLASS 1 COMPUNE:.NTS SAFETY INJECTION SYSTtM (CONTD)

ASNE ASHE SECT Xl Sl:CT Xl IJ[H NU CATGY U-J LJq. c; 0-J u-J B-J WELO NUMIH:H ANU/UR EXAMINATION ARE A lllENT If ICA TION IO-~J-1111 (SLI: tIGURl A-S5)

( COl'lll))

  • lll"".SJ-11.H-d f'lf'[ TO fLHllW 10-S.l-1131-9 fLllllW TO l'lt'E l o-s.1-1121-3 PIP~-

TO PI Pl l ll-S.l-l 121-li t:.LllllW _TO PI PE f), AM.

ME THOIJ UTOL 111115 UT"5T _

llTbO UTOL UIOW llfij'j II fl15 I Ulbll SHIH SllHMARY PROCHIURI: SllHT NU 0 /HEV 0 tHJl111lH t>00-3/bl 099b00 UEV. 1 i!

b00--5/b) 100200 llEV. 12

  • N 0

R E c -

x -x -

x x -x x I

0 N G T s l H

I 0 E (i H H Rf.MARKS

-x x -

x x -

      • IUSIC fALJflHAIJUN HLOCK***

to-sS-160-l.llq-?2-SAH i~O EXAMINArJUN flWM Jiil DOWN-STHEAM SIDE OllE JO I 1-tf Punx-x x -

IM!IY OF THE:: PENlTHAllUN-SLE.lVE.

      • flASlC CALlHHAI IOM llLOLK *"'*

lu-S9-lb0-l.11Q-?~-SAN

SALLM GtNt~ATING ~TAllOH UNIT l9dQ INSEHVICE EXAMINATION CLASS l COMPONENTS SAFETY INJlCTlON SYSTtM (CUNlU)

ASME ASMI:

SECT XI SECT XI llf.M NO CATGY Wf Lil NllMllf I~ AND/IJH l::.XAt1ll~AilllN Allt A llllflrIFICATlllN IO-SJ-1121 (SU. flGllHE A-Sb) ccn:11 u>

EXAM.

MLT11llU SWHI Slll'IHARY l'IWCUHJHl SHH 1 NIJ./llEV.

NllMnE*:H N

0 U N G T R S E It I: I IJ E C G t1 H HEMAHKS PAGE

SALE.H GE.NtliAT!Ni; SIAT!ON UNIT 19UQ INSf:HVICE EXAttlNAllUN CLASS l CUMPUNlNTS SAFE.TY INJECllO~ 9YSIEM (CONTD I ASME SHI XI ITEM NIJ Bll.S ASML SLCT XI CATGY ll-J U-J B-J B-K-1 Wt:LD NUMll[I{ ANll/IJH UAHINATIUN AHl.A lllt:NTIFICAlIUN 8-SJ-llt.2 (SH. flGUlitS A-58, A-59) l\\-SJ-llb2-1 VALVI:

TU PIPE ll-SJ-llb2-l~

FLllUW TU PI PE B-SJ-llb.?.-2.S PIPL JU PIPE ll-SJ-1152 (:>Et.: flGlllH':S A-bO, A-bl) u-s.1-11~2-IPL-3 PIPt LU~

EXAM.

ML HIOLJ

. UTOL UTOW Ulll5 UTLIST UTbO UTOL UTOW UTLl5 UTL15T UTbO UTllL lJ 111~

Ulll5T UlbO Pl lJ l lll UTll~

lllll5f SWiil

SUMMARY

l'HUCfllUllf: SHH l rw. /IH: v.

NUHllLH t>00-3/bl l01f2U1l uEv. 12 bOO-j/bl 1051\\00 UEV. l.?

hllU-3/bl 106900 OE.V. 12 200-1/'.it>

lll11700 Ill v. ?

hOO-.S/bl

()~ v. 12 N

U 0 ti 1; T II S E H E I 0 E C G M H x

)( - - )( -

x -

)(

x

)( - )( x -

)( -

)(

)( -

)(

)( -

)( - )(

)( -

)(

)(

x -

I' A Gt REMAHKS NO EXAMINATION fllOM THE UP-STHEAM SIOE UllE 10 VALVE CONFIGURATION.

      • BASIC [ALIAHATIUN ~LOCK***

R-SS-XX*.llb0-23-SAH LIMITF.11 E.XAMINATlllN

~RIJH TttE DOWNS lf{f AH S IOE llU~.

111 AN AOJACFNT AHANCH CllNNt[JIUN.

"'**HASIC [Al IHl~AI IUN 11LllCK**"'

R-SS-XX-.llt.0-1.3-SAM

    • "'UASIC [ALIHHAIJUN ALOLK"'**

u-ss-XX-.llb0-~3-SAH LIMI ffl> Ill OUf TU wt LDEll ttA1~1;1:11 HRACKU.

NU UIOW IHJE 10 Hllll AHLA CIJNHGllHAJIUN.

PT WAS PtllfllHMlll A::i A Slll'PLE-HENTAI. EXAMINATION.

"*"HAS IC: [AL Ill HA I I UN 1.1 L l ILK "* "'

R-Ss-xx-.ttho-~J-SAH

SAi EM t;ENl:.l~A l J NG STAT HIN llN IT JC)IJll INSEH\\/ICE E:.XAMINAl ION CLASS I CLIHl'llNl:.NlS SAFETY INJfCTION SYST[M CCON H>)

ASHE SECT.XI llEM NO ASMI:.

  • SECT XI CATGY

. WELD NUHHEH ANU/OH fXAMINATJUN AREA IOENTJFICAllON 8-SJ-llS2 (SEE fJGllHES A-bO, A-blJ 1cm110>

EXAM

  • H[ TllllU
  • SWIH SllHMARY PIWCl:OllRI:. SHHl NO. IHE.V.

Nl.IMllE.R N

0 0 N t; T R S E H E I O E.

C G M H HEMAHlALEH t;t:Nt:HA fl NL; ST A TlUN ll~Jl t9~Q INSLRVICl EXAHINATIUN CLASS l CllHPUNl:NIS SAFETY INJECTION SYSltM (CUN JO)

ASl1E SE.LT XI I TEH NO llQ. 5 U4 0 5 flq.5 UQ.5 A:;ME St.Cl XI f.A Jl;y H-J tt,-J' H-J 1\\-.J

  • WtLI>

NUHttl:~ ANU/OR

[XAHINATlilN AHtA JOENTlflCATlUN IJ-S.1-1135 (SEE flt;llkE A-b3) 8-SJ-1135-b PIPE TU fllh)W b-SJ-llQ?. (SH f I GlltH: A-bll) b-SJ-llQ2-IO PIPE TU ELBOW h-SJ-llQ2-ll ELllOW JO PIPE b-SJ-1 IQI CSH f lLIJllf A-b5) b-S.J-1 IQl-b Pl l'E 10 f.LIWW SWiii

SUMMARY

EX Al1.

PRUC EUUIH. SllE.E 1 MlTttOU NO./llEV.

NUMl\\f-. R llTOL b00-3/bl 1131>00 lll q5 OEV. 12 Ufq51 UTbO UlOL bOO-.S/bl llQ800 U1Q5 UEV. 12 utqST llT hO UIOL bOO-..S/bl 114900 lJTllS Of V. 12 Ult15T 11160 lJJOL bOO-.S/bl 1156011 UlQS OE V. 12 llJQST llTbO PAGE N

0 0 N G T R s E H E I 0 E c G M R UEMAHKS

)( -

)( -

)( -

)(

)(

11t**BASIC CALIBHATIUN flLUCK***

e-ss-xx-.Hbo-23-SAM

)( - )(

x - x u*fJASIC CALlf1HATJON RLOCK***

b-SS-lb0-.7bQ-25-SAM

~

EXAHINATlON :>CllEl>llLE lJ IN

)( -

Ar:tOIHIANCI:: Hlltt If fHJLU_ I INS x

1h-Ob ANO 79-17.

- - x -

      • BASIC CALllll~A I JUN HL!ICKU:*

b-SS-lh0- 0 7hll-25-SAH x -

)(

)( -

x -

)(

      • HASIC CALIHHAllUN HLOCK1r**

b-SS-lb0-.7ntl-~~-SAM

SALEM GENERATING STA~JUN UNIT lq8q lhSERVICt E.)(AMJNATION Cl-ASS l CllMl'(INl:IHS SAFETY lN.JfCT ION SYSTfM (CONIO)

ASHE SfCT )(l ITEH NO llll. 5 ASMI:.

SH I XI CA l t;Y li-J H-J ll-J U-J H-J W[Lll NUMUtk AND/llll fXAMINATION AHfA lUENTl~ICArlON b-SJ-1112 CSEE f IGUWE A-hh) 6-SJ-1132-3/2-SJ-1119 2 IN. llRANCH CONN[CTIUN 6-SJ-1112-6 ELUUW TU PIPE b-SJ-l 132-11 El.HOW TO l'IPE 6-S.1-11.51 CSE.E flGllkF: A-b7) b-S.1-11~1-2 PI Pt 10 E.LllOW b-SJ-11~2 (SEE FIGUHE A-6Ul b-SJ-1122-~

PI Pt: Ill ELlllJW f.)( Ari.

ME. TllOIJ PT llTOL lllll5 UTllST lll60 llTOL UTOW Ill 115 Ul115T lll bl)

UTOL UTll5 llTllSr IJTbO llTOL u1qs LJT 11~; T ll 1 h(J SWHJ

SUMMARY

PRUCtlllJHf. SliE.f T Nll 0 /llEV.

NllHHlR 200-l/Sb 1171100 01:. v. 2 600-3/bl 117700

  • OE V. 12 600-3/61 1181100 oEv. 12.

600-3/hl 118900 uf:.v. 12 t>00-3/61 1212011 llEV. 12 N

0 0 N G T R S F ti E I 0 l C G M R

)( -- -

)(

- x x -

x

- x x

)(

- x x -

x -

)( -

)( -

- x )( -

x

- x x -

)( x -

)( -

- x ). -

Hf MARKS it1uHASIC CALlbHAI JUN flLOlKuit 6-SS-lt>0-.7bll-c5-SAH LIMllEO EXAHINATJON tRUH THE UPSTREAM SIDE lllll:. TO THE PROXIMITY OF WHO b-S.1-1132-10 itititllASIC CALIHHATION ALOCKititit 6*SS-lb0-.7hll-25-SAH

      • BASIC CALIHMAIJUN llLOCK***

6-SS-lt>0-.7bll-c~-SAH

      • tlASl[ (AllllHAIJUM llLO(.Kuit b*SS*lbO-.f~q-?~-SAM

HAFETY INJECTIO~ SYSTEM (CONTI>)

ASMI:

SALEM l.;HH:.RAllNG STATION UNIT lqttq INSERVTCE EXAMINATION CLASS I CtlMPONUHS SWHI SllMMllHY ASME SECJ XI IJEH NU SECT x 1

  • CATGY WELO NlltlBE.R ANO/UH tXANlNllTION AH~A IOENTIFICATIUN

[XAll.

~IE T 11111>

PIWCl:l>UHI: SliEf l NU. /Hf V.

tHIHH[H


~---------------------------- -------- --------- -------

IJQ.5 11-J b-SJ-112\\-Q UJUL b00-3/bl l?.2500 PIPE. TO ELBOW UT5 llf v. 12 llTQST UThll 6-SJ-1112 (SEE FJr.llHf A-70) llQ.5 11-J 6-SJ-1112-3 UJOL bOO-.S/bl 12.SOOO PIPE TU lLHOW Ulll5 DEV.*

I~

UT45T lll 60 ll-SJ-11911 (SH flGllHI: A-73) llQ.5 13-J

'l-SJ-119Q-b IJTOL bUO-.S/bl 12!>200 ELBOW T lJ I'll'[

Ul 11'.)

Ofv. 12 llTll5T ur6u llQ.<J U-K-1 ll-SJ-1 I 'Jll-71'S-2 lJJOL bOO-.S/bl 125500 PLNl TllAT(llN TO PIPE Ufll5 IJE V*. 12 lJTll5 r N

0 0 N G T H S I: Ii E I ll f C G M H x - - -

- x x - x x -

x - x x -

x - )(

x x x

)(

)( - x x -

Hl:HAHKS u*AASIC CALHIRATION HLOCK***

b-SS-lb0-.7bQ-25-SAM it**llASlC CALI 1110 1 llJN HLllCK***

b-SS-lb0-.7bQ-25-SAM

    • itBASIC CALlllHATlllN llLllCI< "'*"'

4-SS-Jbo-.5.Sh-l.S NO EXAMINATION FIWM Tiit UP-Sllff AH SlUE OllE 1 ti P[NlTHATIUN Cllrff 1 GURA T lON

  • NO ll I 0 Ill SCAN OllE 10 Tllf Wt.LU lONfl(;llWAflON.

"'**llASIC CAL lflHAl IUN llLllLK"' *

  • 11-ss-xx-.hH9-1.1~s11M

SALEH GENERATING STATION llNIT.

19UQ l~StHVICE EXAHlNAllUN Lt.ASS l COMPONENTS

iAf£1Y lllJECl (()o'j sv:HEM (ClWlll I ASt1E SECT XI l TEM NO ASM~

SfC I XI CA l GY 0 WELU NUH~EH ANU/OH EXAMINArJuN AHEA IOtNTIFICATIUN ll-:JJ-ll'M (SEE. FIGlll<E 4-73)

(LllrHUI EXAM.

Hl:lllOU SliH I SIJMM/110 PIWCt()URl: SllEf. T NO. /l{E V.

NUMBER N

0 0 N i; T R S E ti E I 0 f C G M R Rf MAH KS PAl:iE Q5

9AFL1Y INJECIJON SYSTLH

( cuu 11>)

ASMl:

WELU NUMttEH ANU/UR SALEM GENlHATING STATION UNIT 19d4 INSLHVICl:. EXAMINAllUN CLASS l CllMPllNENTS SHRI SllHMAHY St:CT XI llf.M NU ASMt:.

SLCI XI CAIGY EXAt11NA I ION Al!E"A ll>ENJ If ICA 11111~

EXAM.

Ht: Tlllll>

l'ROCI:: lllJHl SUH T NO. ll<E V.

IHJMHE.R


~-------------------- -------- --------- -------

4-SJ-1182 (Sl:.E FIGURE A-7q)

( ClltH ll) 1)4. 5 11-J

  • 11-SJ-1182-10 UTOL bOO-.S/t>l 128600 PIPE TO ELHOW u1qs lJE. v
  • 12 UH5T
  • UlbO 114.5 H-J 4-SJ-1182-13 llTOL t>00-3/bl 126900

[Ll)\\IW TU t'lPE UT45 UEV. 12 lll45T UTbO 11q.s H-J 11-SJ-1162-U IJTOL t>00-3/bl 130000 PIPE T fl ELllOW lll45 OEV. 12 ll145T Ult>O 11-s.1-1112 (SEE FIGIJHE A-7S) 1111. ~

H-J 4-SJ-llU-'>

UlllL b00-3/bl 131600 fLHl)W TO PIPE 111115 l>EV. 12 111 4~ r UTbO N

U U N f, T R S

~ H E I ll f:

C G 11 R x

x -

x - x x x

)( -- x x - x - -

x -

- x x -

x -

)( -

- x I' Al>E lib HEMAHKS 11ru8ASIC CA.LlBHATIUN fjLf.lLK***

4-SS-lbU-.536-1.S

      • BASl& CALIBRAllUN HUICK111111111

't-SS-lbO-. 536-13 111111111BASlC C Al lfllUI. I I UN flLOCK111111*

4-53-lb0-.5.Sh-13 lllc**BASIC C Al. lfll~ A Tl llN llLOCK***

4-SS-lb0-.53L-13

SALl:.M Gtr~LHATJtJG STAT!Ut~ UNll l'ltlq I"~.HVICf EXAMINATION CLAS!i l CllMPllNtNTS SAFETY lNJl:CllON SYSTEH CCUNTr))

ASME SECT XI ITEM Nll A!iME Sf.CT XI CA fl; Y WE.LU NllMl.lt:R ANl>/UR tXAHINATIUN AHEA IUENTJFICATION tXAH.

Ml: TllOD SWll I SllHHARY PROCEDURE SllEET NO./lff.V.

NllHIH:.R

~------

Q-SJ-1172 (SEE FIGURE. A-75)

(Cll:HOJ u11.s 11-J Q-SJ-1112-18 UTOL b00-3/bl 132':>00 PIPF lO ELt.HIW UTllS l>E V. 12 lJl 'Vil lJTbO

'3-SJ-11'12 (SEE FI GIJRE A-72) llll.5 H-J 3-SJ-1192-12 ll 1 OL b00-3/bl 135300 PIPE TO VALVE ll TO w DEV. 12 UT45 llf4'>T lllbO 2-:>J-1149 (SH f 11;u1H: S A-76, A-77)

Ut1 0 8 IJ-J 2-S.1-1149-5 PT 200-1/Sb 13&400 VALVE. TO PI t'E l>EV. 2 1111.8 11-J 2-SJ-llQ'l-11 I' l

,>oii-1 /'>I>

I 3 71>110 P J PE 1 ll f.LlllJW 1>rv. ?

N 0

H F c x -x -

x x ---

x x

N s

J G

x x

x x x II 1; T F H (I E.

M R 117 REHAHKS

      • BASIC CALIRHATION !\\LOCK*"'*

q-SS-lb0-.531>-13 NO EXAHINAIJUN fRllM Tiit uowN-STREAt4 SIOt UUE. TO VAi VE CONF I CUR A 1 ION.

      • BASIC CALlflRAllUN llLllCI<- ***

3-SS-lb0-.451-30-!iAM

r SALEH GENERATJNG SIAJJUN UNIT lqll4 INSFRVICE EXAMINATION CLASS l COHPUNlNTS SAFETY JNJECTION SYSTEM CCONTIJJ AS"1E ASMI:

SECT Xl SECT l\\l ITEM NU CAlGY B-J 13-J..

U4.ll B-J U-J b-J ti-J WlLU NUMU~H ANU/OH EXAMINATION AH£A lllf.NTlflCAllUN 2-SJ-1149 C3Et: f JGlll<ES A-H,, A-77)

CCONJI>)

2-SJ-1149-37 PlPl 10 ELHOH 2-SJ-1147 (SEE FIGURE A-7H) 2-SJ-lttH-l HHANCll CONNECTION 'Tu Pll'I:

2-SJ-1147-8 PIPI: TO fLAllGE 2-s.1-1110-1.s

  • VAL VI'. TU l'll'E 2-SJ-11 :S'> ( Sl:E I-l GlltlE A-79 l 2-SJ-llS9-ll P Jl'l 1 ll E.LIHIW 2-SJ-1139-B ELfhJW lll tlRANCll [llNNE.CTION l:XAM.

Mt TIHJU PT PT PT Pl PT Pl SHHI SIH1MAHY PROCEDURE SHtfT N0 0 /Hl:V 0 NIJHUlH 200-l/5b lHt>OO IJEV. 2 200-l/5t>

lll0700 LIE V. 2 200-1/56 141400 OEV. 2

.:'llll-1 /':>h 1 *I,! n 1111 l.1f "

  • 2 200-1151>

144300 l>E v. 2 200-1/St.

146800 l>EV. 2 N

0 0 N r; T

H S I-H f

I 11 E C G 11 R x - - -

)( - - -

x - - -

x - - -

x - - -

x - - -

PAGE lltl REMAHKS

SALEH GENl:.RATINb SIATIUN UNIT l98Q I~SERVICE EXAMINATIO~

CLASS l COMPONENJS SAfEIY INJt.CJIOH SYSTEM Cl.:ONTO >

ASHE ASME SEC I X l SECT X l I r EM N ll CAT 1; Y

--~----

IJQ.8 tl-J U-J ll-J HQ.Ii 11-J lt4. 8.

tl-.J 11-J IJ-.1

~ELU NUMUEH ANU/UR E.XAMINA I TOii Al~E.A IUUITIF ICAT ION 2-SJ-1137 (SEE FIGURE A-80) 2-SJ*l 157*7 ELIJllW JO PI PE 2-SJ-l l H-6 PIPt JO ELHOW 2-SJ-1137-20 ELBOW Tu Pll'E 2-SJ-l U 7-32 Llltll'LING 10 ureAtlCH CUNNCTN 2-:>J-1129 (SEE flGlJIH::l A*8l 1 A*82)


~----~-------------------

2-SJ-1129-13 TH ro UtlWCEI~

2-SJ-1124-2':>

PlPl Ill 1-LBOW 2-S.1-1129-H PIPt:: ru COllPL lNl; EX All.

HI:. T ltlll>

PT PT PT PT PT PT Pr PT SWRI

SUMMARY

PIWCt.llURl Sllt.E l NU./REV.

NlJMHl:R 200-l/Sb 1117500 OEV. 2 200-l/5h lQ7bOO DEV. 2 200-1/5b 1Qli900 OEV. 2 200-1/':ih 1~>0100 (Jf v. 2 200-1/':ib 151500 DEV. 2 200-1/51>

152700 DEV. 2 200-l/5to lSHOO OEV. 2 N

U U N 1; T R S 1:-

H E I n E C (; M H

)( - - -

x - - -

x - - -

x - - -

x - - -

)(

x -

x - - -

PAGf.

REt1AHKS Sff. CNF HQ-l-007.

ONt LI NtAR ANO UNE HOUNU INUILAllUN.

AfffR COSMlllC llUHJtl(; HY PSt~G NO RECUHUAhLt. INUILA-T IONS WEHE OtJSl:.HVt.ll.

119

r 9ALtH GEN~HATING SJ AT ION UNIT.

1984 I"SERVJCt EXAMINAllUN CLASS 1 COMPONENTS

>AFETY INJE:t:Tlllil :JYSTtl1 (CUNTDJ llSME SH T X 1 ITEM Nil tM.8 II II 0 ll ffll. 8 t}Q. 8 ASME SHT XI (A TGY 11-J H-.1 tl-J 11-J ll-J U-J

~ffL() NUHHt.H llNU/OR f.XA~IJNATIUN AUfll ll>t:NTiflCATION 2-SJ-1129 (SEE flGUHtS.11*81, A-82)

(CON TU) 2-SJ-1129-IH}

COllPllNG fll HRANCti CONNCTI~

2-SJ-1121\\ (SEE F H;i11U::> A-In, A-1111 1 A-85)

<'-SJ-11211-11 PIPE Ill VALVE 2-SJ-1121\\-lfl F LIHlw TU PIPE

?.-SJ-ll<'li-~O I' I Pl: TO TH

<'-S.l-l lcl\\-(11 CUUl'L INC; T 0 PI Pt:

  • 2-SJ-1 lcll-~'d l:LIJUW T II PIPE EXAM.

HF. rtiOI>

Pl PJ PT PT Pl Pl Pl

. SWIH SllMMllRY PIWCEDUIH:. SHE.ET NU 0 /REV.

lnlMAt:R cull - 1 / ', h 1 *;.,II 0 0 11~.v. /

200-1/Sb 155700

!>EV. 2 200-l/Sb 157100 DEV. 2 20Ud /Sb 1'>11300 DEV. 2 200-1/.,b 1">'1500 OE V. 2 200-1/Sb lb0700 DEV. 2 N

0 0 N 1; T R S (

H E I II E C G M R

)( - - -

x - - -

x x - - -

- x x

x - - -

PAGE 50 HEHllRKS SEt CNF. 84-1-005 0 s l )( LINtAR INUI CA JIUNS.

Af l rn COSME: TIC bllff I NG ti y PSfl!.G NO IU CORllARLE JNUIC*TION~ WFRE flDSERVEll.

SALEH GENlNATING STATION UNIT 196Q lHStRVICE EXAHINAllON CLASS 1 COMPONENTS SAFETY INJECTIUN SYSlfH (1,;UNlO)

~I -

ASMI:.

AS~H:

SECT XI SHT XI I IE. M Ntr CA I 1; Y H-J H-G-2 till. 8 11-.J 1111.H H-J l\\Q. 8 11-J WE.LO NlJHtl[tl AND/UH tXAMl~AllUN ARE.A l~~NllFICAllON 2-SJ-1&26 C~E.£ FlGllHES A-63, A-8Q, A-85)

(CUNIO) 2-SJ-1126-711 PIP[ TO HEOUCER c-SJ-l t l 9 C sEt: FI (;!JIU: A-6b l 2-SJ-1119-2FH FL Atl(;l: BOLT 1 HG 2-SJ-1119-'l v Ill v~. TO I' I PE 2:-SJ-1119-17 I' I Pf Ill fLllUW 2-SJ-111'1-2.S Pl Pt 10 ELHllW EXAM.

Mt l lllJI>

PT PT UTOL UTQS UTllST VI PT I' T PT SHRI SUHHAHY PHUCE.OURE SllH 1 r111.11<l V.

tHl~:l\\tR 200-1/Sb lb2600 DEV. 2 b00-19/2 DEV. q 900-1/50 lt*JIOO 200-1/Sb lbJQOO OEV. 2 200-1/St.

lhllhOO llE V. 2 200-1/Sb lb5?.00 llf. v. 2 N I 0

0 N r; I

R S H

E I u E C 1; M H x

x x -

x x -

)( -

x -

x -

)(

. PAGf 51 REMAHKS SEE CNF HQ-t-ooq.

UNl LINEAN lNOICATIUN. *AFTtR CUSHEllC BUFFING HY PSE&G NIJ HECOl<UAALE INDICATIONS WEHE U83ERVfD.

NO UT FHOH IHE UOWNSlkEAH Slllt UlJE ro THE REDUCtfl CllN~ 11;u-RAT1Utr.

l'T WAS Pflfflll<MEU AS A SUPPLEHE.NTAL EXflMTNAllllN.

      • H{\\SIC CALlf(HAllllN HLllCl<u*

2-SS-lbO-.s,u-_sq-SAH

SALEM GlNtNATJNG STATION UNIT

  • 1984 IN~EkVICE EXAMINAllUN CLA3S l COMPONENTS SAFETY lNJECllUN SYSlEH (COIHU)

ASME A:.iH~_

Ste T )( l Sf Cf XI ITE.M NII CATl;Y wt.LU NllMUER ANO/UH EXAM I NA 1 Ill N A IH:: A 1 ll F. N f IF IC AT I 0 N EXAM.

ML TllOO SWHI SUMMAHY PIWCl::.DlJHt StlH 1 NO./HEV.

NllHlit.H HQ. J 2 B-G-2 U4,8 tj-J H4 *ti H-J H4,8 H-J All. 12 11-G-2 ll 4. ll ll-J 2-SJ-llltt (:iLt F11;11ttES A-87, A-88) 2-SJ-11111-4FH 1-LAtH;l flUL T !Nl; 2-SJ-1118-5 FLANl;f TO f'IP[

2-SJ-11\\6-17 IE I: !fl PIPE 2-SJ-lllll-29 ELBOW TO PI l'E l-l/2-SJ-l 142lSl.f FlGUHtS Vl PT Pl PT PT PT A-89,A-90,A-'ll) l-112-SJ-llt12-7Fll VT t'LANr.t hllLTlNG l-1/c-S,l-l lll2-9 Pl PIPE I 0 VALVE 900-1/50 lb5800 200-1/51>

11>5'100 L>EV. 2 2 0 0- 1 / 5 b 1 b 7 hi 0 OEI/. 2 200*1/Sb lb8300 DEV. 2 900-1/50 170700 200-1/St>

170900 11E V, 2 N

0 II N r; T H S 11 E

11 E C 6 M R x - - -

x - - -

- x x

x x

x - - -

x - - -

PA bf 52 Hf MAH KS SEI::. CNF 84-1-001.

ONE LINl:AH ANO ONE IHIUNI> I NO IC A IJ llN.

AFTEH COSMETIC

~UF~ING AY t>SER.b 110 RECllRl>AHLI::. INLJICA-J IUNS WEHE OHSl:RVEU, SEE CNF 64-1-006, ONf Lll~l::.AH INUICATION, AfTlR roSNFllL BUFFING BY P~f~G ~U H~COHOARLE INOICATIUNS WERE OHSERVfU,

SALEH 1;1:.NlHATHIG STATION UNIT 1Q84 INStHVICE FXAMINATIUN lL ASS 1 CllHPUNEN fS SAFETY INJECTION svsrEM (CONfll)

ASMF..

5EC I XI I H.M NII ll4.8 Ull. B uq. 6 1111. tl 1)11. 6 AS Mt

!itc I X 1 CATGY H-J h-J 11-J 11-J ll-J tl-J WI: LD NUMllEll ANl>/llR EXAMIHAllUN AHl:A lUENrIFlCAllON (Cll1ll())

l-112-SJ-1142-?I ELBOW TO PIPE 1-112-sJ-11112-.B PlPf JU ELllOw 1-l/2-SJ-1142-45 EL HOW TO PIPE l-l/2-SJ-1152 (SEI:. FIGURES A-92, A-9J) 1-1/2-SJ-l l.S2-1 llHMICH CUNNClN ro Clllll'LINI; 1-1 /?.-SJ-l I S2-15 P 11'1:. Tll ELUuw l-l/2-SJ-11S2-23 ELllUW To PIPE

~-X AM.

Mt T llU().

Pr PT I' T t' T PT PT PT Swill SllHHARY l'HllCfDllHI:.

S~tEE T NO./RE.V.

NllMBE.H 200-1/56 172100 ill: v. ?

200-1/56 173300 UEV. 2 200-l/Sb 174500 llE v. 2 200-l/Sb 1751100 l>E V. 2 200-1/Sb l7b600 OEv. 2 2011-1/56 1 77'1(111 UI:" V. 2 N

0 0 N I. T R S I-II E I o E C G 11 I~

x - - -

x - - -

x - - -

x - - -

)( - - -

x x -

HfMAHKS SH. CNF tl4-1-002.

TWO l.INl:AH INL>ll:A TlllNS.

AF lfH UlSMl:T IC

!ilJfflNG UY PSF.K.G NU IH.LOIH>AALE l'lf. HE OllSUlVl I).

SAi.EM 1;Lr~1 HA l JIH; ST AT lllN UNIT 19tl4 INSLHVILE EXAHINAllUN CLASS I CUHPONENTS SAFEJY INJHllON SYSTtM (CONTD)

ASHE SECI XI lTEH NU AS Mt Sl CI XI (AIGY Wl'Lll NUMBl-H Alm/OH l:.XAMINAT [llN AHtA lllt:NT If ICAT ION EXAM.

Hl fttOll SWHI SllMMARY l'RULUHJHt SM[f T NO. /HEV.

lll_lllllt-:H


~--- -------- --------- -------

B4,8 ll-J 1111. tl 11-J 114. ll 11-J 11499 B-K-1 114. 6 ll-J tj4. 8 ll-,l 1-1/2-SJ-l I \\2 CSfE FIGUHES A-92, A-93)

CCUtHIJl 1-1/2-SJ-11~2-35 f LllOW TO PI PE 1-l/2-SJ-1122 (SEL tlGUHES A-94, A-95) 1-l/2-SJ-1122-3 PIPE TO ELEHIW l-l/2-SJ-1122-15 VALVE Tll I' I I' E l-l/2-SJ-ll22-15PS-l p I Pl '.HJl'POH T 1-l/2-SJ-1122-17 ELllUW TO I' I l'f 1-l/2-SJ-1122-37 I' IP[ Ill f LllUW

!I. 2 PT PT PT PT Pl I' l I' T 200-1/Sb 179100 llEV. 2

~OO-l/5b 180SOO OEV, 2 20ll-1/5b 181 llllO IH V. 2

~00-1/Sb 11!2000 OEV. 2 200-1/Sb 182200 DEV. 2

~llll-1/'Jh J 11'(,-'llll ut v

  • 2 N

U 0 N G T R S I' U E I ll t C G M H

)( - - -

- x x

x - - -

x - - -

x - - -

x - - -

511 Hf MARKS SEE CNF 1!4-1-003.

l w (J L l NE AH INOICATIUNS, Af Jf H UISHE Tl C BUFF ING BY PSF&G NO HECOfHlARLF WfHE OtiSERVE 0.

SALEH GlN[HATJNG STATION UNIT 19dq INSEHVICE EXAMINATION CLASS 1 COHPUNtNTS SAFETY INJECTION SYSltM CCOfHO)

  • ASHE SECT XI ITE.M NO 114. H.

tt4.8 U4.8 IM 0 8 ASMl-_

Sl CT XI CAlGY U-J H-J

.1)-.1 11-J WELi>

NIJMBU~ ANll/OR EXAl11NAT ION Af(f A J(llNTif IC Al ION 1-l/2-SJ-1112 CSEl FIGUHE~ A-96, A*97J 1-l/2-SJ-1112-3 PI Pl TO l:LOUW l-l/2-SJ-1112-15 PIPE TO fLBOW 1-l/2-SJ-1112-39 ELllOW Tll Pit' I:

1-112-s~-1112-1111 PIPE T f) VALVE EXAM.

HE T 1101>

PT PT "r

I' T I' T SWRI

SUMMARY

PHOCt:OUHL SllH T NO./kEV.

NllMl:\\lR 200-1/56 lfl~400 L>lV. 2 200-l/5b 166700

!>EV~ 2 200-l/S6 189100 L>f v. i:>

200-l/'j6 169600 l>EV. 2 N I 0

0 N r; T R S* t H E I II E.

C G M R x - - -

)(

x -

)( - - -

)( - - -

PALF 55 REMARKS SEE CNF 611-1-004.

TWO LI NE..AH lNIJICATIONS.

AF l EH LllSMlTIC llUfF ING HY PSF&f. NU Hf CORI> AHLF HERE UBStHVEO~

SALEH GENLUATIHG STATION UNll 19811 IHStHVJCt EXAHIHAlJOH CLASS l COMPUNlNIS llEACJOR COULA~T PUMP::l ASME SECT X J I H.M NO RG l

  • l ii UGl.111 A::lMt Sl er XI CA I 1;y WELi) NllHIH:. I~ AND/UR EXAMINATION AIH:A lL>f.NllflCATlUN PUMI' MlllllH fLYWliEEL 11-PMl'-t LH 11 1JMP 1rn mu FL YHt1EE.L I.S-l'MP-FU~

PUMt' MO Tim FLYWllf-t:L EXAM.

H[TllOL>

PT I' 1 HT MT UTO UTllS PT MT MT UlO 111115 SHRI

SUMMARY

PROCl:.l>IJHE SltHT N0 0 /HEV.

1~1JHBU~

200-1/'ln 1'11300 DEV. 2 30U-l/2b DEV. 1 b00-bll2 UfV. 1

.!OO-l/5b 192900 DE I/. 2 J00-1/26 Uhl. 1 600-b/22 nEv. 1 N

0 0 N (;

T R S f H E I II E C G t* H

)(

x - - x x

x

)( -

)(

- )(

)(

)(

)( -

PAGE Sb RE HARKS SEE CNF H4-1-0l?.

10 LINfA~

PT INOICAJIONS ON INNER LiOIH:.

AfffR SPOT GHINOING A ONE SfJUAHF. INCH AREA TllE INl>ICA-l IONS HEkE Rf.SOLVED AS NUNHE-LEVANT AND ACC~PTtO HY PSE&~.

SEE CNf 611-1-013.

?9 HT INOl-CATIUNS ON lUP SU~FACE.

AFTER REWORK THf REFXAMINAllON Rt-VEALl:.O NII HECOHOAHLf INOlCA-T IONS.

Pl Oti lNNfH HllRt ANO KEYWAYS, AND MT ANL> IJT ON IOP ANO ttOTlUM SURFACES.

      • BASIC CALIBRAJION kLOCK***

'>-CSCL-112-SAM 7-CSCL-50-SAM SEE CNF'S tt4-l-010 AND 84-1-014.

SIX MT lNL>llATIONS ON BOT roM :JURF Act ANI> ONt INOICATIUN ON UIP SllHfAn.

AfTEH HEWOHK THf HtEXAHJNATIUN HEVEALEI> NO HfClllWAALt: INl>lCA-rt ONS.

PT Ut* I NNEH UOllf ANO KEYHAYS, ANI) MT ANO lll ON IOP ANO HUTTUM SUHfAlES.

      • RASIC CALIBNAIJUN BLOCK***

5-CSlL-112-SAM 7-CSCL-50-SAM

SALEM GLN[llATINt; STAflflN lJNll l q811.. tr:SlH\\l lCE £XAHIHA l lllN CLASS l CUHPONL~TS ASHE

!ilC 1 XI 111:.M NU ASMI.'.

Sl:LT XI CAlGY HELO NUMUtH ANU/011 lXAHlNArluN AlltA IOtNllFICAJION EXAM.

Ml TllOO SWiil

SUMMARY

PHOCl::UUIH: Stll:.£1 rlU. IRE V *. NllHHER PUMP MOllll< FLYWltfEL l~G l

  • 111 lq-PHP-fl.W PUMP llOTOH FLYHltEll PT PT MT HT UTO UTllS

<!OO-l/5b 1'1.S700 OEV. 2 l00-1./2b OEV. l bOO-b/22 OEV. 7 N

U 0

N 1; r R SI. H-f-

I 0 l'.

C G M H x -

x x x

- x

- x PAGE 57 Hf.MAHKS SEE CNF au-1-011.

IHRtE LIN-

. EAH PT INOICAlIONS ON INNER BOHE~

AFTER SPOI GRINUING.A ONE SQUAHE INCH AklA IHE INOl-CATIUNS WEHE RESOlVEO AS NON-HELEVANT AND ACCtPIEU HY PSf~G SEE CNF 811-1-0111 *. MT JNDICA-JJUNS ON TOP SURFALE.

  • AfllH REWORK THE REEXAHINAllUN R~-

. VEALtO NU RECOHUA~LF TNUJCA-1 IONS.

PT ON INNER UOHt ANO KEYWAYS, ANO MT Af'IU UT ON 101' ANO BO r1 UH SllRF A.CE S.

      • HASIC CALIHHAllON ttl.OLK***

5-CSCL-112-SAM 7-CSCL-50-SAl1

SALtM liLNlHAllNli SJ A I llltl IJN I J l 9B'l I flSl:.l~V I CE E )(AH l ll A l ) I IN CLASS I COMPONENTS PAGE 58 VALVES N

0 0 N c I A3ME ASML SWUI SIJMt1ARY*

R s f H

SE.c I XI SH I XI wELI> NlJHBfH ANU/llH

. EXM1.

PIWCl:.llUHt SHl:.l:.T E I II E ITEH NO CA 11; Y f.XAMINAJION Al~l A lt>ENTIFICATIUN HE T ttol>

t10 0 /HEV.

Nllt!Hf R c G 11 H Rf.MARKS HOLTINl; Bb.9 R-G-2 I CV 77 VT 900-1/50 194000 x - - -

ON LINE.3-CV-1133 116.9 U-G-2 I

CV ni VT 900-1/50 194100 x - - -

ON LINE 3-CV-1133 H6.9 H-1;-2 I CV 79 VT 900-1/50 194200 x - - -

UN LINE 3-CV-1141 Ab.9 n-1;-2 l

CV 80 VT 900-1/50 194300 x - - -

ON Lll~t 3-CV-1141 06.9 H-1;-2 I CV 275 VT 900-1/50 194500 x - - -

ON LINE.3-CV-1141 Hb.9 11-G-2 I PH

.3 VT 900-1150 19'l'J00 x - - -

ON LlNE b-PH-110.3 Bb.9 H-G-2 l PH 5 VT 900-1/50 195100

)( - - -

ON LINE ti-PH-1105 IH-..9 fl-G-2 I l'R 7 VT 900-1/50 195300 x - - -

llN LINI:.

~-Pll-11 <l'l

VALVES (CUNIO)

ASHE

. ASMl:

. SECT XI SECT XI IHM NII CAlGY Ub.9 B-G-?

1\\6.9 U-G-2 Bb 0 9 H-G-?

Rb.9 H-G-2 13b.9 11-G-2 Bb.9 11-c~-2 116.Q H-1;-2 SALlM GtNlRAllNC STATION UNIT lQUll lNSLkVICE tXAMTNAllUN CLASS l CUttPON[NTS SWHI

SUMMARY

WLLO NllMIU.R ANO/OH EXAHJNATION AREA IOENTJFICAllON EXAM.

ME TllOO PRllCtDURF. S.. EEl HO 0 /H[11.

NllMLIER BOLTING (CONTD) l PS l VT 900-1150 195t100 UN LINf. ti-PS-1111 1 PS 2ti VT

'100-1/50 195'100 ON LINE 11-PS-llll 1 PS 25 VT 900-1/50 195700 OU urn: 11-PS-llll 1 l HC 20 VT CJ00-1/50 190700 or-. LINE.S-HC-1113 12 Hf 20 VT 900-1/50 197noo llN L 1111:

3-l~C-1123 12 HC 23 VT 900-1/~0 l 97700 ON LINl. 3-HC-1123 n llC 20 VT 900-1/~0 l 'Hl'>llO ON uriE

~-RC-ll.S~

N 0

0 N G T R S [

H E I n F C G H R x - - -

x - - -

x - - -

x - - -

x - --

x - - -

x - - -

PAt;E Hf.MARKS

VAL VI'S 1 (Cl.llHU)

ASl1f_

SEL:T XI ITfH NO ASHE SEC I XI CA TGY H-G-2 IJ-G-2 wt.Lil NUMl>ER ANll/OR SALEH GENlHAllNG STAllUN UNIT lqttq lNSlRVlCl EXAMINAllON CLASS 1 COMPUNlNTS SWiii

SUMMARY

EXAMINA T.lllN AHEA ll>l:NT If IC Al ION EXAM.

MllltllU PIWCUHJIU.. StlH l NO.IHEV.

NllMHEH

~-------------------------------------~.--------

tlllt I I NG (CIHH ll) 13 Rt 23 vr

'100-1/50 lqtlbOO UN LINE 1-HC-1133 14 tll 20 VT 900-1150 199300 ON LlllE 3-RC-1143 J 11 UC ?.1 VT 900-1/':iO 1991100 UN LlllE 3-HC-1141 N I 0

0 N f; T R S E Ii E I u E C G M R

)( - -* -

x -. - -

x - - -

I' A Gf.

lffMARKS.

C J

<.1-'

CLASS 2 COMPONENTS

fHOWAll-.H SYSH11 ASME.

SEC I X l I TlM NII ASME SH f. XI CATt;Y WELi> NIJHlll:.H Allll/OH SALEH l;j:.NI RATING STATION UNIT lq8q lllSlHVICE EXAMINATION CLASS 2 COHPUNENIS SWH I

SUMMARY

PROCEOllR[ SllffT EXAMWAI !LIN AREA ll>EllTlfICATION E.XAM.

ME moo N0 0 /HEV.

NllMHEH IQ-llf-21111 CSU: I' IGURL H-10)

C2 *I C-G IQ-Hf-21111-tb llTOL b00-3/bl 210600 REIHJC[tl TU NOZZLt lHOW DEV. 12 UT'IS llTllST llTbO IQ*Uf-2131 CSH FJGllHf R-11)

C2. I C-G 1 11-11r-21H-23 UTOL t.00-3/bl 213350 EllillW TU lLtilh-1 Ill OW DE II. 12 Ill 115 UT 115 T UTbO c2.1 c-r.

lQ-IH'-21 Jt-,~q llTOL bOO-.S/bl 2131400 f.LHUW ltl flOLZU.

llTOW OEV. 12 UT14~

llT145r UlhO N I 0

0 N G T H S f H

E I fl* E CG H_H x x -- x x -

x - x x -

x x

x x x.-- x x -

x x x -

x - x x -

r PAGF.

bl kEMAllKS LIMITED EXAMINATION I RUM THE UPSrnEAH SIOE [)llE To TllE PHOX-I Ml TY OF TWO THEfHIUCOllPUS.

LIMI JEO EXAHlNAllON UN WE.LI>

DUl TO Hf LU CRmHI Clll'IF I GU-R~ TIUN.

NO lXAMHIAT ION fRUM Tlif llOWNS rnE AH SIDE OllE. 1 Cl Ttlf

~llZZLE CONf IGllRA lllJN.

  • HTH IE lllJLLE. TIN 7'1-13.
      • llASIC CAL lf\\tlA 1 JUN BUICK***

14-CS-60-.7b0-J5-SAM SEE CNF 8ll-1-0H>.

ONF INllJCA-TIUl\\I WAS OUSER\\/t-D llllHING Hlf UTOW SCAN.

IMO I CAT ION HAS HfSllLVlO AS A LUllt ALLOWAHLE 1NCLIJS10t4 RY SWRI l'EHSIJNNfL AMI) HAS ACCE PH.D

~y PSl:.K.G PlHSllNNF.L AF JtH l:.VALlJAI IUN.

LIMllEU EXAHlNAlJON f RUl-I TllE UIJWNS IRE AM S llH:: IHlf_

111 AN AOJ ACEllT. 111flH1llCl111t'l l.

      • IJASIC CAllBt{AI lllM tllfJCK**..

lb-CS-lbO-J 0 bl0-5q-SAM 1q-cs-80-.7b0-J5-SAH Lll'll IED f.XAMlNATlllM FROM THf IJPS THEAM SIOE llllt. I (I A WHO OVERLAY.

L 1H1 Tf [I lXAMINAI ION fffUM Tltf l)UW14S JREllM Slnf. [)l)f 10 Nlllll.1-.

Clli~FJGlJHAl ION.

  • "'*HASIC CAL IHHA 1 llJl\\I BLOCK***

lo-CS-lnO-l.610-~Q-SAM 114-LS-8U-.7b0-~5-SAH

F El: L>WA It. R SYS THI

<C01HOl ASH!-.

SECT XI lftM NU I: 2. l c2.1 c2.1 C2. l ASML St::CT XI CATf.Y c-r.

C-G C-G r-G SALfH GENLHAfl~G STATION UNll 19H4 _l~SlHVICf EXAMINATION CLASS 2 COHPllNl:.NTS SHI! I

SUMMARY

W~ L D NllMtlE I< ANL! /llll EXAMINATION ARlA ll!lNTIFlCATIUN

[XAM, ML HtOU PHUCLDURI_ s11u:: T NU 0 /Uf. V.

NIJMlll:.R lll-llf-2121 CSEE FIGllRE H-12) lll-[jf-2121-10 Eurnw TU 1~Euucrn 1'1-IH--2121-19 llU>uCl:.R TO NllZZLE.

lll-UF-2111 (SH flGlJlll 11-13) 14-llf-2111-17 l:LHIJW TO HfOIJct H lll-llF-2111-18 RUHJCt.H Ill NllllLt lll OL Ulll5 lllllST UTl>U llTOL UTOW UT 115 UllJST tllbO UTOL UT'l5 Ulll5T llTbO 111 OL llTOW ll T ll 'i Ul 115 T llJbO 600-~/61 217780 DEV. 12 bOO-J/bl 217790 OE V. 12 bOU-3/bl 220570 l>EV. 12 1>00-:~/6 I 220'iU t>E v. 12 c:

N u

() N G 1 R s [

H E I 0 E c (; H H x

- x x -

x

- x x -

x x - x x -

)( - x x - x x -

x - x )( -

)(

x - - x -

x -- - x -

REMAHKS J11J11J11HASIC CALlH~ATIUN ALOCK""'"'

tq-CS-Ho-.7b0-35-SAH NO EXAHINATIUN FROM THI:. UOWN-STHEAH SIOt llUE TO ltiE NU7lLE CONFIGURATION.

LIMITf D Uf ll51 SCAN OUF TU IHE Wt.LO CHOWN CONFIGllRATION.

J11J11J11HASIC CALIHHAllON ALOCK*"'"'

14-CS-80-.7b0-~S-SAM 1H*J11llASIC CALlllHAl IUN llLOlK"""'

111-cs-ao-.7b0-3~-SAH NO EXAMINATJ1HI FIWM THI: DOWN-STHFAM s1ut out T Cl T ttE-NlJZlll:.

CllNF IGUHAT 101~.

UMllEfl 1Jflj5J SCAN OUE ro Hit WELD CIWWN CllNflf.URAllON.

J111UHASIC CALlliRAl IUN AUJLK"'"

  • 14-CS-6U-.7bP-35-SAH 4

).. --_.-----------:------------

SAL[M Gt.Nl:HATIN~ STATJUN UNIT f91l4 IHSLHVICE FXAMINATIU~

CLASS 2 CllMl'UNENIS CUEHICAL AND VllLIJMt. CllNllhll SYSHH ASHE SE.CT XI ITEM NII c2.1 c2.1 c2.1 ASHE Sf.CT XI CAlGY c-~

C-F C-f Wl'LO NUMllEll l\\Nl>/OH EXAMINATION AllEA JOENTlflCATlUN


~---------------------------------

~-cv-2101 (SEE tlGUHES ll-15, H-lb,

~-17) ll-CV-2101-:-21 TE.t. Hl PIPE ij-CV-2101-25 ELBOW TU PIPE 8-CV-?.101-1111 Pll't. 111 11:.E EXAM.

HETtlOU UIOL 11I115

.IJTll51 llTOL UTll5 lllll5T lHOL l1Tll5 IJJ(j'jJ

  • SWiii SllHHAHY PHUCEOURL SHEET Nll 0 /HEV.

NIJHl\\t.H 600-3f\\/20 220622 DEV. 12 llOO-jb/28 220b30 OEV. 12 800-jb/21l UllbbO DEV. 12 N I CJ N R s E I c G x -

- x CJ G T E H Cl E H H

- x x -

x - x x -

x - - -

x x

)(

\\.

I' A GE b3 RFMAHKS lXAHINAlltJN SCltl:DllLFU IN ACCOl([)ANCE Willi It lllltlEllNS H1-0b AtW "/9-17.

NO f XAMINA-T IUN FHUH THE UPSTHEAH*SIOE.

DllE 10 TllE TEE CUNF JGltHAIIUN.

      • BASIC CALIA~ATlUN llLOCK***

8-Ss-10-.1qo-211-SAl1 fXAHINAT ION SCl!EOUU:u JN ACCORDANCE WITH If BUl.LEllNS 76-0b AN!) 7'1* 17 *

      • RASIC CALIAWAllUN BL~CK***

e-ss-20-.zf\\ij-JJ-SAH E.XAHJNAl HIN

~CllE.lJllLf() IN ACCORDANCE Willi H flllLLf llNS 7b-Ob ANU 7'1-17, NO lXAMINA*

T ION fHlltl THE OOWN:> TIH. AM S ll)f.

t>llE JO THE lE.f CONJ' IGllt<A I IUN.

UARASJC CALIHHA I ION IH.OCK*U

~-ss-10-.1qo-211-SAM

SALEM

~LNLHAfl~~ STATION UNIT 1quq IrlSUlVl<.:f 1-XAMlllATillN CLASS 2 CllMPUNtNTS SAftTY INJECTION SYSTEM ASMt AS Mt SlCl >cl SfCT XI ITEM NU CA 11;y C2.l C-f WE.Lil NUHUt ~ ANl>/Ofl f.lCAt1JNATIUN Al<f-.A llll:IHIFICAllllN 8-SJ-~152 C9tt flCUl<E B-5b) 11-SJ-?.152-21 I'll'[ 10 EUHHI EXAH.

M[ TllOll llTOL llT45 UT45T SWWI

SUMMARY

f'H(JCtUUIHc StlE.FT NIJ./&IEV.

NllMHtfl tlOO-.Sb/2(1 264022 uE v. 12 N

II 0 N G T R S I: lt E I 11 E C G M R x

- x x

I' At;f HEMAl<KS EXAMINATllJN SCttEOllLflJ IN ACCO~OANCE WITH IE HllLLfl[NS 7h-Ob ANO 7q-17.

      • ttASIC CALIBflATIUN ~LUCK***

6-SS-40-.310-44-SA~

J ~

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101.

2.

Plant:

Salem Generating Station p.o. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

Na t.ional Board Number for Uni l N/ A.

7.

Examinations Dales:

10/16/82 through 5/21/83.

8.

This examination report is for the first examination conducted in the third inspection period which ends July 1, 1987.

Salem's first inspection interval is from July 1, 1977 lo July 1, 1987.

9.

Components Inspected.

MANUFACTURER STATION OR COMPONENTS OR MANUFACTURER OR INSTALLER PROVINCE NATIONAL APPURTENANCE OR INSTALLER SER. NO.

NUMBER BOARD NO.

  1. 1 Reactor Combustion fi6201 Head Vessel Engineering 66101 Vessel N/A 20757
  1. 11 Steam Westinghouse 1003 N/A 68-10 Generator Tampa Div.

P.O. Rox 19218 Tampa, FL 33616

  1. 12 Steam Generator It II 1022 N/A 68-08
  1. 13 Steam Generator It II 1023 N/A 68-09
  1. 14 Steam Generator It If 1203 N/A 68-51
  1. 11 Regen.

Sentry Equip.

41C!5-A4 N/A 385, 386, Hl. Exch.

Corp.

7, 8, 9 387 Oconomowoc, WI Page 1 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED HY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

9.

Components Inspected (cont'd).

COMPONENTS OR MANUFACTURER APPURTENANCE OR INSTALLER

  1. 1 Pressur-Della Southern MANUFACTURER OR INSTALLER SER. NO.

1011 izer Chemical Volume &

Control Piping System Containment Spray Piping system Mains team Piping Sys.

  1. 1 VCT Tank
  1. 1 Excess Letdown Heal Exchanger
  1. 1 Letdown Heal Exchanger
  1. 1 RHR Heat Exchanger United Engineers

& Constructors (UE&C) 30 South 17th Sl., Phila.

PA 19101 UE&C UE&C Joseph Oats

& Sons, Inc.

Atlas Industries 81 Somerset Place Clifton, NJ Atlas Industries Engineers &

Fabricators, Inc.

N/A N/A N/A 1781-2A 850 N/A Sl5860-C Page 2 of 27 STATION OR PROVINCE NUMBER N/A N/A N/A N/A N/A N/A N/A N/A NATIONAL BOARD NO.

68-8 N/A N/A N/A 374 701 694 1122

FORM NIS-1 OWNERS 1 S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED RY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization {if required) N/A_.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

9.

Components Inspected (cont'd).

MANUFACTURER COMPONENTS OR MANUFACTURER OR INSTALLER APPURTENANCE OR INSTALLER SER. NO.

Press*ur i zer UE&C N/A Relief Piping System Reactor UE&C N/A Coolant Piping sys.

Residual Heal UE&C N/A Removed Piping Sys.

Steam Gen.

UE&C N/A Feed Piping System Safely Inject.

UE&C N/A Piping System Page 3 of 27 STATION OR PROVINCE NATIONAL NUMBER BOARD NO.

N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Eleclric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

-Planl:

Salem Generating Slation P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unil 1

4.

Owner Certificate of Aulhorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

Nalional Board Number for Unit N/A.

10.

Abstracts of Examinations:

NOTE:

This report also contains augmented examinations required by Salem Technical Specifications and Regulatory Guides, Circulars, and bulletins issued by the United Stales Nuclear Regulatory Commission.

Examinations were conducted by PSE&G as well as companies under contract to PSE&G.

The following is a brief summary with further details found in lhe attached report and on file al lhe Salem Generating Station.

Since nearly all inservice examination requirements can be found in Salem's Technical Specifications, this summary lisls these requirements first arranged according lo Tech. Spec.

paragraph nunber followed by applicable NRC circulars and bulletins.

1.0 Technical Specification 4.0.5 -

ASME XI These examinations constituted the sixth ISI performed al Salem, Unil 1, and the first ISI of lhe third 40-monlh period of commercial operation.

The components were examined in accordance wilh the Page 4 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED RY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Eleclric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Stalion P.O. Box P.,

Hancock's Bridge, N.J.

08038

3.

Planl Unit 1

4.

Owner Cerlificate of Aulhorizalion (if required) N/A.

5.

Commercial Service Dala 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examinalion Summary (Conl'd)

"Examination Plan for lhe 1984 Inservice Examinalion of Salern Generating Station, Unit l."

1.1 Summary southwest Research Inslitute (SwRI) -

conducled one hundred twenly-one (121) ultrasonic, eighty (80) liquid penetrant, five (5) magnetic parlicle, and thirty-two (32) visual examinations on the main steam, residual heat removal,, reactor coolant, chemical and volume control, sleam generator feedwater, safely injeclion, and containment spray systems.

There were sixteen (16) nonconformahces reported by SwRI:

Visual examinations on lhe reactor vessel studs numbered 23-27 revealed severe pilling and corrosion.

Il should be noted that lhese sluds were in the vicinity of a reactor vessel head leak.

These sluds were reporlerl lo PSE&G by SwRI on Cuslomer Notification Form (CNF)

Page 5 of 27

FORM NIS-1 OWNERS'S DATA REPORT POR INSERVICE INSPECTIONS AS REOUIRED BY THP. PROVISiotJS-OF THE ASME CODE RrJLP.S

1.

Owner:

Public Service Eleclric & Gas Co., AO Park Plaza Newark, N.J.

07101

2.

Planl:

Salem Generaling Slalion P.O. Rox E, Hancock's Rridge, N.J.

08038

3.

Planl Unil 1

4.

owner Cerlificale of Aulhorization (if required) N/A.

5.

Commercial Service Dala 7/1/77.

6.

National Roard Number for Unit N/A.

10.

Examinalion Summary (Conl'd) 84-1-15 and were rejected and replaced with sluds S6 through SlO.

There were also lhree (3) olher studs rejecled by PSE&G for being oul of tolerance.

These were replaced with studs S2 lhrough S4.

Raseline UT and MT were performed on lhe replacemenl sluds and found acceptable.

Liquid penetranl examinalions revealed indications on nine (9) small bore fillet welds.

These were reported lo PSE~G on CNFs 84-1-001 to 84~1-009.

All indications were renoved by light blending with a flapper wheel.

The areas were reexamined by liquid penetrant and ultrasonic thickness examinations to assure minimum wall was not violated.

No deficiencies were found on the reexaminations.

During UT examinations one reporlable indication was noted on a feedwater weld and reported lo PSE&G on CNP 84-1-16.

The indication was resolved hy SwRI rersonnel as a Code-acceptable inclusion and was accepted Page 6 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED RY THE PROVISIONS OF THE ASME CODE RULSS

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Rox E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) after evaluation by PSE&G.

The remaining UT examinations revealed numerous insignificant and geometric indicalionsi however, no additional reportable UT indications were observed.

1.2 Catalytic, Inc. - Sile Quality Control Group -

conducted visual examinations on three hundred eighty-one {381) supports.

Six (6) discrepancies were found i.e. rust, loose nuts, etc., all noted conditions were corrected.

1.3 PSE&G Maintenance Department -

conducted thirty-three {33) safely relief valve lift set tests.

Twenty (20) main steam safeties and thirteen (13) various system relief Valves were tested.

Of all the valves tested four (41 accumlator relief valves were found out bf tolerance, and seven (7) main steam safeties were found to exceed the allowable limits Page 7 of 27

FORM NIS-1 OWNERS 1 S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark~ N.J.

07101

2.

Plant:

Salem Generating Station P.O. Rox E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd)

(worst case was 8.3 lbs. high and 13.0 lbs low).

In addition, the Maintenance Department conducted lift set tests on three (3) vacuum breakers, (which are outside lhe scope of section XI) and were found acceptable.

1.3.l In addition to the valves tested on-site, lhe three (3) pressurizer relief valves (1PR3, 4, and 5) were tested by Wyle Laboratories at Huntsville, Alabama.

The "As Received" tests revealed that 1PR3 and 1PR4 wre found satisfactory but lPRS lifted 16 lbs. high and was leaking.

All three (3) valves had leakage on the posl tesl leakage lest.

All valves were then disassembled and inspected by a Crosby Valve representative.

No significant problems were found.

All valves were cleaned and the seats and discs lapped Page 8 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd)

1. 3
  • 1

( Cqn t ' d )

prior to reassembly.

After reassembly, all valves were tested and found satisfactory.

1.4 NUS corporation, under the direction of the Salem ISI Group, conducted a reactor vessel internal examination on all accessible areas as required by ASME XI (fuel was removed).

The results of this examination revealed no abnormal conditions within the reactor vessel.

1.5 PSE&G Nuclear Site Maintenance -

ISI Group, conducted five, Ten Year Hydrostatic Pressure Test_ procedures, this outage.

The following piping sections were tested:

the pressurizer relief valve discharge piping,.the pressurizer relief tank, the high pressure.portion of component cooling water inside containment,*

the reactor* coolant system, the reactor coolant pump sealwater return and bypass lines, and the changing pump minimum flow Page 9 of 27

r I

=

1 *

2.

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES Owner:

Public Service Electric & Gas Co.,.80 Park Plaza Newark, N.J.

07101 Plant~ Salem Generatin~ Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 1.5 (Cont'd) recirculating lines.

Other than mechanical joint or valve seat leakage (which were corrected), no leakage was icentified.

2.0 Technical Specification 4.4.5.0 -

Steam Generator Tube Eddy Current Examination 2.1 Summary

  • Eddy Current examinations were conducted on

. No. 12 and No. 14 steam generator tubes this outage.

The examinations were conducted by Westinghouse Electric Corporation and coordinated by the Salem.IS! Group.

The results of the examinations are*as follows:

Full length (Hot or Cold Leg)

"U" Bend (From Hot Leg to

  1. 7 Support Plate Cold Leg)

TOTAL.

Page 10 of 27

  1. 12
  1. 14 3,168 3,159 178 173 3,346 3,332

--~------=-================----=====-c---~~---------

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101-

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10 *.

Examination Summary (Cont'd)

% of Indications T.S.

Classification

<20%

(Imperfection)

>20.:..39%

(Degraded)

>40%

(Defective)

  1. 12 9

9 0

  1. 14 39 18 0

From the r~sults of the examinations no (0) tubes were plugged in either No. 12 or No. 14 steam generator.

At this time the total number of tubes plugged in lhe Salem Unit 1 generators are as follows:

Generator #

Tubes Plugged

.P.age 11 of 27 11 14 12 18 13 13 14 31

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

.4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial service Data 7/1/77.

6.

National Board Number for Unit N/A.

~-

10.

Examination Summary (Cont'd) 3.0 Technical Specification 4.4.9.1.2 "Reactor Vessel Irradiated Specimens" 3.1 Summary Capsule "Y" was removed from Unit 1 reactor vessel this outage and sent lo Westinghouse Electric Corporation for analysis.

As of yet, results have not been received from Westinghouse.

4.0 Technical Specification 4.4.10.1.l (b) "Reactor Coolant Pump Flywheel Examinations" 4.1 Summary Ten Year Examinations were per formed

)i. t-o.

11, 13 and 14 reactor coolant pump (RCP) flywheels in accorda~ce with U.S. NRC Reg.

Guide 1.14, Article C.

The elements comprising this 10-year examination included PT examinations on the Page 12 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS*

AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

owner:

Public Service Electric & Gas Co., 80 Park Plaza.

Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 4.1 (Cont'd) top surface, bottom surface, and outer perimeter of the flywheel.

During the PT examinations, indications were recorded on the inner bores of No. 11 and No. 14 flywheels and reported to PSE&G on CNFs 84-1-012 and.

84-1-11.

After the spot grinding, of a one-square-inch section of each of the flywheels, the indications were resolved as superficial chatter marks and accepted after evaluation by PSE&G.

MT indicatons were observed on the bottom surf ace of RCP flywheel No. 13 and the top surface of RCP flywheel Nos.* 11, l 3, l,.

These were reported to PSE&G on CNFs 84-1-010, -013, and -014 (includes top surface* of No. 13 and No. 14), respectively.

The indications were dispositioned by PSE&G, and reexamination by SwRI personnel revealed no recordable indications.

No reportable indications were observed during the UT examination of the flywheels.

5.0 Technical Specification 4.6.1.2 (a) "Reactor Containment Type "A" Test" Page 13 of 27

1

  • FORM NIS-l OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES Owner:

Public Service Eleclric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Cerlificale of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 5.1 summary The second of three containment Type A tests was performed during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> period ending August 13, 1984.

The test instrumentation was setup and monitored by the PSE&G Research Corp. and directed by the Salem ISI Group.

After 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of data. collection, the calculated leak rate was 0.033% of containment volume per day.

With 95% confidence level and other corrections this converts into 0.0411%

of containment volume per day or 0.411La*

This is within the Technical Specification acceptance criteria of 0.75La*

6.0 Technical Specification 4.6.1.2 (d) "Containment Type "B" (Penetrations) and "C" (Isolalion valves)

Leak Rale Testing" Page 14 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 6.1 Summary PSE&G Research Corporation under the supervision of the Salem ISI Group conducted sixty three (63) Type B tests and one hundred twenty.two (122) Type C tests.

At this time the total leakage 6f all Type B and C tests is 29,524.3 SCCM out 'of an

  • allowable 129,750 SCCM.

7.0 *Technical Specification 4.6.1.2 (e) "Elevation 100' and 130' Personnel Airlocks."

7*1 Summary The PSE&G Research Corporation under the supervision of the Salem ISI Group performed*

leak rate tests on the 100' and 130' airlocks.

Prior to replacement of the chevron seals on the airlock handwheel penetrations, the

. combined leakage was 15,810 SCCM.

After

  • page 15 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit l

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77~

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) replacement the leakage dropped t6 3,815 SCCM which is within acceptable administrative limits.

8.0 Technical Specification 4.6.1.6.l "Visual Examination of Containment ~urfaces" 8.1 SU:mmary the PSE&G Research Corporation along with the Salem ISI Group conducted an examination of the containment interior and exterior surfaces, both prior to and after the Type A test.

One adverse condition was noted -

several old attachment lugs were starting to rust above the spring line.

This condition was identified on Deficiency Report No. MT 84-093 and will be corrected during the next refueling outage

  • Page 16 of 27

/

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 9.0 Technical Specification 4.7.9.(a) "Visual Inspection of Hydraulic and Mechanical Snubbers" 9.1 Summary Catalytic, Inc. QC Department with assistance from the Salem ISI Group conducted visual examinaitons on all mechanical snubbers.

No discrepencies were found that would effect operability.

However, several were found with indications such as minor rust and Attachment ends missing washers.

Work orders were issued on these, and deficient conditions were corrected.

The PSE&G ISI Group conducted visual examinations on all hydraulic snubber~.

several minor union leaks were found.

These discrepancies were corrected by Catalytic, Inc. under the direction of the PSE&G Nuclear Construction Support Group.

Page 17 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 10.0 Technical Specification 4.7.9 (c) "Functional Testing of Selected Hydraulic and Mechanical snubbers" 10.1 Summary -

Hydraulic Snubbers Technical specification 4.7.9 requires functional testing on 10% of the snubber total during each plant refueling outage.

In addition, all snubbers which failed their previous functional test shall also be functionally tested.

Acco~dingly seventeen (17) snubbers were tested (see below):

One (1) 200 kip main steam isolation valve (MSIV) hydraulic snubber.

Sixteen (16) 1000 kip steam generator (s/g) hydraulic snubber.

NOTE:

100% of the 1000 kip snubbers (sixteen, (16 ea.)) failed their previous functional test.

In-place testing was performeQ by Babcock and Wilcox, using a hydraulic snubber testing Page 18 of 27

FORM NIS-1 OWNERS.'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.
  • National Board Number for Unit N/A.
10.

Examination Summary (Cont'd) 10.1 (Cont'd) machine developed by Leen Company.

All failures were sent to Wyle Laboratories in Huntsville, Alabama for retest and refurbishment.

The results of these tests revealed the following:

One (1) 200 kip (MSIV) snubber found acceptable.

Fourteen (14) 1000 kip (S/G) snubbers found acceptable.

Two (2) 1000 kip (S/G) snubbers failed, due to snubbers exceeding the "lockup" velocity requirements.

Both failed snubbers were refurbished and retested satisfactorily at Wyle Laboratories, Huntsville, Alabama.

10.2 Summary -

Mechanical Snubbers Technical Specification 4.7.9 requires functional testing on 10% of the snubber total.

during each Plant Refueling Outage.

In Page 19 of 27

1.

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd)

10. 2 (Cont'd) additional, for each type of snubber that does not meet the acceptance criteria an additional 10% of that type of snubber shall be functionally tested.

Also per the Pacific Scientific Service Report No. 83-01 (Potential Flaws in Mechanical Snubber Capstan Springs),

a visual and functional test shall be performed on specific mechanical snubbers identified by serial number.

The first (10%) sample included fourteen (14) snubbers of which two (2) ((1) PSA 1/4, and (1) PSA 3) failed.

Due to this failure an additional 10% were sent to Wyle for testing.

The second (10%) sample, a total of ten (10) snubbers, was tested with one (1) failure (PSA-3), which prompted another 10% to be removed and tested.

Al this time it was decided to bring Wyle Laboratories on site with their mobile snubber testing trailer for the balance of the samples.

Page 20 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED RY THE PROVISIONS OF THE ASME CODE RULES

1.

owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Sta(ion P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 10.2 (Cont'd)

The third (10%) sample, totaling twenty-eight (28) snubbers, were tested with sixteen (16) failures (3 ea. PSA l/4, 8 ea. PSA 1, 4 ea.

PSA 3 and 1 ea. PSA 10).

The large sample was selected due to the excessive failures in the feed waler system PSA 1/4 and PSA 1/2.

The fourth sample was selected and removed for Les ling.

The fourth (10%) sample, totaling thirteen (13) snubbers, were tested with one (1) failure (1 ea. PSA 3).

The fifth and final sample encompassing the balance of the mechanical snubbers were removed for testing.

The fifth and final sample, to~aling twenty-two (22) snubbers, was tested with two (2) failures (1 ea. PSA 1 and PSA 10).

Below is a summary of the results of the 100%

functional testing of Unit l's mechanical snubbers:

snubbers Tested = 104 (100%)

Snubbers Failed =

22 Page 21 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED RY T~E PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Eleclric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038 3

  • 4.
5.
6.
10.

Plant Unit 1 owner Cerlificale of Authorization (if required) N/A.

Commercial Service Data 7/1/77.

National Board Number for Unit N/A.

Examinalion Summary (Cont'd) 10.2 (Conl'd)

- Model #'s of Failures:

PSA 1/4 = 4 PSA 1

= 9 PS!\\

3

= 7 PSA 10

= 2 All nonradioaclively conlaminaled failed snubbers were sent lo their manufacturer, Pacific Scientific, Anaheim, California for retest, repair and evaluation.

In lhose cases where the snubber was contaminated, lhe snubber was sent lo Wyle Laboratories for retest, repair and evaluation.

As of this date, PSE&G has not received back the evaluation (failure ~echanism) on snubbers that were rejected.

PSE&G Engineering also performed a safety evaluation on the failed snubbers, and it was concluded that the altached piping and componenls were not impaired due to inoperabilily of the snubbers

  • Page 22 of 27.

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

owner:

Public Service Eleclric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Stalion P.O. Rox E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

Nalional Board Number for Unil N/A.

10.

Examination Summary (Conl'd) 10.3 Summary -

Pacific Scienlific Service Report 83-01 In addition to the required sample uf snubbers lo be funclionally tested, seventeen (17) PSA 1 and 3's were senl lo Wyle Laboratories for capslan spring inspections, all of which were found acceptable.

11.0 NRC Circular 76-06 and NRC bulletion 79-17 "Commitment to examine and/or flush stainless sleel lines conlaining stagnant borated waler" 11.1 Summary As part of the ISI program, SwRI performed ultrasonic examinations on eight (8) piping welds covered by this circular.

Ouarterly che,mistry samples were laken by the

~SE&G Chemislry Department and resulls transmilled lo lhe Salem ISI Group as required by Mainlenance Procedure Ml7G.

Page 23 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Puhlic Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 11

  • 1 (Cont' d)

There were no adverse findings in the examinations or tests conducted relative to the reporting requirement of this circular.

12~0 NuReg 0578 -

TMI Lessons Learned -

"Performing Service Pressure Leak Exams, measuring leakage outside Containment, and lake Corrective Actions necessary to reduce leakage as low as possible on systems likely to contain Radioactive liquids in the event of an incident" 12.1 Summary The Salem ISI Group along with members of the PSE&G Maintenance Department performed Service Pressure Leak Exams on the Safety Injection, Chemical and Volume Control, Residual Heat Removal and Containment Spray Systems.

In addition, PSE&G Research Corp. under the direction of the Salem ISI Group conducted the waste Gas System Leak Rate Test in accordance with Maintenance Procedure MllC.

Page 24 of 27

~--*---- --- -

Form NIS-1 OWNERS Is DATA REPORT FOR. ItJSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS C~ THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza

  • Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 12.1 (Cont'd)

There were no adverse findings in the examinations or tests conducted relative to this bulletin.

13.0 NRC Bulletin 79-13 Steam Generator Feedwater Nozzle Cracking, Follow-up 13.1 Southwest Research Institute (SwRI) under the direction of the Salem ISI Group performed ultrasonic examinations on all four (4) steam generator feedwater nozzle to piping welds.

The UT results were evaluated for any cracking or any other defective conditions.

The results of these examinations were satisfactory.

14.0 NRC Bulletin 82-02 "Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants" Page 25 of 27

FORM NIS-1 OWNERS'S DATA REPORT FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

10.

Examination Summary (Cont'd) 14.l Summary Due to this bulletin, all steam generator primary manway bolts on No. 12 and No. 14 S/G were magnetic partical (MT) surface examined by Magnaflux Quality Services, and visually examined by the Salem ISI Group.

Although no bolts were rejected, one was selected for analysis, due lo some indications noted on the visual exam -

possibly caused by the forming process.

It should be noted that this bolt had no indications when MT examined.

In addition, the reactor coolant pump main flange bolts were visually examined in place by the PSE&G Maintenance Department and the ISI Group.

No discrepancies were noted.

Page 26 of 27

\\,

--~

FORM NI~--;:- OWNERS'S~DA~~~R; FOR INSERVICE INSPECTIONS AS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

1.

Owner:

Public Service Electric & Gas Co., 80 Park Plaza Newark, N.J.

07101

2.

Plant:

Salem Generating Station P.O. Box E, Hancock's Bridge, N.J.

08038

3.

Plant Unit 1

4.

Owner Certificate of Authorization (if required) N/A.

5.

Commercial Service Data 7/1/77.

6.

National Board Number for Unit N/A.

we certify that the statements made up in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code,Section XI.

Signed PSE&G -

Owner Certificate of Authorization No. (if applicable) N/A Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State of Province of New Jersey and employed by Lumberman's Mutual Casualty Company, Long Grove, Illinois, have inspected the components described in lhis Owner's Data Report during the period 2/24/84 to 10/23/84 and state that to the best of my knowledge and belief the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Data Repor~.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Date I~

I J comm is s i 0 n s /II. :r: 3 7 3 r National Board, State, Province and No.

Page 27 of 27