Line 2: Line 2:
| number = ML072950298
| number = ML072950298
| issue date = 05/09/2007
| issue date = 05/09/2007
| title = Sequoyah April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
| title = April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
| author name =  
| author name =  
| author affiliation = Tennessee Valley Authority
| author affiliation = Tennessee Valley Authority
Line 14: Line 14:
| page count = 129
| page count = 129
}}
}}
See also: [[followed by::IR 05000327/2007301]]


=Text=
=Text=
{{#Wiki_filter:ES-1.4Rev.5 TRANSFERTOHOTLEG RECIRCULATION
{{#Wiki_filter:r--- ]
r---]I SQN I L-I..-.----L.----J (\.I[ACTION/EXPECTED
I    SQN                  TRANSFER TO HOT LEG RECIRCULATION ES-1.4
RESPONSE I I RESPONSE NOT OBTAINED 17.ISOLATE SI pumpflowtocoldlegs
(                                                                                            Rev. 5
: a.CHECK BOTH 81 pumps ALIGNED forhotleg recirculation.
\. I L-            I..-.--                                                                --L.        ----J ISTE~ [ACTION/EXPECTED RESPONSE                  IIRESPONSE NOT OBTAINED
a.PERFORM the following:
: 17. ISOLATE SI pump flow to cold legs :
1)IF one 81 pump is alignedforhotleg recirculation, THEN ENSURE 81 pump aligned to cold legs STOPPED.2)GOTO Step 18.(b.CHECK power.AVAILABLEtoSI pumpcoldleg inject ion valve FCV-63-22.b.DISPATCH personnel to restore powerto81pumpcoldleg
: a. CHECK BOTH 81 pumps ALIGNED                a. PERFORM the      following:
injection valve FCV-63-22, USING EA-201-1 , 480 VBoardRoom Breaker Alignments.
for hot leg recirculation.
WHEN power available to FCV-63-22 , THEN CLOSE 81pumpcoldleg
: 1) IF one 81 pump is aligned for hot leg recirculation, THEN ENSURE 81 pump aligned to cold legs STOPPED.
injection valve FCV-63-22.RETURNTO procedure and step in effect.--..---c.CLOSE SI pumpcoldleg injection valve FCV-63-22.
: 2) GO TO Step 18.
---------Page15of16
: b. CHECK power .A VAILABLE                    b. DISPATCH personnel to restore power
Rev.5---TRANSFERTOHOTLEG RECIRCULATION
(            to SI pump cold leg injection valve FCV-63-22 .
b_[ACTION/EXPECTED
to 81 pump cold leg injection valve FCV-63-22, USING EA-201-1 , 480 V Board Room Breaker Alignments.
RESPONSE][RESPONSE NOT OBTAINED_18.RETURN TO procedureandstep in effect.---..END (L._Page16of16
WHEN power available to FCV-63-22, THEN CLOSE 81 pump cold leg injection valve FCV-63-22.
JPM B.1.e Page 1of13Rev.7 SEQUOVAH NUCLEAR PLANT JOB PERFORMANCE
RETURN TO procedure and step in effect.
MEASURE B.1.eJPM36 RETURN PRESSURIZER
: c. CLOSE SI pump cold leg injection valve FCV-63-22.
RELIEF TANK TO NORMALOriginalSignaturesonFile
Page 15 of 16
PREPAREDIREVISEDBY:
 
Date!VALIDATEDBY:
b
Date!APPROVEDBY:
  ~ [ACTION/EXPECTED RESPONSE                ]
Date!(Operations
TRANSFER TO HOT LEG RECIRCULATION
Training Manager)CONCURRED:
[RESPONSE NOT OBTAINED
"*Datel (Operations
                                                                      ~S~fJ E  *4 Rev. 5
Representative)*Validationnotrequiredfor
: 18. RETURN TO procedure and step in effect.
minorenhancements,procedureRev
                          -~
changesthatdonot affecttheJPM,orindividualstepchangesthatdonot
END
affecttheflowoftheJPM.
(
*" Operations
L    ~_.          .      _
ConcurrencerequiredfornewJPMsandchanges
Page 16 of 16
that affecttheflowoftheJPM(ifnotdriven
 
by a procedure revision).
JPM B.1.e Page 1 of 13 Rev. 7 SEQUOVAH NUCLEAR PLANT JOB PERFORMANCE MEASURE B.1.e JPM 36 RETURN PRESSURIZER RELIEF TANK TO NORMAL Original Signatures on File PREPAREDI REVISED BY:                                                              Date!
((JPM B.1.e Page2of13Rev.7NUCLEARTRAININGREVISIONIUSAGELOG
VALIDATED BY:                                                            Date!
REVISION DESCRIPTION
APPROVED BY:                                                            Date!
OF VDATEPAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY: 4 TransferfromWP.Procedure change to N 8/17/94 AllHJBirchRev.4.Made a perform JPM,nota simulate JPM.pen/ink Added dates to cover sheep.N 10/26/95 1HJBirch penlinkRevchg.Minor rewording of N 9/25/96 4,8HJBirch step13.Addstepto
(Operations Training Manager)
monitorRCDTlevel.
CONCURRED:    "*                                                        Datel (Operations Representative)
penlinkChgdinit iatingcuestodirectprtdrainfirst.N1/9/97 4HJBirchTohelpflowthru
* Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
procedures
              *" Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).
.Deleted step to reset Pri Wtr alarm.Itno longer comes in.SO-68-5RevchgN11/17/97 4 HJ.B irch pen/ink SO-68-5Revchg.Added transition
 
s tep N 5/12/98 4-9HJB irch to sect 8.2.Several step enhancements
JPM B.1 .e Page 2 of 13 Rev. 7
.5 Rev ised steps,7and18, addedstep19N9/18/98 All JP Kearneyasaresultof
(
revisions to SO-68-5.Changes d id not affecttheflowofthe
NUCLEAR TRAINING REVISIONIUSAGE LOG REVISION                    DESCRIPTION OF                    V      DATE    PAGES    PREPAREDI NUMBER                            REVISION                                    AFFECTED REVISED BY:
JPM.Rev ised JAITAtask numbers.RevisedKIAratings.
4        Transfer from WP. Procedure change to            N    8/17/94    All      HJ Birch Rev. 4. Made a perform JPM, not a simulate JPM.
Reformatted
pen/ink      Added dates to cover sheep.                      N    10/26/95    1      HJ Birch penlink      SO~68-5 Rev chg . Minor rewording of            N    9/25/96    4,8      HJ Birch step 13. Add step to monitor RCDT level.
crit ical steps.pen/ink SO-68-5Revchg.Correcttypoin N 8/21/00 4 SR Taylor Direction to trainee penlink SO-68-5Revchgonlyno
penlink      Chgd initiating cues to direct prt drain first. N      1/9/97    4      HJ Birch To help flow thru procedures. Deleted step to reset Pri Wtr alarm . It no longer comes in .
effect N 12/13/00 4 W.R.Ramsey 6 Incorporated
SO-68-5 Rev chg                                N    11/17/97    4      HJ .Birch pen/ink      SO-68-5 Rev chg . Added transition step          N    5/12/98    4-9      HJ Birch to sect 8.2 . Several step enhancements.
pen/ink changes N 8/22/02 4JP Kearney , Pen/ink Updated references&IC#N 11/17/03 2,4 T.E.Pitchford 7 Updated references.
(      5          Rev ised steps , 7 and 18, added step 19        N    9/18/98    All    JP Kearney as a result of revisions to SO-68-5.
M inor format N 2/09/07 2,4 R.H.Evans changes.v-Specifyifthe JPM changewillrequire
Changes did not affect the flow of the JPM. Revised JAITA task numbers.
another Validation
Revised KIA ratings. Reformatted crit ical steps.
(YorN).See cover sheet for criter ia.
pen/ink      SO-68-5 Rev chg . Correct typo in                N    8/21/00      4      SR Taylor Direction to trainee penlink      SO-68 -5 Rev chg only no effect                  N    12/13/00    4    W . R. Ramsey 6        Incorporated pen/ink changes                    N    8/22/02      4    J P Kearney
r\JPM 8.1.e Page3of13Rev.7SEQUOYAH NUCLEAR PLANT ROISRO JOB PERFORMANCE
  , Pen/ink      Updated references & IC#                        N    11/17/03    2,4  T. E. Pitchford 7          Updated references. Minor format                N    2/09/07    2,4    R. H. Evans changes.
MEASURE Task: Pzr Vapor Space Accident(ReturnPRT
v - Specify if the JPM change will require    another Validation (Y or N).
to Normal)JAITA task#:007004010100700501010680990101
See cover sheet for criteria.
(RO)0070010102 (SRO)KIA Ratings: 008AA 1.08 (3.8/3.8)007 A2
 
JPM 8.1 .e Page 3 of 13 Rev. 7 SEQUOY AH NUCLEAR PLANT r                                                  ROISRO
\
JOB PERFORMANCE MEASURE Task:
Pzr Vapor Space Accident (Return PRT to Normal)
JAITA task # : 0070040101      0070050101      0680990101        (RO) 0070010102      (SRO)
KIA Ratings:
008AA1.08 (3.8/3.8)            007K4.01 (2.6/2 .9) 007A2.01 (3.9/4 .2)            007A2.02 (2.6/3.2)
Task Standard:
Pressurizer Relief Tank (PRT) parameters have been returned to within normal ranges ;
temperature G:.1550F} , pressure (1.5 - 6.5 psi), and level (-70%).
Evaluation Method:      Simulator    X          In-Plant        _
  = ==~================================ === =============== =========;========
Performer:
Performer:
c Performance
NAME                                                      Start Time Performance Rating: SAT           UNSAT            Pertormance Time                    Finish Time C Evaluator:
Rat ing: SAT Evaluator:
SIGNATURE I
NAME UNSAT SIGNATUREPerformanceTime
DATE
DATEStartT ime_FinishTime_
  ===================================================================================
================
COMMENTS
===================
(
========================================
 
COMMENTS  
JPM 8.1.g Page 4 of 9 Rev. 9 SPECIAL INSTRUCTIONS TO EVALUATOR:
(JPMB.1.f P age4of16 Rev.2 SP ECIAL INSTRUCTIONS
: a. Set up the simulator post trip with one spray valve cracked and stuck open. RCS pressure
TO EVALUATOR:
(        should be dropping but not less than approximately 2100*2150 psig when the applicant reaches the step to check pressure control. If possible, fail pressurizer backup heaters to automatically energize so that they must be energized manually Validation Time: CR.       11 mins            Local ToolslEquipmentlProcedures Needed: '
1.Critical s teps areident ifi edwithinthes tep 2.Sequenced s teps ident i fi edby a n" s" 3.AnyUNSATrequires comments 4.InitializethesimulatorinI
ES-O.1 Reference                                            Title                          Rev No.
C#16.Ensure a-AERCWpumpi s inse rv ice a nd t he selector s w itchi s selectedf or a-A.Ensure 1B-BCCP i s runningand 1 A-Ai s in standby.5.Activate MF#RW01G (Trips a-AERCWPump)6.Freezethes
ES-O.1                                      Reactor Trip Response                                      30 READ TO OPERATOR Directions to Trainee:
imulator until theopera t orhasbeenbrie
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
fedandisreadytoperformtask.
INITIAL CONDITIONS:
7.Console operator mus t insert malfu nctio n RW13Bat 90%prior toJP M st ep 8.8.See spec i fic J PM steps forr e quir ed remote func tion manipula tions.9.Ensure operator performsthefollowingrequired actions forSELF-CHECKING;a.Identifiesthe
: 1.       Unit has tripped.
correctunit , train, component , etc.b.Reviewstheintendedactionand
: 2.        Transition to ES-O.1 has been performed.
expectedresponse.
INITIATING CUES:
c.Comparestheactualresponsetotheexpectedresponse.
You have been directed to stabilize the unit in accordance with ES-O.1 , beginning at step 1.
Validation
Notify the SRO when the unit is stable
Time: CR.15m ins Local_Tools/EquipmentlProcedure
 
s Needed: AOP-M.01 , Section2and 2.1 , 2.10 Reference AOP-M.01 Los sofERCW TitleRevNo.15=================
JPM 8 .1.g Page 5 of 9 Rev. 0 Job Perfo rmance Checkl ist:
=================
STEP/STANDARD                                              SAT/UNSAT
===============
(  Note:
==========================
Applicant may take action re lated to cri tica l steps prior to reaching req u ired steps by use of the E8-0 .1 Handout.
REA D TOOPERATOR Directi ons t o Trainee:Iwill explainth e initi a l condit ions, a nd state thetask tobeperformed.A ll controlrooms teps shall be performedf or thisJP M.I will provideinit
STEP 1.:        Obtain the appropriate procedure .                                          -    SAT
iatingcuesandreportso n othera ct ions whendirectedbyyou.Wh en youcompleteth e t ask successfully,theobjectivef or th i s jobperformance measurewill be satisfied.Ensure yo u i n d icat e t o m e wh en y ou understand yourass ignedtask.To i n d ica t e th at y ou have completedyourassignedtask r eturn th e handoutsheetI providedy ou.INITIAL CONDITIONS:
                                                                                              -    UNSAT STANDARD: Ope rator obtains a copy of ES-O.1.
Uni tisinmode1at
Start Ti me_ _
100%power INITIATIN G CU ES:Youare theCROandaretomonitortheboardand
STEP 2 .:  [1] M ON ITO R 8 1N O T a ct uated:                                              -    SAT
respond ,asareade r/doer ,toanyeventtha
                                                                                              -    UNSAT
t may occur.InformSMwhenanyrequiredaction (s)assoc iatedwithth e failure havebee n comp le ted.  
* 81 A CTUATED p e rm iss ive DAR K [M-4A, D4 ]
Job Performance
STANDARD : Determines SI is NOT actuated by observing annunciator M-4A-D4 perm issive is dark STJ;;P 3.:  [2] VE R IFY genera tor b re a ke rs OP E N .                                   -    SAT
Checkli s t:JPMB.l.!Page5of16 Rev.12 (Examiner NOTE: STEP/STANDARD
                                                                                              -    UNSAT STANDARD: Verifies generator breakers open by observing green lights on 1-M-1 benchboard .
CandidatemayperformtheARP
STEP 4.: [3]    M ON ITOR RCS temperatures:                                                  -    SAT
actions.Theyareidentic
                                                                                              -    UNSAT
al toprocedurestep
* R CPs Runn ing: CH ECK T -avg stable at or tr e nd ing to between 547° F a nd 5 5 2 °F.
s.SAT/UNSAT_SAT_UNSATSTEP1.: Obta inacopyoftheappropriate
STANDARD: Determines T-avg is stable at or trending to between 547° F and 5 52° F .
procedure.StartTime__cCue:TheSM willevaluateTechSpecs,TRM,andtheREP
(
STANDARD:Acop yoftheAOP-M.Olhasbeenobtainedandgoestosection2
 
.1.COMMENTS: STEP.k:[1]IDENTIFY
JPM B.1 .g Page 6 of 9 Rev. 0 Job Performance Checklist:
andLOCKOUTfailedERCWpump
STEP/STANDARD                                     SAT/UNSAT
STANDARD:ERCWpumpQ-
( STEP 5.   [4]  MONITOR feedwater status:                                          -  SAT T-avg less than 550 °F .                                       UNSAT
AHANDSWITCHhasbee
* MFW regulating valves CLOSED.
nplacedinthePULLTOLOCKposition.COMMENTS: 3.:[2]START addition alERCWpumpsasrequir
* MFW regulating bypass valve controller outputs ZERO.
edtomaintainhe
* MFW isolation valves CLOSED.
aderpressurebetween78p sigand124psig
* MFW pumps TRIPPED.
._SAT_UNSAT_SAT_UNSAT STANDARD: COMMENTS:Operators tartsanotherA (J-A)Tra inERCWpump.Thisstepiscriticaltoreturnheaderpressuretonormal
* MFW flow ZERO.
.CriticalStep
* Total feed flow to SIGs greater than 440 gpm .
(STEP4.:[3]CHECKtwoATrainERCWPumpsAVAIL
STANDARD: Determines Tavg is NOT less than 550°F and goesto step 5.
ABLE.STAND ARD: Operatorverifiesat
STEP 6.:   [5] CHECK if emergency boration is required:                          -  SAT
l east2Atra inERCWpumpsavailable
[aJ    VERI FY all control rods fully inserted:                   -   UNSAT
COMMENTS:_SAT_UNSAT
* Rod bottom lights LIT
STEP5.:[4]CHECK lA and 2AERCWsupplyheaderpre ssuresandflows-SAT NORMA L: a.Supp ly He ader pressures[between78psigand124
* Rod position indicators less than or equal to 12 steps.
psig]:-UNSAT*l-PI-67-493A*2-P I-67-493A S TANDARD: Opera tor checks header pressures a re between78and124ps
STANDARD: Determines All rod Bottom lights are illuminated.
ig o n bo th A T rain i n d icators..COMMENTS: STEP 6.: b.Sup p ly Heade r flows[e xpe cted v a lue].-S AT*l-FI-67-61*2-FI-67-6 1-UNSAT STANDARD: O pe rato r che cks there isflowontheA trainsupply header a s i n dicate d onboth indicators.
STEP 7.:       [b]     MONITOR RCS temperature:                                   -  SAT UNSAT
C OMM ENTS: Consoleopera tor ins ert malf un ctionRW13Bat 9 0%p riortocheckingheader flows.r"[5]CHE CK1Band2B ERCWsupp ly heade r pressuresandfl ows-SAT NO RMA L: a.SupplyHe a der p re ssu re s[bet wee n78psigand124 psig]:-UNSAT*1-PI-67-488 A*2-PI-67-488A b.Supply headerflows[expected value]:*l-Ft-67-62*2-FI-67-62 STANDA RD: O peratorchec kshea de r pressu r esarebetween78and124psig on bothBTra inind icators.Flo wsarea bnormal, trans it ions t o se ction 2.10.COMMENTS: (((JobP erform ance Check list: ST EP/STANDARD JP M B.1.IPage6of16 Re v.12 SAT/UNSAT
* T -avg greater than 540°F if any RCP running          -
EVALUATORNOTE:Thefollowinastepsarefromsection2.
STANDARD: Determines T-avg is approximately 551 °F STEP 8.:   [6] ANNOUNCE reactor trip USING PA system.                            -   SAT
10: ST EP 8.:[1]Stopand L O CKOUTAllTrainB ERCWPumps-SAT STANDARD: O perator p laces all runningBtrain
                                                                                    -   UNSAT STANDARD: Announces reactor trip over PA system
ERCWpumps inpull-to-lock-UNSAT position.Thisste piscr iti cal t a prevent pum pin g water autthe break.CriticalSt ep COMMENTS:STEP9.:[2]DISP ATCH operator swithradio stoperformthefollowing:-SA T*PERFORM Appe ndix F , E RCWRxMOV Board ERCWValves.*PERFORMAppendixG,ERCWMCCValves.
(
-UNSA T*ENSU REallpumpingstation
 
watertightdoorsareCLOSED.
JPM 8.1.g Page 7 of 9 Rev. 0 Job Performance Checklist:
Cr it ical Step Cue: Play r oleofA UO and acknowledge t he request.STANDARD:Operatordispatchesoperatorstoperformtherequiredappendicesand
STEP/STANDARD                                      SAT/UNSAT
actions.This stepisc ritica l t o supply power t o valves needed t o iso late the leak.COMMENTS:-STEP10.:[3]ENSURE 1Aand2ACCPsRUNNING.-SATCue:Play role ofU2CROa nd start 2A CCP-UNSAT STANDARD: Opera tor s tarts lA-A charg ingpump.Thisstepi s criti cal to supply CriticalStep
( STEP 9.:   [7] MONITOR pressurizer level control:                                  -     SAT
RC P seal s a nd norma l charging from A trai n eq uipment.COMMENTS: (JobPerformance Checklist:
                                                                                    -     UNSAT
STEP/STANDARDJPMB.l.fPage7of 1 6 Rev.12 SAT IUNSA T
* C HEC K pressurizer level greater than 17%.
STEP11.:[4]STOP andLOCKOUT effectedequip
* V ER IFY cha rging IN SERVICE.
ment:-S AT a.PLACE thefollowingpump
* V ERIFY letdown IN SERVICE.
s i n PU LL T O LOCK:-UNS AT*1BCCP Cr itical Step*2BCCP*1BSlP ump*2BSl PumpCue:Playrole
* C HEC K pressu rize r level trending to 25% (normal range 20% to 30%).
ofU2CRO and S top/Lockout
STANDARD: Determines Charging and Letdown are in service and PZR level is >17%
associated
and trending to 25%.
pumps STAND ARD: Operator securestherunning pump sinthecontrolroom anddispatches a n AUO to lockouttheBAuxControl Air Compressor.ThisstepiscriticaltopreventstartofECCSequipmen
STEP 10.:  [8] MONITOR pressurizer pressure control:                               -   SAT UNSAT
twithoutcoolingwater
* Pressurizer pressure greater than 1870 psig.            -
availabletotheroomcoolers.
* Pressurizer pressure stable at or trending to 2 23 5 psig (normal range 221 0 psig to 22 6 a psig).
CO M MENTS: S TEP 1 2.: b.DISPATCH operator toplaceTr ain B A ux A ir Compressorin
STANDARD: Deterrnines PZR pressure> 1870but NOT trending toward 2210-2260 psig.
SAFE STOP.Cue:Playroleof
EVALUATOR NOTE:         JPM steps 11 ,12 and 13 are from procedure steo 8 RNO STEP 11 .:     IF pressure less than 2235 psig and dropping, THEN                  -   SAT PERFORM the following:
AUO and acknowledgetherequest.
_    UNSAT
STANDARD: Operator securestherunningpumpsinthecontrol room anddispatches anAU O tolockoutth e B A ux ControlAir Compressor COMMENTS: STEP 1 3.:[5]OPEN alternate ERCW supply toBtr ain DGs:-S AT*1-FCV-67-65 (1BDG)*2-FCV-67-65 (2BD G)-U NSAT Cue:Playroleof
* ENSURE pressurizer PORVs CL OSE D.                   Critical Step
CRO/AVO andacknOWledgethe
* ENS URE spray valves C LO SED.
request.STANDARD: Operator opens 1-FCV-67-65anddirectsopeningof 2-FCV-67-65
* IF spray valve(s) CANNOT be closed, THEN STOP RCP s #1 and 2.
.COMMENTS: (c Job Performance
* IF pressurizer pressure continues to drop, TH EN STO P additional RCPs as necessary.
Checklist: STEP/S TANDARD JPM B.1.f Pa ge 8 of 16 Rev.12 SAT/UNSAT
* ENSURE all pressurizer heaters ON .
JPM B.1.I Page9of16 Rev.12 Job Performance
STANDARD: Stops Number 1 Rep by rotating handswitch counter-clockwise.
Checklist:
(
(STEP/STANDARD
 
EVALUATOR NOTE: RCP Temperature
JPM B.1. g Page 8 of 9 Rev. 0 Job Performance Checklist:
alarms mav come in deoendinoonoace.STEP14.:[6]ISOLATEBTrainERCW
( STEP 12.:
Header rupture: a.CLOSE 1-FCV-67-489
STEP/STANDARD IF pressure less than 2235 psig a nd dropping, THEN SAT/UNSAT PERFORM the following:                                                 -    SAT
.Header1BIsolBefore
                                                                                        -   UNSAT
Strainer[ERCWMCC1BBCornpt.3C]
* ENSURE pressurizer PORVs CLOSED.
.b.CLOSE 2-FCV-67-489.
* ENSURE spray valves CLOSED .                             Critical Step
Header2BIsoI Before Strainer[ERCWMCC2BBCompt,3C].Cue:Playrole
* IF spray valve(s) CANNOT be closed , THEN STOP RCPs #1 and 2.
of AUO and acknowledge
* IF pres surizer pressure continues to drop, THEN STOP addition al RCPs as necessary.
the request.STANDARD: OperatornotifiesanAUOtoclosethevalvestoisolatetheBERCW
* ENSURE all pressurizer heaters ON.
header.This step is critical to isolate the ERCW leak.COMMENTS: Console Operator perform the following to isolate the leak: MRF RWRV489 0%MRF RWR2V489 0%SAT/UNSAT_SAT_UNSAT Critical Step STEP 15.:[7]OPERATE availableATrainERCW
STANDARD: Stops Number 2 RCP by rotating handswitch counter-clockwise, if candidate determ ines that RCSpressure continues to drop, additional RCPs may be stopped.
Pumps to maintain pressure between78psigand124psig.
STEP 13.:    IF pressure less than 2235 psig and dropping, THEN PERFORM the following :                                                 -   SAT
c STANDARD: COMMENTS: Operatorwillstartan
                                                                                        -    UNSAT
additionalAtrainpump.
* ENSURE pressurizer PORVs CLOSED.
This step is critical to return ERCW supply header pressure to normal._SAT_UNSAT Critical Step (P ressureislessthan78psiq
* ENSURE spray valves CLOSED.                             Critical Step
, but procedurealsoallows
* IF spray valve(s) CANNOT be closed, THEN STOP RCPs #1 and 2.
reducingflowto non-essential
* IF pressurizer pressure continues to drop, THEN STOP add itional RCP s as necessary.
equipmenttoraise pressure._.-'---.....J
                      *  . ENSURE all pressurizer heaters ON.
J ob P erf ormanc e Checklist: JPM B.1.1Page10of16
I STANDARD:     Manually energized PZR heater Bank D by rotating handswitch clockwise.
Re v.12 (STEP16.:[8]Cue: Cue: S T ANDARD: CO MMENTS: STEPIST ANDARD EVALUATEaligningTrainAERCWto
End of JPM
supplyTrainB:
 
a.IFalig ning1Ato 2Bheaderisdesired
Page 9 of 9 Rev . 0 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
, THEN PERFORMthefollowing
(
: 1)DISPATCH per sonnel t o CLOSE 0-67-1501CCSHtx OB2 I nlet valve.2)WHEN 0-67-1501 CLOSED ,THENOPEN 1-FCV-67-147
DIRECTION TO TRAINEE:
, Hdr1AtoHdr2BIsolValve[R xMOVBd1A2-A c/9A]ANDRECORDthetime
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you .
3)WHEN1-FCV-67-147 ha s b eenOPENfor approximately10
INITIAL CONDITIONS:
minutes, THENOPEN0-67*1501CCSHt x OB2 Inlet valve Direct operator to align 1A and2AERCW Supplies toTrainB Play role of AUO and acknowledgetherequest.When1
Unit has tripped .
*FCV*67*147hasbeen
Transition to ES-O.1 has been performed .
directedopened,cue
INITIATING CUES:
that 10 minuteshaveelapsed.
You have been directed to stabilize the unit in accordance with ES-O.1, beginning at step 1.
Ope rator dispatchesanAUOto close 0-67-1501,open1-FCV-67-147
Notify the SRO when the unit is stable
andreopens 0-67-1501after1-FCV*67*147
 
hasbeenopenfor
(
-10 minutes.This step is critical to supply cooling water to A train equipment.SAT/UNSAT S AT UNS AT Critical Step (Console Operator perform the following to open 1*FCV*67*147 (ig nore cycling 0-I 6 7*1501): RWRV489 100%
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EOI PROGRAM MANUAL EMERGENCYSUBPROCEDURE ES-0.1 REACTOR TRIP RESPONSE Revision 30 QUALITY RELATED PREPARED/PROOFREAD BY: _ _..!o!...o...J~:::w..!~
J ob PerformanceChecklist:JPMB.1.!Page 11of16Rev.1 2 (STEP17.: STEP/STANDARD
D. A PORTER                  _
b.IFaligning2Ato1Bhead
RESPONS IBLE ORGAN IZATION : ....;O~P!....!E:.!.RA=.!.T~IO~N!l:S'--  _
erisdesired ,THENPERFORMthe
APPROVED BY:.             ....l:.!.~..!=.b~.!...-
following:*OPEN 1*FCV-67-424 ,Hdr1BtoHdr
1. LEARY                              _
2ACCSH X I sol Val ve[R xMOVBd1 A2-A Comp t.9B]ANDRECORDtheTime*ENSURE1-FCV-67-223,Hdr1BtoHdr2A
EFFECTIVE DATE: 08101/2005 REVISION DESCRIPTION:    Added new step which checks generator PCBs open. This step is being relocated from E-Q Step 3 in conjunction with incorporation of E-OA. Revised step 11 .b to provide details on placing steam dumps in pressure mode.
Iso1ValveisOPEN.[RxMOVBd1A2-ACom
This procedure has a handout page (2 copies) and foldout page.
pt.8B].*ENSURE2-FCV-67-223,Hdr2AtoHdr1BIsolValveis
 
OPEN.[R xMOVBd2A2-A Comp t.8B].SAT/UNSAT_SAT_UNSAT Critical S tep Cue: Play role of AUO and acknowledge
SQN                        REACTOR TRIP RESPONSE            ES*O.1 IRev. 30 FOLDOUT PAGE SI ACTUATION CRITERIA IF either of the following conditions occurs:
the request.ST ANDARD: Oper ator dispatche s an AUOtoopen1-FCV-67-424,anden sures th at 1-FCV-67-223 and 2*FCV-67-223areopen.This step is critical to supply cooling water to A train equipment.
* RCS subcooiing based on core exit TICs less than 40 of OR
C O MMENTS: Console Operator perform the follow ing to open 1-FCV*67-424 (1/2-FCV-67-223
* Pressurizer level CANNOT be maintained greater than 5%,
are already open): MRF RWRV424 100%STEP18.:[9]STARTadditi
THEN ACTUATE SI and GO TO E-D, Reactor Trip or Safety Injection .
onal Lo wer CompartmentCoolingFansandCRDMFansas I requiredtomaintaincontainmenttemper
EVENT DIAGNOSTICS IF both trains of shutdown boards deenergized, THEN GO TO ECA-D.O, Loss of All AC Power.
ature.(STANDARD: COMMENTS:STEP19.:[10]ST ANDARD: COMMENTS:Operatorchecks containment
TANK SWITCHOVER SETPOINTS IF CST level less than 5%.
temperatureandstartsfansifneeded.
THEN ALIGN AFW suction to ERCW.
MONITOR Containment Pressure and Temperature.
Page 1a of 15
Operatormonitorscontainment temperatureandpressure.
 
_SA T_UNSAT_S AT_U NSAT
SQN                      REACTOR T RIP RESPONSE                        ES-0.1
STEP 20.:[11]CHECK1Aand2AERCW
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Rev. 30 I
header pressuresandflows adequate for-SAT current alignment:
HANDOUT Page 1 of 2 STEP                                          ACTION IF RCS subcooling based on core exit TICs less than 40'F FOP OR Pressurizer level CANNOT be maintained greater than 5%,
*1-FI-67-61and2-FI-67-61 ,atexpectedvalue-UNSAT*1-PI-67-493and2-P
THEN ACTUATE SI and GO TO E-O, Reactor Trip or Safety Injection.
I-67-493 STANDARD: Operatorchecksabove
IF CST level less than 5%,
indicator s and observes parametersarenormal.
FOP THEN ALIGN AFW suction to ERCW.
Ifnotstarts additiona lAt rainERCWpumps(seeJPMstep15)
: 1. MONITOR SI NOT actuated:
. STE P 21.:[12]RESTOR E equ ipment:-SAT a.CHE CKTrainBERCWheadersuppliedf
: 3. MONITOR RCS temperatures stable at or trending to between 547"F and 552 'F.
romTrainAcrosstie.
3.c. (if RCS temperature continues to drop)
-UNSAT b.RESTOREtherfollowing
RNO
handswltchesasapplicable
* CONTROL total feed flow to minimize RCS cooldown .
:*1B-BCCPtoA-AUTO Critical Step*1B-BSIPumptoA-AU
* MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10% in at least one S/G.
TO*2B-BCCPtoA-AU
: 4. MONITOR feedwater status : (verify FVIII when T-avg less than SSO°F) 5.b. MONITOR RCS temperatures greater than 540°F.
TO*1B-BSIPu mptoA-AUTOCue:Playro
: 7. MONITOR pressurizer level control: (pressurizer level greater than 17%)
le of AUO an d acknow ledgetherequest
7.a. (if pzr level less than 17%)
.I STANDARD: OperatorrestoresBTrain
RNO    3)      CONTROL charging to restore pressurizer level greater than 17%.
component stoservice.Thisstepi s critica l t orestoreAtrai
: 4)      WHEN pressurizer level greater than 17%,
nECCSequi pment.COMMENTS: S TEP 22.:[13]EVALUATEisolationof
THEN OPERATE pressurizer heaters as necessary.
non-essential
7.c.. (if letdown not in service)
A TrainCCSheatloads
RNO    WHEN charging established AND pressurizer level greater than 17%,
USING-SAT Appendi x E ,CCSHeatLoadReduction.
THEN ESTABLISH letdown.
-UNSAT Cue: SM will perform the evaluation STANDARD: Operator ensures AppendixEevaluated
7 .d. (if pzr level is NOT trending to 25%)
.COMMENTS:(Job Performance
RNO    CONTROL charging and letdown to maintain pressurizer level at 25%
Che ckl i st: STEP/STANDARD JPM B.l.I Page 12of16 Rev.12 SAT/UNSAT
(normal range 20% to 30%).
STEP 23.:[14]ENSUREallACBsopened
: 8. MONITOR pressurizer pressure control : (pzr pressure greater than 1870 psig and stable at or trending to 2235 psig) a.b.2) (if pzr pressure greater than 2235 psig and rising)
USINGthefollowing
RNO    CONTROL pressure.
appendixes:
: 9. MA INTAIN SlG narrow range levels: (between 10% and 50%)
-SAT*AppendixF,ERCWRxMOVBoardAppendi
9.a.  (if SIG levels less than 10%)
xRValves-UNSAT*AppendixG,ERCWMCCAppendixRValvesCue:Playrole
RNO    MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10% .
of AVO and acknowledgetherequest.
Page 1b of 15
STANDARD: Ope rator dispatchesanAUOtoperformthe
 
appendices
SQN                      REACTOR TRIP RESPONSE                        IES-0.1 Rev. 30 HANDOUT Page 2 of 2 STEP                                         ACTION 12.b.2). (if NO RCP can be started)
.COMMENTS: STEP 24.:[15]REFERtothefollowing:
RNO    MONITOR natural circulation.
-SAT*Appendix B , Affected EquipmentList(Heade
: 13. MONITOR if source range channels should be reinstated :
r1B)-UNSAT*Appendi xD,Affected
(IRM flux less than 10. 4 % power)
EquipmentList(Header2B)
: 15. MAINTAIN stable plant conditions:
*Appendi x P ,PotentialTechSpec
: a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
Impacts Cue: SM will refer t o the Appendices.
: b. Pressurizer level at 25% (normal range 20 % to 30%)
ST ANDARD: Operator ensures Appendi xBreferredto
: c. S/G narrow range levels between 10% and 50%
.COMMENTS: STEP 25.:[16]REFER TO AOP*M.03,Lossof Component Cooling Water.-SA T Cue: SM will refer to AOP-M.03.-UNSA T STANDARD: Operator ensures AOP-M.03referredto.
: d. RCS temperature at 547"F (between 540'F and 550'F)
COMMENTS: (Job Pe rformance Checklist:
Page 1c of 15
STEP/ST ANDARDJPMB.1.IPage13of16Rev.12 SAT/UNSA T
 
STEP 26.:[1 7]G O T O appropriateplantprocedure
SQN                      REACTOR TRIP RESPONSE                          ES-0.1
.-SA T Cue:Direct operatortocomplete perfo rmance of AOP-M.01section2.1.
_ __ _...L-IRev. 30 HANDOUT Page 1 of 2 STEP                                           ACTION IF RCS subcooling based on core exit TICs less than 40"F FOP OR Pressurizer level CANNOT be maintained greater than 5%,
-UNSAT STANDARD:SMis informedofcompletionofAOP-M
THEN ACTUATE SI and GO TO E*O, Reactor Trip or Safely Injection.
.01section2.10.Stop Time__COMMENTS: EVALUATOR NOTEThefollow ina s teosarefromsection2
IF CST level less than 5%,
.1STEP27.:[5]b.CHECK 18 and 28 ERCWsupply Headerflows[expectedvalue].-SAT*1-FI-67-62*2-FI-67-62-UNSA T STANDARD: Operator check sthereisflowonthe8trainsupplyheade
FOP THEN ALIGN AFW suction to ERCW.
r as indicatedonboth indicators.
: 1. MONITOR SI NOT actuated:
COMM ENTS:.STEP28.:[6]DISPATCH per sonnel to INSPECT fa iled pump(s)and determine cause-SA Tforfailure
: 3. MONITOR RCS temperatures stable at or trending to between 547"F and 552"F.
.-UNSAT Cue:ThefloorUS
3.c.  (if RCS temperature continues to drop)
reportsthatthe 5 1relayhas a flag pickedup.TheAUOreports n o apparent reasonforthetripl
RNO
ocally.STANDARD:TheFloorUSorAUOhasbeennotifiedtoin
* CONTROL total feed flow to minimize RCS cooldown .
spectthebreakerandanAUOhasbeen
* MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10% in at least one S/G.
dispatchedtothepump.
: 4. MONITOR feedwater status: (verify FWl when T*avg less than 550"F) 5.b. MONITOR RCS temperatures greater than 540"F.
COMMEN T S:STEP29.:[7]NOT IFYSTAto evaluateTechSpecLCO3.7.4,ERCWSystem
: 7. MONITOR pressurizer level control : (pressurizer level greater than 17%)
.Cue:Playro
7.a. (if pzr level less than 17%)
le of STA and acknowledgethereq uest.STANDARD: S TAhasbee n nolifed.COMMENTS: (Job Performance
RNO    3)      CONTROL charging to restore pressurizer level greater than 17%.
Checklist:
: 4)      WHEN pressurizer level greater than 17%,
STEP/ST ANDARD JPM 8.1.f Page 140f 16 Rev.12 SATIUNSAT
THEN OPERATE pressurizer heaters as necessary .
STEP30.: (8)CHECK ERCW pumpload ingampsNORMAL.
7.c. (if letdown not in service)
-SAT STANDARD: Pumpampmeterforpumpthat
RNO    WHEN charging established AND pressurizer level greater than 17%,
wass tarte dverifiedt obeinnormal-UNSA T opera ting range.COMM E N TS: STEP 31.: (9)TRAN SFER emergencypowerselec
THEN ESTABLISH letdown .
to r sw itch a wayfromfa iled pump.-SAT-UNSAT STANDARD: The Emergency Po werSelector Swi tch ispositionedawayfromQ-A
7.d. (if pzr level is NOT trending to 25%)
ERCW pump.Critical Step COMM ENTS: ST EP (10)EVALUATE needtoclosea ndplacec lea rance o n manual discharge-SAT va lvef or fa i l ed pu m p.-UNS AT Cue:IfAU O i s conta cted , Playrole o f A UO and ackn owledge the request.STANDARD: Operato r may notify anAUOtoc losethema nual d ischarge val ve o f Q*A E RCW pump.COMMENTS: STEP 33.: Inf o rm SMoffailu re o fERCWpumpandheade
RNO    CONTROL charging and letdown to maintain pressurize r level at 25%
r an d performance
(normal range 20% to 30%).
of-S AT A OP-M.0 1-UNSAT S TANDARD:SMisinformedofp umpandhead erfailureandthatAOP-M.01 has bee n performed.Stop Time__COMMENTS: (((Job Perform ance Checklist:
: 8. MONITOR pressurizer pressure control : (pzr pressure greater than 1870 pslg and stable at or trending to 2235 psig) 8.b.2) (if pzr pressure greater than 2235 psig and rising)
STEP/S TANDARDEndofJPM JPMB.1.I Page15of16 Rev.1 2 SAT/UNSAT
RNO    CONTROL pressure.
((Page16of16
: 9. MAINTAIN SIG narrow range levels : (between 10% and 50%)
Rev.2CANDIDATECUESHEET(TOBE RETURNEDTOEXAMINERUPON
9.a. (if S/G levels less than 10%)
COMPLETIONOFTASK)DIRECTION TO TRAINEE:Iwillexplaintheinitialconditions,andstatethetasktobeperformed.All
RNO    MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10%.
controlroomstepsshallbe
Page 1d of 15
performedforthisJPM,includinganyrequired
 
communications
SQN                      REACTOR TRIP RESPONSE                        I ES*0.1 Rev. 30 HANDOUT Page 2 of2 STEP                                        ACTION 12.b.2). (if NO RCP can be started)
.Iwillprovideinitiatingcuesandreportsonother
RNO    MONITOR natural circulation.
actions when directedbyyou.Ensureyouindicatetomewhenyouunderstandyour
: 13. MONITOR if source range channels should be reinstated:
assignedtask.Toindicatethatyouhavecompletedyourassignedtaskreturnthe
(IRM flux less than 10. 4 % power)
handout sheetIprovidedyou.
: 15. MAINTAIN stable plant conditions:
-INITIAL CONDITIONS:Unitisinmode1at100%power
: a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
INITIATING
: b. Pressurizer level at 25% (normal range 20% to 30%)
CUES:YouaretheCROandaretomonitortheboardandrespond,asa
: c. SIG narrow range levels between 10% and 50%
reader/doer, to any eventthatmayoccur.InformSMwhenanyrequiredaction(s)
: d. RCS temperature at 547°F (between 540°F and 550°F)
associatedwiththefailurehavebeen
Page 1e of 15
completed
 
(
SQN                        REACTOR TRIP RESPONSE                            ES-O.1 Rev. 3D
(TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANTAOIPROGRAMMANUAL
                -----------------                                              I 1.0  PURPOSE This procedure provides the necessary Instructions to stabilize and control the plant following a reactor trip WITHOUT a safety injection.
ABNORMAL OPERATING PROCEDURES
2.0  SYMPTOMS AND ENTRY CONDITIONS 2.1  ENTRY CONDITIONS E-O      Reactor Trip or Safety Injection
AOP-M.01LOSSOF ESSENTIALRAWCOOLING
* SI NOT actuated and NOT required 3.0  OPERATOR ACTIONS Page 2 of 15
WATERRevision15
 
QUALITY RELATED PREPARED/PROOFREAD
SQN                      REACTOR TRIP RESPONSE                        IES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE              II RESPONSE NOT OBTAINED NOTE          This procedure has a foldout page.
BY: D , A.PORTER RESPONSIBLE
: 1. MONITOR 81 NOT actuated:                   IF SI actuated, THEN
ORGANIZATION:
* SI ACTUATED permissive DARK            GO TO E-O, Reactor Trip or Safety
OPER ATIONS APPR OVEDBY:W.T.LEARY EFFEC TIVE DATE: 07/21/06 REVISION DESCRIPTION
[M-4A, D4]                              Injection.
: Incorporated
: 2. VERIFY generator breakers OPEN.              OPEN generator breakers .
various enhancementstoSect.2,1
Page 3 of 15
1basedupon feedbackfromREPdrill(PER97828
 
, NB-060173 , NB-060178), Relocated caution, notes , and administrative
SQN                    REACTOR TRIP RESPONSE                              IES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE             I IRESPONSE NOT OBTAINED
act ions from Sect ion 2,0, Incorporated
: 3. MONITOR RCS temperatures:                IF temperature less than 547 °F and dropping,
other enhancements
* IF any RCP running,                    THEN THEN                                  PERFORM the following:
and minor corrections
CHECK T-avg stable at or trending to
, INTENT CHANGES TO SECTION2.11OFTHIS
: a. ENSURE steam dumps and between 547 °F and 552°F.
PROCEDURE MUST BE APPROVED BY PORCo
atmospheric reliefs CLOSED.
AOP-M.01 Rev.15 SQN____---e[LOSS OF ESSENllAL RAW COOLING WATER (1.0PURPOSE
OR                                      b. ENSURE S/G blowdown isolation valves CLOSED.
This procedure providestheactions
* IF RCPs stopped ,                      c. IF cool down continues, THEN THEN CHECK T-cold stable at or trending PERFORM the following:
necessarytomitigatetheeffectsofanERCWpumporpipingfailure
to between 547 °F and 552°F.
.Page 2 of 142
: 1) CONTROL total feed flow USING EA-3-8 , Manual Control of AFWFlow.
(LOSSOF ESSENTIAL RAW COOLING WATER AOP-M.01Rev.15
: 2) MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10%
j ACTION/EXPECTED
in at least one S/G.
RESPONSE 2.0 OPERATOR ACTIONS RESPONSE NOT OBTAINED CAUTION: ERCW headerrupturein Auxiliary Build ing could fillthepassive
: 3) DEPRESS RESET on MSR control panel.
sumpin15minutes.
: 4) IF any MSR temp control valve fails to close ,
Promptactionisneeded.
THEN ISOLATE HP steam to MSRs.
1.DIAGNOSE the failure:IF...GOTO SECTION PAGE ERCW Pump(s)trippedorfailed 2.1 ERCWpumpfailure
: d. IF cool down still continues, THEN CLOSE MSIVs and bypass valves.
5 H igh flow ERCW Supp ly Header 1A 2.2 Supp lyHdr1AFa ilure 8toAuxBldg H igh flow ERCW Supply Header 18 2.3 Supply Hd r1BFai lure 12 toAuxB ldgHighflow ERCW S upply Header 2A 2.4 Supp lyHdr2AFailure 16toAu x BldgHighflow ERCW Supply Header 28 2.5 Supp lyHdr2BFailure
IF temperature greater than 552 °F and rising, THEN
22toAuxBldg Indications
* DUMP steam to condenser.
of an ERCW Return Header rupture 2.6ReturnHdrrupture
OR DUMP steam USING atmospheric reliefs.
27 (must be diagnosed l ocally since M-27 indicationsinAuxBldgarenot affected)Lowf low ERCW Supply Header1Aand2A, 2.7SupplyHeade
.~
r 1AJ2A 38 AND Fa ilureinYardArea
Page 4 of 15
STRAINER DIFF PRESSHIGHalarmLIT
 
[M-27 A , C-3 and/or D-2]Low flow ERCW Supply Header 18 and 28 , 2.8SupplyHeader1B
SQN                      REACTOR TRIP RESPONSE                        I ES-O.1
/2B 52 AND FailureinYa rd Area STRA INER OIFF PRESS H IGHalarmLIT[M-27 A , C-6 and/or 0-5](step continued on next page)Page 3 of 142
~                                                                            R_e_v_._3_0 _
(LOSSOF ESSENTIALRAWCOOLING
ISTEP I IACTION/EXPECTED RESPONSE             I IRESPONSE NOT OBTAINED
WATER AOP-M.01Rev.15 RESPONSE NOT OST AINED I STEP I ACTION/EXPECTED
: 4. MONITOR feedwater status:
RESPONSE[---'---'------'2.0 OPERATOR ACTIONS (Continued)
: a. T-avg less than 550°F.                   a. GO TO Step 5.
3.(Continued)IF...GOTOSECTION
                                                                          ~
PAGELowflow ERCW supplyheaders1Aand2A, AND STRAINERDIFFPRESSalarmsDARK[M-27A ,C-3andD-2]
: b. MFW regulating valves CLOSED.          b. CLOSE valves.
, AND at leastone ofthefollowing
: c. MFW regulating bypass valve controller  c. CLOSE valves.
alarms LIT:*ERCWDECKSUMPLEVELHIa
outputs ZERO.
larm LIT 2.9 SupplyHeaderA 63[1-M-158 , A-3]Failure Upstream of Strainer Inlet Va lves OR*ERCW DECK S UMP P MP RUNNING[1-M-158 , 0-2 o r 0-4]OR*MECHEQU IPSUMPLVLH IalarmLIT[1-M-15A , 8-6]Lowflow ERCW supply headers18and28 , AND STRAINERDIFFPRESSalarmsDARK[M
: d. MFW isolation valves CLOSED.            d. CLOSE valves.
-27A, C-6andD-5]I AND at leastoneofthe followingalarmsLIT: ERCW DECK SUMP LEVEL HIalarmLIT[1
: e. MFW pumps TRIPPED.                      e. TRIP MFW pumps.
-2.10 Supply Header B 71*M-158 , A-3]FailureUpst
: f. MFW flow ZERO .                        f. CLOSE feedwater heater isolation MOVs as necessary.
ream of St rainerInletVa lves OR*ERCWDECKSUMPPMP
OR D1SPATCH personnel to isolate MFW regulating and regulating bypass valves USING EA-3-12, Local Isolation of Main Feedwater.
RUNNING[1-M-158 , 0-2orD-4]OR*MECHEQUIPSUMPLVLHIalarmLIT[1-M-
: g. Total feed flow to S/Gs                  g. ESTABLISH AFWflow greater than 440 gpm.                      as necessary.
15A ,8-6]'\LossofflowonALL
IF AFW flow CANNOT be established, THEN ESTABLISH main feedwater flow USING EA-2-2, Establishing Secondary Heat Sink Using Main Feedwater or Condensate System.
ERCW supp ly headers 2.11Lossofall ERCW flow 77 in modes 1-4.ENDOFSECTIONPage4 of 142
Page 5 of 15
(SQNLOSSOF ESSENTIALRAWCOOLING
 
WATER AOP-M.01Rev.15 I STEP I ACTION/EXPECTED
SQN                    REACTOR TRIP RESPONSE                              I~:~~*~O        .1 ISTEP IIACTION/EXPECTED RESPONSE                  II RESPONSE NOT OBTAINED
RESPONSE 2.1 ERCWPumpFailure
: 5. CHECK if emergency boration is required:
1.IDENTIFY and LOCK OUTfailedERCW
: a. VERIFY all control rods fully inserted:      a. IF any of the following conditions exists:
pump.2.START additional
Rod bottom lights LIT
ERCW pumpsasrequ iredtomaintainsupplyheader
* two or more RPls indicate
pressurebetween78ps
* greater than 12 steps Rod position indicators less than or equal to 12 steps.                  OR
igand124psig.
* two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA*68-4, Emergency Boration.
3.CHECKtwoTrainAERCWPumps
: b. MONITOR RCS temperature:                    b. EMERGENCY BORATE as necessary to maintain shutdown
AVAILABLE.4.CHECK1Aand2AERCWsupp
* T-avg greater than 540* F                    margin USING EA-68-4, Emergency if any RCP running                          Boration .
ly header pressuresandflowsNORMAL
OR
:a.Supply header pressures[between78psigand124psig]
* T-cold greater than 540*F if all Reps stopped.
:*1-PI-67-493A*2-PI-67-493A
: 6. ANNOUNCE reactor trip USING PA system.
b.Supply header flows[expectedvalue]:*1-FI-67-61*2-FI-67-61 RESPONSE NOT OBTAINED IFlessthantwoTrainA
Page 6 of 15
ERCW Pumps available , THENEVALUATEisolationofnon-essentialTrainACCSheatloads
 
USING Appendix E , CCSHeatLoadReduction
SQN REACTOR TRIP RESPONSE                           IES-O.1
[C.1]IFBOTH1A AND 2A ERCW Headers FAILED , THENGOTOSection2.9, ERCW SupplyHeaderAFailurePriortoERCWStrainerInletValves
_ _ _ _ _ _ _ _ _ _ _ ....;.R..:,.e_v ._3_0          _
.IF 1A OR2AERCWHeader
ISTEP II ACnONIEXPECTED RESP ONSE              II RESPONSE NOT OBTAINED
FAILED, THENRETURNTO Section 2.0ford iagnosis.Page5 of 142
: 7. MONITOR pressur izer level control:
(LOSSOF ESSENTIALRAWCOOLING
: a. CHECK pressurizer level                  a. PERFORM the following :
WATER AOP-M.01Rev.15 I STEP 1 ACTION/EXPECTED
greater than 17%.
RESPONSE2.1ERCW Pump Failure (cont'd)5.CHECK18and
: 1) ENSURE normal and exces s letdown ISOLATED.
28ERCWsupplyheaderpressuresandflowsNORMAL:a.Supplyheaderpressures[between78psigand124psig]:
: 2) ENSURE pressurizer heaters OFF.
*1-PI-67-488A
: 3) CONTROL charging to rest ore pressurizer level greater than 17%.
*2-PI-67-488Ab.Supplyheaderflows[expectedvalue]:*1-FI-67-62*2-F I-67-626.DISPATCHpersonneltoINSPECTfailedpump(s)anddeterminecauseforfailure.7.NOTIFYSTAtoevaluateTechSpecLCO3.7.4 ,ERCWSystem
: 4) WHEN pressurizer leve l greater than 17%,
.8.CHECKERCWpumploadingamps
THEN OPERATE pressurizer heaters as necessary.
NORMAL.RESPONSENOTOSTAINED
: b. VERIFY charging IN SERVICE.             b. ESTABLISH charging USING EA-62-5. Establishing Normal Charging and Letdown.
IF 80TH18AND28ERCWHeaders
: c. VERIFY letdown IN SERVICE.              c. WHEN charging established AND pzr level greater than 17%,
FAILED , THENGOTOSection2
THEN ESTABLISH letdown USING EA-62-5.
.10 ,ERCWSupplyHeader8FailurePriortoERCWStrainerInletValves.IF18OR 28ERCWHeaderFAILED
Establishing Normal Charging and Letdown.
, THENRETURNTOSection2
: d. CHECK pressu rizer level                d. CONTROL charg ing and letdown trend ing to 25%                            to maintain pressurizer level at 25%
.0ford iagnosis.INVESTIGATEabnormalampreadings:*CHECKheaderflowsandpressures.IFampsareh
(norma l range 20% to 30%).                 (normal range 20% to 30%).
ighduetoonlyonepump
Page 7 of 15
available , THENEVALUATEisolationofnon-essentialERCW
 
loads.---------_._--------------------------'
L-SQN
Page6of142
          .....L..
AOP-M.01 Rev.15 LOSS OF ESSENTIAL RAW COOLING WATER--l.-------.L_------l
REACTOR TRIP RESPONSE                          I ES -O.1 Rev. 30 I.
(ISTEP[ACTION/EXPECTEDRESPONSERESPONSENOTOBTAINED
ISTEP IIACTIONfEXPECTED RESPONSE                    IIRESPONSE NOT OBTAINED
2.1ERCWPumpFailure(cont'd)
: 8. MONITOR pressurizer pressure control:
9.TRANSFER emergency power selectorswitchawayfromfailedpump.
: a. Pressurizer pressure                          a. ENSURE SI ACTUATED.
10.EVALUATEneedtocloseandplaceclearanceonmanualdischargevalveforfailedpump.
greater than 1870 psig.
11.GOTO appropriateplantprocedure
GO TO E-O, Reactor Trip or Safely Injection.
.--...--ENDOFSECTION
: b. Pressurizer pressure                          b. IF pressure less than 2235 psig stable at or trending to 2235 psig            and dropping, (normal range 2210 psig to                    THEN 2260 psig).                                   PERFORM the following:
Page I of 142
: 1) ENSURE pressurizer PORVs CLOSED.
(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP*M.01 Rev.15
IF pressurizer PORV CANNOT be closed, THEN CLOSE its block valve.
ACTION/EXPECTED
: 2) ENSURE spray valves CLOSED .
RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inlet Valves CAUTION: During operation, CCP and SI Pumps may experience
IF spray valve(s) CANNOT be closed, THEN STOP RCPs #1 and 2.
bearing failure 10 minutes after loss of ERCW cooling.1.STOP and LOCKOUTallTrainB
IF pressurizer pressure continues to drop, THEN STOP additional Rep as necessary.
ERCW Pumps.2.DISPATCH operators w ith radios to perform the following:*PERFORM Appendix F ,RxMOVBoard
: 3) ENSURE all pressurizer heaters ON.
ERCW Valves[AuxBldgel.749'
(step continued on next page)
, R xMOVBoards]
Page 8 of 15
.*PERFORM Appendix G , ERCW MCC Valves.[ERCW Pumping Stations]*ENSUREallpumpingstation
 
watertight
SQN                  REACTOR TRIP RESPONSE                         IES-0.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE          IIRESPONSE NOT OBTAINED
doors are CLOSED.[ERCW Pumping Station].3.ENSURE 1 A-Aand2A-ACCPs
: 8. b. (continued)                            IF pressure greater than 2235 psig and rising, THEN PERFORM the following:
RUNNING.4.STOP and LOCK OUT affected equipment:
: 1) ENSURE all pressurizer heaters OFF.
a.PLACE the followingpumpsinPULLTOLOCK
: 2) CONTROL pressure USING normal spray.
:*1B-BCCP*1B-BSIPump*2B-BCCP*2B-BSIPump
IF normal spray NOT available AND letdown in service, THEN CONTROL pressure USING EA-62-4, Establishing Auxiliary Spray.
b.DISPATCH operatortoplaceTrainB
IF normal spray NOT available AND letdown NOT in service, THEN ENSURE pressure controlled with pressurizer PORV(s).
Aux AirComp ressor inSAFESTOP.
: 9. MAINTAIN SIG narrow range levels:
[Aux Bldg , 734'elev ,RefuelFloor]
: a. Greater than 10%.                    a. MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10%
Page 71 of 142
in at least one S/G.
(SQN LOSS OF ESSENTIAL RAW COOLING WA TER AOP-M.01 Rev.1 5 , I S TEP I AC TION/EXPECTED RESPONSE RESPONSE NOT OBTA INED 2.10 ERCW Supply Heade rBFa ilure Upstrea m ofERCWS trainer InletValves(co nt'd)5.OPENalternate ERCW supply to Train8 DGs*1-FCV-67-65
: b. Between 10% and 50%.                  b. IF level in any SIG continues to rise, THEN ENSURE feed flow STOPPED to that SlG .
(18DG)*2-FCV-67-65 (2 8 DG)NOTEF loo d ing at th e ERCWstationmaypreventFCVsfromcl os in g.Manua l valves a re locatedsouthof the CCW stationandare normally lockedopen.6.ISOLATETrain8ERCW Header rupture: a.CLOSE 1-FCV-67-489 , Header 18 Iso l Befo re Strainer[ERCWM GG1B-8 Cornpt, 3C].b.CLOSE 2-FC V-67-489 , Header28Is ol B e f o re Strainer[ER GWMGG28-8 C ornpt, 3C].7.OPERATE ava i l able TrainA ERCW P umps tomai ntain pressure between78ps ig an d124ps ig.a.CLOSE1-VLV-67-5188
Page 9 of 15
, ERC W Supply Iso lation Va lve b.CLOSE 2-VLV-6 7-5188 , ERGWS upply Isola tio n V a lve Page 72of142
 
(saN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I STEP I ACT ION/EXPECTED
SQN                     REACTOR TRIP RESPONSE                      I ES-0.1
RESPONSERESPONSENOTOBTAINED
_ _ _----'                                                                R_e_v_,3_0  _
2.10 ERCW Supply Heade rBFailureU p streamo fERCWStrainer Inlet Va lves (cont'd)CAUTION1 CrosstyingAa nd B trainERCW supp lyheadersshou
ISTEP' IAcnONIEXPECTED RESPONSE         IIRESPONSE NOT OBTAINED
ld only be performed i f cooling is urgently requiredforTra in8CCSrelatedequipment.LCO3.0.3maybeapp licable.CAUT ION 2 Opening of crosstie valve1-FCV-67-1
: 10. VERIFY AC busses ENERGIZED          PERFORM the following :
47 may resultinsevere fouling or flow blockage of OB1/082CCSHeatE xchanger , therefore theCCSH x OB2 should be isolatedp rior to opening.After approximately
from start busses .
10 minutes OB2CCSHx will be returned toservice.NOTE*Thefollowingstepallows
: a. ENSURE diesel generators supplying shutdown board loads as necessary:
1AERCWheadertosupply2B
CCPs
ERCWheader (including OB1 and OB2CCSHX).*Withthe ERCW headercrosstie
* ERCW pumps .
valves attheCCW (I PS)stationope
* AFWpumps.
n , 1A heade r w ill supp ly2Band1BERCW AuxBldgsupply heade rs.8.EVALUA TE aligning TrainA ERCWto supply TrainB: a.IF a ligning 1 Ato2Bheaderisdesired
* Thermal barrier booster pumps.
, T HEN PERFORMthefollowing:
* CCS pumps.
1)DISPATCH personne ltoCLOSE 0-67-1501CCSH x OB2 Inletval ve.2)WHEN 0-67-15 01 CL OSED.THEN OPEN 1-FCV-67-147, Hdr 1 A toHdr2B IsolVa lve[RxMOVBd1A2-
Pressurizer heaters A-A and B-B.
A Compt.g A l and RECORDtime_3)WHEN 1-FCV-67-147
: b. ATTEMPT to restore offsite power USING EA-202-1 , Restoring Off-Site Power to 6900V Shutdown Boards.
hasbeenOPEN f or approximately10minutes , THEN OPEN 0-67-1501CCSH xOB2Inlet valve (stepco ntinued on next page)Page 73 of 142
: c. ENSURE control air compressors A and B started USING EA*32*2, Establishing Control and Service Air.
(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I ST EP I ACTION/EXPECTED
Page 10 of 15
RESPO NSE RESPONSE NOT OBT A INED (2.10ERCW Supply HeaderBFailure Upstream of ERC W S tr ainer InletVa lves (c ont'd)8.b.IF alig ning2Ato1B headeri s desired , THEN PERFOR M thefo llowing:*OPEN 1-FCV-67-424, Hdr1Bto Hdr2ACCS H X Isol Valve[Rx MOVBd1A2-A Compl.9B]and RECORD theTime_*ENSURE 1-FCV-67-223, Hdr1 B to Hdr2A IsolValveisOPEN.[R x MOV B d 1A2-A Compl.8B].*ENSURE 2-FCV-67-223
 
, Hdr2A to H dr1BIsolValveisOPEN.[Rx MOV Bd2A2-ACornpt.8B].9.START a dditionalLower Compa rtment Cooling Fansand CRDM Fans as requiredtomai ntain containment
SQN~
temperature
      ~I.-
.10.MONITOR Co nta inment Pressu reand Temperature.Page 74 of 14 2
REACTOR TRIP RESPONSE                            IES-O.1 R_8_V_._3_0    _
(SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01 Rev.15 I STEP I ACTION/EXPECTED
- -IIACTION/EXPECTED RESPONSE ISTEP                                        I IRESPONSE NOT OBTAINED CAUTION      Arming steam dumps In pressure mode with demand signal present could result in rapid RCS cooldown.
RESPONSERESPONSENOT
11, DETERMINE if steam dump to condenser available:
OBTAINED2.10ERCWS upp ly Header B Failure Upstream of ERCW Strainer Inlet Valves (cont'd)(11.CHECK.1Aand2AERCWheaderpressuresandflowsadequateforcurrent
: a. CHECK condenser AVAILABLE:                a, USE atmospheric reliefs In AUTO and set for 84% (1005 psig).
alignment:*1-F I-67-61and 2-FI-67-61 , a t expectedv a lu e*1-PI-67-493Aa nd 2-PI-67-49 3A 12.RESTOREequipment:a.CHECKTra
* c-s CONDENSER INTERLOCK permissive LIT [M-4A, E6l                IF atmospheric reliefs NOT functioning in AUTO,
in B ERCW header supplied from Tr ainAcrosstie.b.RESTORE thefollowinghandswitches
* At least one Intact S/G MSIV            THEN OPEN,                                    USE manual control of atmospheric reliefs, IF local control of atmospheric reliefs is necessary, THEN DISPATCH personnel to dump steam USING EA-1-2, Local Control of SIG PORVs.
as applicable:*1B-BCCP t o A-AUTO*1B-B 81PumptoA-AUTO*2B-BCCPtoA-AUTO*2B-B 81PumptoA-AUT O*TrainBAuxAir
GO TO Note prior to Step 12.
CompressortoAUTO[AuxBldg , 734'elev ,RefuelFloor]STARTaddit
: b. PLACE steam dumps in STEAM PRESS mode:
ional" A" Train ERCWpumpsasnecessary.
: 1) PLACE steam dumps in OFF.
ISOLATE no n-essentia l ERC W loa ds as necessary.DONOTCONTINUEUNTILheader pressureandflowareadequatef or current alignment.a.GOTOstep 1 4.Page 75 of 142
: 2) ENSURE steam dumps in steam pressure mode ,
(SQNLOSSOF ESSENTIALRAWCOOLING
: 3) ENSURE zero output (demand).
WATER AOP-M.01 Rev.15 I STEP I ACTION/EXPECTED
: 4) PLACE steam dumps in ON.
RESPONSERESPONSENOT
: 5) ADJUST steam dump controller setpoint to 84% (1005 psig) in AUTO, Page 11 of 15
OBTAINED 2.10 ERCW Supply Header B Failure UpstreamofERCW Strainer Inlet Valves (cont'd)13.EVALUATE i sol a tionofnon-essential TrainACCSheat loads USING AppendixE , CCSHeat L oad Reduction.14.ENSUREallbreakerso penedUSINGt he following appendi xes*Appendix F , R x MOV Boa rd ERC W Valves*App endixG,ERCWMCC Valves 1 5.REFERTO thefollowing:*AppendixB , AffectedEquipm
 
ent List (Header1B)*Appendi x D , AffectedEquipmentList
SQN REACTOR TRIP RESPONSE                                IES-O.1
(Header2B)*Append ixP , Potential Tec h Spec Impa cts.16.REFERTO AOP-M.03 , Loss of ComponentCoo ling Water.17.GOTOappropr
                                                                          ---J~R-e-v-.-3-0---
iate p lant pr ocedure.---.--ENDOFSECTION
ISTEP IIACTION/EXPECTED RESPONSE            II RESPONSE NOT OBTAINED NOTE      Loop 2 RCP and associated spray valve will provide adequate spray flow for RCS pressure control. If Loop 2 is not available, all three remaining RCPs may be required to ensure adequate spray flow.
Page76of142
12  CHECK RCP #2 RUNNING.                     PERFORM the following:
(PREPAREDI REVISED BY:VALIDATEDBY:
: a. IF NO RCPs running, THEN ENSURE all RCS dilution STOPPED.
APPROVED BY:*JPM8.1.g Page 1 of 9 Rev.9.SEQUOY AH NUCLEAR PLANT JOB PERFORMANCE
: b. ATIEMPTto start RCP(s) to provide normal pzr spray :
MEASURE B.1*9RespondtoSpray
: 1) ESTABLISH conditions for starting RCP(s) USING EA-68-2, Establishing RCP Start Conditions.
Valve Failure Or iginal Signatureso n File Dat e l Date l Da te l (Op eratio nsT rain ing Manager)CONCURRED:
: 2) IF RCP start conditions established, THEN START RCP #2 (if available)
**(Operat io ns Representative)
OR RCPs #1, 3, and 4.
Dat e l*Va lidationnotrequiredforminorenhancements
IF NO RCP can be started, THEN MONITOR natural circulation USING EA-68-6, Monitoring Natural Circulation Conditions.
, procedure R ev chang es thatdonotaffec
IF natural circulation CANNOT be verified, THEN RAISE steam dump rate.
ttheJPM ,orind ividual step changesthatdonotaffecttheflowoftheJPM.**Operations Concurrence
Page 12 of 15
required fo rnewJPMsand
 
changes that affectthe flowoftheJPM(i
SQN                       REACTOR TRIP RESPONSE                      I ES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE              IIRESPONSE NOT OBTAINED
f not driven by a procedure revision).  
: 13. MONITOR if source range channels
(JPM8.1.g Page2of9 Rev.9 I NUCLEA R TRAINING REVISION/USAGE
        -should be reinstated:
LOG REVISION DESCRIPTION
: a. CHECK intermediate range flux        a. ~O  TO Step 14-.
O F V DATEPAGESPR EPARED/NUMBER REVISIONAFFECTEDREVISEDBY
less than 10* 4 % power on operable channels.
: 0 Initial Issue Y 2/13/07 A ll RH Evans v-Speci fy i f th e JPMchange willrequireanother v a lidatio n (Y o r N).Seecover sheetforcriteria.  
: b. CHECK source range channels          b. REINSTATE source range channels REINSTATED .                            by simultaneously placing both SRM TRIP RESET-BLOCK switches to RESET position . [M-4]
JPMB.1.gPage3of9 Rev.9 (SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE
C. SELECT one SRM and one IRM on NR-45 recorder.
MEASURE Task:RespondtoSprayValvefailure
: d. ENSURE audio count rate operation.
Note: This JPM satisfies Simulator Manipulation
: e. RESET shutdown monitor alarm setpoints. [M-13]
XXXXXX.JAIT A task#: 3210140401
: f. WHEN shutdown monitor ALARM LEDs dark AND HIGH FLUX AT SHUTDOWN bistable lights dark, THEN PLACE HIGH FLUX AT SHUTDOWN alarm block switches in NORMAL.
0000910501(RO)0150050101 (RO)(RO)0150040101(RO)
[M-13]
KIA Ratings: Task Standard: Repssupplyingfailedsprayvalvearetripped
Page 13 of 15
.Pressurizerheatersareenergized.
 
In-Plant_x Evaluation
SQN
Method: Simulator_--C>.-__===================================================================================
_ _ _ _..1.
[                  REACTOR TRIP RESPONSE                IES-O.1 R_e_v_,3_0 _
ISTEP II ACTION/EXPECTED RESPONSE                IIRESPONSE NOT OBTAINED
: 14. SHUT DOWN unnecessary plant equipment:
* REFER TO O-GQ-12, Realignment Of Secondary Equipment Following ReactorlTurbine Trip.
: 15. MAINTAIN stable plant conditions:
: a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
: b. Pressurizer level at 25%
(normal range 20% to 30%)
: c. SIG narrow range levels between 10% and 50%
: d. ReS temperature at 547°F (between 540°F and 550°F) :
* T-avg if any Rep running OR
            .*  T-cold if all Reps stopped.
: 16. PERFORM EA-0-9, Post Trip Administrative Requirements and Recovery Actions.
Page 14 of 15
 
SQN                      REACTOR TRIP RESPONSE                          IES-0.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE              I IRESPONSE NOT OBTAINED
: 17. DETERMINE if natural circulation cooldown is required:
: a. CHECK at least one RCP RUNNING.          a. IF plant cooldown required with NO RCP available, THEN GO TO ES-0.2, Natural Circulation
                                                              --II Il_- -
Cooldown.
DO NOT CONTINUE this procedure UNTIL at least one RCP restarted .
: b. CHECK at least one AFW pump              b. DO NOT CONTINUE this procedure AVAILABLE.                                 UNTIL at least one AFW pump AVAILABLE.
  ~
: c. SELECT appropriate procedure:
* O*GO-6, Power Reduction from 30% Reactor Power to Hot Standby (if maintaining hot standby)
OR
* 0-GO-7, Unit Shutdown from Hot Standby to Cold Shutdown OR
* other appropriate procedure as determined by Shift Manager or TSC (if manned).
                  --IIIIl_--
: d. GO TO appropriate plant procedure.
END Page 15 of 15
 
Page 12 of 12 Rev. 2 CANDIDATE CUE SHEET
(              (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
DIRECTION TO TRAINEE:
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.
INITIAL CONDITIONS:
Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line.
Res boron is 1400 ppm and the previous shift determined that B Train RHR boron concentration is 1450 ppm.
Shutdown margin required boron concentration is 1200 ppm.
A Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.
B Train RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.
INITIATING CUES:
You are the Unit 1 OATC and the SRO has directed you to place B Train RHR in service and take A Train RHR out of service.
Align B Train injection flowpath to loops 1 & 4.
Notify the SRO when you have B Train RHR in service.
(
 
J PM B.1.h Page 1 of 12 Rev . 2
(
SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE B.1.h JPM 152 Swap RHR Pumps (A Train to B Train)
With Level in the Pressurizer
(
Original Signatures on File PREPAREDI REVISED BY:                                                                          Datel VALIDATE D BY:
* Datel APPROV ED BY:                                                                        Datel (Ope rations Traini ng Manager)
CONCU RRED:    **                                                                    Datel (Operations Representat ive)
* Validation not required for minor enhancements, proced ure Rev changes that do not affect the JPM , or individual step changes that do not affect the flow of the JPM.
                  ** Operations Concurrence requi red for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision) .
(
 
JPM B.1.h Page 2 of 12 Rev. 2
(                                                  NUCLEAR TR AINING REVISIONIUSAGE LOG REVISION                    DESCRIPTION OF                    V      DATE    PAGES    PREPAREDI NUMBER                          REVISION                                      AFFECTED REVISED BY:
0        New                                          Y    10/14/98    All    JP Kearney penl ink            0-SO 1 Rev change only            N      9/21 /99    4      SR Taylor penlink              0-SO 1 Rev change only            N      8/29/00      4      SR Taylor penlink                  Updated references                Y      2/5/01      2,4    GS Poteet pen/ink                  Updated reference                  N    12/10101      3    Lacy Pauley 1        Updated to current revision and simulator    Y      8/25/04    All    MG Croteau commands. Verify new IC-2 satisfactory.
2          Updated to current revision of procedure. N      2/5107      All    RH Evans v - Specify if the JPM change will require another vaiidation (Y or N).
See cover sheet for criteria.
 
JPM B.1.h Pa ge 3 of 12 Rev. 2 SEQUOYAH NUCLEAR PLANT
(                                                              RO/SRO JOB PERFORMANCE MEASURE T as k:        Swap RHR Pumps (A Train to B                  JAIT A task # :  0050030101        (RO)
Train ) with Level in the                                      0050080101        (RO)
Pressu rizer KiA Ratings:
005K4.03 (2.9/3.2 )                      005A1.01 (3.5/3.6)            005A4 .02 (3.4/3.1) 005K4.10 (3.1/3.1)                        005A1.02 (3.3/3.4)            005A4 .01 (3.6/3.4)
Task Standard:
              '8" Train RHR is placed in service inject ing to Loops 1 & 4.
Evaluation Method :                              x _ In-Plant Simulator _...L:>.._                  _
  ===~=====================================================                     === = == = == == == == = = = = = == = = = = =
Performer:
Performer:
NAMEStartTime Performance
NAME                                                  Start time            _
Rating:SATUNSAT Pertormance
Performance Rating: SAT                        UNSAT          Performance Time                  Finish time            _
TimeFinishTime
Evaluator:           _ _ __ _ _ _ _ ----1                              _
C Evaluator:
SIGNATURE           DATE
I SIGNATURE DATE===================================================================================
-( ~= = = = = = = == === = = = = = = == = = ========== ==================== == = == = ===== = = = ======= == = = = = == = =
COMMENTS (
COMMENTS
(JPM8.1.g Page 4 o f 9Rev.9SPECIALINSTRUCTIONSTOEVALUATOR:a.Setupthe
 
simulator post trip with one spray valve cracked and stuckopen.RCS pressure should be dropping but not less than approximately
JPM B.1.h Page 4 of 12 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:
2100*2150 psigwhenthe applicant reaches the step to check pressure control.If possible , fail pressurizer
( 1. Sequenced steps identified by an "s"
backup heaters to automatically
: 2. Initialize IC-2. Ensure A Train RHR is in service with flow aligned through FCV-63-93 to Loops 2 & 3.
energize so that they must be energized manually Validation
: 3. A Console operator will be required at steps 4, 8, & 10.
Time: CR.11min s Local ToolslEquipmentlProcedures
: 4. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press ..
Needed: 'ES-O.1 Reference ES-O.1 Directions
: 5. Any UNSAT requires comments
to Trainee: Reactor Trip Respo nseREADTOOPERATOR
: 6. Ensure operator performs the following required actions for SELF-CHECKING;
Title RevNo.30Iwillexp laintheinitialconditions
: a. Identifies the correct unit, train , component, etc.
,andstatethetasktobeperformed
: b. Reviews the intended action and expected response.
.Allcontrolroomstepssha
: c. Compares the actual response to the expected response.
llbeperfo rmedforthisJPM.Iwillprovideinitiatingcuesandreportsonotheractionswhend
Validation Time: CR.       11 minutes          Local              _
irectedbyyou.Whenyoucompletethetasksuccess
Tools/Equipment/Procedures Needed:
fully,theobjectiveforthisjobperformancemeasurewillbe satisfied.Ensureyouindicatetomewhenyouunderstandyourassignedtask.ToindicatethatyouhavecompletedyourassignedtaskreturnthehandoutsheetIprovidedyou.
0-SO-74-1 , Section 8.
INITIALCONDITIONS:
 
1.Un ithastripped.
==3.2 REFERENCES==
2.Transition to ES-O.1hasbeenperformed.INITIATINGCUES:
Reference                                            Title                          Rev No.
Y ou have bee n directedtostabilizeth
0-SO-74-1                                     Residual Heat Removal S stem                              61
eunitin accordance
  =============================================================================
with ES-O.1 , beg inning atstep 1.N ot ify the SRO whent he unitisstable
READ TO OPERATOR Directions to Trainee:
JPM8.1.g Page 5of9 Re v.0JobPerfo rmance Checkl ist: SAT/UNSAT STEP/STANDARD
I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM . I will provide initiating cues and reports on other actions when directed by you.
Note: Applicant may take actio n re latedtocritical steps prior to reach ing required steps by use of the E8-0.1 Handout.STEP1.:Obtaintheappropriateprocedure
When you complete the task successfully, the objective for this job performance measure will be satisfied.
.-SAT-UNSAT STANDARD: Ope ratorobtainsacopyof
Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.
ES-O.1.Start Time__S TEP 2.:[1]M ON ITOR 8 1 NOT act uated:-SAT 81 A CT UATED permissive DARK[M-4A, D4]-UNSA T*STANDARD: Determine s SI isNOTactuatedbyobservingannunciatorM-4A-D4permissiveisdark
INITIAL CONDITIONS:
STJ;;P 3.:[2]VE R IFY generat or breakers OPEN.-SAT-UNSA T STANDARD: Verifies generatorbreakersopenbyobse
: 1. Unit 1 had been in Mode 5 for 72 hours to repair a leak on the #1 Steam Line.
rving g reen l ightson1-M-1 benchboard.STEP4.:[3]M ON I TOR RCS temperat ures:-SA T R CP s Ru nn ing: CH ECK T-avg stable at or tr e ndingt o-UNSAT*betwee n 547°F a nd 552°F.STANDARD: DeterminesT-avg isstableato
: 2. RCS boron is 1400 ppm and the previous shift determined that B Train RHR boron concentration is 1450 ppm.
r t rendingtobetween 547°F an d 5 52°F.((
: 3. Shutdown margin required boron concentration is 1200 ppm.
STEP5.[4]MONITOR feedwater status:-SAT*T-avg less than 550°F.-UNSAT*MFW regu lating valves CLOSED.*MFW regulating
: 4. A Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.
bypass valve controller
: 5. B Train RHR has been checked out locally by the AUXiliary Bldg. AUO and is ready for service.
outputs ZERO.*MFW isolation valves CLOSED.*MFW pumps TRIPPED.*MFW flow ZERO.*Total feed flow to SIGs greater than 440 gpm.STANDARD: DeterminesTavgisNOTlessthan550
INITIATING CUES:
°Fandgoestostep5
You are the Unit 1 OATC and the SRO has directed you to place B Train RHR in service and take A Train RHR out of service. Align B Train injection flowpath to loops 1 & 4.
.STEP6.:[5]CHECK if emergency boration is required:-SAT[aJ VERIFYall control rods fully inserted:-UNSAT*Rod bottom lights LIT*Rod position indicators
Notify the SRO when you have B Train RHR in service.
less than or equalto12 steps.STANDARD: DeterminesAllrod Bottom l ights are illuminated.STEP7.:[b]MONITOR RCS temperature:
 
-SAT*T-avg greater than 540°F if any RCP running-UNSAT STANDARD: Determines
JPMB.1 .h Page 5 of 12 Rev. 2 Job Performance Checklist:
T-a vg is approximately
(                                            STEP/STANDARD
551°FSTEP8.:[6]ANNOUNCE reactor trip USING PA system.-SAT-UNSAT STANDARD: AnnouncesreactortripoverPAsy
                                                                  -                      SAT/U NSAT STEP 1.:       Obtain copy of 0-SO-74-1 and determ ine appropriate section            -   SAT
stem ((Job Performance
                                                                                          -   UNSAT STAN DARD:   Operator obtains a copy of 0-SO-74-1 and goes to Section 8.3.2.
Che cklist: STEP/ST ANDARDJPMB.1.gPage6of9 Rev.0 SAT/UNSAT
Start Time__
STEP 9.:[7]MONITOR pre ssurizer level control:-SAT CHECK pressurizer
COMM ENTS:
level greater than 17%.-UNSAT**V ER IFY chargingIN SERVICE.*V ERIFY letdo wn I N SERVICE.*CHECK pressurize r level trending t o 25%(normal range 20%t o 30%).STAN DARD: Determ ines ChargingandLe t do wn areinse rv ice a nd PZR levelis>17%an d trending t o 25%.STEP 10.:[8]MONITO R pressurizer
STEP 2.:   [1) IF adjustment is required on CCS flow throug h RHR Hxs, T HEN            -   SAT ENSURE [FCV-70-153) RHR Hx B CCS outlet is THROTTLED.
pressure control:-SAT*Pressurizer
                                                                                          -   UNSAT NOTE:     Ope rator may deci de to keep FCV-70-153 Open STANDAR D: Operato r ensures HS-70-153 has a RED & GREEN light LIT with fiow indicated on 0-M-27A.
pressure greater than 1870 psig.-UNSAT*Pressurizer
COMMENTS:
pressu re stableatort rending to 2235 psig (n ormalra nge 221 0 psig t o 22 6 a psig).STANDARD: Deterrn ines PZR pressure>1870butNOT
I c  STEP 3.:   [2) ENSURE [FCV-74-28) RHR Hx B Outlet is CLOSED.                            -   SAT
trending toward 2210-2260 p sig.E VALUATORNOTE: JPM steps 11 ,12and13ar e from pro ceduresteo8 RNO STEP 11.: IF pressure less than 2235psiganddr opp ing, THEN-SAT PERFORM the following:
                                                                                            -  UNSAT STANDARD:   Operator ensures FCV-74-28 RHR Hx B Outlet CLOSED, FIC-74-28 @
_UNSAT*ENSURE pressuri zer PORVs CLOSED.Critical Step*ENSURE spray valves C LO SE D.*IF spray valve(s)CANNOT be cl osed , THEN STOP RCP s#1 and 2.*IF pressur izer pressure cont inues to drop , TH EN S TO P add it ional RCPs as necessary.
100%.
*ENSURE all pressurizer
90MM ENTS:
heater s ON.STANDARD: StopsNumber 1 R ep by ro t at inghandsw itch counter-cloc
STEP 4.:   [3)  STAR T RHR Pump B-B with [HS-74-20A).                                 -  SAT
k w ise.((Job Perfo rmanceCheckl ist: STEP/STANDARDJPM8.1.g P age7of9 Rev.0 SAT/UNSAT  
                                                                                            -  UNSAT STANDARD :     Operator starts 1B-B RHR Pump, verifies RED light LIT on HS. This step is criti cal to place th e B t rai n RHR Pu mp in serv ice. Critical Step COMM ENTS:
STEP 1 2.: IF pressure less than 2235 psigand dropping, THEN PERFORM t he following:-S AT-UNSAT*ENSURE pre ssur izer PORVs CLOSED.*ENSURE sprayvalves CLOSED.CriticalStep
 
*IF spray valve(s)CANNOT be closed , THEN STOP RCPs#1 and 2.*IFpres s urizer pressure cont inues to drop , THE N STOP additional RCPs asnecessary.*ENSURE all pressurizer
JPM B.1.h Page 6 of 12 Rev. 2 Job Performance Checklist:
heaters ON.STANDARD: Stop s Number2 R CP b y rotating handsw itchcounter-c lockwise, i f candid ate de term inesthatRCSpressure continuestodr op , additional RCP smaybestopped.STEP1 3.:IFp ressurelessth an 2235psigand dropp ing , THEN PERFORM the following:-SAT-UNSAT*ENSURE pressurizer
(                                           STEP/STAN DARD                                SAT/UNSAT STEP 5.:  [4] VERIFY [FC V*74*24] RHR Pump B-B miniflow OPENS                            -    SAT OR                                                                          -   UNSAT greater than 500 gpm in indicated on FI-74-24 .
PORVs CLOSED.*ENSURE spray valves CLOSED.Cr itical Step*IF spray valve(s)CANNOT be closed, THEN STOP RCPs#1 and 2.*IF pressurizer pressure continues to drop , THEN STOP additional RCPsas necessary.*.ENSURE all pressurizer
Cue:       IF dispatched: FI*74*24 indicates -550 gpm.
heaters ON.I STANDARD: Manually ene rg ized PZR heater BankDb y rotating handsw itch c lockw ise.(JobPerfo rmance Chec kl ist: STEP/STANDARDEndofJPM JP M B.1.g Page8o f 9 Rev.0 SAT/UNSAT
STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator F[-47-24.
(Page9of9 Rev.0CANDIDATECUESHEET(TOBERETURNEDTOEXAMINERUPONCOMPLETIONOF
COMMENTS:
TASK)DIRECTIONTOTRAINEE:Iwillexplainthe
STEP 6.:   [5] IF aligning Train B RHR cooling to loops 1 and 4, THEN PERFORM the          -  SAT following:
initialconditions,andstatethetasktobeperformed.All
[aJ ENSURE [FCV-63-94] OPEN.                                                 -  UNSAT
control room stepsshallbeperformedforthisJPM,includinganyrequired
[b] ADJU ST [FCV-74-28] to establish flow from train B RHR.
communications.Iwillprovideinitiatingcuesandreportsonotheractions
[cJ ADJUST [FCV-74-16] AND [FCV-74-32] to reduce Train A RHR flow.
when directedbyyou.Ensureyouindicatetomewhenyouunderstandyour
STANDARD: Operator performs the following:
assignedtask.To indicatethatyouhavecompletedyourassignedtaskreturnthe
Critical Step
handout sheetIprovidedyou
* ENSURE FCV*63*94 OPEN
.INITIAL CONDITIONS:Unithastripped
* ADJUS T FCV*74*28 RHR Hx B Outlet OPEN, using FIC-74-28 CLOSE FCV-74-16 RHR Hx A Outlet, place FIC-74-16 @ 0%. This step is criti cal to align the B train RHR Pump flow path to the RCS.
.Transition
COMMENTS:
to ES-O.1hasbeen performed.INITIATINGCUES:
l
You have been directed to stabilize the unit in accordance
 
with ES-O.1, beginning at step 1.NotifytheSRO when the unit is stable
JPM B.1.h Page 7 of 12 Rev. 2 Job Performance Checklist:
(
(                                        STEP/STANDAR D                                    SAT/UNSAT STEP 7.:        [d]    VERIFY FCV-74-12 RHR Pump A-A miniflow OPENS                        -   SAT OR                                                                  -   UNSAT greater than 500 gpm in indicated on FI-74-12.
TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANTEOIPROGRAM
Cue:      IF dispatched: FI-74-12 indicates -550 gpm.
MANUAL EMERGENCYSUBPROCEDURE
STANDARD: Operator verifies FCV-74-12 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-12.
ES-0.1REACTORTRIPRESPONSE
COMMENTS:
Revision 30 QUALITY RELATED D.A PORTER PREPARED/PROOFREAD
STEP 8.:        [e]  CLOSE [FCV-74-33] RHR Hx A Outlet.                                   -  SAT
BY:__
                                                                                              -  UNSAT STANDARD:    Operator closes FCV-74-33. This step is critical to isolate A train    Critical Step c    COMMENTS:
_RESPONS IBLE ORGAN IZA TION:
RHR from B train RHR.
_W 1.LEARY APPROVED BY:.
ST EP 9.:     [f]    ENSURE [FCV-74-35] RHR Hx B Outlet OPEN.                             -  SAT STANDARD: Operator ensures FCV*74*35 RHR Hx B Outlet OP EN.                               -  UNSAT COMMENTS:
_EFFECTIVE DATE: 08101/2005
 
REVISION DESCRIPTION
JP M B.1.h Page 8 of 12 Rev. 2 Job Performance Checklist:
: Added new step which checks generator PCBs open.This step is being relocated from E-QStep3in conjunction
(                                            STEP/STANDARD                              SAT/UNSAT STEP 10.:      [9]    OPEN [VLV*74-531] RHR Hx B to Letdown Hx.                           -  SAT NOTE:      Console operator needs to modify remote function RHR04 to 100.             -  UNSAT Cue:      Open HCV*74*531 as an AUO local/y.
with incorporationofE-OA.Revised step 11.b to provide details on placing steam dumps in pressure mode.This procedurehasa handout page (2 copies)and foldout page.  
STANDARD:     Operator directs an AUO to OPEN HCV-74-531 RHR Hx B to Letdown      Critical Step Hx. This step is crilicalto align B train RHR Pump for CVCS letdown.
REACTOR TRIP RESPONSE SQN I ES*O.1'---'-Rev.30 FOLDOUT PAGE SI ACTUATION CRITERIA IF eitherofthefollowing
COMMENTS:
conditions
STEP 11.:      [h]    STOP RHR Pump A-A with [HS-74-10A].                                 -  SAT
occurs:*RCS subcooiingbasedonco re e xit TICslessthan40
                                                                                            -  UNSAT STANDARD:      Operator stops RHR pump 1A*A, verifies GREEN light on handswitch.
o f OR*Pressurizer
This step is critical to remove the A train RHR Pump from service. Cr itical Step CO MM ENTS~
level CANNOT be maintained
STEP 12.:     [i]    OPEN [HCV-74 -37] RHR Hx B Bypass.                                 -  SAT NOTE:      Console operator needs to modify remote fu nction RHR07 to 100.             -  UNSAT Cue:     Open HCV*74*37 as an AUO locally (including IV).
greaterthan5%, THEN ACTUATESIandGOTOE-D
Cri tical Step STANDARD:      Operator directs an AUO to OPEN HCV*74-37 RHR Hx B Bypass.
, Reac torTripor Safety Injection.EVENT DIAGNOSTICS
This step is cr it ical to align the B train RHR HX bypass valve so operator can control HX outlet temperature.
IF both trains of shutdown boards deenergized, THENGOTO ECA-D.O,LossofAll AC Power.TANK SWITCHOVER
COMMENTS:
SETPOINTSIFCSTlevellessthan5%.
(
THEN ALIGN AFWsuctiontoERCW.Page1aof15
 
REACTOR TRIP RESPONSE SQN I ES-0.1________________________
JP M B.1.h Page 9 of 12 Rev. 2 Job Performance Checklist:
Rev.30 HANDOUTPage1of2 STEP ACTION FOPIFRCS subcoolingbasedoncoreexit
(                                          STEP/STANDARD                              SAT/UNSAT STEP 13.:      Ul      CLOSE IHCV-74-36! RHR Hx A Bypass.                              -  SAT NOTE:      Console operator needs to modify remote fu nction RHR06 to O.         -  UNSAT Cue:       Close HCV-74-36 as an AUO locally (including IV).
TICslessthan40
Critical Step STANDARD: Operator directs an AUO to CLOSE HCV-74-36 RHR Hx A Bypass.
'F OR Pressurizer
Th is step is critical to isolate the A train RHR HX bypass valve.
level CANNOTbema intained greaterthan5%, THEN ACTUATESIandGOTOE-O
COMMENT S:
,ReactorTriporSafetyInjection.
STEP 14.:      [k]    CLOSE [HCV-74-530] RHR Hx A-A to Letdown Hx.                   -  SAT NOTE :    Console operator needs to modify remote function RHR03 to O.           -  UNSAT Cue:      Close HCV-74*530 as an AUO locally (including IV).
.FOPIFCSTlevellessthan5%
STANDARD: Operator directs an AUO to close HCV-74-530. This step is critical to isolate the A train RHR flow path to CVCS letdown.
, THEN ALIGN AFWsuctiontoERCW
COMMENTS:
.1.MONITORSINOTactuated:
STEP 15.:      [I]    ENSURE [FCV*63-93] CLOSED.                                     -  SAT
3.MONITOR RCS temperaturesstableatortrend
                                                                                        -  UNSAT STANDARD: Operator ensures FCV-63-93 CLOSED. This step is critical to isolate  Critical Step the A train RHR RCS injection low path.
ingtobetween 547"Fand552'F.3.c.(ifRCS temperaturecontinuestodrop)
    .COMMENTS :
RNO*CONTROLtotalfeedflowto
(
minimizeRCScooldown
 
.*MAINTAINtotalfeedflow
JPM B.1.h Page 10 of 12 Rev . 2 Job Performance Checklist:
greaterthan440gpmUNTILnarrowrangelevel
(                                             STEP/STANDARD                                  SAT /UNSAT STEP 16.: [6] IF aligning RHR cooling to loops 2 and 3, THEN PERFORM the                    -  SAT following:
greaterthan10%inatleastone
                                                                                                -  UNSAT NOTE:      Step is NA'd, initiating Cues direct alignment to loops 1 &4.
S/G.4.MONITOR feedwater status: (verify FVIIIwhenT-avglessthan SSO°F)5.b.MONITOR RCS temperatures
STANDARD: Ope rator NA's the step.
greate rthan540°F.7.MONITOR pressurizerlevelcontrol
COMMENTS:
: (pressurizerlevelgreaterthan17%)
STEP 17.:  [7] THROTTLE one or both of the following to maintain desired cooling            -  SAT rate: (N/A if not throttled) :
7.a.(ifpzrlevellessthan17
                                                                                                -   UNSAT FCV-74-28, RHR Hx B Outlet, FCV-74-32, RHR Hx Bypass.
%)RNO 3)CONTROLchargingtorestore
Critical Step STAI\!DARD : Operator throttles open FCV-74-28 and/or FCV-74-32 to stabilize RCS temperature and estab lish RHR flowrates at approximately the same values that were present prior to the flowpath realignment. This step is critical to control RCS cooldown rate.
pressurizerlevelgreaterthan17%.
c    COMMENTS:
4)WHEN pressurizer
I I STEP 18.~~]  WHEN injection flow is > 1250 gpm, THEN VERIFY [FCV-74-24] RHR Pump B-B miniflow is CLOSED.
level greaterthan17%, THEN OPERATE pressurizerheatersas necessary.7.c..(ifletdownnotinservice)RNOWHENcharging
                                                                                                -   SAT
established
                                                                                                -   UNSAT STANDARD: Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch .
AND pressurizer
COMMENTS:
level greaterthan17%, THEN ESTABLISH letdown.7.d.(ifpzrlevelisNOT
 
trendingto25%)RNO CONTROLchargingandle
JPM B.1.h Page 11 of 12 Rev . 2 Job Performance Checklist:
tdowntoma intain pressurizerlevelat25%
(                                        STEP/STANDARD                                        SAT/UNSAT STEP 19.: [9] IF cooling water is to be removed from Train A Hx, THEN                         -    SAT CLOSE [FCV-70-1561.                                                           -   UNSAT Cue:        Lea ve cooling water aligned to A Train at its current fJowrate.
(normalrange20%to30%).
STANDARD: Operator NA's step.
8.MONITOR pressurizer
COMMENTS:
pressure control:(pzrpressuregreaterthan1870psigandstableator
STEP 20.:       Notify U1 US that B train of RHR Is in service to loops 1&4 and A train of    -   SAT RHR has been removed from service.
trendingto2235psig)
                                                                                                -     UNSAT STANDARD: None.                                                                         Stop Time__
a.b.2)(ifpzr pressure greaterthan2235psigandrising)
90MMENTS:
RNO CONTROL pressure.9.MA INTAIN SlG narrowrangelevels:(between10%and50
c                                                  End of JPM
%)9.a.(if SIGlevelslessthan10
(
%)RNO MAINTAINtotalfeedflow
 
greaterthan440gpmUNTILlevel
SQN                            RESIDUAL HEAT                          0-50-74-1
greaterthan10%.Page 1bof15
(
SQN STEP 12.b.2).RNO REACTOR TRIP RESPONSE HANDOUTPage2of2 ACTION(ifNORCPcanbestarted)
[---l--_ _---'------------'
MONITORnaturalcirculation.
Unit 1,2 REMOVAL SYSTEM                            Rev: 61 Page 132 of 204 Date        _
I ES-0.1 Rev.30 13.MONITORifso urcerangechannelsshouldbereinstated
8.3.2 Placing Train B in Service and Removing Train A from Service.
:(IRMfluxlessthan10.
CAUTION          CCS flow should be adjusted to provide adequate flow through the RHR Hx to prevent RHR Hx CCS outlet temperature from exceeding 145°F. The RHR Hx CCS outlet temperature alarm will come in a 115°F.
4%power)15.MAINTAINstableplantconditions: a.Pressurizerpressureat2235psig(normal range2210ps
NOTE              The following steps may require operators in both heat exchanger rooms and one outside the pump rooms.
igto2260 psig)b.Pressurizerlevela t 25%(normalrange20
[1] IF adjustment is required on CCS flow through RHR Hxs, THEN ENSURE [FCV-70-153] RHR Hx        s ccs outlet is THROTTLED.
%to30%)c.S/G narrowrangelevelsbetween10
[2] ENSURE [FCV-74-28] RHR Hx B Outlet is CLOSED.
%and50%d.RCStemperatureat
CAUTION 1        Failure to maintain shutdown cooling flow rate for an RHR pump at the maximum possible could result in reduced thrust bearing life.
547"F(between540
[C.3]
'Fand550'F)Page1cof15
CAUTION 2       If RHR pressure downstream of pumps exceeds 600 psig, then RHR discharge pressure must be reduced below 600 psig or RHR isolated from the RCS within 1 hour.
REACTOR TRIP RESPONSE SQN I ES-0.1____...L-Rev.30 HANDOUTPage1of2 STEP ACTION FOPIFRCS subcoolingbasedoncoreexit
NOTE            RHR motor lower bearing oil level will increase after pump is started and may increase above sightglass. The presence of oil can be verified by a golden tint in sightglass.
TICslessthan40"F OR Pressurizer
[3] START RHR Pump B-B with [HS-74-20Al
level CANNOTbemaintainedgreaterthan5
[4] VERIFY [FCV-74-24] RHR Pump B-B miniflow OPENS OR greater than 500 gpm is indicated on FI-74-24.
%, THEN ACTUATESIandGOTO E*O,ReactorTripo
 
r Safely Injection.FOPIFCSTlevel
SQN                          RESIDUAL HEAT                        0-SO-74-1 REMOVAL SYSTEM
lessthan5%, THEN ALIGN AFWsuctionto ERCW.1.MONIT ORSINOTactuated:
(      1,2 Rev: 61 Page 133 of 204 Unit            _                                                          Date        _
3.MONITOR RCS temperaturesstableatortrendingtobetween547"F and 552"F.3.c.(ifRCS temperaturecontinuest
8.3.2 Placing Train B in Service and Removing Train A from Service (Continued)
o drop)RNO*CONTROLtotalfeedflowtom
CAUTION 1        To reduce vibration across FCV*74-16 and FCV-74-28 (RHR Hx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.
inimizeRCScooldown
CAUTION 2      Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74-531 OPEN) and on miniflow for > 10 minutes may result in pump damage due to one pump dead-heading. [C.2] [C.13]
.*MAINTAINtotalfeedflow
NOTE            Step 5[b] and [c] may be performed together to ensure continuous flow delivered to RCS.
greaterthan440gpmUNTILnarrowrange
[5] IF aligning Train B RHR cooling to loops 1 and 4, THEN PERFORM the following:
level-greaterthan1 0%inatleastone
(
S/G.4.MONITOR feedwater status: (ve rifyFWlwhen T*avglessthan550"F)5.b.MONIT OR RCS temperatures
[a]    ENSURE [FCV*63-94] OPEN.
greaterthan540"F.
[b]    ADJUST [FCV-74-28] to establish flow from Train B RHR.
7.MONITOR pressurizerlevelcontrol
[c]  ADJUST [FCV-74-16] AND [FCV-74-32] to reduce Train A RHR flow.
: (pressurizer
[d]    VERIFY [FCV-74-12] RHR Pump A-A miniflow OPENS OR greater than 500 gpm is indicated on FI-74-24.
level greaterthan17%)7.a.(ifpzrleve llessthan17%)RNO3)CONTROLchargingtorestore
(
pressurizer
 
level greaterthan17%.4)WHEN pressurizer
SQN                        RESIDUAL HEAT                    0-SO-74-1
level greaterthan17%, THEN OPERATE pressurizerheatersasnecessary
(      1,2 REMOVAL SYSTEM                    Rev: 61 Page 134 of 204 Unit        _                                                          Date      _
.7.c.(ifletdownnotinservice)RNOWHEN charging established
8.3.2 Placing Train B in Service and Removing Train A from Service (Continued) tel  CLOSE [FCV-74-331 RHR Hx A Outlet.
AND pressurizer
[f)  ENSURE [FCV-74-35] RHR Hx B Outlet OPEN.
level greaterthan17%, THEN ESTABLISH letdown.7.d.(ifpzrlevelisNOTtrendingto25
[g)   OPEN [VLV-74-531] RHR Hx B to Letdown Hx.
%)RNO CONTROLchargingand
1~        CV
letdowntomainta in pressurize
[h)   STOP RHR Pump A-A with [HS-74-10AJ.
rlevelat25%(normalrange20%to30%).8.MONITOR pressurizer
[i)   OPEN [HCV-74-37] RHR Hx B Bypass.
pressure control:(pzrpressure
1~        CV
greaterthan1870 pslg and stableatortrendingto2235psig)
[j]    CLOSE [HCV-74-36] RHR Hx A Bypass.
8.b.2)(ifpzrpressure
1~        CV
greaterthan2235ps
[k]    CLOSE [VLV-74-530] RHR Hx A to Letdown Hx.
igandrising)
1"        CV
RNO CONTROL pressure.9.MAINTAIN SIG narrowrangelevels
[I]    ENSURE [FCV-63-93] CLOSED.
:(between10%and50%)
(
9.a.(ifS/Glevelslessthan10%)
 
RNO MAINTA INtotalfeedflow
SQN                          RESIDUAL HEAT                        0-50-74-1
greaterthan440gpmUNTILlevel
(                                REMOVAL SYSTEM                        Rev: 61 1,2                                                              Page 135 of 204 Unit          _                                                          Date          _
greaterthan10%.Page1dof1 5
8.3.2 Placing Train B in Serv ice and Removing Train A from Service (Continued)
SQN STEP 12.b.2).RNO 13.REACTOR TRIP RESPONSE HANDOUTPage2 of2 ACTION(ifNORCPcanbestarted)
CAUTION 1        To reduce vibration across FCV-74-16 and FCV-74-28 (RHR Hx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.
MONITORnaturalcirculation.
CAUTION 2       Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74-531 OPEN) and on miniflow for> 10 minutes may result in pump damage due to one pump dead-heading. [C.2) [C.13)
MONITORifsourcerange
NOTE            Step 6[d) and [e) may be performed together to ensure continuous flow delivered to RCS.
channelsshouldbereinstated: (IRMfluxlessthan10.
[6]  IF aligning Train B RHR cooling to loops 2 and 3, THEN PERFORM the following:
4%power)I ES*0.1 Rev.30 15.MAINTAINstableplantconditions:
[a)    ENSURE [FCV-63-93) OPEN.
a.Pressurizerpressureat2235psig(normalrange2210psigto2260psig)
[b]    ENSURE [FCV-74-33] RHR Hx A Outlet OPEN.
b.Pressurizerlevelat25%(normalrange20%to30%)
[c]    ENSURE [FCV-74-35) RHR Hx B Outlet OPEN.
c.SIG narrowrangelevelsbetween10%and50%
[d]    A DJ UST [FCV-74-28) to establish Train B RHR flow.
d.RCS temperatureat547°F(between540°Fand550°F)Page1eof15
[e]    ADJUST [FCV-74-161 and [FCV-74-321 to reduce Train A RHR flow.
REACTOR TRIP RESPONSE SQN I ES-O.1 Rev.3D-----------------1.0PURPOSEThisprocedureprovidesthenecessaryInstructionstostabilizeandcontroltheplantfollowingareactortripWITHOUTasafetyinjection.2.0SYMPTOMSANDENTRYCONDITIONS2.1ENTRYCONDITIONS
[f]    VERIFY [FCV-74-12] RHR Pump A-A miniflow OPENS or greater than 500 gpm is indicated on FI-74-24.
E-OReactorTriporSafetyInjection*SINOTactuatedandNOTrequired
[g)    OPEN [VLV-74-5311 RHR Hx B to Letdown Hx.
3.0OPERATORACTIONSPage2of15
(                                                                        1"          CV
SQNREACTORTRIPRESPONSE
 
I ES-O.1Rev.30 I STEP II ACTION/EXPECTED
C~
RESPONSE II RESPONSE NOT OBTAINED NOTEThisprocedurehasa
N                            RESIDUAL HEAT                          0-SO-74-1
foldout page.1.2.MONITOR 81NOTactuated:*SI ACTUATED permissive
(                                    REMOVAL SYSTEM                          Rev: 61 1,2                                                                    Page 136 of 204 Unit              _                                                              Date        _
DARK[M-4A,D4]VERIFY generatorbreakersOPEN.
8.3.2    Placing Train B in Service and Removing Train A from Service (Continued)
IFSIactuated, THENGOTO E-O,ReactorTripor
[h]    STOP RHR Pump A-A with [HS-74-10A].
Safety Injection.---OPEN generator breakers.Page 3 of 15
[i]    OPEN [HCV-74-37] RHR Hx B Bypass.
SQN REACTOR TRIP RESPONSE I ES-O.1 Rev.30 I STEP II ACTION/EXPECTED
st 1          cv
RESPONSE I I RESPONSE NOT OBTAINED.3.MONITOR RCS temperatures
[j]    CLOSE [HCV-74-361 RHR Hx A Bypass.
:*IFanyRCPrunning, THEN CHECK T-avgstableator
1"          cv
trending to between 547°Fand552°F.OR*IFRCPs stopped , THEN CHECK T-coldstableat or trending to between 547°Fand552°F.IF temperaturelessthan547
[k]    CLOSE [VLV-74*530] RHR Hx A to Letdown Hx.
°F and dropping , THEN PERFORM the following:
st 1          cv c                    [I]   ENSURE [FCV-63-94] CLOSED.
a.ENSUREsteamdumpsand
NOTE                One or both of the valves in the next step may be throttled to maintain RCS at desired temperature.
atmospheric
[7]  THROTTLE one or both of the following to maintain desired cooling rate (N/A if not throttled):
reliefs CLOSED.b.ENSURE S/G blowdown isolation valves CLOSED.c.IFcooldown
VALVE NO.                     FUNCTION                INITIALS FCV-74-28                RHR Hx B Outlet FCV*74*32                  RHR Hx Bypass
continues, THEN PERFORM the following: 1)CONTROLtotalfeed flow USING EA-3-8 , Manual Control of AFWFlow.2)MAINTAINtotalfeed flow greaterthan440gpm
[8]    WHEN injection flow is > 1250 gpm, THEN VERIFY [FCV-74-24] RHR Pump B-B miniflow is CLOSED.
UNTIL narrow range level greaterthan10%inatleastone
[9]    IF cooling water is to be removed from Train A Hx, THEN CLOSE [FCV 156].
S/G.3)DEPRESS RESETonMSRcontrolpanel.
(                                           END OF TEXT}}
4)IFanyMSR temp control valvefailstoclose
, THEN ISOLATE HP steamtoMSRs.d.IFcooldownstill
continues, THEN CLOSEMSIVsand bypass valves.IF temperature
greaterthan552°Fandrising, THEN*DUMPsteamto condenser.
OR DUMPsteamUSING
atmospheric
reliefs.Page4of15
SQN REACTOR TRIP RESPONSE I ES-O.1R_e_v_._3_0_I STEP I I ACTION/EXPECTED
RESPONSE I I RESPONSE NOT OBTAINED 4.MONITOR feedwater status:a.T-avglessthan
550°F.a.GOTOStep5.b.MFWregulatingvalves
CLOSED.b.CLOSE valves.c.MFWregulatingbypassvalve
controller
c.CLOSE valves.outputsZER
O.d.MFWisolationvalvesCLOSED.
d.CLOSE valves.e.MFW pumps TRIPPED.e.TRIP MFW pumps.f.MFWflowZERO.f.CLOSE feedwater heater isolationMOVsas necessary.
OR D1SPA TCH personnel to isolate MFWregulatingandregulating
bypassvalvesUSINGEA-3-12,LocalIsolationofMainFeedwater.
g.TotalfeedflowtoS/Gs
g.ESTABLISH AFWflow greaterthan440gpm.asnecessary.
IF AFW flow CANNOT be established, THEN ESTABLISH main feedwater flowUSINGEA-2-2, Establishing
SecondaryHeatSinkUsing
Main Feedwater or Condensate
System.Page5of15
SQN REACTOR TRIP RESPONSE I
.1 I STEP II ACTION/EXPECTED
RESPONSE IIRESPONSENOTOBTAINED
5.CHECK if emergencyborationisrequired:
a.VERIFYallcontrolrodsfullyinserted:Rodbottomlights
LITRodposition
indicatorslessthanorequalto
12 steps.b.MONITOR RCS temperature
:*T-avg greater than 540*FifanyRCPrunn
ing OR*T-cold greater than 540*Fifall Reps stopped.6.ANNOUNCE reactor trip USING PA system.a.IFanyofthefollowing
conditions
exists:*twoormoreRPls
indicate*greater than 12 steps OR*twoormorecontrolrodpos
itionsCANNOTbe determined, THENEMERGENCYBORATE
USING EA*68-4 , Emergency Boration.b.EMERGENCYBORATE
as necessary to maintain shutdown margin USING EA-68-4, Emergency Boration.Page6of15
SQNREACTORTRIPRESPONSE
I ES-O.1_______________________
....;.R..:,.e_v_.3_0_I STEP II ACn ONIEXPECTED
RESP ONSE II RESPONSE NOT OBTAINED 7.MONITOR pressur izerlevelcontrol
: a.CHECK pressurizer
level greaterthan17%.b.VERIFYchargingIN
SERVICE.c.VERIFYletdownIN SERVICE.d.CHECK pressu rizer level trend ingto25%(norma lrange20%to30%).a.PERFORMthefollowing
:1)ENSUREnormal
andexces s letdown ISOLATED.2)ENSURE pressurizer
heaters OFF.3)C ONTROLchargingtorest
ore p ressurizer
level greaterthan17%.4)WHEN pressurizerleve
l g reater tha n 17%, THEN OPERATE press urizer heaters as necessary.b.ESTABLISH chargingUSINGEA-62-5.Establishing
NormalChargingandLetd
own.c.WHENcharging
established
ANDpzrleve l greaterthan17%, THEN ESTABLISH letdownUSINGEA-62-5.Estab lishing Norma l Charging and Letdown.d.CONTROL charg ing and letdown t o mainta in pressurizer
leve lat25%(norma lrange20%to30%).Page7of15
SQN REACTOR TRIP RESPONSE I ES-O.1 I L-.....L..Rev.30.I STEP II A CTIONfEXPECTED
RESPONSE IIRESPONSENOT
OBTAINED 8.MONIT OR pressurizer pressu re control: a.Pressurizerpressuregreaterthan1870psig
.b.Pressu ri zer pressurestableatortrending
to2235psig(normalrange221
0psigto2260ps ig).a.ENSURESIAC
TUATED.GOTOE-O ,ReactorTr iporSafely Injection.*b.IFpressurelessthan2235psig
a nd dr opping, THEN PERF ORMthefollowing:1)ENSUREpressurizerPORVs
CLOSED.IFpressur izer POR VCANNOTbeclosed, THENCLOSEitsblockvalve
.2)ENSUREsprayval
ves CLOSED.IFsprayvalve(s)
CANNOT be closed , THENSTOPRCPs#1and2
.IFpressurize
r p res su re continues tod rop, THENSTOPadd itional Repasnecessary.
3)ENSUREallpre
ssurizer heaters ON.(stepcont inued onnextpage)Page8of15
SQN REACTOR TRIP RESPONSE I ES-0.1 Rev.30 I STEP II ACTION/EXPECTED
RESPONSEIIRESPONSENOT
OBTAINED 8.b.(continued)IFpressuregreaterthan
2235 psigandrising, THENPERFORMthefollowing:
1)ENSUREallpressurizerheaters
OFF.2)CONTROLpressureUSINGnormal
spray.IFnormalsprayNOTavailableANDletdowninservice, THENCONTROLpressureUSINGEA-62-4,EstablishingAuxiliary
Spray.IFnormalsprayNOTavailable
ANDletdownNOTinservice, THENENSUREpressurecontrolledwithpressurizerPORV(s).
9.MAINTAINSIGnarrowrangelevels:
a.Greaterthan10%.b.Between10%and50%.
a.MAINTAINtotalfeedflowgreaterthan440gpmUNTILlevelgreaterthan10%inatleastone
S/G.b.IFlevelinanySIGcontinuestorise, THENENSUREfeedflow
STOPPEDtothatSlG.Page9of15
SQN REACTOR TRIP RESPONSE I ES-0.1___----'R_e_v_, 3_0_I STEP'I AcnONIEXPECTED
RESPONSE II RESPONSE NOT OBTAINED 10.VERIFYACbusses ENERGIZEDfromstartbusses
.PERFORMthefollowing
: a.ENSURE diesel generators
supplyingshutdownboardloadsas
necessary:
CCPs*ERCW pumps.*AFWpumps.*Thermal barrier booster pumps.*CCSpumps.
Pressurizer
heaters A-A and B-B.b.ATTEMPTtorestore offsite power USING EA-202-1 , Restoring Off-SitePowerto 6900V Shutdown Boards.c.ENSUREcontrolair
compressorsAand B started USING EA*32*2 , EstablishingControland
Service Air.Pa ge 10 of 15
REACTOR TRIP RESPONSE I ES-O.1R_8_V_._3_0
_--ISTEPII ACTION/EXPECTED
RESPONSE I I RESPONSE NOT OBTAINED CAUTION Arming steam dumps In pressure mode with demand signal present could result in rapid RCS cooldown.11, DETERMINEifsteamdumpto
condenser available:
a.CHECK condenser AVAILABLE:*c-s CONDENSER INTERLOCK permissiveLIT[M-4A,E6l*At leastoneIntact S/G MSIV OPEN, b.PLACEsteamdumpsin
STEAM PRESS mode: 1)PLACEsteamdumpsinOFF.
2)ENSURE steamdumpsin steam pressure mode , 3)ENSUREzerooutput(demand).
4)PLACEsteamdumpsinON.
5)ADJUSTsteamdump controller
setpointto84%(1005psig)inAUTO,a,USE atmosphericreliefsIn AUTOandsetfor84%(1005psig).
IF atmospheric
reliefs NOT functioninginAUTO, THEN USE manual control of atmospheric
reliefs,IFlocalcontrolof
atmospheric
reliefs is necessary, THEN DISPATCH personnel to dump steamUSINGEA-1-2,Local
Control of SIG PORVs.GOTO NotepriortoStep
12.----Page11of15
SQN REACTOR TRIP RESPONSE I ES-O.1____-'-
I STEP II ACTION/EXPECTED
RESPONSE II RESPONSE NOT OBTAINED NOTELoop2RCPand
assoc iated spray valve will provide adequate spray flowforRCS pressurecontrol.IfLoop
2isnot available , all three remainingRCPsmaybe requiredtoensure adequatesprayflow.
12 CHECK RCP#2 RUNNING.PERFORM the following:a.IFNORCPsrunning, THEN ENSUREallRCS dilution STOPPED.b.ATIEMPTto start RCP(s)to provide normal pz r spray: 1)ESTABLISH conditions
forstartingRCP(s)
USING EA-68-2, Establishing
RCP Start Conditions.
2)IFRCPstart
conditions
established, THEN START RCP#2 (if available)ORRCPs#1,3, and 4.IFNORCPcanbe
started , THEN MONITOR natural circulation
USING EA-68-6, Monito ring Natural Circulation
Conditions.
IFnatural circulat ion CANNOT be verified, THEN RAISE steam dump rate.Page12of15
SQN REACTORTRIPRESPONSE
I ES-O.1 Rev.30---------------------------------
I STEP II ACTION/EXPECTED
RESPONSE II RESPONSE NOT OBTAINED 13.MONITORifsourcerange
channels-shouldbereinstated:
a.CHECK intermediaterangefluxlessthan10*
4%power on operable channels.b.CHECKsourcerange
channels REINSTATED
.C.SELECToneSRMandoneIRMon
NR-45 recorder.d.ENSURE audio countrateoperation.
e.RESET shutdown monitor alarmsetpoints.[M-13]
f.WHEN shutdown monitor ALARMLEDsdark ANDHIGHFLUXAT
SHUTDOWN bistablelightsdark, THEN PLACE HIGH FLUX AT SHUTDOWNalarmblock
switches in NORMAL.[M-13]a.TOStep14-.b.REINSTATEsourcerange
channels by simultaneously
placing bothSRMTRIP RESET-BLOCK
switches to RESET position.[M-4]Page13of15
SQN[REACTOR TRIP RESPONSE I ES-O.1____..1.R_e_v_, 3_0_I STEP II ACTION/EXPECTED
RESPONSEIIRESPONSENOT
OBTAINED14.SHUTDOWNunnecessaryplant
equipment:*REFERTO O-GQ-12 , RealignmentOfSecondaryEquipmentFollowing
ReactorlTurbine
Trip.15.MAINTAINstableplantconditions
: a.Pressurizerpressureat2235psig(normalrange2210psigto2260psig)
b.Pressurizerlevelat25%(normalrange20%to30%)
c.SIG narrowrangelevelsbetween10%and50%
d.ReStemperatureat547
°F(between540°F
and 550°F):*T-avgif any Rep running OR.*T-cold if all Reps stopped.16.PERFORMEA-0-9,PostTrip
Administrative
Requirements
andRecoveryAct
ions.Page14of15
SQNREACTORTRIP
RESPONSE I ES-0.1 Rev.30 I STEP II ACTION/EXPECTED
RESPONSEII RESPONSE NOT OBTAINED 17.DETERMINEifnaturalcirculationcooldownisrequired
: a.CHECKatleastoneRCPRUNNING.a.IFplantcooldownrequiredwithNORCPavailable, THENGOTOES-0.2,Natural
Circulation
Cooldown.--IIIIl_--DONOTCONTINUEthis
procedureUNTILatleastoneRCPrestarted
., b.CHECK at leastone AFW pump AVAILABLE.
c.SELECT appropr iate procedure:*O*GO-6,PowerReductionfrom30%ReactorPowertoHot
Standby (if maintaining
hot standby)OR*0-GO-7,UnitShutdownfromHotStandbytoColdShutdown
OR*other appropriate
procedureasdeterminedbyShift
ManagerorTSC(ifmanned).d.GOTOappropriate
plant procedure.
--IIIIl_--END b.DONOT CONTINUE this procedureUNTILatleastone
AFW pump AVAILABLE.Page15of 1 5
((Page12of12Rev.2CANDIDATECUESHEET(TOBERETURNEDTOEXAMINERUPONCOMPLETIONOFTASK)DIRECTIONTOTRAINEE:Iwillexplaintheinitialconditions,andstatethetasktobeperformed.All
controlroomstepsshallbe
performedforthisJPM,includinganyrequired
communications.Iwillprovideinitiatingcuesandreportsonotheractionswhen
directedbyyou.Ensureyouindicatetomewhenyouunderstandyour
assignedtask.Toindicatethatyouhavecompletedyourassignedtaskreturnthe
handout sheetIprovidedyou
.INITIAL CONDITIONS:Unit1hadbeeninMode5for72hourstorepairaleakonthe
#1SteamLine.Resboronis1400ppmandthepreviousshiftdeterminedthatBTrainRHRboron
concentrationis1450ppm.
Shutdownmarginrequiredboron
concentrationis1200ppm.ATrainRHRpumpneedstobeshutdowntoallowMEGtoaddoiltothemotor.BTrainRHRhasbeencheckedoutlocallybytheAuxil
iaryBldg.AUOandisreadyfor
service.INITIATINGCUES:Youarethe Unit1OATCandtheSROhas
directed you to place B TrainRHRin serviceandtakeA Train RHR out of service.Align B Train injection flowpath to loops 1&4.Notify the SRO when youhaveB TrainRHRin service.
(((J PM B.1.h Page 1 of 1 2 Rev.2 SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE
MEASUREB.1.hJPM152
Swap R HR Pumps(ATrain t o B Tra in)With Le ve l int he Pr essur izer Original S igna turesonFile PREPAREDI REVISEDBY: Date l VALIDATEDBY:*Date l APPROV ED BY: Date l (Operations Traini ng Manager)CONCURRED:**Date l (Operations
Representative)*Val idatio nnotrequired
for minor en hancements
, procedureRevchanges
thatdonot affecttheJPM ,orindividualstepchangestha
t do notaffect theflowoftheJPM.**Operations
Concurrence
requi redfornewJ PMsandchanges
thataffecttheflowof theJPM(if not dr i ven by a procedure revision).
(JPM B.1.hPage2of 1 2 Re v.2_.NU CLEAR TRAINING REVISIONIUSAGELOG REVISION DESCRIPTION
OF VDATEPAGES PREPAREDI NUMBER REVISIONAFFECTEDREVISEDBY:0New Y 10/14/98 AllJPKearney pen link 0-SO-74-1Revchangeonly
N 9/21/99 4SRTaylor pen link 0-SO-74-1 Revchangeonly N 8/29/00 4SRTaylor pen link Updated references
Y 2/5/01 2,4GSPoteet pen/inkUpdatedreference
N 12/10 101 3LacyPaule y 1Updatedtocurrentrevisionand
simulator Y 8/25/04 AllMGCroteau commands.Verif y new IC-2satisfa
ctory.2Updatedtocurrentrevi
sionofprocedure.
N 2/5 107 AllRHEvansv-SpecifyiftheJPMchangewillrequ
ire another vaiidation(YorN).
See coversheetforcriteria.
JPM B.1.h Pa ge 3 of 1 2 Rev.2 (SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE
MEASURE Task: Swap RHR Pump s(AT raintoB Train)withLevelinthe Pressurizer
JAIT A task#:0050030101(RO)0050080101(RO)
KiA Ratings: 005K4.03 (2.9/3.2)005K4.10 (3.1/3.1)005A1.01(3.5/3.6)005A1.02 (3.3/3.4)005A4.02 (3.4/3.1)005A4.01 (3.6/3.4)Task Standard:'8"TrainRHRis
placedinservice inject ingtoLoops1&4.
In-Plant_x Evaluation
Method: Simulator_...L:>..__Performer: NAME Start time_Performance
Rating: SAT UNS AT Performance
Time Fini sh t ime_DATE-(Evaluator:________----1_SIGNATURE COMMENTS
(JPM B.1.h Page4of12Rev.2 SPECIAL INSTRUCTIONS
TO EVALUATOR:
1.Sequenced steps identifiedbyan"s" 2.Initialize
IC-2.Ensure A TrainRHRisin servicewithflow aligned through FCV-63-93 to Loops 2&3.3.A Console operatorwillbe requiredatsteps4 , 8 ,&10.4.An extra operatorwillbe required to acknowledge
alarms and monitorS/Glevels,RCS
temp, RCSpress..5.Any UNSAT requires comments 6.Ensure operator performs the following required actions for SELF-CHECKING;
a.Identifies
the correctunit,train
, component , etc.b.Reviews the intendedactionand expected response.c.Compares the actual responsetothe expected response.Validation
Time:CR.11 minutes Local_Tools/Equipment/Procedures
Needed: 0-SO-74-1 , Section 8.3.2 REFERENCES:
0-SO-74-1 Reference Title Residual Heat RemovalSstemRevNo.61==========================
===================================================
READ TO OPERATOR Directions
to Trainee: I will explaintheini tial conditions
,andstatethe
tasktobe performed.Allcontrolroom
stepsshallbe performedforthisJPM
.I will provide initiatingcuesandreportson
otheractionswhen
directedbyyou.When you complete the task successfully
, the objectiveforthisjob
performance
measurewillbe satisfied.
Ensure you indicatetomewhenyou
understand
your assigned task.To indicatethatyou have completed your assigned taskreturnthe handout sheet I providedyouandtoindicatecompletion
of your answertoa knowledge questionreturnthewritten
copyofthe questiontome.INITIAL CONDITIONS:
1.Unit 1 hadbeeninMode5for72hoursto
repairaleakonthe#1SteamLine.2.RCS boronis1400ppmandthe
previous shift determinedthatBTrainRHRboron
concentrationis1450 ppm.3.Shutdown marginrequiredboron
concentration
is 1200 ppm.4.A Train RHR pumpneedstobe shutdowntoallowMEGtoaddoiltothemotor.5.B TrainRHRhasbeen
checked out locallybytheAUXiliaryBldg.AUOandisreadyfor
service.INITIATING
CUES:YouaretheUnit1
OATCandtheSROhas
directedyoutoplaceBTrainRHRin
service and takeATrainRHRoutof service.AlignB Train injection flowpathtoloops1&4.
NotifytheSROwhenyouhaveBTrainRHRin
service.
JPMB.1.hPage5of12 Rev.2 SAT/UNSAT STEP/STANDA
RD Job Performance
C he cklist:-ST EP 1.:Obtaincopyof0-SO-74-1anddetermineappropriatesection
-SAT-UNSA T STANDARD: Operatorobtainsacopyof
0-SO-74-1andgoestoSection8
.3.2.Start Time__COMMENTS: STEP 2.:[1)IF adjustmenti s requiredo nCCSflowthroug
hRHRHxs , THEN-SAT ENSURE[FCV-70-153)
RH R H x BCCSout let is THRO TTLED.-UNSA T N OTE: Opera tor may decide t o ke ep FCV-70-153 Open STANDAR D: Operato rensuresHS-70-153hasaRED&GREEN lightLIT with fiow indicatedon0-M-27 A.COMMENTS: ISTEP3.:[2)ENSURE[FCV-74-28)RHRH xBOut let is CL OSED.-SA T-UNSAT S TANDARD: Opera torensuresFCV-74-28 R HR H xBOutlet C LOSED , FIC-74-28@100%.90MM ENTS:STEP4.:[3)STARTRHRPump B-Bwith[HS-74-20A).-SAT-UNSAT S TANDARD: Operatorstarts1B-B
RHRPump,verifiesRE
D light LIT on H S.This stepi s criticalt o place theB train RH R Pumpinservice.Critical St ep COMMENTS: (c
(Job Performance
Checklist:
STEP/STANDARD
JPM B.1.hPage6of12Rev.2 SAT/UNSAT l S TEP 5.:[4]VERIFY[FC V*74*24]RHR PumpB-BminiflowOPENS
-SAT OR-UNSAT greaterthan500gpminindicated
onFI-74-24.Cue: IF dispatched:
FI*74*24 indicates-550 gpm.STANDARD: Operator verif iesFCV-74-24isopenbyRed
lightLI TonhandswitchorcheckswithAUO
locallytoverify>500gpmflowindicatedonlocalflow
indicator F[-47-24.COMMENTS:STEP6.:[5]IFaligningTrainBRHRcoolingto
loops1and4,THENPERFORMthe
-SA T following:
[aJ ENSURE[FCV-63-94]OP EN.-UNSAT[b]ADJU ST[FCV-74-28]
toestablishflowfromtrainBRHR
.[cJ ADJUST[FCV-74-16]AND[FCV-74-32]toreduceTrainARHR
flow.STANDARD: Operator performsthefollowing:
Critical Step*ENSURE FCV*63*94 OP EN*ADJUS T FCV*74*28RHRHxBOutletOPEN,usingF
IC-74-28 C LOSE FCV-74-16RHRHxAOutle
t , place FIC-74-16@0%.This stepis criticalto aligntheB train RHR Pump flow path to the RCS.COMMENTS:
(Job Performance
Chec klist: STEP/STANDAR DJPMB.1.hPage7of12 Rev.2 SAT/UNSAT c ST EP 7.:[d]VER IFY FCV-74-12 RH RPumpA-AminiflowOPENS
-SAT OR-UNSAT greater th an500gpminindicatedonFI-74
-12.Cue: IF dispatched
: FI-74-12indicates-55 0 gpm.STANDARD: OperatorverifiesFCV-74-12isopenbyRedlightLITonhandswitcho
rcheckswithAUO
locallytoverify
>500gpmflowindicatedonlocalflow
indica tor F I-47-12.COMMENTS:STEP8.:[e]CLOSE[FCV-74-33]RHRHxAOutlet.
-SAT-UNSAT STANDARD: OperatorclosesFCV-74
-33.This step is crit ical to iso late A train Critical Step RHR from B trainRHR.C OMMENTS:--S T EP9.:[f]ENSURE[FCV-74-35]RHRHxBOutletOPEN.-SAT STANDARD: Operator ensures FCV*74*35RHRHxBOutletOPEN.-UNSAT COMMENTS:
JP M B.1.h Page8of1 2Rev.2 SAT/UNSATSTEP/STANDARD
J ob PerformanceChecklis
t:--STEP10.:[9]OPEN[VLV*74-531]RHRH xBtoLetdown H x.-SAT NOTE: Console operator needs to modify remote functionRHR04to100.
-UNSAT Cue:OpenHCV*74*531 asanAUO local/y.STANDARD:Operatordirectsa n AUOtoOPENHCV-74-5 31RHRH x B to Letdo wn C ritical Step H x.This step is crilicalto
align B train RHR Pump for CVCS letdown.COM MENTS: STE P 1 1.:[h]STOPRHRPumpA-Awith[HS-74
-10A].-S AT-UNSAT STANDARD: Operator stopsRHRpump1A*A, verifiesGRE
EN ligh tonhandswitch.This step is critical to remove the A train RHR Pump from serv ice.Cr itical StepSTEP12.:[i]OPEN[HCV-74
-37]RHRH x B Bypass.-S AT NOTE: Console operator needs to modify remote fu nction RHR07to100.
-UNSAT Cue: Open HCV*74*37 asanAUO locally (including
IV).Cri tical Step STANDARD: Operator directs an AUOtoOPENHCV*74-37RHRH xBBypass.This stepiscr it ical to aligntheB trainRHRHX bypass valve so operator can controlHX outlet temperature.
COMMENTS: ((
STE P 13.: Ul C LOSEIHCV-74-36!RH
R HxA Bypass.-S AT NOTE: Console operator needs to mod ify r emo te fu nctionRHR06to O.-UNSAT Cue: Close HCV-74-36 asanAUO loc ally (including IV).C ritical Step STANDARD:Operatordirects anAUOtoCLOSEHCV-74-36RHRHxA Bypass.Th is step is critical to isol atetheA trainRHRHX bypass valve.COMMENTS:STEP14.:[k]CLOSE[HCV-74-530]RHRH xA-AtoLetdo
wn H x.-S AT NOTE: Co nsole operator needs to modify remote func tionRHR03to O.-UNS AT Cue: Close HCV-74*530 as an AUO locally (including
IV).STANDARD: Operator directsanAUOt o closeHCV-74-530.This step is critical t o isola te the A train RHR flow path to CVCS letdown.COMM E N T S: STEP 15.:[I]ENSURE[FCV*63-93]CLOSED.-SA T-UNS AT S TANDARD: Operator ensuresFC V-6 3-9 3 CLOSED.This stepisc ritical to isolate Critic al Step the A trainRHRRCSi njection low path..COMMENTS: ((Jo b P erformance
Checklist: STE P/STANDARD
JP M B.1.h Page9of12Rev.2 SAT/UNSAT
(Job Performance
Checklist:
STEP/STANDARDJPMB.1.hPage10of12
Rev.2 SAT/UNSAT cSTEP16.:[6]IFaligningRHRcoolingtoloops2and3,THENPERFORMthe
-SAT following:
-UNSAT NOTE: Step is NA'd, initiating
Cues direct alignment to loops1&4.STANDARD: Ope ratorNA'sthestep.
COMMENTS:STEP17.:[7]THROTTLEoneorbothofthefollowingtomaintaindesiredcooling
-SATrate:(N/Aifnotthrottled)
:-UNSAT FCV-74-28,RHRHxBOutlet,FCV-74-32,RHRHxBypass.
Critical Step STAI\!DARD
: Operatorthrottlesopen
FCV-74-28and/orFCV-74-32tostabilizeRCS
temperatureandestab lishRHRf lowrates at approximatelythesamevaluesthatwerep
resentpriortotheflowpathrealignment.
This step is critical to control RCS coold own rate.COMMENTS: I I STEPWHENinjectionflowis
>1250gpm,THENVERIFY[FCV-74-24]RHR
-SATPumpB-Bminiflowis
CLOSED.-UNSAT STANDARD: Operator verifies FCV-74-24closed,GREENlightLITonhandswitch
.COMMENTS:
(JobPerfo rmance Checklist:
STEP/STANDARD JPM B.1.hPage11o f 12 Rev.2 SAT/UNSA T c (STEP19.:[9]IFcoolingwateristobere
movedfromTrainAHx, TH EN-SAT CLOSE[FCV-70-15 61.-UNSAT Cue:Leave coo ling water alignedtoATrai
n at its currentfJowrate
.STANDARD: OperatorNA'sstep.COMMENTS:STEP20.:NotifyU1USthatBtrainofR
HRIsinservicetoloops1&4a
ndAt rain of-SA TRHRhasbeenremovedfromservice
.-UNSAT STANDARD: None.StopTime__90MMENTS:---EndofJPM
0-50-74-1Rev:61 Page 132of20 4RESIDUALHEATREMOVALSYSTEM
1 ,2 SQN[---l--__---'------
------'(Uni t_Date_8.3.2 Placing Train B in Service and RemovingTrainA from Service.CAUTIONCCS
flow should be adjusted to provide adequate flow through theRHRHxto preventRHRHxCCS outlet temperature
from exceeding 145°F.TheRHRHxCCS
outlet temperature
alarm will comeina 115°F.NOTEThefollowingstepsmay requireoperatorsinbothheatexchangerroomsandoneouts
idethepumprooms
.[1]IFadjustment isrequ iredonCCSflowthroughRHRH xs , THENENSURE[FCV-70-153]RHRH
xsccs outlet i s THROTTLED.[2]ENSURE[FCV-74-28]RHRHx
BOutletisCLOSED
.CAUTION 1 Failure to maintain shutdown cooling flow rate foranRHR pump at the maximum possible could result in reduced thrust bearing life.[C.3]CAUTION2 NOTE If RHR pressure downstream
of pumps exceeds 600 psig ,thenRHR discharge pressure must be reduced below 600 psigorRHR isolated fromtheRCS within 1 hour.RHRmotorlowerbearingoillevelwillincreaseafterpumpisstartedandmayincreaseabovesightglass.Thepresenceofoilcanbeverifiedbyagoldentintinsightglass
.[3]STARTRHRPump
B-B with[HS-74-20Al[4]VERIFY[FCV-74-24]RHRPu
mp B-B miniflow OPENS OR g reaterthan500gpm
i s indicatedonFI-74-24.
(SQN 1,2 Unit_RESIDUAL HEATREMOVALSYSTEM
0-SO-74-1Rev:61Page133of204Date_8.3.2 Placing TrainBin Service and Removing Train A from Service (Continued)CAUTION1CAUTION2 NOTE To reduce vibration acrossFCV*74-16andFCV-74-28(RHRHx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.Operating RHR pumps in parallel(HCV-74-36andHCV-74-37OPENOR74-530and74-531OPEN)andon
miniflow for>10 minutes may result in pump damageduetoone pump dead-heading
.[C.2][C.13]Step5[b]a nd[c]maybeperformed togethertoensurecontinuousflo
w del iveredtoRCS.(([5]IFaligningTrainBRHRcoolingtoloops1and4
, THENPERFORMthefollowing
:[a]ENSURE[FCV*63-94]
OPEN.[b]ADJUST[FCV-74
-28]toestabl ishflowfrom Tra in B RHR.[c]ADJUST[FCV
-74-16]AND[FCV-74-32]toreduceTrainARHRflo w.[d]VERIFY[FCV-74-12]RHRPumpA-A
miniflow OPENS ORgreaterthan5
00gpmisindicatedonFI-74-24
.
(SQNRESIDUALHEAT
0-SO-74-1REMOVALSYSTEMRev:61 1 ,2Page1 34 of 204 Un it_Date_(8.3.2Placing TrainBin Service and Removing Train A from Service (Contin ued)telCLOSE[FCV
-74-331 RHRHxA Outlet.[f)E NSURE[FCV-74-35]
RH R H xBOutlet OPE N.[g)OPEN[VLV-74-531]RHRH x B toLetdownH x.CV[h)STOPRHRPumpA-A with[HS-74-10AJ.
[i)OPEN[HCV-74
-37]RHRHxBBypass.CV[j]CLOSE[HCV-74-36]RHRH
x A Bypass.C V[k]CLOSE[VLV-74-530]
RHRHxA toLetdown H x.1" CV[I]ENSURE[FCV-63-93]C
LOSED.
(SQNRESIDUALHEAT
0-50-74-1REMOVALSYSTEMRev:61 1 ,2 Page 135o f 2 04 Unit_Date_8.3.2P lacing T rainBinServ ice and Removing TrainA fromServ ice (Conti n u e d)CAUTION 1CAUTION2 NOTE To reduce v ibratio n across FCV-74-16andFCV-74-28(RHRHxO utlet Valves), RHR must be aligned too nly two cold legs with one trainin service.Operat ing RHR pumps in parallel(HCV-74-36andHCV-74-37 OPENOR74-530and74-531OPEN)a
nd on miniflow f or>10 minu tes may result in pump damageduetoone pump dead-heading.[C.2)[C.13)
Step 6[d)and[e)m aybeperfo rmed t oge the r t o en sure continuous fl ow deliveredtoRCS.[6]IF aligningTrainBRHR coolingt o loops2an d 3 , THEN PERFORM the following:[a)ENSURE[FCV-63-93)OPE
N.[b]ENSURE[FCV-74-33]R
HR H xAOutletOPEN.[c]ENSURE[FCV-74-35)RHRH xBOutletOPEN.[d]ADJUST[FCV-74-28)to
est ab lish TrainBRHRflow.[e]ADJUST[FCV-74-161 and[FCV-7 4-321 t o reduce T ra inA RHRfl ow.[f]VERIFY[FCV-74-12]
RHRPumpA-A miniflowOPENSorgreaterthan500gpmis
indicated o n FI-74-24.[g)OPEN[VLV-74-5311RHRHx B (toLetdown H x.1" CV
0-SO-74-1Rev:61 Page136of204 RESIDUAL HEAT REMOVAL SYSTEM 1 ,2-------------------'------------'(Unit_Date_8.3.2 Placing TrainBin Service a nd Removing Train A fromSe rvice (Continued)
c[h]STOPRHR PumpA-A w ith[HS-74-10A].
[i]OPEN[HCV-74-37]RHRH xBBypass.1 st cv[j]CLOSE[HCV-74-361
RHRH xABypass.1" cv[k]CLOSE[VLV-74*530]RHRH x AtoLetdownH
x.1 st c v[I]ENSURE[FCV-63-94]
CLOSED.NOTE One o r bo th ofth e valves i n thene xt st epmaybeth rottledtomaintainRCSatdesiredtemperature.
[7]THROTTLEoneorbothoft
he followingt o m a intain de s ire d cool ing rate (N/A ifnotthrottled): VALVE NO.FUNCTION INITIALS FCV-74-28RHR HxBOutlet FCV*74*32 RHR H x B ypass[8]WHEN injection fl ow i s>1250g pm , THEN VERIFY[FCV-74-24]RHRPump B-B miniflow i s CLOSED.([9]IFcooling
water istoberemovedfromTrainAHx, THEN CLOSE[FCV-70-156].E NDOFTEXT
}}

Latest revision as of 10:19, 13 March 2020

April/May 2007 Exam Nos. 05000327-07-301, 05000328-07-301, - Draft JPMs and Outlines (Part 3 of 3) Section 2 of 2
ML072950298
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/09/2007
From:
Tennessee Valley Authority
To:
NRC/RGN-II
References
50-327/07-301, 50-328/07-301
Download: ML072950298 (129)


Text

r--- ]

I SQN TRANSFER TO HOT LEG RECIRCULATION ES-1.4

( Rev. 5

\. I L- I..-.-- --L. ----J ISTE~ [ACTION/EXPECTED RESPONSE IIRESPONSE NOT OBTAINED

17. ISOLATE SI pump flow to cold legs :
a. CHECK BOTH 81 pumps ALIGNED a. PERFORM the following:

for hot leg recirculation.

1) IF one 81 pump is aligned for hot leg recirculation, THEN ENSURE 81 pump aligned to cold legs STOPPED.
2) GO TO Step 18.
b. CHECK power .A VAILABLE b. DISPATCH personnel to restore power

( to SI pump cold leg injection valve FCV-63-22 .

to 81 pump cold leg injection valve FCV-63-22, USING EA-201-1 , 480 V Board Room Breaker Alignments.

WHEN power available to FCV-63-22, THEN CLOSE 81 pump cold leg injection valve FCV-63-22.

RETURN TO procedure and step in effect.

c. CLOSE SI pump cold leg injection valve FCV-63-22.

Page 15 of 16

b

~ [ACTION/EXPECTED RESPONSE ]

TRANSFER TO HOT LEG RECIRCULATION

[RESPONSE NOT OBTAINED

~S~fJ E *4 Rev. 5

18. RETURN TO procedure and step in effect.

-~

END

(

L ~_. . _

Page 16 of 16

JPM B.1.e Page 1 of 13 Rev. 7 SEQUOVAH NUCLEAR PLANT JOB PERFORMANCE MEASURE B.1.e JPM 36 RETURN PRESSURIZER RELIEF TANK TO NORMAL Original Signatures on File PREPAREDI REVISED BY: Date!

VALIDATED BY: Date!

APPROVED BY: Date!

(Operations Training Manager)

CONCURRED: "* Datel (Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
  • " Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JPM B.1 .e Page 2 of 13 Rev. 7

(

NUCLEAR TRAINING REVISIONIUSAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY:

4 Transfer from WP. Procedure change to N 8/17/94 All HJ Birch Rev. 4. Made a perform JPM, not a simulate JPM.

pen/ink Added dates to cover sheep. N 10/26/95 1 HJ Birch penlink SO~68-5 Rev chg . Minor rewording of N 9/25/96 4,8 HJ Birch step 13. Add step to monitor RCDT level.

penlink Chgd initiating cues to direct prt drain first. N 1/9/97 4 HJ Birch To help flow thru procedures. Deleted step to reset Pri Wtr alarm . It no longer comes in .

SO-68-5 Rev chg N 11/17/97 4 HJ .Birch pen/ink SO-68-5 Rev chg . Added transition step N 5/12/98 4-9 HJ Birch to sect 8.2 . Several step enhancements.

( 5 Rev ised steps , 7 and 18, added step 19 N 9/18/98 All JP Kearney as a result of revisions to SO-68-5.

Changes did not affect the flow of the JPM. Revised JAITA task numbers.

Revised KIA ratings. Reformatted crit ical steps.

pen/ink SO-68-5 Rev chg . Correct typo in N 8/21/00 4 SR Taylor Direction to trainee penlink SO-68 -5 Rev chg only no effect N 12/13/00 4 W . R. Ramsey 6 Incorporated pen/ink changes N 8/22/02 4 J P Kearney

, Pen/ink Updated references & IC# N 11/17/03 2,4 T. E. Pitchford 7 Updated references. Minor format N 2/09/07 2,4 R. H. Evans changes.

v - Specify if the JPM change will require another Validation (Y or N).

See cover sheet for criteria.

JPM 8.1 .e Page 3 of 13 Rev. 7 SEQUOY AH NUCLEAR PLANT r ROISRO

\

JOB PERFORMANCE MEASURE Task:

Pzr Vapor Space Accident (Return PRT to Normal)

JAITA task # : 0070040101 0070050101 0680990101 (RO) 0070010102 (SRO)

KIA Ratings:

008AA1.08 (3.8/3.8) 007K4.01 (2.6/2 .9) 007A2.01 (3.9/4 .2) 007A2.02 (2.6/3.2)

Task Standard:

Pressurizer Relief Tank (PRT) parameters have been returned to within normal ranges ;

temperature G:.1550F} , pressure (1.5 - 6.5 psi), and level (-70%).

Evaluation Method: Simulator X In-Plant _

==~================================ === =============== =========;==========--=======

Performer:

NAME Start Time _

Performance Rating: SAT _ _ UNSAT _ _ Perlormance Time _ _ Finish Time _

( = ~:= ;=====================================--========= =======~=======================

Evaluator:

SIGNATURE DATE COMMENTS i

lv

JPM B.1.e Page 4 of 13 Rev. 7 SPECIAL INSTRUCTIONS TO EVALUATOR:

( 1. Sequenced steps identified by an "s"

2. Any UNSAT requires comments
3. Acknowledge any associated alarms.
4. Initialize the simu lator in IC-96.
5. NOTE: This JPM has been pre-shot in IC # 96. Should IC # 96 be erased or fail to perform as expected then use the following set-up instructions:
  • Initialize Simulator in IC: #16. ACTIVATE MF RC05 at 5% to cause PCV-68-334 to leak through .
  • Allow PORV Tailpipe temperature to increase and bring in the alarm , then close FCV-68-333.

ACTIVATE RF RCR04 to remove power from valve.

  • Activate the following OVERRIDES: ZAOPI68301 10 [PRT pressure at 10 psi], ZAOTI68309 130 [PRT temperature at - 1800F], and lOR AN:OVRD[357] ON & AN:OVRD[21 09] ON
  • (These will be deleted during the performance)
  • Ensure FCV-81-12 is open. .
6. Due to time restraints CUEs for PRT level and temperature will be given at appropriate times.

Validation Time: CR. 17 mins Local _

Tools/Equipment/Procedures Needed:

. 1-80-68-5 8ection 8.2 & 8.4.

Reference Title Rev No.

1-80-68-5 Reactor Coolant System 17

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% power, steady state. Pressurizer pressure controls in automatic.

Pressurizer sprays in automatic.

PORV PCV-68-334 is partially opened but the block valve has been closed and de-energized.

The valve is no longer leaking through.

1A Rx Coolant Drain Tank pump is inoperable.

INITIATING CUES:

You are the Unit 1 CRO and are to cool the PRT and then , if necessary, drain the PRT to within normal parameters.

Notify the US when the PRT parameters have been returned to the normal conditions.

JPM 8.1.e Page 5 of 13 Rev. 7 Job Performance Checklist:

( STEP/STANDARD SAT/UNSAT STEP 1.: Obtain correct procedure to return PRT parameter(s) to normal. - SAT

- UNSAT STANDARD: Operator obtains a copy of 1*S0*68*5 Sections 8.2 & 8.4. _

Start Time - -

COMMENTS:

NOTE: The operator may choose to pump the PRT level down first, start at step 5 of the JPM in that case.

NOTE: This portion is performed using Section 8.4 of the SO. - SAT STEP 2.: [1] ENSURE [FCV-81-12] OPEN. - UNSAT STANDARD: Operator verifies that FCV*81-12 is open by red light on.

COMMENTS:

c STEP 3.: [2] OPEN [1-FCV-68-303] by placing [1-HS-68-303A] to OPEN - SAT position.

- UNSAT NOTE: When FCV-68-303 is opened, THEN delete ZAOTI68309 and AN:OVRD[21 09] Overrides Critical Step STANDARD: Operator takes hand switch HS*68*303A on M-5 to OPEN. Handswitch indicates valve is open by red light "ON". This step is critical to add primary water to the PRT for cooling.

COMMENTS:

JPM B.1.e Page 6 of 13 Rev. 7 Job Perfo rmance Checklist:

( STEP/STANDARD SAT/U NSAT STEP 4.: [3] IF PRT level increases to ? 88% or PRT temperature decreases to - SAT s 1200F THEN

_ UNSAT CLOSE [1-FCV-S8-303]

Cue: PRT level is 91 %. Critical Step PRT temp is as indicated.

STANDARD: Operat or monitors PRT level on U 300 and temperature on TI-68-309, then places FCV-68-303 in the closed position and verifies green light ON. This step is crit ic al t o prevent overfilling the PRT.

COMM ENTS:

ST EP 5.: [4] IF PRT level is :2: 88% THEN - SAT GO TO section 8.2 or 8.3 of this instruction, AND - UNSAT RETURN to step [1] of this section if further temperature reduction is needed.

STANDARD: Operator goes to section 8.2 (1A RCDT pump is inop)

COMM ENTS :

EVALUATOR NOTE The Iollowlno step evaluate section 8.2 STEP 6.: [1] VERIFY RCDT pumps aligned for service in accordance with - SAT valve check list 1-77-1.02.

- UNSAT Cue: NO devia tions.

STANDARD: Operator checks status log to ensure no deviations exist.

COMM ENTS :

I

JPM B.1 .e Page 7 of 13 Rev. 7 Job Performance Checklist:

( STEPISTANDARD SAT/UNSAT STEP 7.: [2] STAT ION AUO at panel 0-L-2 . - SAT Cue: Role play the Rad Waste AUO. State that you are at O-L-2 - UNSAT panel and will stay here and wait on your instructions.

STANDARD Operator ensures an AUO is stationed at 0-L-2 panel.

COMMENTS:

STEP .a,: [3] IF RCDT level >20%, THEN - SAT PUMP down RCDT level in accordance with Appendi x C of this - UNSAT Instruction.

Cue: Role play the Rad Waste AUO. State that you are at O-L-2 panel and the level in Unit 1 RCDT is 18%.

STAN DARD: Operator checks with an AUO at 0-L-2 panel and ensures level is

<20%

CO MMENTS:

STEP 9.: [4] ENSURE [1- FCV-77-91and [1-FCV-77-10] are OPEN . - SAT

- UNSAT STANDARD : Operator verifies FCV-77 -9 and FCV-77-10 open on panel M-15 (red iights on handswitches ON)

COMMENTS:

JP M B.1.e Page 8 of 13 Rev. 7 Job Performance Check list:

( STEP/STANDARD SATIUNSAT STEP 10.: [5] ENSURE [1-HS-n-6Al for RCDT Pump B is in the PULL*P-AUTO - SAT position.

- UNSAT Cue: Rad was te Operator informs UO that RCDr Pump "B" is in p-AUrO and that the level in the Unit 1 RCDr Is s tIl/18%.

STANDARD: Operator contacts Rad Wa ste Operator and verifies HS-77-6A for RCDT Pump B is in P-AUTO.

COMMENTS:

STEP 11.: [6] OPEN [1- FCV-68-305l Nitrogen Supply to PRT. - SAT

- UNSAT STANDARD : Operator verifies FCV-68-305 open on panel 1 M-5 (red lights on handswitches ON). This step is critical to align Nitrogen to the PRT. Critical Step

( COMMENTS :

STEP 12.: [7] PLACE [1-HS-68-310A] in the OPEN position, AND - SAT VERIFY [1-FCV-68-310] OPENS - UNSAT Cue : When operator opens FCV-68*31 0 and the operator contacts the Crillcal Step Rad Waste operator, then state to the operator the B RCDr pump has started.

STANDA RD: Operator ensures FCV*68*310 open on panel l-M-5, red light. This step is critical to drain the PRT to normal level.

COMMENTS:

(

JP M B.1.e Page 9 of 13 Rev. 7 Job Perfo rmance Checklist:

( STEP/STANDARD SAT/UNSAT STEP 13.: [8] ENSURE RCDT Pump B STARTS . - SAT

- UNSAT Cue: RCDr pump B is running.

STANDARD : Operator checks with Rad W aste AUO to ensure RCDT pump B starts .

COMMENTS :

ST EP 14.: [9] IF PRT pressure drops < 1.5 psig, THEN ... - SAT

- UNSAT NOTE : 30 seconds after FCV*68*310 is open, DELETE ZAOPI68301 &

AN:OVRD[357}

Cue : PRr pressure is constant - 6.5 psig. "

( ST.ll,NDA RD: Operator monitors PRT pressure with PI*68*301 on 1*M-5.

I COMM ENTS:

STEP 15.: [10] IF at any time while pumping down the PRT the RCDT level approaches - SAT 50%, THEN ..

- UNSAT Cu e: When AUO contacted, Sta te: I will monitor RCDr level, Stop RCDr pump and notify you to close FCV*68*310 if RCDr approaches 50%.

STANDARD: Operator notifies AUO of this step.

COMMENTS :

(

JPM B.1.e Page 10 of 13 Rev. 7 Job Performance Checklist

( STEP/STANDARD SAT/UNSAT STEP 16.: [11] IF returning from Appendix C, THEN - SAT

- UNSAT STANDARD : Operator N/A's step.

CQMMENTS:

STEP 17.: [12] WHEN PRT level reaches desired level, THEN - SAT STOP "B" RCDT. - UNSAT Cue: When the operator begins to monitor level on LI-68-300, Tell the Critical Step operator that "PRT level has decreased to 70%",

Cue: When operator requests AVO to stop RCDT pump 1B, Tell him "RCDT pump 1B is stopped and HS is in Pull-P-Auto".

STAN_DARD: Operator verifies level, and has the Rad Waste Operator STOP RCDT Pump 1B and place HS in Pull*P*Auto. This step is critical to prevent pumping down PRT to below normal level.

COMMENTS:

JP M B.1.e Page 11 of 13 Rev. 7 Job Perlo rmance Checklist:

( STEP/ST ANDARD SATIUNSAT STEP 18.: [13] CLOSE [1-FCV-68-310] . - SAT

- UNSAT 9!£: If operator asks, PRT Level Is 70%, Temp Is 110"F, and Press Is 6.5 pslg.

Cr itical Step STAN DARD : Operator closes with HS-68-3 10A and verifies ciosed on paneI1-M-5 (green lights on handswitches ON). This step Is critical to return system to normal alignment.

COMM ENTS :

ST EP 19.: [14] PLACE [1-HS-77-6AJ RCDT pump B in PULL-P-AUTO position _ SAT at O-L-2 panel.

- UNSAT CUE: When operator requests AUO to place the HS for RCDT pump 18, Tell him "RCDT pump 18 HS Is In Pull-P-Auto ".

STANDARD: Operator has the Rad Waste Operator place HS in Pull-P-Auto.

COMMENTS:

STEP 20.: [15] CLOSE [1-FCV-68-305] . - SAT

- UNSAT STANDARD: Operator closes with HS-68-305A and verifies closed on panel 1-M-5 (green lights on handswitches ON).

COMM ENT S:

JPM B.1.e Page 12 of 13 Rev. 7 Job Performance Checklist:

( STEP/STANDARD SAT/UNSAT SAT STEP 21.: Inform the US/SRO that the PRT paramete rs have been returned to within normal operating conditions/ranges. UNSAT Stop Time _ _

STANDARD: Ope rator informs the US/SRO that the PRT parameters have been returned to within normal operating conditions/ranges.

COMMENTS:

c l

Page 13 of 13 Rev. 7

( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 is at 100% power, steady state. Pressurizer pressure controls in automatic.

Pressurizer sprays in automatic.

PORV PCV-68-334 is partially opened but the block valve has been closed and de-energized.

The valve is no longer leaking through.

1A Rx Coolant Drain Tank pump is inoperable.

INITIATING CUES:

You are the Unit 1 CRO and are to cool the PRT and then, if necessary, drain the PRT to within normal parameters.

Notify the US when the PRT parameters have been returned to the normal conditions l

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT SYSTEM OPERATING INSTRUCTION 1-50-68-5 PRESSURIZER RELIEF TANK Revis ion 17 QUALITY RELATED PREPARED/PROOFREAD BY: JUDY VARNER RESPONSIBLE ORGANIZATION: OPERATIONS APPROVED BY: D. A. PORTER EFFECTIVE DATE: 05/09/2006 LEVEL OF USE: CONTINUOUS USE REVISION DESCRIPTION: Revised to incorporate PCF 007. Added steps in section 8.9 to allow purging PRT with either Hydrogen or Nitrogen on VCT.

(

SQN 1 [ PRESSURIZER RELIEF TANK 1-S0-68-5 Rev: 17 Pag e 2 of 35 TABLE OF CONTENTS Page 1 of 2 Section Title Pag e

1.0 INTRODUCTION

4 1.1 Purpose ........................................ ............................................................... ............. 4 1.2 Scope 4

2.0 REFERENCES

4 2.1 Performance References 4 2.2 Developm ental References 5 3.0 PRECAUTIONS AND LIMITATIONS.................................. ........... ......................... ........ 5 4.0 PREREQUISITE ACTIONS 6 5.0 STARTUP/STANDBY READINESS 7 C 6.0 NORMAL OPERATION 8 7.0 SHUTDOWN 8 8.0 INFREQUENT OPERATION 9 8.1 Increa sing PRT Level .............. 9 8.2 Reducing PRT Level Using B RCDT Pump 10 8.3 Redu cing PRT Level Using A RCDT Pump .. 13 8.4 Reducing the Temperature of the PRT..................................................................... 16 8.5 Incre asing the Pressure of the PRT 17 8.6 Reducing the Pressure of the PRT ............................ ..... ....................... ................... 18 8.7 Gravity Draining PRT to the Containment Floor and Equipment Drain Sump (RBF & EDS) 19 8.8 Reducin g the O2 Co ncentration in the PRT in Mode 5 or 6 22 8.9 Purging the PRT . 23

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 3 of 35 TABLE OF CONTENTS Page 2 of 2 Section Title Page 9.0 RECORDS 25 APPENDI X A: PRT O2 CONCENTRATION REDUCTION USING RCDT PUMP B 26 APPENDI X B: PRT O2 CONCENTRATION REDUCTION USING RCDT PUMP A 30 APPENDI X C: REDUCING LEVEL IN RCDT 34 SOURCE NOTES 35 ATTACHMENT 1: POWER CHECKLIST 1-68-5.01 ATTACHMENT 2: VALVE CHECKLIST 1-68-5.02 l

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 4 of 35

1.0 INTRODUCTION

1.1 Purpose To provide instructions for the operation of the Pressurizer Relief Tank (PRT).

1.2 Scope A. Placing the PRT in service .

B. Increasing the PRT level.

C. Decreasing the PRT level.

D. Reducing the temperature of the PRT.

E. Increasing the pressure of the PRT.

F. Reducing the pressure of the PRT.

G. Gravity draining PRT to the Containment Floor and Equipment Drain Sump (RBF & EDS).

H. Reducing the 0 , Concentration in the PRT in Mode 5 or 6.

I. Purging the PRT in Modes 1 thru 4.

2.0 REFERENCES

2.1 Performance References None l

1-S0-68-5 SQN PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 5 of 35 2.2 Developmental References A. SOI-68.1, Reactor Coolant System B. O-MI-MXX-068-006.0, Venting of Pressurizer, Pressurizer Relief Tank, and Reactor Head C. SPP-10.3, Verification Program D. TVA Draw ing

1. 47W813-1
2. 47W819-1
3. 47W830- 1
4. 47W830-6 E. FSAR
1. Section 5.5 3.0 PRECAUTIONS AND LIMITATIONS A. During normal opera tion , PRT water temperature should not exceed 120°F.

B. Mainta ining 3 to 6 psig N, gas blanket on the PRT will prevent the formation of explosive hydrogen-oxygen mixtures .

C. The PRT concentration of oxygen shall be limited to less than or equa l to 2% by volume whenever the hydrogen concen tration excee ds 4% by volume .

D. Over filling the PRT to solid water condition during oxygen reduction pe r Section 8.8 may result in failure of the PRT rupture disc.

E. The PRT press ure shou ld be main tained < 7.5 psig during normal operation. (Except during the performance of section 8.9).

F. The PRT rupture discs are rated at 85 psig .

G . The level in the PRT shou ld be maintained at 70% . If the level increases to 88% , then decreas ing level to 70% is necessary. If the level decreases to 55%, then increasing level to 70% is needed when the PRT is required to be operable.

H. Complete ly dra ining the PRT may result in gas binding the RCDT pumps.

I. Water intrusion into the waste gas vent header is possible during PRT venting operations with PRT level high . This could affect RCP sea lleakoff flows and the vent capab ility of tanks which vent to waste gas vent header.

J. PRT level indications or alarms are not available in the Au x Control Room ,

thus PRT level manipulations and feed & bleed processes are unavailable.

~-~---~._---------------------~-----~

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 6 of 35 Date _

4.0 PREREQUISITE ACTIONS NOTE Throughout this Instruction, where an IFITHEN statement exists , the step should be N/A if condition does not exist.

[1] ENSURE Instruction to be used ,is a copy of the effective version .

[2] ENSURE Precautions and Limitations, Section 3.0 have been reviewed.

[3] ENSURE Attachment 1, Power Checklist 1-68-5.01 is complete .

[4] ENSURE Attachment 2, Valve Checklist 1-68-5.02 is complete.

[5] VERIFY primary water is available to fill and cool the PRT (N/A if primary water will not be used).

[6] VERIFY Waste Disposal System is available to receive liquid from PRT.

Print Name Initials

[1 0] INDICATE below which performance section of this Instruction will be used and the reason for this performance:

o 5.0 STARTUP/STANDBY READINESS o 8.0 INFREQUENT OPERATION REASON : _

SQN 1-50-68-5 PRESSURIZER RELIEF TANK Rev : 17

( 1 Page 7 of 35 Date _

5.0 STARTUP/STANDBY READINESS

[1] VERIFY PRT has normal operating level of - 70%.

[2] IF PRT level needs adjusting, THEN REFER TO Section 8.1, 8.2, or 8.3, AND ADJUST level as necessary.

[3] IF PRT pressure needs adjusting, THEN REFER TO Section 8.5 or 8.6, AND ADJUST pressure as necessary.

END OF TEXT

(

(

SQN 1-50-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 8 of 35 6.0 NORMAL OPERATION None.

7.0 SHUTDOWN None.

(

SQN 1-S0-68-5

  • PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 9 of 35 Date _

8.0 INFREQUENT OPERATION 8.1 Increasing PRT Level

[1] ENSURE a primary water pump is running.

[2] ENSURE [1-FCV-81-12] primary water con tainment isolation valve is OPEN.

[3] OPEN [1-FCV-68-303] PRT makeup valve.

[4] MAINTAIN PRT pressure between 3 and 6 psig by operating

[1-PCV-301] PRT vent valve.

NOTE Normal PRT level is appro ximately 70%,

[5] WHEN PRT level increases to desired level (not to exceed 88%) ,

THEN

(

CLOSE [1 -FCV-68*303].

1st IV

[6] ENSURE [1-PCV-68-301] PRT vent valve CLOSED.

1st IV END OF TEXT

(

1-50-68-5 SQN PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 10 of 35 Date _

8.2 Reducing PRT Level Using B RCDT Pump CAUTION 1 Pump damage could occur if suction is lost while pumping water> 175'F.

CAUTION 2 RCDT pump 1B will NOT automatically stop on low level in PRT OR closure of FCV-68-310.

NOTE RCDT pump B will Auto start when 1-FCV-68-310, PRT drain to RCDT opens.

[1] VERIFY RCDT pumps aligned for service in accordance with Valve Checklist 1-77-1.02.

NOTE An AUO at panel O-L-2 in communication with a MCR UO is needed to perform this Instruction.

[2] STATION an AUO at panel 0-L-2.

[3] IF RCDT level> 20%, THEN PUMP down RCDT level in accordance with Appendix C of this Instruction.

[4] ENSURE [1-FCV-77-9] and [1-FCV-77-10] RCDT pump outlet isolation valves are OPEN.

[5] ENSURE [1-HS-77-6A] for RCDT pump B is in the PULL-P-AUTO position.

[6] OPEN [1-FCV-68-305] Nitrogen Supply to PRT.

[7] PLACE [1-HS-68-310A] in the OPEN position, AND VERIFY [1-FCV-68-310] OPENS.

[8] ENSURE RCDT pump B STARTS .

SQN 1-50-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 11 of 35 Oate _

8.2 Reducing PRT Level Using B RCDT Pump (Continued)

[9] IF PRT pressure drops < 1.5 psig, THEN COMPLETE the following :

[a] STOP 'B' RCOT pump at 0-L-2, AND CLOSE [1-FCV-68-3101

[b] WHEN PRT pressure returns to normal, THEN OPEN [1-FCV-68-310], AND VERIFY RCDT pump B STARTS.

CAUTION The RCDT level is to be maintained < 50% while 1-FCV-68-310 is open to prevent inadvert ent opening of 1-LCV*77-415 which could cause overfilling of RCDT from the PRT.

[10] IF at any time while pumping down the PRT the RCDT level approaches 50%, THEN PERFORM the following before continuing the PRT level reduction :

[a] PLACE [1-HS-77-6A] RCDT pump B in the PULL*TO*LOCK position.

[b] CLOSE [1-FCV-68-3101

[c] GO TO Appendix C of this Instruction for RCOT level reduction and return to Step [11) of Section 8.2.

l

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 12 of 35 Date 8.2 Reducing PRT Level Using B RCDT Pump (Continued)

[11] IF returning from Appendix C, THEN PERFORM the following:

[a] PLACE [1-HS-77-6A] RCDT pump Bin PULL-P-AUTO position .

[b] OPEN [1-FCV-68-31 0].

[12] WHEN PRT reaches desired level, THEN STOP 'B' RCDT pump.

[13] CLOSE [1-FCV-68-310l 151 IV

[14] PLACE [1-HS-77-6A] RCDT pump 'B' in PULL-P-AUTO C position at O-L-2 panel.

1st IV

[15] CLOSE [1-FCV-68-305] Nitrogen Supply to PRT.

1st IV END OF TEXT

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 13 of 35 Date _

8.3 Reducing PRT Level Using A RCDT Pump CAUTION 1 Pump damage could occur if suction is lost while pumping water> 175°F.

CAUTION 2 RCDT pump 1A will NOT automatically stop on low level in PRT OR closure of FCV-68-310.

NOTE RCDT pump A operates automatically with 1-LCV-77-415 from the RCDT only.

[1] VERIFY RCDT pumps aligned for service in accordance with Valve Checklist 1-77-1.02 .

[2] IF RCDT level> 20%, THEN PUMP down RCDT level in accordance with Appendi x C of c NOTE this Instruction.

Communications will have to be established between MCR, Radwaste (0-L-2), and switchgear for "A" RCDT pump.

[3] STATION an AUO at panel O-L-2.

[4] STATION an AUO at Switchgear for "A" RCDT pump.

[5] ENSURE [1.FCV-77-9] and [1.FCV-77-10] RCDT pump outlet

. isolation valves are OPEN.

[6] OPEN [1-FCV*68-305] Nitrogen Supply to PRT.

[7] PLACE [1-HS-77*6A] RCDT Pump B in PULL-TO-LOCK.

[8] PLACE transfer switch XS-77-4 on 1A-A Reactor Vent Board compartment 2C to AUX position.

[9] PLACE [1-HS-68-31 OA] in the OPEN position , AND VERIFY [1-FCV-68-310] OPENS.

1-S0-68-5 SQN PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 14 of 35 Date _

8.3 Reducing PRT Level Using A RCDT Pump (Continued)

[10] PLACE [1-HS-77-4Dl RCDT Pump A, in the START position (at switchgear).

[11] IF PRT pressure drops < 1.5 psig, THEN STOP RCDT pump A.

[12] WHEN PRT pressure returns to normal, THEN PLACE [1-HS-77-4Dl RCDT pump A to the START position (at switchgear).

CAUTION The RCDT level is to be maintained < 50% while 1-FCV-68-310 is open to prevent inadvertent opening of 1-LCV-77-415 which could cause overfilling of RCDT from PRT.

[13] IF at any time while pumping down the PRT the RCDT level approaches 50%, THEN PERFORM the following before continuing the PRT level reduction:

[a] PLACE [1*HS-77-4Dl RCDT pump A in the STOP position.

[b] CLOSE [1-FCV-68-310].

[c] OPEN [1-LCV-77-415J.

[d] START RCDT pump "A" with 1-HS-77-4D, AND REDUCE RCDT level to approximately 20%.

Ie] WHEN RCDT level is approximately 20%,

THEN STOP RCDT pump "A" with 1-HS-77-4D.

If] ENSURE [1-LCV-77-4151 closed.

(

SQN 1-50*68*5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 15 of 35 END OF TEXT

SQN 1-50-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 16 of 35 Date NOTE May need an extra copy of this Instruction.

8.4 Reducing the Temperature of the PRT

[1] ENSURE [1-FCV 12] OPEN.

[2] OPEN [1-FCV-68-303] by placing

[1-HS-68-303A] to OPEN position.

[3] IF PRT level increases to ~ 88% or PRT temperature decreases y 120°F, THEN CLOSE [1-FCV-68-303] .

1st IV

[4] IF PRT level is ~ 88%, THEN GO TO section 8.2 or 8.3 of this Instruction , AND

(

RETURN to step [1] of this section if further temperature reduction is needed.

END OF TEXT

(

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 17 of 35 Date _

8.5 Increasing the Pressure of the PRT

[1] OPEN [1-FCV 305] Nitrogen Supply to PRT.

[2] WHEN [1-PI-68-3011 is between 3 to 6 psig, THEN CLOSE [1-FCV-68*305] Nitrogen Supply to PRT.

1st IV END OF TEXT

(

~--'----'-------- ----------- --------T-------'

SQN 1-50-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 18 of 35 Date _

8.6 Reducing the Pressure of the PRT

[1] STATION AUO at panel 0-L-2 to monitor vent header pressure and start Waste Gas Compressor (WGC) if necessary.

[2] OPEN [1-PCV-68-301].

[3] WHEN [1-PI-68-3011 is between 3 to 6 psig, THEN CLOSE [1-PCV-68-301l 1st IV NOTE: Step [4] may be repeated if it is suspected that water remains in waste gas vent header and additional venting is necessary.

[4] IF the PRT pressure will not drop while venting or water is suspected to be in waste gas vent header, THEN PERFORM the following:

[a] NOTIFY U-1 and U-2 SRO that vent header is about to be vented and to monitor AS area radiation monitors and 0-RM-90-1 01 , AS vent monitor. o

[b] OPEN [O-LCV-77-403], Loop Dr LCV (653' U1 pipe chase), for 15 seconds, THEN CLOSE.

[c] OPEN [O-LCV-77-404], Loop Dr LCV (653' U1 pipe chase), for 15 seconds, THEN CLOSE.

[d] OPEN [O-LCV-77-405], Loop Dr LCV (669' U2 pipe chase) for 15 seconds, THEN CLOSE.

END OF TEXT l

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 19 of 35 Date _

8.7 Gravity Draining PRT to the Containment Floor and Equipment Drain Sump (RBF & EDS)

CAUTION Completely draining PRT may result in gas binding RCDT pumps.

[1] OBTAIN permission from US to drain PRT to RBF & EDS.

[2] ENSURE the following RCDT control switches in the PULL-TO-LOCK position:

A. [1-HS-77-4A] RCDT PUMP 1A.

B. [1-HS-77-6A] RCDT PUMP 1B.

[3] PLACE [1-HS-77-415] RCDT pump suction in the CLOSE position AND ENSURE [1-LCV-77-415] remains CLOSED.

(switch is spring return to auto)

[4] IF both of the following conditions exist:

  • RCS is vented to atmosphere, THEN MARK Steps [5] and [6] as N/A.

NOTE: If Step [4] is N/A, then either Step [5] or Step [6] must be performed to prevent drawing a vacuum in PRT while draining.

[5] IF all of the following conditions exist:

  • Pressurizer PORVs are CLOSED,
  • PRT is NOT vented to atmosphere,

c'

1-S0-68-5 PRESSURIZER RELIEF TANK

( Rev: 17 Page 20 of 35 Date, _

8.7 Gravity Drain ing PRT to the Containment Floor and Equipment Drain Sump (RBF & EDS) (Continued)

[6] IF all of the following conditions exist:

  • PRT has been purged and vented to atmosphere,
  • PRT manual vent to be used as a vent path,

THEN ENSURE [1-68-573] PRT Manual Vent OPEN .

[7] OPEN [1-FCV-68-310] PRT to RCDT suction header.

[8] OPEN [1-FCV-77-3] RCDT to RBF & EDS.

[9] IF high level alarm Illuminates on RCDT during this operation ,

THEN

[a] CLOSE [1-FCV-68-31 0]

AND DRAIN RCDT to -20% level.

[b] WHEN RCDT level is in the normal range , THEN ENSURE [1-LCV-77-415] is CLOSED AND OPEN [1-FCV-68-310] to resume PRT draining.

[10] WHEN it is no longer desired to transfer PRT to RBF & EDS, THEN CLOSE [1-FCV-77-31 1st IV

[11] CLOSE [1-FCV-68-31 0].

1st IV L

.-'- - . - - - , - - -- - - - - - - - - - - - - -- - - - - ' - - r - - -- - - - - ,

SQN 1-S0-68-5 PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 21 of 35 Date _

8.7 Gravity Draining PRT to the Containment Floor and Equipment Drain Sump (RBF & EDS) (Continued)

[12] ENSURE [1-FCV-68-305] Nitrogen Supply to PRT is CLOSED.

1st IV

[13] IF manual vent used as vent path is step [6] ,

THEN ENSURE [1-68 -573] PRT Manual Vent CLOSED.

1st IV NOTE RCDT suction piping may be gas bound if PRT was drained completely.

[14] IF PRT was drained completely, THEN EVALUATE need to prime the RCDT pumps using 1-S0-77-1, Reactor Coolant Drain Tank.

[15] ENSURE [1-HS-77-415] RCDT pump suction in AUTO.

1st IV

[16] PLACE the following control switches to the PULL-P-AUTO position.

A. [1-HS-77-4Al RCDT pump 1A.

1st IV B. [1-HS-77-6A] RCDT pump 1B.

1st IV END OF TEXT

SQN 1-S0-68-5 c 1 PRESSURIZER RELIEF TANK Rev: 17 Page 22 of 35 Date _

8.8 Reducing the 0 , Concentration in the PRT in Mode 5 or 6 NOTE 1 Local AUG assistance will be needed to perform this Instruction.

NOTE 2 Several copies of Appendices A and B may be needed to complete this Instruction .

NOTE 3 This Instruction can only be performed in modes 5 and 6.

NOTE 4 Step [1] may be NA'd if flange has been previously removed and hose installed.

[1] REQUEST Mechanical Maintenance to REMOVE blind flange from [1-68-573] and to INSTALL a temporary hose.

[2] IF reducing PRT oxygen concentration utilizing RCDT pump "B", THEN PERFORM Appendix A to reduce the PRT 0 , concentration .

[3] IF reducing PRT oxygen concentration utilizing RCDT pump "A", THEN PERFORM Appendix B to reduce the PRT 0 , concentration.

[4] ENSURE [1-PCV-68-304] PRT N2 pressure regulator maintains - 6.5 psig.

[5] CLOSE [1-FCV-68-305] nitrogen inlet isolation valve.

1st IV

[6] ENSURE [1- FCV-68-308] gas analyzer FeV CLOSED .

1st IV

[7] ENSURE [1-68-573] PRT vent is CLOSED.

[8] REQUEST Mechanical Maintenance to remove hose from

[1-68-5731, AND INSTALL blind flange.

[9] ENSURE [1- 68-573] PRT vent to atmosphere CLOSED AND Blind Flange INSTALLED.

1st IV END OF TEXT

(

_ L._ _---'--_

SQN 1

PRESSURIZER RELIEF TANK 1-50-68-5 Rev: 17 Page 23 of 35 Date _

8.9 Purging the PRT CAUTION If PRT temperature is >130°F (1-TI-68-309) , this procedure can NOT be performed.

NOTE 1 This section purges the PRT by increasing pressure to - 15 psig then decreasing pressure to - 5 psig. Number of times pressure will be increased and decreased will be determined by Chem Lab.

NOTE 2 0 , concentrat ion for inservice Waste Gas Decay Tank should be monitored during this process.

NOTE 3 When PRT is vented to the RCDT, pressure will increase to near PRT pressure.

NOTE 4 Two or three gas decay tanks will be required for this purge.

NOTES VCT pressure must be maintained ~ 25 psig when purging PRT.

[1] IF desired to raise PRT level to just below high level alarm, THEN PERFORM Section 8,1.

[2] IF hydrogen aligned to VCT, THEN ADJUST [1*PCV 120] VCT Hydrogen Blanket, to maintain ~ 25 psig. (on top of VCT room)

[3] IF Nitrogen aligned to VCT, THEN ADJUST [1-PCV-62-119] VCT Nitrogen Blanket, to maintain ~ 25 psig. (on top of VCT room)

[4] ADJUST [1-PCV-68-304] setpoint to - 15 psig.

(located in 690 pipe chase northeast corner)

NOTE 1-XA-55-5A window D1 is an expected alarm when this process increases pressure > 8 psig.

[5] OPEN [1-FCV-68-3051 Nitrogen Supply to PRT.

[6] WHEN [1-PI-68-301] is - 15 psig, THEN CLOSE [1-FCV-68-3051 Nitrogen Supply to PRT.

1-S0-68-5 PRESSURIZER RELIEF TANK

( Rev: 17 Page 24 of 35 Oate _

8.9 Purging the PRT (Continued)

[7] STATION AUO at panel 0-L-2 to MONITOR Vent Header pressure D.

NOTE 1-XA-55-5B window A2, B2, C2, & 02 are expected alarm when PRT is vented to the vent header due to increased pressure on RCOT.

[8] OPERATE Waste Gas Compressor as necessary. o

[9] OPEN [1-PCV-68-3011, PRT Vent header PCV.

[10] WHEN [1-PI-68-301] is - 5 psig, THEN CLOSE [1-PCV-68-301] , PRT Vent header PCV.

[11] REPEAT steps [5] thru [10] as directed by Chem Lab.

[12] VERIFY [1-PCV-68-305] CLOSED, Nitrogen to PRT.

IV

[13] VERIFY [1-PCV-68-301] CLOSED, PRT Vent header PCV.

IV

[14] RETURN [1-PCV-68-304] setpoint to - 6.5 psig (located in 690 pipe chase northeast corner) 1st CV

[15] IF using Hydrogen, THEN ADJUST [1-PCV-62-120] VCT Hydrogen Blanket, to maintain approximately 17-20 psig. (on top ofVCT room)

[16] IF using Nitrogen, THEN ADJUST [1-PCV-62-119] VCT Nitrogen Blanket, to maintain approximately 17-20 psig. (on top of VCT room)

[17] NOTIFY Chem Lab that PRT purge has been completed.

END OF TEXT

1-S0-68-5 SQN PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 25 of 35 9.0 RECORDS Completed copies of all sections, Appendices , and attachments shall be transmitted to the Operations Superintendent's Secretary.

~_____l 1-50-68-5 SQN PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 26 of 35

[

APPENDIX A Page 1 of 4 Oate _

PRT 0, CONCENTRATION REDUCTION USING RCDT PUMP B CAUTION Over filling

. the PRT

. to solid water condition may result in failure of the PRT rupture disc.

[1] ENSURE [1*FCY*68*305] nitrogen inlet isolation valve is CLOSED.

[2] ENSURE [1-PCY-68-301] PRT vent valve to vent header is CLOSED.

[3] ENSURE [1-68-573] PRT vent to atmosphere is OPEN.

[4] OPEN [1-FCY-68-303] primary water supply to PRT.

[5] YERIFY [1-L1*68*300] PRT level indicator on 1-M-4 shows increase.

[6] YERIFY PRT high level alarm comes in at - 88%.

[7] WHEN water level reaches 98%, as indicated on

[1-L1-68*3001, THEN CLOSE [1-FCY-68-303l 1st IV

[8] CLOSE [1-68-573] PRT vent to atmosphere. .

[9] OPEN [1*FCY*68*305] nitrogen inlet isolation valve.

[10] VERIFY RCOT pumps aligned for service in accordance with Valve Checklist 1-77-1.02.

NOTE An AUO at panel 0-L-2 in communication with a MCR UO is needed to perform this Instruction.

[11] STATION an AUO at panel 0-L-2.

[12] ENSURE [1-FCY*77*9] and [1-FCY*77*10] RCOT pump outlet isolation valves are OPEN.

1-50-68-5 SQN PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 27 of 35 APPENDIX A Page 2 of 4 Oate _

[13] IF filling and venting of RCOT suction line or pumps IS NOT required, THEN GO TO step [20] and N/A steps [14] through [19].

[14] PLACE control switches in the PULL-TO-LOCK position:,

A. [1-HS-77-4A] RCOT pump 1A.

B. [1*HS-77-6A] RCOT pump 1B.

NOTE Steps [15] through [19] fill and vent the RCOT pump suction header.

Step [20] starts the O2 concentration reduction.

[15] PLACE [1-HS-68-310A] in the OPEN position, AND VERIFY [1-FCV-68-310] opens.

NOTE Opening 1-FCV-77-3 allows suction header to be vented to Cntmt Floor & Equip. Drain Sump.

[16] OPEN [1-FCV-77-3] RCOT to RBF&EOS isolation.

[17) WHEN a drop in PRT level is observed, THEN CLOSE [1-FCV-77-31.

[18] IF RCOT or suction line from RCOT has been drained and is ready to be filled, THEN

[a] OPEN [1-LCV-77-415] while MONITORING RCOT and PRT levels.

[b] WHEN a drop in PRT level is observed and/or RCOT level increases or is at desired level, THEN CLOSE [1-LCV-77-415].

l [19] CLOSE [1-FCV-68-3101.


J[ _ _--------'-------'

SQN 1-50-68-5 PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 28 of35 APPENDIX A Page 30f4 Date _

CAUTION 1 Pump damage could occur if suction is lost while pumping water> 175°F.

CAUTION 2 RCDT pump 1A will NOT automatically stop on low level in PRT OR closure of FCV-68-310.

NOTE RCDT Pump B will Auto start when 1-FCV-68-310, PRT drain to RCDT opens.

[20] ENSURE control switches are in the P-AUTO position:

A. [1-HS-77-4A] RCDT pump 1A.

1st IV B. [1-HS-77 -6A] RCDT pump 1B.

1st IV

[21] PLACE [1-HS-68-310A] in the OPEN position, AND VERIFY [1-FCV-68-310] opens.

[22] ENSURE RCDT Pump B STARTS .

[23] IF PRT pressure drops < 1.5 psig, THEN COMPLETE the following:

[a] STOP 'B' RCDT pump at O-L-2, AND CLOSE [1-FCV-68-310].

[b] WHEN PRT pressure returns to normal, THEN OPEN [1-FCV-68-310],

AND VERIFY RCDT pump B STARTS.

(

~C_ _

1-S0-68-5 PRESSURIZER RELIEF TANK Rev: 17

( .

Page 29 of 35


L-----------'

APPENDIX A Page 4 of 4 Date_ _-,--_

[24] WHEN PRT reaches desired level, THEN STOP RCDT Pump B.

[25] CLOSE [1-FCV-68-310].

tst IV

[26] DIRECT Chem Lab to obtain grab sample of the PRT atmosphe re for oxygen concentration.

[27] IF PRT O2 concentration is > 2% by volume, THEN

.RETURN to step [1] of this Appendix .

[28] IF PRT O2 concentration is < 2% by volume , THEN RETURN to step [4] Section 8.8 of this Instruction .

END OF TEXT

(

~Q.1_

1-S0-68-5 PRESSURIZER RELIEF TANK

( Rev: 17 Page 30 of 35 N_ -.L. L - -----'

APPENDIX B Page 1 of 4 Date _

PRT 0, CONCENTRATION REDUCTION USING RCDT PUMP A CAUTION Over filling the PRT to solid water condition may result in failure of the PRT rupture disc.

[1] ENSURE [1-FCV-68-305] nitrogen inlet isolation valve is CLOSED .

[2] ENSURE [1-PCV-68-301] PRT vent valve to vent header is CLOSED.

[3] ENSURE [1-68-573] PRT vent to atmosphere is OPEN.

[4] OPEN [1-FCV 303] primary water supply to PRT.

[5] VERIFY [1-L1-68-300] PRT level indicator on 1-M-4 shows increase.

[6] VERIFY PRT high level alarm comes in at - 88%.

[7] WHEN water level reaches 98%, as indicated on

[1-L1-68-300], THEN CLOSE [1-FCV-68-303].

1sl IV

[8] CLOSE [1-68-573] PRT vent to atmosphere.

[9] OPEN [1-FCV-68-305] nitrogen inlet isolation valve.

[10] VERIFY RCDT pumps aligned for service in accordance with Valve Checklist 1-77-1.02.

NOTE An AUO at panel 0-L-2 in communication with a MCR UO is needed to perform this Instruction.

[11] STATION an AUO at panel O-L-2.

ENSURE [1-FCV-77-9] and [1-FCV-77-10] RCDT pump outlet l [12]

isolation valves are OPEN.

1-50-68-5 SQN

(

L---.-.ll_ _--'-----------'

1 PRESSURIZER RELIEF TANK Rev: 17 Page 31 of 35 APPENDIXB Page 2 of 4 Date _

[13] IF filling and venting of RCDT suction line or pumps IS NOT required, THEN GO TO step [20] and N/A steps [14] through [19].

[14] PLACE control switches in the PULL-TO-LOCK position:,

A. [1-HS-77-4A] RCDT pump 1A.

B. [1-HS-77-6A] RCDT pump 1B.

NOTE Steps [15] through [19] fill and vent the RCDT pump suction header.

Step [20] starts the O2 concentration reduction.

[15] PLACE [1-HS-68-310A] in the OPEN position, AND VERIFY [1-FCV-68-310] opens.

NOTE Opening 1-FCV-77-3 allows suction header to be vented to Cntmt Floor & Equip. Drain Sump.

[16] OPEN [1-FCV-77-3] RCDT to RBF&EDS isolation.

[17] WHEN a drop in PRT level is observed, THEN CLOSE [1-FCV-77-31 (18] IF RCDT or suction line from RCDT has been drained and is ready to be filled, THEN

[a] OPEN [1-LCV-77-415] while MONITORING RCDT and PRT levels.

[b] WHEN a drop in PRT level is observed and/or RCDT level increases or is at desired level, THEN CLOSE [1-LCV-77-415].

~_N_'--L-1-S0-68-5 PRESSURIZER RELIEF TANK

( Rev: 17 Page 32 of 35

.L, -----l APPENDIX B Page 3 of4 Date, _

[19] CLOSE [1-FCV 31OJ-CAUTION 1 Pump damage could occur if suction is lost while pumping water> 175'F.

CAUTION 2 RCDT pump 1A will NOT automatically stop on low level in PRT OR closure of FCV-68-310.

NOTE RCDT Pump A operates automatically with 1-FCV-77-415 from the RCDT only.

[20] ENSURE [1-HS-77-61 RCDT Pump B in PULL-TO-LOCK.

[21] PLACE [1-HS-68-310A] in the OPEN position, AND VERIFY [1-FCV-68-310] opens,

[22] START RCDT PUMP 'A' by placing [1-HS-77-4Al in the START position.

[2 3] IF PRT pressure drops < 1.5 psig, THEN COMPLETE the following :

[a] STOP 'A' RCDT Pump at O-L-2.

[b] WHEN PRT pressure returns to normal, THEN START RCDT PUMP 'A' by placing [1-HS-77-4A] in the START position.

[24] WHEN PRT reaches desired level, THEN STOP RCDT Pump A

[25] CLOSE [1-FCV 310]

1st IV

(

1-50-68-5 SQN PRESSURIZER RELIEF TANK

( 1 Rev: 17 Page 33 of 35 APPENDIX B Page 4 of4 Date _

[26] DIRECT Chem Lab to obtain sample of the PRT atmosphere for oxygen concen tration.

[27] ENSURE control switches are in the P-AUTO position:

A. [1-HS-77-4Al RCDT pump 1A.

t st IV B. [1-HS-77 -6A] RCDT pump 1B.

1st IV

[28] IF PRT 0 , concentration is > 2% by volume, THEN RETURN to step [1] of this Appendix.

[29] IF PRT 0 , concentration is < 2% by volume, THEN RETURN to step [4] Section 8.8 of this Instruction .

END OF TEXT

(

1-50-68-5 SQN PRESSURIZER RELIEF TANK Rev: 17

( 1 Page 34 of 35 APPENDIX C Page 1 of 1 Date _

REDUCING LEVEL IN RCDT

[1] ENSURE [1-LCV-77-415] RCDT pump suction OPEN.

[2] START RCDT pump A or B by placing

[1-HS-77-4Al or [1-HS-77-6A] in START .

[3] WHEN RCDT level is approximately 20% , THEN STOP the running RCDT pump.

[4] ENSURE [1-LCV *77*415] RCDT pump suction CLOSE D.

END OF TEXT .

(

[~

1-50-68-5 PRESSURIZER RELIEF TANK

( Rev: 17 Page 35 of 35 SOURCE NOTES Page 1 of 1 REQUIREMENTS SOURCE IMPLEMENTING STATEMENT DOCUMENT STATEMENT Procedures that do not contain NCO 970071001 C.1 appropriate verification requirements will be revised . (This item is not annotated within the procedure since the entire procedure must meet the verification program requirements.

JPM 8.1 .1 Page 1 of 16 Rev. 2 SEQUOYAH NUCLEAR PLANT

( JOB PERFORMANCE MEASURE B.1 .f JPM 115-2AP Respond To ERCW Pump Trip per AOP-M.01 PREPARED! .

REVISED BY: Date!

VALIDATED BY:

  • Date!

APPROVED BY: Datel (Operations Training Manager)

CONCURRED: ** Datel (Operations Representative)

  • Validation not required for minor enhancements, procedure Rev changes that do not affect the JPM, or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision).

JP M B.1.f Page 2 of 16 Rev 2 I NUCLEAR TRAINING

( REVISIONIUSAGE LOG REVISION DESCRIPTI ON OF V DATE PAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY:

0 New JPM for NRC Exam. Update for V 12/4/01 all L. Paule y proc edur e rev. And reorder JPM step 8 and cons ole operator act ion.

1 Updated to current revision and IC. Y 8/1 6/04 All MG Croteau Rewrote to include returning to section 2.1 afte r header break isolated. Extensive rewr ite. Needs full validation run including time.

2 Updated to current procedure revision. N 2/5107 All RH Evans Minor Form at changes c

V - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

l

JPMB.1 .f Page 3 of 16 Rev. 2 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE

( Task:

Respond to ERCW Pump Trip Note: This JPM satisfies Simulator Manipulation "L".

JAITA task # : 0000620501 (RO)

KIA Ratings:

076A2.01 (3.5/3.7) 076K4.06 (2.8/3.2) 076A4.01 (2.9/2.9) 076A2.02 (2.7/3.1 )

076K6.04 (2.1/2.2)

Task Standard:

STANDBY A TRAIN ERCW Pump has been started and the auto start selection switch is selected away from Q-A ERCW Pump position. ERCW Header leak has been isolated.

Evaluation Method : Simulator _-LX~_ In-Plant _

~============ == =================================================================

Performer:

NAME Start Time _

Performance Rating: SAT UNSAT Performance Time Finish Time _

c Evaluator:

SIGNATURE DATE

===============================================================

COMMENTS

JPM B.1.f Page 4 of 16 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:

1. Critical steps are identified within the step

( 2 . Sequenced steps identified by an "s" 3 . Any UNSAT requires comments

4. Initialize the simulator in IC #16. Ensure a -A ERCW pump is in service and the selector switch is selected for a-A. Ensure 1 B-B CCP is running and 1 A-A is in standby.
5. Activate MF #RW01G (Trips a-A ERCW Pump)
6. Freeze the simulator until the operator has been briefed and is ready to perform task.
7. Console op erato r must insert malfu nction RW13B at 90% prior to JP M step 8.
8. See specific J PM st eps for required remote function manipul ations.
9. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train, component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 15 mins Local _

Tools/EquipmentlProcedures Needed:

AOP-M.01, Section 2 and 2.1, 2.10 Reference Title Rev No.

AOP-M.01 Loss of ERCW 15

===============================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance meas ure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit is in mode 1 at 100% power INITIATIN G CUES:

You are the CRO and are to monitor the board and respond, as a reader/doer, to any event that may occur.

Inform SM when any required action(s) associated with the failure have been completed.

JPM B.l.!

Page 5 of 16 Rev. 12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

( _ SAT Examiner NOTE: Candidate may perform the ARP actions. They are identical to procedure steps. _ UNSAT STEP 1.: Obtain a copy of the appropriate procedure. Start Time_ _

Cue: The SM will evaluate Tech Specs, TRM, and the REP STANDARD : A copy of the AOP-M.Ol has been obtained and goes to section 2.1.

COMMENTS :

STEP.k: [1] IDENTIFY and LOCK OUT failed ERCW pump _SAT

_ UNSAT STANDARD : ERCW pump Q-A HAND SWITCH has been placed in the PULL TO LOCK position.

COMMENT S:

c §'1~ P 3.: [2] START additional ERCW pumps as required to maintain header pressure between 78 psig and 124 psig.

_ SAT

_ UNSAT STANDARD: Operator starts another A (J-A) Train ERCW pump. This step is Critical Step critical to return header pressure to normal.

COMMENTS:

STEP 4.: [3] CHECK two A Train ERCW Pumps AVAILABLE. _ SAT

_UNSAT STANDARD : Operator verifies at least 2 A train ERCW pumps available COMMENTS:

(

JP M B.1.I Page 6 of 16 Rev. 12 Job Perfo rmance Check list:

STEP/STAN DARD SAT/UNSAT

( STEP 5.: [4] CHECK lA and 2A ERCW supply header pressures and flows - SAT NORMAL :

a. Supply Header pressures [between 78 psig and 124 psig]: - UNSAT
  • l-PI-67-493A
  • 2-PI-67-493A STAND ARD: Opera tor checks header pressures are between 78 and 124 psig on both A Train indicators.

. COMMENTS:

STE P 6.: b. Supply Header flows [expected value]. - SAT

  • l-FI-67-61
  • 2-FI-67-61 - UNSAT STANDARD: Operator checks there is flow on the A train supply header as indicated on both indicators.

COMM ENTS:

Console operator insert malfunction RW13B at 90% prior to checking head er flows.

(

r" [5] CHECK 1B and 2B ERCW supply header pressures and flows NORMAL:

a.

b.

Supply Header pressures [between 78 psig and 124 psig]:

  • 1-PI-67-488A
  • 2-PI-67-488A Supply header flows [expected value]:

SAT UNSAT

  • l-Ft-67-62
  • 2-FI-67-62 ST ANDA RD: Operator checks header pressu res are between 78 and 124 psig on both B Train indicators. Flows are abnormal, trans itions to section 2.10.

COMMENTS:

(

JPM B.l .f Page 7 of 16 Rev. 12 Job Perform ance Checklist:

STEP/STANDARD SATIUNSAT

( EVALU AT OR NOTE: T he followina steps are from section 2.10:

STEP 8.: [1] Stop and LOCK OUT All Train B ERCW Pumps - SAT STANDARD: Operator places all running B train ERCW pumps in pull-to-lock - UNSAT position. This ste p is cr itical ta prevent pumping water aut the break. Crit ical Step COMMENTS:

STEP 9.: [2] DISPATCH operators with radios to perform the following: - SAT

  • PERFORM Appendix G, ERCW MCC Valves. - UNSAT
  • ENSURE all pumping station watertight doors are CLOSED.

Cr it ical Step Cue: Play role of A UO and acknowledg e the request.

STANDARD: Operator dispatches operators to perform the required appendices and actions. This step is critical to supply power to valves needed to isolate the leak.

COMMENTS :

STEP 10.: [3] ENSURE 1A and 2A CCPs RUNNING. - SAT Cue: Play role of U2 CRO and start 2A CCP - UNSAT STANDARD: Operator starts lA-A charging pump. Th is step is critical to supply Criti cal Step RCP seal s and normal charging from A train equipment.

COMMENTS:

JPM B.1.f Page 8 of 16 Rev. 12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

(

ST EP 11.: [4] STOP and LOCK OUT effecte d equip ment: - SAT

a. PLACE the following pump s in PULL TO LOC K: - UNSAT
  • 1B CCP Critical Step
  • 1B Sl Pump
  • 2B Sl Pump Cue: Play role of U2 CRO and Stop/Lockout associated pumps STAN DARD : Operator secures the running pump s in the control room and dispatche s an AUO to loc kout the B Aux Control Air Compressor. This step is critical to prevent start of ECCS equipmen t without cooling water available to the room coolers.

CO MMENTS :

STEP 12.: b. DISPATCH operato r to plac e Train B Aux Air Compressor in SA FE STOP.

c Cue: Play role of AUO and acknowledge the request.

STANDA RD: Ope rato r secures the runn ing pumps in the contro l room and dispatc hes an AUO to loc kout the B Aux Contro l Air Compressor COMME NTS:

STEP 13.: [5] OPEN alternate ERCW supply to B train DGs: - SAT

  • 1-FCV-67-65 (1B DG)
  • 2-FCV 65 (2 B DG) - UNSAT Cue : Play role of CRO/AVO and acknOWledge the request.

STANDARD: Op erat or op ens 1-FC V-67-6 5 and directs opening of 2-FCV-67-65.

CO MM ENT S:

JPM B.1.I Page 9 of 16 Rev. 12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

( EVALUATOR NOTE: RCP Temperature alarms mav come in deoendino on oace.

STEP 14.: [6] ISOLATE B Train ERCW Header rupture: _ SAT

a. CLOSE 1-FCV-67-489. Header 1B Isol Before Strainer [ERCW _UNSAT MCC 1BB Cornpt. 3C].
b. CLOSE 2-FCV-67-489. Header 2B IsoI Before Strainer [ERCW MCC 2BB Compt, 3C]. Critical Step Cue: Play role of AUO and acknowledge the request.

STANDARD: Operator notifies an AUO to close the valves to isolate the B ERCW header. This step is critical to isolate the ERCW leak.

COMMENTS:

Console Operator perform the following to isolate the leak:

MRF RWRV489 0%

MRF RWR2V489 0%

STEP 15.: [7] OPERATE available A Train ERCW Pumps to maintain pressure _ SAT c

between 78 psig and 124 psig.

_ UNSAT STANDARD: Operator will start an additional A train pump. This step is critical to return ERCW supply header pressure to normal.

Critical Step COMMENTS:

Pressure is less than 78 psiq , but procedure also allows reducing flow to non-essential equipment to raise pressure.

_ . -'--- .....J

(

JPM B.1.1 Page 10 of 16 Rev. 12 Job Perf ormance Checklist:

STEPISTANDARD SAT/UNSAT

(

STEP 16.: [8] EVALUATE aligning Train A ERCW to supply Train B: SAT

a. IF aligning 1A to 2B header is desired , THEN PERFORM the following : UNSAT
1) DISPATCH personnel to CLOSE 0-67-1501 CCS Htx OB2 Inlet valve.
2) WHEN 0-67 -1501 CLOSED , THEN OPEN 1-FCV-67-147, Hdr Critical Step 1A to Hdr 2B Isol Valve [Rx MOV Bd 1A2-A c/9A] AND RECORD the time
3) WHEN 1-FCV-67-147 has been OPEN for approximately 10 minute s, THEN OPEN 0-67*1501 CCS Htx OB2 Inlet valve Cue: Direct operator to align 1A and 2A ERCW Supplies to Train B Cue: Play role of AUO and acknowledge the request. When 1*FCV*67*

147 has been directed opened, cue that 10 minutes have elapsed.

ST ANDARD: Ope rator dispatches an AUO to close 0-67 -1501 , open 1-FCV 147 and reopens 0-67-1501 after 1-FCV*67*147 has been open for - 10 minutes. This step is critical to supply cooling water to A train equipment.

CO MMENTS:

( I Console Operator perform the following to open 1*FCV*67*147 (ignore cycling 0-67*1501):

. ~R F RW RV489 100%

JPM B.1.!

Page 11 of 16 Rev. 12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

(

STEP 17.: b. IF aligning 2A to 1B header is desired, THEN PERFORM the _ SAT following:

  • OPEN 1*FCV-67-424, Hdr 1B to Hdr 2A CCS HX Isol Valve [Rx _ UNSAT MOV Bd 1A2-A Compt. 9B] AND RECORD the Time
  • ENSURE 1-FCV-67-223, Hdr 1B to Hdr 2A Iso1 Valve is OPEN.

[Rx MOV Bd 1A2-A Com pt. 8B]. Critical Step

  • ENSURE 2-FCV-67-223, Hdr 2A to Hdr 1B Isol Valve is OPEN.

[Rx MOV Bd 2A2-A Compt. 8B].

Cue: Play role of AUO and acknowledge the request.

STANDARD: Operator dispatches an AUO to open 1-FCV-67-424 , and ensures that 1-FCV-67-223 and 2*FCV-67-223 are open. This step is critical to supply cooling water to A train equipment.

COMMENTS:

Console Operator perform the follow ing to open 1-FCV*67-424 (1/2-FCV-67-223 are already open):

MRF RWRV424 100%

( I STEP 18.: [9] START additional Lower Compartment Cooling Fans and CRDM Fans as required to maintain containment temperature.

_ SAT

_ UNSAT STANDARD: Operator checks containment temperature and starts fans if needed.

COM MENTS:

STEP 19.: [10] MONITOR Containment Pressure and Temperature. _ SAT STANDARD : Operator monitors containment temp erature and pressure. _ UNSAT COMMENTS:

JPM B.l.I Page 12 of 16 Rev . 12 Job Performance Checkl ist:

STEP/STANDARD SAT/UNSAT

(

STEP 20.: [11] CHECK 1A and 2A ERCW header pressures and flows adequate for - SAT current alignment:

  • 1-FI-67-6 1 and 2-FI-67-6 1, at expected value - UNSAT
  • 1-PI-67-493 and 2-P I-67-493 STANDARD: Operator checks above indicators and observes parameters are normal.

If not starts additional A train ERCW pumps (see JPM step 15).

~OMMENTS :

STE P 21.: [12] RESTORE equ ipment: - SAT

a. CHE CK Train B ERCW header supplied from Train A crosstie. - UNSAT
b. RESTORE ther following handswltches as applicable :
  • 1B-B SI Pump to A-AUTO Cue: Play role of AUO and acknowledge the request.

I STANDARD: Operator restores B Train components to service . This step is critica l to restore A train ECCS equi pment.

COMMENTS :

STEP 22.: [13] EVALUATE isolation of non-essential A Train CCS heat loads USING - SAT Appendi x E, CCS Heat Load Reduction.

- UNSAT Cue: SM will perform the evaluation STANDARD: Operator ensures Appendix E evaluated .

COMMENTS:

~-

JPM B.1.I Page 13 of 16 Rev. 12 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

(

STEP 23.: [14] ENSURE all ACBs opened USING the following appendixes: - SAT

  • Appendix F, ERCW Rx MOV Board Appendi x R Valves - UNSAT
  • Appendix G, ERCW MCC Appendix R Valves Cue: Play role of AVO and acknowledge the request.

STANDARD : Ope rator dispatches an AUO to perform the appendices .

COMMENTS:

STEP 24.: [15] REFER to the following: - SAT

  • Appendix B, Affected Equipment List (Heade r 1B) - UNSAT
  • Appendix D, Affected Equipment List (Header 2B)
  • Appendix P, Potential Tech Spec Impacts Cue: SM will refer to the Appendices.

STANDARD: Operator ensures Appendi x B referred to.

COMMENTS:

STEP 25 .: [16] REFER TO AOP*M.03, Loss of Component Cooling Water. - SAT Cue: SM will refer to AOP-M.03. - UNSAT STANDARD: Operator ensures AOP-M.03 referred to.

COMMENTS:

JPM 8 .1.f Page 140f 16 Rev . 12 Job Performance Checklist:

STEP/ST ANDARD SATIUNSAT

( ST EP 26.: [17] GO TO appropriate plant procedure . - SAT Cue: Direct operator to complete performance of AOP-M.01 section 2.1. - UNSAT STANDARD: SM is informed of completion of AOP-M .01 section 2.10. Stop Time__

COMMENTS :

EVALUATOR NOTE The follow ina steos are from section 2.1 STEP 27. : [5] b. CHECK 18 and 28 ERCW supply Header flows [expected value]. - SAT

  • 1-FI-67 -62
  • 2-FI-67 -62 - UNSAT STANDARD: Operator check s there is flow on the 8 train supply heade r as indicated on both indicators.

COMM ENTS :

STEP 28 .:

.SAT

[6] DISPATCH personnel to INSPECT failed pump(s ) and determine cause -

for failure .

- UNSAT Cue: The floor US reports that the 51 relay has a flag picked up. The AUO reports no apparent reason for the trip locally.

STANDARD: The Floor US or AUO has been notified to inspect the breaker and an AUO has been dispatched to the pump.

COMMENTS:

STEP 29.: [7] NOT IFY STA to evaluate Tech Spec LCO 3.7.4, ERCW System .

Cue: Play role of STA and acknowledge the request.

STANDARD: STA has been nolifed.

COMMENTS:

J PM B.1.I Page 15 of 16 Rev. 12 Job Perform ance Checklist:

ST EP/ST ANDARD SAT/UNSAT

( STEP 30 .: (8) CHECK ERCW pump loading amps NORMAL. - SAT STANDARD: Pump amp meter for pump that was started verified to be in normal - UNSAT operating range.

COM MENTS :

STEP 31 .: (9) TRANSFER emergency power selector switch away from failed pump . - SAT

- UNSAT ST ANDAR D: The Emergency Power Selector Switch is positioned away from Q-A ERCW pump. Critical Step COMMENTS:

ST EP~.g,: (10) EVALUATE need to close and place clearance on manual discharge - SAT valve for failed pump.

- UNSAT

( Cue: If AUO is conta cted, Play role of A UO and ackn owledge the request.

STANDARD: Operator may notify an AUO to close the manual discharge valve of Q*A ERCW pump.

COMMENTS:

STEP 33.: Inform SM of failure of ERCW pump and header and performance of - SAT AOP-M .01

- UNSAT STANDARD: SM is informed of pump and header failure and that AOP-M.01 has been performed. Stop Time__

COMM ENTS:

End of JPM

(

Page 16 of 16 Rev. 2

( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you. -

INITIAL CONDITIONS:

Unit is in mode 1 at 100% power INITIATING CUES:

( You are the CRO and are to monitor the board and respond, as a reader/doer, to any event that may occur.

Inform SM when any required action(s) associated with the failure have been completed

(

( TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT AOI PROGRAM MANUAL ABNORMAL OPERATING PROCEDURES AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER Revision 15 QUALITY RELATED PREPARED/PROOFREAD BY : D, A. PORTER RESPONSIBLE ORGANIZATION: OPER ATIONS A PPROVED BY: W. T. LEARY EFFEC TIVE DATE: 07/21/06 REVISION DESCRIPTION: Incorporated various enhancements to Sect. 2,1 1 based upon feedback from REP drill (PER 97828 , NB-060173, NB-060178), Relocated caut ion , notes, and administrative actions from Section 2,0, Incorporated other enhancements and minor corrections ,

INTENT CHANGES TO SECTION 2.11 OF THIS PROCEDURE MUST BE APPROVED BY PORCo

( ____---e[

SQN LOSS OF ESSENllAL RAW COOLING WATER AOP-M.01 Rev . 15 1.0 PURPOSE This procedure provides the actions necessary to mitigate the effects of an ERCW pump or piping failure .

Page 2 of 142

AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15

["Si~ j ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.0 OPERATOR ACTIONS CAUTION: ERCW header rupture in Auxiliary Building could fill the passive sump in 15 minutes. Prompt action is needed.

1. DIAGNOSE the failure:

IF... GO TO SECTION PAGE ERCW Pump(s) tripped or failed 2.1 ERCW pump failure 5 High flow ERCW Supp ly Header 1A 2.2 Supply Hdr 1A Failure 8 to Aux Bldg High flow ERCW Supply Header 18 2.3 Supply Hdr 1B Failure 12 to Aux Bldg High flow ERCW Supply Header 2A 2.4 Supply Hdr 2A Failure 16 to Aux Bldg High flow ERCW Supply Header 28 2.5 Supply Hdr 2B Failure 22 to Aux Bldg Indications of an ERCW Return Header rupture 2.6 Return Hdr rupture 27 (must be diagnosed locally since M-27 indications in Aux Bldg are not affected)

Low flow ERCW Supply Header 1A and 2A, 2.7 Supply Header 1AJ2A 38 AND Failure in Yard Area STRAINER DIFF PRESS HIGH alarm LIT

[M-27A , C-3 and/or D-2]

Low flow ERCW Supply Header 18 and 28 , Supply Header 1B/2B 52 2.8 AND Failure in Yard Area STRAINER OIFF PRESS HIGH alarm LIT

[M-27A, C-6 and/or 0-5]

(step continued on next page)

Page 3 of 142

AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 I STEP I ACTION/EXPECTED RESPONSE [ RESPONSE

---'---' NOT OSTAINED ------'

2.0 OPERATOR ACTIONS (Continued)

3. (Continued)

IF... GO TO SECTION PAGE Low flow ERCW supply headers 1A and 2A, AND STRAINER DIFF PRESS alarms DARK

[M-27 A, C-3 and D-2] ,

AND at least one of the following alarms LIT:

2.9 Supply HeaderA 63

  • ERCW DECK SUMP LEVEL HI alarm LIT Failure Upstream of

[1-M-158 , A-3]

Strainer Inlet Valves OR

[1-M-158, 0-2 or 0-4]

OR

  • MECH EQU IP SUMP LVL HI alarm LIT

[1-M-15A, 8-6]

Low flow ERCW supply headers 18 and 28 ,

AND STRAINER DIFF PRESS alarms DARK [M-27A, C-6 and D-5] I AND at least one of the following alarms LIT:

2.10 Supply Header B 71

  • ERCW DECK SUMP LEVEL HI alarm LIT [1-Failure Upstream of M-158, A-3]

Strainer Inlet Valves OR

OR

  • MECH EQUIP SUMP LVL HI alarm LIT [1-M-15A,8-6] '\

Loss of flow on ALL ERCW supp ly headers Loss of all ERCW flow 77 2.11 in modes 1-4.

END OF SECTION Page 4 of 142

SQN LOSS OF ESSENTIAL RAW COOLING WATER AOP-M.01

( Rev. 15 I STEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.1 ERCW Pump Failure

1. IDENTIFY and LOCK OUT failed ERCW pump.
2. START additional ERCW pumps as required to maintain supply header pressure between 78 psig and 124 psig.
3. CHECK two Train A ERCW Pumps IF less than two Train A ERCW Pumps AVAILABLE. available ,

THEN EVALUATE isolation of non-essential Train A CCS heat loads USING Appendix E, CCS Heat Load Reduction [C.1]

4. CHECK 1A and 2A ERCW supply IF BOTH 1A AND 2A ERCW Headers header pressures and flows NORMAL: FAILED, THEN
a. Supply header pressures GO TO Section 2.9, ERCW Supply

[between 78 psig and 124 psig]: Header A Failure Prior to ERCW Strainer Inlet Valves .

  • 1-PI-67-493A
  • 2-PI-67-493A
b. Supply header flows IF 1A OR 2A ERCW Header FAILED,

[expected value]: THEN RETURN TO Section 2.0 for diagnosis.

---~

  • 1-FI-67-61
  • 2-FI-67-61 Page 5 of 142

AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 I STEP 1 ACTION/EXPECTED RESPONSE RESPONSE NOT OSTAINED 2.1 ERCW Pump Failure (cont'd)

5. CHECK 18 and 28 ERCW supply header IF 80TH 18 AND 28 ERCW Headers pressures and flows NORMAL: FAILED, THEN GO TO Section 2.10, ERCW Supply
a. Supply header pressures [between Header 8 Failure Prior to ERCW 78 psig and 124 psig]: Strainer Inlet Valves.
  • 1-PI-67-488A
  • 2-PI-67-488A
b. Supply header flows [expected value]: IF 18 OR 28 ERCW Header FAILED ,

THEN

  • 1-FI-67-62 RETURN TO Section 2.0 for diagnosis.
  • 2-FI-67-62

---~

6. DISPATCH personnel to INSPECT failed pump(s) and determine cause for failure.
7. NOTIFY STA to evaluate Tech Spec LCO 3.7.4, ERCW System .
8. CHECK ERCW pump loading amps INVESTIGATE abnormal amp readings:

NORMAL.

  • CHECK header flows and pressures.

IF amps are high due to only one pump available, THEN EVALUATE isolation of non-essential ERCW loads.

Page 6 of 142

~_N AOP-M.01 LOSS OF ESSENTIAL RAW COOLING WATER

( --l.-

Rev. 15


.L_------l I STEP [ ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.1 ERCW Pump Failure (cont'd)

9. TRANSFER emergency power selector switch away from failed pump.
10. EVALUATE need to close and place clearance on manual discharge valve for failed pump.

11.

GO TO appropriate plant procedure .

END OF SECTION Page I of 142

AOP*M.01 SQN LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 L::iii~ ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inlet Valves CAUTION: During operation, CCP and SI Pumps may experience bearing failure 10 minutes after loss of ERCW cooling.

1. STOP and LOCK OUT all Train B ERCW Pumps.
2. DISPATCH operators with radios to perform the following :
  • PERFORM Appendix F, Rx MOV Board ERCW Valves

[Aux Bldg el. 749' , Rx MOV Boards] .

  • PERFORM Appendix G, ERCW MCC Valves. [ERCW Pumping Stations]
  • ENSURE all pumping station watertight doors are CLOSED . [ERCW Pumping Station].
3. ENSURE 1A-A and 2A-A CCPs RUNNING.
4. STOP and LOCK OUT affected equipment:
a. PLACE the following pumps in PULL TO LOCK :
b. DISPATCH operator to place Train B Aux A ir Comp ressor in SAFE STOP.

[Aux Bldg , 734' elev , Refuel Floor]

Page 71 of 142

AOP-M.01

( SQN LOSS OF ESSENTIAL RAW COOLING WATER Rev. 15 I STEP I AC TION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inl et Valves (cont'd)

5. OPEN alternate ERCW supply to Train 8 DGs
  • 1-FCV-67-65 (18 DG)
  • 2-FCV-67-65 (28 DG)

NOTE Flooding at the ERCW station may prevent FCVs fro m closing. Manual valves are located south of the CCW station and are normally locked open .

6. ISOLATE Train 8 ERCW Header rupture:
a. CLOSE 1-FCV-67-489, Header 18 Isol a. CLOSE 1-VLV-67-5188 , ERCW Supply Befo re Stra iner [ERCW MGG 1B-8 Isolation Va lve Cornpt, 3C].
b. CLOSE 2-FCV-67-489 , Header 28 Isol b. CLOSE 2-VLV-67-5188, ERGW Supply Before Strainer [ERGW MGG 28-8 Isolation Valve Cornpt, 3C] .
7. OPERATE available Train A ERCW Pumps to mai ntain pressure between 78 psig and 124 psig.

Page 72 of 142

AOP-M .01 saN LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 I STEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failu re Upstream of ERCW Straine r Inlet Valves (cont'd)

CAUTION 1 Crosstying A and B t rain ERCW supply headers shou ld only be performed if cooling is urgently requi red for Train 8 CCS related equipment. LCO 3.0.3 may be applicable.

CAUTION 2 Opening of crosstie valve 1-FCV-67-147 may result in severe fouling or flow blockage of OB1 /082 CCS Heat Exchanger, therefore t he CCS Hx OB2 should be isolated prior to opening. After approx imatel y 10 minutes OB2 CCS Hx will be returned to service.

NOTE

8. EVALUATE aligning Train A ERCW to supply Train B:
a. IF aligning 1A to 2B header is desired, THEN PERFORM the following:
1) DISPATCH personnel to CLOSE 0-67-1501 CCS Hx OB2 Inlet valve.
2) WHEN 0-67-1501 CLOSED.

THEN OPEN 1-FCV-67-147, Hdr 1A to Hdr 2B Isol Valve

[Rx MOV Bd 1A2-A Compt. gAl and RECORD time _

3) WHEN 1-FCV-67-147 has been OPEN for approximately 10 minutes, THEN OPEN 0-67-1501 CCS Hx OB2 Inlet valve (step continued on next page)

Page 73 of 142

AOP-M.01 SQN LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 I ST EP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTA INED 2.10 ERCW Supply Header B Fail ure Upst rea m of ERCW Strainer Inlet Va lves (cont'd)

8. b. IF alig ning 2A to 1B header is des ired ,

THEN PERFORM the fo llowing:

  • OPEN 1-FCV-67-424, Hdr 1B to Hdr 2A CCS HX Isol Valve

[Rx MOV Bd 1A2 -A Compl. 9B] and RECORD the T ime _

  • ENSURE 1-FCV-67-223, Hdr 1B to Hdr 2A Isol Va lve is OPEN .

[Rx MOV Bd 1A2-A Compl. 8B].

  • ENSURE 2-FCV-67-223 , Hdr 2A to Hdr 1B Isol Va lve is OPEN .

( [Rx MOV Bd 2A2 -A Cornpt. 8B].

9. START additional Lower Compartment Cooling Fans and CRDM Fans as required to mai ntain containment temperature.
10. MONITOR Co ntainment Pressure and Temperatu re.

Page 74 of 142

AOP-M.01 SQN LOSS OF ESSENTIAL RAW COOLING WATER

( Rev . 15 I STEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inlet Valves (cont'd)

11. CHECK .1A and 2A ERCW header START additional "A" Train ERCW pressures and flows adequate for current pumps as necessary.

alignment:

ISOLATE non-essential ERCW loads as

  • 1-FI-67-61 and 2-FI-67-61, necessary.

at expected value DO NOT CONTINUE UNTIL header

  • 1-PI-67-493A and 2-PI-67-493A pressure and flow are adequate for current alignment.
12. RESTORE equipment:
a. CHECK Train B ERCW header a. GO TO step 14.

supplied from Train A crosstie.

b. RESTORE the following handswitches as applicable:
  • 1B-B 81 Pump to A-AUTO
  • 2B-B 81 Pump to A-AUTO
  • Train B Aux Air Compressor to AUTO

[Aux Bldg, 734' elev, Refuel Floor]

(

Page 75 of 142

AOP-M.01 SQN LOSS OF ESSENTIAL RAW COOLING WATER

( Rev. 15 I STEP I ACTION/EXPECTED RESPONSE RESPONSE NOT OBTAINED 2.10 ERCW Supply Header B Failure Upstream of ERCW Strainer Inlet Valves (cont'd)

13. EVALUATE isolation of non-essential Train A CCS heat loads USING Appendix E, CCS Heat Load Reduction.
14. ENSURE all breakers opened USING the following appendixes
  • Append ix F, Rx MOV Board ERCW Valves
15. REFER TO the following:
  • Appendix B, Affected Equipment List (Header 1B)
  • Appendix D, Affected Equipment List (Header 2B)
  • Appendix P, Potential Tech Spec Impacts.
16. REFER TO AOP-M.03, Loss of Component Cooling Water.

17.

GO TO appropriate plant procedure.

END OF SECTION Page 76 of 142

JPM 8.1 .g Page 1 of 9 Rev. 9

.SEQUOYAH NUCLEAR PLANT

( JOB PERFORMANCE MEASURE B.1*9 Respond to Spray Valve Failure Original Signatures on File PREPAREDI REVISED BY: Datel VALIDATED BY:

  • Datel APPROVED BY: Datel (Operations Training Manager)

CONCURRED: ** Datel (Operations Representative)

  • Validation not required for minor enhancements, procedu re Rev chang es that do not affec t the JPM , or individual step changes that do not affect the flow of the JPM.
    • Ope rations Concurrence required for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision) .

JP M 8 .1.g Page 2 of 9 Rev. 9 I

NUCLEA R TRAINING

( REVISION/USAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPARED/

NUMBER REVISION AFFECTED REVISED BY:

0 Initial Issue Y 2/13/07 All RH Evans v - Specify if the JPM change will require another validation (Y or N).

See cover sheet for criteria.

JPM B.1.g Page 3 of 9 Rev. 9 SEQUOYAH NUCLEAR PLANT RO/SRO JOB PERFORMANCE MEASURE

(

Task:

Respond to Spray Valve failure Note: This JPM satisfies Simulator Manipulation XXXXXX.

JAITA task #: 3210140401 (RO) 0150050101 (RO) 0150040101 (RO) 0000910501 (RO)

KIA Ratings:

Task Standard:

Reps supplying failed spray valve are tripped . Pressurizer heaters are energized.

Evaluation Method: x Simulator _--C>.-_ _ In-Plant _

=======================================================================

Performer:

NAME Start Time Performance Rating: SAT UNSAT Pertormance Time Finish Time C Evaluator:

SIGNATURE I

DATE

=======================================================================

COMMENTS

(

JPM 8.1.g Page 4 of 9 Rev. 9 SPECIAL INSTRUCTIONS TO EVALUATOR:

a. Set up the simulator post trip with one spray valve cracked and stuck open. RCS pressure

( should be dropping but not less than approximately 2100*2150 psig when the applicant reaches the step to check pressure control. If possible, fail pressurizer backup heaters to automatically energize so that they must be energized manually Validation Time: CR. 11 mins Local ToolslEquipmentlProcedures Needed: '

ES-O.1 Reference Title Rev No.

ES-O.1 Reactor Trip Response 30 READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM. I will provide initiating cues and reports on other actions when directed by you. When you complete the task successfully, the objective for this job performance measure will be satisfied. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

1. Unit has tripped.
2. Transition to ES-O.1 has been performed.

INITIATING CUES:

You have been directed to stabilize the unit in accordance with ES-O.1 , beginning at step 1.

Notify the SRO when the unit is stable

JPM 8 .1.g Page 5 of 9 Rev. 0 Job Perfo rmance Checkl ist:

STEP/STANDARD SAT/UNSAT

( Note:

Applicant may take action re lated to cri tica l steps prior to reaching req u ired steps by use of the E8-0 .1 Handout.

STEP 1.: Obtain the appropriate procedure . - SAT

- UNSAT STANDARD: Ope rator obtains a copy of ES-O.1.

Start Ti me_ _

STEP 2 .: [1] M ON ITO R 8 1N O T a ct uated: - SAT

- UNSAT

  • 81 A CTUATED p e rm iss ive DAR K [M-4A, D4 ]

STANDARD : Determines SI is NOT actuated by observing annunciator M-4A-D4 perm issive is dark STJ;;P 3.: [2] VE R IFY genera tor b re a ke rs OP E N . - SAT

- UNSAT STANDARD: Verifies generator breakers open by observing green lights on 1-M-1 benchboard .

STEP 4.: [3] M ON ITOR RCS temperatures: - SAT

- UNSAT

  • R CPs Runn ing: CH ECK T -avg stable at or tr e nd ing to between 547° F a nd 5 5 2 °F.

STANDARD: Determines T-avg is stable at or trending to between 547° F and 5 52° F .

(

JPM B.1 .g Page 6 of 9 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

( STEP 5. [4] MONITOR feedwater status: - SAT T-avg less than 550 °F . UNSAT

  • MFW regulating valves CLOSED.
  • MFW regulating bypass valve controller outputs ZERO.
  • MFW isolation valves CLOSED.
  • MFW pumps TRIPPED.
  • Total feed flow to SIGs greater than 440 gpm .

STANDARD: Determines Tavg is NOT less than 550°F and goesto step 5.

STEP 6.: [5] CHECK if emergency boration is required: - SAT

[aJ VERI FY all control rods fully inserted: - UNSAT

  • Rod bottom lights LIT
  • Rod position indicators less than or equal to 12 steps.

STANDARD: Determines All rod Bottom lights are illuminated.

STEP 7.: [b] MONITOR RCS temperature: - SAT UNSAT

  • T -avg greater than 540°F if any RCP running -

STANDARD: Determines T-avg is approximately 551 °F STEP 8.: [6] ANNOUNCE reactor trip USING PA system. - SAT

- UNSAT STANDARD: Announces reactor trip over PA system

(

JPM 8.1.g Page 7 of 9 Rev. 0 Job Performance Checklist:

STEP/STANDARD SAT/UNSAT

( STEP 9.: [7] MONITOR pressurizer level control: - SAT

- UNSAT

  • C HEC K pressurizer level greater than 17%.
  • V ER IFY cha rging IN SERVICE.
  • V ERIFY letdown IN SERVICE.
  • C HEC K pressu rize r level trending to 25% (normal range 20% to 30%).

STANDARD: Determines Charging and Letdown are in service and PZR level is >17%

and trending to 25%.

STEP 10.: [8] MONITOR pressurizer pressure control: - SAT UNSAT

  • Pressurizer pressure greater than 1870 psig. -
  • Pressurizer pressure stable at or trending to 2 23 5 psig (normal range 221 0 psig to 22 6 a psig).

STANDARD: Deterrnines PZR pressure> 1870but NOT trending toward 2210-2260 psig.

EVALUATOR NOTE: JPM steps 11 ,12 and 13 are from procedure steo 8 RNO STEP 11 .: IF pressure less than 2235 psig and dropping, THEN - SAT PERFORM the following:

_ UNSAT

  • ENSURE pressurizer PORVs CL OSE D. Critical Step
  • ENS URE spray valves C LO SED.
  • IF spray valve(s) CANNOT be closed, THEN STOP RCP s #1 and 2.
  • IF pressurizer pressure continues to drop, TH EN STO P additional RCPs as necessary.
  • ENSURE all pressurizer heaters ON .

STANDARD: Stops Number 1 Rep by rotating handswitch counter-clockwise.

(

JPM B.1. g Page 8 of 9 Rev. 0 Job Performance Checklist:

( STEP 12.:

STEP/STANDARD IF pressure less than 2235 psig a nd dropping, THEN SAT/UNSAT PERFORM the following: - SAT

- UNSAT

  • ENSURE pressurizer PORVs CLOSED.
  • ENSURE spray valves CLOSED . Critical Step
  • IF spray valve(s) CANNOT be closed , THEN STOP RCPs #1 and 2.
  • IF pres surizer pressure continues to drop, THEN STOP addition al RCPs as necessary.
  • ENSURE all pressurizer heaters ON.

STANDARD: Stops Number 2 RCP by rotating handswitch counter-clockwise, if candidate determ ines that RCSpressure continues to drop, additional RCPs may be stopped.

STEP 13.: IF pressure less than 2235 psig and dropping, THEN PERFORM the following : - SAT

- UNSAT

  • ENSURE pressurizer PORVs CLOSED.
  • ENSURE spray valves CLOSED. Critical Step
  • IF spray valve(s) CANNOT be closed, THEN STOP RCPs #1 and 2.
  • IF pressurizer pressure continues to drop, THEN STOP add itional RCP s as necessary.
  • . ENSURE all pressurizer heaters ON.

I STANDARD: Manually energized PZR heater Bank D by rotating handswitch clockwise.

End of JPM

Page 9 of 9 Rev . 0 CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

(

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you .

INITIAL CONDITIONS:

Unit has tripped .

Transition to ES-O.1 has been performed .

INITIATING CUES:

You have been directed to stabilize the unit in accordance with ES-O.1, beginning at step 1.

Notify the SRO when the unit is stable

(

TENNESSEE VALLEY AUTHORITY SEQUOYAH NUCLEAR PLANT EOI PROGRAM MANUAL EMERGENCYSUBPROCEDURE ES-0.1 REACTOR TRIP RESPONSE Revision 30 QUALITY RELATED PREPARED/PROOFREAD BY: _ _..!o!...o...J~:::w..!~

D. A PORTER _

RESPONS IBLE ORGAN IZATION : ....;O~P!....!E:.!.RA=.!.T~IO~N!l:S'-- _

APPROVED BY:. ....l:.!.~..!=.b~.!...-

W 1. LEARY _

EFFECTIVE DATE: 08101/2005 REVISION DESCRIPTION: Added new step which checks generator PCBs open. This step is being relocated from E-Q Step 3 in conjunction with incorporation of E-OA. Revised step 11 .b to provide details on placing steam dumps in pressure mode.

This procedure has a handout page (2 copies) and foldout page.

SQN REACTOR TRIP RESPONSE ES*O.1 IRev. 30 FOLDOUT PAGE SI ACTUATION CRITERIA IF either of the following conditions occurs:

  • RCS subcooiing based on core exit TICs less than 40 of OR
  • Pressurizer level CANNOT be maintained greater than 5%,

THEN ACTUATE SI and GO TO E-D, Reactor Trip or Safety Injection .

EVENT DIAGNOSTICS IF both trains of shutdown boards deenergized, THEN GO TO ECA-D.O, Loss of All AC Power.

TANK SWITCHOVER SETPOINTS IF CST level less than 5%.

THEN ALIGN AFW suction to ERCW.

Page 1a of 15

SQN REACTOR T RIP RESPONSE ES-0.1

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Rev. 30 I

HANDOUT Page 1 of 2 STEP ACTION IF RCS subcooling based on core exit TICs less than 40'F FOP OR Pressurizer level CANNOT be maintained greater than 5%,

THEN ACTUATE SI and GO TO E-O, Reactor Trip or Safety Injection.

IF CST level less than 5%,

FOP THEN ALIGN AFW suction to ERCW.

1. MONITOR SI NOT actuated:
3. MONITOR RCS temperatures stable at or trending to between 547"F and 552 'F.

3.c. (if RCS temperature continues to drop)

RNO

  • CONTROL total feed flow to minimize RCS cooldown .
  • MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10% in at least one S/G.
4. MONITOR feedwater status : (verify FVIII when T-avg less than SSO°F) 5.b. MONITOR RCS temperatures greater than 540°F.
7. MONITOR pressurizer level control: (pressurizer level greater than 17%)

7.a. (if pzr level less than 17%)

RNO 3) CONTROL charging to restore pressurizer level greater than 17%.

4) WHEN pressurizer level greater than 17%,

THEN OPERATE pressurizer heaters as necessary.

7.c.. (if letdown not in service)

RNO WHEN charging established AND pressurizer level greater than 17%,

THEN ESTABLISH letdown.

7 .d. (if pzr level is NOT trending to 25%)

RNO CONTROL charging and letdown to maintain pressurizer level at 25%

(normal range 20% to 30%).

8. MONITOR pressurizer pressure control : (pzr pressure greater than 1870 psig and stable at or trending to 2235 psig) a.b.2) (if pzr pressure greater than 2235 psig and rising)

RNO CONTROL pressure.

9. MA INTAIN SlG narrow range levels: (between 10% and 50%)

9.a. (if SIG levels less than 10%)

RNO MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10% .

Page 1b of 15

SQN REACTOR TRIP RESPONSE IES-0.1 Rev. 30 HANDOUT Page 2 of 2 STEP ACTION 12.b.2). (if NO RCP can be started)

RNO MONITOR natural circulation.

13. MONITOR if source range channels should be reinstated :

(IRM flux less than 10. 4 % power)

15. MAINTAIN stable plant conditions:
a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
b. Pressurizer level at 25% (normal range 20 % to 30%)
c. S/G narrow range levels between 10% and 50%
d. RCS temperature at 547"F (between 540'F and 550'F)

Page 1c of 15

SQN REACTOR TRIP RESPONSE ES-0.1

_ __ _...L-IRev. 30 HANDOUT Page 1 of 2 STEP ACTION IF RCS subcooling based on core exit TICs less than 40"F FOP OR Pressurizer level CANNOT be maintained greater than 5%,

THEN ACTUATE SI and GO TO E*O, Reactor Trip or Safely Injection.

IF CST level less than 5%,

FOP THEN ALIGN AFW suction to ERCW.

1. MONITOR SI NOT actuated:
3. MONITOR RCS temperatures stable at or trending to between 547"F and 552"F.

3.c. (if RCS temperature continues to drop)

RNO

  • CONTROL total feed flow to minimize RCS cooldown .
  • MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10% in at least one S/G.
4. MONITOR feedwater status: (verify FWl when T*avg less than 550"F) 5.b. MONITOR RCS temperatures greater than 540"F.
7. MONITOR pressurizer level control : (pressurizer level greater than 17%)

7.a. (if pzr level less than 17%)

RNO 3) CONTROL charging to restore pressurizer level greater than 17%.

4) WHEN pressurizer level greater than 17%,

THEN OPERATE pressurizer heaters as necessary .

7.c. (if letdown not in service)

RNO WHEN charging established AND pressurizer level greater than 17%,

THEN ESTABLISH letdown .

7.d. (if pzr level is NOT trending to 25%)

RNO CONTROL charging and letdown to maintain pressurize r level at 25%

(normal range 20% to 30%).

8. MONITOR pressurizer pressure control : (pzr pressure greater than 1870 pslg and stable at or trending to 2235 psig) 8.b.2) (if pzr pressure greater than 2235 psig and rising)

RNO CONTROL pressure.

9. MAINTAIN SIG narrow range levels : (between 10% and 50%)

9.a. (if S/G levels less than 10%)

RNO MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10%.

Page 1d of 15

SQN REACTOR TRIP RESPONSE I ES*0.1 Rev. 30 HANDOUT Page 2 of2 STEP ACTION 12.b.2). (if NO RCP can be started)

RNO MONITOR natural circulation.

13. MONITOR if source range channels should be reinstated:

(IRM flux less than 10. 4 % power)

15. MAINTAIN stable plant conditions:
a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
b. Pressurizer level at 25% (normal range 20% to 30%)
c. SIG narrow range levels between 10% and 50%
d. RCS temperature at 547°F (between 540°F and 550°F)

Page 1e of 15

SQN REACTOR TRIP RESPONSE ES-O.1 Rev. 3D


I 1.0 PURPOSE This procedure provides the necessary Instructions to stabilize and control the plant following a reactor trip WITHOUT a safety injection.

2.0 SYMPTOMS AND ENTRY CONDITIONS 2.1 ENTRY CONDITIONS E-O Reactor Trip or Safety Injection

  • SI NOT actuated and NOT required 3.0 OPERATOR ACTIONS Page 2 of 15

SQN REACTOR TRIP RESPONSE IES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE II RESPONSE NOT OBTAINED NOTE This procedure has a foldout page.

1. MONITOR 81 NOT actuated: IF SI actuated, THEN

[M-4A, D4] Injection.

2. VERIFY generator breakers OPEN. OPEN generator breakers .

Page 3 of 15

SQN REACTOR TRIP RESPONSE IES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE I IRESPONSE NOT OBTAINED

3. MONITOR RCS temperatures: IF temperature less than 547 °F and dropping,
  • IF any RCP running, THEN THEN PERFORM the following:

CHECK T-avg stable at or trending to

a. ENSURE steam dumps and between 547 °F and 552°F.

atmospheric reliefs CLOSED.

OR b. ENSURE S/G blowdown isolation valves CLOSED.

  • IF RCPs stopped , c. IF cool down continues, THEN THEN CHECK T-cold stable at or trending PERFORM the following:

to between 547 °F and 552°F.

1) CONTROL total feed flow USING EA-3-8 , Manual Control of AFWFlow.
2) MAINTAIN total feed flow greater than 440 gpm UNTIL narrow range level greater than 10%

in at least one S/G.

3) DEPRESS RESET on MSR control panel.
4) IF any MSR temp control valve fails to close ,

THEN ISOLATE HP steam to MSRs.

d. IF cool down still continues, THEN CLOSE MSIVs and bypass valves.

IF temperature greater than 552 °F and rising, THEN

  • DUMP steam to condenser.

OR DUMP steam USING atmospheric reliefs.

.~

Page 4 of 15

SQN REACTOR TRIP RESPONSE I ES-O.1

~ R_e_v_._3_0 _

ISTEP I IACTION/EXPECTED RESPONSE I IRESPONSE NOT OBTAINED

4. MONITOR feedwater status:
a. T-avg less than 550°F. a. GO TO Step 5.

~

b. MFW regulating valves CLOSED. b. CLOSE valves.
c. MFW regulating bypass valve controller c. CLOSE valves.

outputs ZERO.

d. MFW isolation valves CLOSED. d. CLOSE valves.
e. MFW pumps TRIPPED. e. TRIP MFW pumps.
f. MFW flow ZERO . f. CLOSE feedwater heater isolation MOVs as necessary.

OR D1SPATCH personnel to isolate MFW regulating and regulating bypass valves USING EA-3-12, Local Isolation of Main Feedwater.

g. Total feed flow to S/Gs g. ESTABLISH AFWflow greater than 440 gpm. as necessary.

IF AFW flow CANNOT be established, THEN ESTABLISH main feedwater flow USING EA-2-2, Establishing Secondary Heat Sink Using Main Feedwater or Condensate System.

Page 5 of 15

SQN REACTOR TRIP RESPONSE I~:~~*~O .1 ISTEP IIACTION/EXPECTED RESPONSE II RESPONSE NOT OBTAINED

5. CHECK if emergency boration is required:
a. VERIFY all control rods fully inserted: a. IF any of the following conditions exists:

Rod bottom lights LIT

  • two or more RPls indicate
  • greater than 12 steps Rod position indicators less than or equal to 12 steps. OR
  • two or more control rod positions CANNOT be determined, THEN EMERGENCY BORATE USING EA*68-4, Emergency Boration.
b. MONITOR RCS temperature: b. EMERGENCY BORATE as necessary to maintain shutdown
  • T-avg greater than 540* F margin USING EA-68-4, Emergency if any RCP running Boration .

OR

  • T-cold greater than 540*F if all Reps stopped.
6. ANNOUNCE reactor trip USING PA system.

Page 6 of 15

SQN REACTOR TRIP RESPONSE IES-O.1

_ _ _ _ _ _ _ _ _ _ _ ....;.R..:,.e_v ._3_0 _

ISTEP II ACnONIEXPECTED RESP ONSE II RESPONSE NOT OBTAINED

7. MONITOR pressur izer level control:
a. CHECK pressurizer level a. PERFORM the following :

greater than 17%.

1) ENSURE normal and exces s letdown ISOLATED.
2) ENSURE pressurizer heaters OFF.
3) CONTROL charging to rest ore pressurizer level greater than 17%.
4) WHEN pressurizer leve l greater than 17%,

THEN OPERATE pressurizer heaters as necessary.

b. VERIFY charging IN SERVICE. b. ESTABLISH charging USING EA-62-5. Establishing Normal Charging and Letdown.
c. VERIFY letdown IN SERVICE. c. WHEN charging established AND pzr level greater than 17%,

THEN ESTABLISH letdown USING EA-62-5.

Establishing Normal Charging and Letdown.

d. CHECK pressu rizer level d. CONTROL charg ing and letdown trend ing to 25% to maintain pressurizer level at 25%

(norma l range 20% to 30%). (normal range 20% to 30%).

Page 7 of 15

L-SQN

.....L..

REACTOR TRIP RESPONSE I ES -O.1 Rev. 30 I.

ISTEP IIACTIONfEXPECTED RESPONSE IIRESPONSE NOT OBTAINED

8. MONITOR pressurizer pressure control:
a. Pressurizer pressure a. ENSURE SI ACTUATED.

greater than 1870 psig.

GO TO E-O, Reactor Trip or Safely Injection.

b. Pressurizer pressure b. IF pressure less than 2235 psig stable at or trending to 2235 psig and dropping, (normal range 2210 psig to THEN 2260 psig). PERFORM the following:
1) ENSURE pressurizer PORVs CLOSED.

IF pressurizer PORV CANNOT be closed, THEN CLOSE its block valve.

2) ENSURE spray valves CLOSED .

IF spray valve(s) CANNOT be closed, THEN STOP RCPs #1 and 2.

IF pressurizer pressure continues to drop, THEN STOP additional Rep as necessary.

3) ENSURE all pressurizer heaters ON.

(step continued on next page)

Page 8 of 15

SQN REACTOR TRIP RESPONSE IES-0.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE IIRESPONSE NOT OBTAINED

8. b. (continued) IF pressure greater than 2235 psig and rising, THEN PERFORM the following:
1) ENSURE all pressurizer heaters OFF.
2) CONTROL pressure USING normal spray.

IF normal spray NOT available AND letdown in service, THEN CONTROL pressure USING EA-62-4, Establishing Auxiliary Spray.

IF normal spray NOT available AND letdown NOT in service, THEN ENSURE pressure controlled with pressurizer PORV(s).

9. MAINTAIN SIG narrow range levels:
a. Greater than 10%. a. MAINTAIN total feed flow greater than 440 gpm UNTIL level greater than 10%

in at least one S/G.

b. Between 10% and 50%. b. IF level in any SIG continues to rise, THEN ENSURE feed flow STOPPED to that SlG .

Page 9 of 15

SQN REACTOR TRIP RESPONSE I ES-0.1

_ _ _----' R_e_v_,3_0 _

ISTEP' IAcnONIEXPECTED RESPONSE IIRESPONSE NOT OBTAINED

10. VERIFY AC busses ENERGIZED PERFORM the following :

from start busses .

a. ENSURE diesel generators supplying shutdown board loads as necessary:

CCPs

  • AFWpumps.
  • Thermal barrier booster pumps.

Pressurizer heaters A-A and B-B.

b. ATTEMPT to restore offsite power USING EA-202-1 , Restoring Off-Site Power to 6900V Shutdown Boards.
c. ENSURE control air compressors A and B started USING EA*32*2, Establishing Control and Service Air.

Page 10 of 15

SQN~

~I.-

REACTOR TRIP RESPONSE IES-O.1 R_8_V_._3_0 _

- -IIACTION/EXPECTED RESPONSE ISTEP I IRESPONSE NOT OBTAINED CAUTION Arming steam dumps In pressure mode with demand signal present could result in rapid RCS cooldown.

11, DETERMINE if steam dump to condenser available:

a. CHECK condenser AVAILABLE: a, USE atmospheric reliefs In AUTO and set for 84% (1005 psig).
  • c-s CONDENSER INTERLOCK permissive LIT [M-4A, E6l IF atmospheric reliefs NOT functioning in AUTO,
  • At least one Intact S/G MSIV THEN OPEN, USE manual control of atmospheric reliefs, IF local control of atmospheric reliefs is necessary, THEN DISPATCH personnel to dump steam USING EA-1-2, Local Control of SIG PORVs.

GO TO Note prior to Step 12.

b. PLACE steam dumps in STEAM PRESS mode:
1) PLACE steam dumps in OFF.
2) ENSURE steam dumps in steam pressure mode ,
3) ENSURE zero output (demand).
4) PLACE steam dumps in ON.
5) ADJUST steam dump controller setpoint to 84% (1005 psig) in AUTO, Page 11 of 15

SQN REACTOR TRIP RESPONSE IES-O.1

---J~R-e-v-.-3-0---

ISTEP IIACTION/EXPECTED RESPONSE II RESPONSE NOT OBTAINED NOTE Loop 2 RCP and associated spray valve will provide adequate spray flow for RCS pressure control. If Loop 2 is not available, all three remaining RCPs may be required to ensure adequate spray flow.

12 CHECK RCP #2 RUNNING. PERFORM the following:

a. IF NO RCPs running, THEN ENSURE all RCS dilution STOPPED.
b. ATIEMPTto start RCP(s) to provide normal pzr spray :
1) ESTABLISH conditions for starting RCP(s) USING EA-68-2, Establishing RCP Start Conditions.
2) IF RCP start conditions established, THEN START RCP #2 (if available)

OR RCPs #1, 3, and 4.

IF NO RCP can be started, THEN MONITOR natural circulation USING EA-68-6, Monitoring Natural Circulation Conditions.

IF natural circulation CANNOT be verified, THEN RAISE steam dump rate.

Page 12 of 15

SQN REACTOR TRIP RESPONSE I ES-O.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE IIRESPONSE NOT OBTAINED

13. MONITOR if source range channels

-should be reinstated:

a. CHECK intermediate range flux a. ~O TO Step 14-.

less than 10* 4 % power on operable channels.

b. CHECK source range channels b. REINSTATE source range channels REINSTATED . by simultaneously placing both SRM TRIP RESET-BLOCK switches to RESET position . [M-4]

C. SELECT one SRM and one IRM on NR-45 recorder.

d. ENSURE audio count rate operation.
e. RESET shutdown monitor alarm setpoints. [M-13]
f. WHEN shutdown monitor ALARM LEDs dark AND HIGH FLUX AT SHUTDOWN bistable lights dark, THEN PLACE HIGH FLUX AT SHUTDOWN alarm block switches in NORMAL.

[M-13]

Page 13 of 15

SQN

_ _ _ _..1.

[ REACTOR TRIP RESPONSE IES-O.1 R_e_v_,3_0 _

ISTEP II ACTION/EXPECTED RESPONSE IIRESPONSE NOT OBTAINED

14. SHUT DOWN unnecessary plant equipment:
  • REFER TO O-GQ-12, Realignment Of Secondary Equipment Following ReactorlTurbine Trip.
15. MAINTAIN stable plant conditions:
a. Pressurizer pressure at 2235 psig (normal range 2210 psig to 2260 psig)
b. Pressurizer level at 25%

(normal range 20% to 30%)

c. SIG narrow range levels between 10% and 50%
d. ReS temperature at 547°F (between 540°F and 550°F) :
  • T-avg if any Rep running OR

.* T-cold if all Reps stopped.

16. PERFORM EA-0-9, Post Trip Administrative Requirements and Recovery Actions.

Page 14 of 15

SQN REACTOR TRIP RESPONSE IES-0.1 Rev. 30 ISTEP II ACTION/EXPECTED RESPONSE I IRESPONSE NOT OBTAINED

17. DETERMINE if natural circulation cooldown is required:
a. CHECK at least one RCP RUNNING. a. IF plant cooldown required with NO RCP available, THEN GO TO ES-0.2, Natural Circulation

--II Il_- -

Cooldown.

DO NOT CONTINUE this procedure UNTIL at least one RCP restarted .

b. CHECK at least one AFW pump b. DO NOT CONTINUE this procedure AVAILABLE. UNTIL at least one AFW pump AVAILABLE.

~

c. SELECT appropriate procedure:
  • O*GO-6, Power Reduction from 30% Reactor Power to Hot Standby (if maintaining hot standby)

OR

  • 0-GO-7, Unit Shutdown from Hot Standby to Cold Shutdown OR
  • other appropriate procedure as determined by Shift Manager or TSC (if manned).

--IIIIl_--

d. GO TO appropriate plant procedure.

END Page 15 of 15

Page 12 of 12 Rev. 2 CANDIDATE CUE SHEET

( (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

DIRECTION TO TRAINEE:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM, including any required communications. I will provide initiating cues and reports on other actions when directed by you. Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you.

INITIAL CONDITIONS:

Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to repair a leak on the #1 Steam Line.

Res boron is 1400 ppm and the previous shift determined that B Train RHR boron concentration is 1450 ppm.

Shutdown margin required boron concentration is 1200 ppm.

A Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.

B Train RHR has been checked out locally by the Auxiliary Bldg. AUO and is ready for service.

INITIATING CUES:

You are the Unit 1 OATC and the SRO has directed you to place B Train RHR in service and take A Train RHR out of service.

Align B Train injection flowpath to loops 1 & 4.

Notify the SRO when you have B Train RHR in service.

(

J PM B.1.h Page 1 of 12 Rev . 2

(

SEQUOYAH NUCLEAR PLANT JOB PERFORMANCE MEASURE B.1.h JPM 152 Swap RHR Pumps (A Train to B Train)

With Level in the Pressurizer

(

Original Signatures on File PREPAREDI REVISED BY: Datel VALIDATE D BY:

  • Datel APPROV ED BY: Datel (Ope rations Traini ng Manager)

CONCU RRED: ** Datel (Operations Representat ive)

  • Validation not required for minor enhancements, proced ure Rev changes that do not affect the JPM , or individual step changes that do not affect the flow of the JPM.
    • Operations Concurrence requi red for new JPMs and changes that affect the flow of the JPM (if not driven by a procedure revision) .

(

JPM B.1.h Page 2 of 12 Rev. 2

( NUCLEAR TR AINING REVISIONIUSAGE LOG REVISION DESCRIPTION OF V DATE PAGES PREPAREDI NUMBER REVISION AFFECTED REVISED BY:

0 New Y 10/14/98 All JP Kearney penl ink 0-SO 1 Rev change only N 9/21 /99 4 SR Taylor penlink 0-SO 1 Rev change only N 8/29/00 4 SR Taylor penlink Updated references Y 2/5/01 2,4 GS Poteet pen/ink Updated reference N 12/10101 3 Lacy Pauley 1 Updated to current revision and simulator Y 8/25/04 All MG Croteau commands. Verify new IC-2 satisfactory.

2 Updated to current revision of procedure. N 2/5107 All RH Evans v - Specify if the JPM change will require another vaiidation (Y or N).

See cover sheet for criteria.

JPM B.1.h Pa ge 3 of 12 Rev. 2 SEQUOYAH NUCLEAR PLANT

( RO/SRO JOB PERFORMANCE MEASURE T as k: Swap RHR Pumps (A Train to B JAIT A task # : 0050030101 (RO)

Train ) with Level in the 0050080101 (RO)

Pressu rizer KiA Ratings:

005K4.03 (2.9/3.2 ) 005A1.01 (3.5/3.6) 005A4 .02 (3.4/3.1) 005K4.10 (3.1/3.1) 005A1.02 (3.3/3.4) 005A4 .01 (3.6/3.4)

Task Standard:

'8" Train RHR is placed in service inject ing to Loops 1 & 4.

Evaluation Method : x _ In-Plant Simulator _...L:>.._ _

==~===================================================== === = == = == == == == = = = = = == = = = =

Performer:

NAME Start time _

Performance Rating: SAT UNSAT Performance Time Finish time _

Evaluator: _ _ __ _ _ _ _ ----1 _

SIGNATURE DATE

-( ~= = = = = = = == === = = = = = = == = = ========== ==================== == = == = ===== = = = ======= == = = = = == = =

COMMENTS

JPM B.1.h Page 4 of 12 Rev. 2 SPECIAL INSTRUCTIONS TO EVALUATOR:

( 1. Sequenced steps identified by an "s"

2. Initialize IC-2. Ensure A Train RHR is in service with flow aligned through FCV-63-93 to Loops 2 & 3.
3. A Console operator will be required at steps 4, 8, & 10.
4. An extra operator will be required to acknowledge alarms and monitor S/G levels, RCS temp, RCS press ..
5. Any UNSAT requires comments
6. Ensure operator performs the following required actions for SELF-CHECKING;
a. Identifies the correct unit, train , component, etc.
b. Reviews the intended action and expected response.
c. Compares the actual response to the expected response.

Validation Time: CR. 11 minutes Local _

Tools/Equipment/Procedures Needed:

0-SO-74-1 , Section 8.

3.2 REFERENCES

Reference Title Rev No.

0-SO-74-1 Residual Heat Removal S stem 61

=================================================================

READ TO OPERATOR Directions to Trainee:

I will explain the initial conditions, and state the task to be performed. All control room steps shall be performed for this JPM . I will provide initiating cues and reports on other actions when directed by you.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Ensure you indicate to me when you understand your assigned task. To indicate that you have completed your assigned task return the handout sheet I provided you and to indicate completion of your answer to a knowledge question return the written copy of the question to me.

INITIAL CONDITIONS:

1. Unit 1 had been in Mode 5 for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to repair a leak on the #1 Steam Line.
2. RCS boron is 1400 ppm and the previous shift determined that B Train RHR boron concentration is 1450 ppm.
3. Shutdown margin required boron concentration is 1200 ppm.
4. A Train RHR pump needs to be shutdown to allow MEG to add oil to the motor.
5. B Train RHR has been checked out locally by the AUXiliary Bldg. AUO and is ready for service.

INITIATING CUES:

You are the Unit 1 OATC and the SRO has directed you to place B Train RHR in service and take A Train RHR out of service. Align B Train injection flowpath to loops 1 & 4.

Notify the SRO when you have B Train RHR in service.

JPMB.1 .h Page 5 of 12 Rev. 2 Job Performance Checklist:

( STEP/STANDARD

- SAT/U NSAT STEP 1.: Obtain copy of 0-SO-74-1 and determ ine appropriate section - SAT

- UNSAT STAN DARD: Operator obtains a copy of 0-SO-74-1 and goes to Section 8.3.2.

Start Time__

COMM ENTS:

STEP 2.: [1) IF adjustment is required on CCS flow throug h RHR Hxs, T HEN - SAT ENSURE [FCV-70-153) RHR Hx B CCS outlet is THROTTLED.

- UNSAT NOTE: Ope rator may deci de to keep FCV-70-153 Open STANDAR D: Operato r ensures HS-70-153 has a RED & GREEN light LIT with fiow indicated on 0-M-27A.

COMMENTS:

I c STEP 3.: [2) ENSURE [FCV-74-28) RHR Hx B Outlet is CLOSED. - SAT

- UNSAT STANDARD: Operator ensures FCV-74-28 RHR Hx B Outlet CLOSED, FIC-74-28 @

100%.

90MM ENTS:

STEP 4.: [3) STAR T RHR Pump B-B with [HS-74-20A). - SAT

- UNSAT STANDARD : Operator starts 1B-B RHR Pump, verifies RED light LIT on HS. This step is criti cal to place th e B t rai n RHR Pu mp in serv ice. Critical Step COMM ENTS:

JPM B.1.h Page 6 of 12 Rev. 2 Job Performance Checklist:

( STEP/STAN DARD SAT/UNSAT STEP 5.: [4] VERIFY [FC V*74*24] RHR Pump B-B miniflow OPENS - SAT OR - UNSAT greater than 500 gpm in indicated on FI-74-24 .

Cue: IF dispatched: FI*74*24 indicates -550 gpm.

STANDARD: Operator verifies FCV-74-24 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator F[-47-24.

COMMENTS:

STEP 6.: [5] IF aligning Train B RHR cooling to loops 1 and 4, THEN PERFORM the - SAT following:

[aJ ENSURE [FCV-63-94] OPEN. - UNSAT

[b] ADJU ST [FCV-74-28] to establish flow from train B RHR.

[cJ ADJUST [FCV-74-16] AND [FCV-74-32] to reduce Train A RHR flow.

STANDARD: Operator performs the following:

Critical Step

  • ENSURE FCV*63*94 OPEN
  • ADJUS T FCV*74*28 RHR Hx B Outlet OPEN, using FIC-74-28 CLOSE FCV-74-16 RHR Hx A Outlet, place FIC-74-16 @ 0%. This step is criti cal to align the B train RHR Pump flow path to the RCS.

COMMENTS:

l

JPM B.1.h Page 7 of 12 Rev. 2 Job Performance Checklist:

( STEP/STANDAR D SAT/UNSAT STEP 7.: [d] VERIFY FCV-74-12 RHR Pump A-A miniflow OPENS - SAT OR - UNSAT greater than 500 gpm in indicated on FI-74-12.

Cue: IF dispatched: FI-74-12 indicates -550 gpm.

STANDARD: Operator verifies FCV-74-12 is open by Red light LIT on handswitch or checks with AUO locally to verify >500 gpm flow indicated on local flow indicator FI-47-12.

COMMENTS:

STEP 8.: [e] CLOSE [FCV-74-33] RHR Hx A Outlet. - SAT

- UNSAT STANDARD: Operator closes FCV-74-33. This step is critical to isolate A train Critical Step c COMMENTS:

RHR from B train RHR.

ST EP 9.: [f] ENSURE [FCV-74-35] RHR Hx B Outlet OPEN. - SAT STANDARD: Operator ensures FCV*74*35 RHR Hx B Outlet OP EN. - UNSAT COMMENTS:

JP M B.1.h Page 8 of 12 Rev. 2 Job Performance Checklist:

( STEP/STANDARD SAT/UNSAT STEP 10.: [9] OPEN [VLV*74-531] RHR Hx B to Letdown Hx. - SAT NOTE: Console operator needs to modify remote function RHR04 to 100. - UNSAT Cue: Open HCV*74*531 as an AUO local/y.

STANDARD: Operator directs an AUO to OPEN HCV-74-531 RHR Hx B to Letdown Critical Step Hx. This step is crilicalto align B train RHR Pump for CVCS letdown.

COMMENTS:

STEP 11.: [h] STOP RHR Pump A-A with [HS-74-10A]. - SAT

- UNSAT STANDARD: Operator stops RHR pump 1A*A, verifies GREEN light on handswitch.

This step is critical to remove the A train RHR Pump from service. Cr itical Step CO MM ENTS~

STEP 12.: [i] OPEN [HCV-74 -37] RHR Hx B Bypass. - SAT NOTE: Console operator needs to modify remote fu nction RHR07 to 100. - UNSAT Cue: Open HCV*74*37 as an AUO locally (including IV).

Cri tical Step STANDARD: Operator directs an AUO to OPEN HCV*74-37 RHR Hx B Bypass.

This step is cr it ical to align the B train RHR HX bypass valve so operator can control HX outlet temperature.

COMMENTS:

(

JP M B.1.h Page 9 of 12 Rev. 2 Job Performance Checklist:

( STEP/STANDARD SAT/UNSAT STEP 13.: Ul CLOSE IHCV-74-36! RHR Hx A Bypass. - SAT NOTE: Console operator needs to modify remote fu nction RHR06 to O. - UNSAT Cue: Close HCV-74-36 as an AUO locally (including IV).

Critical Step STANDARD: Operator directs an AUO to CLOSE HCV-74-36 RHR Hx A Bypass.

Th is step is critical to isolate the A train RHR HX bypass valve.

COMMENT S:

STEP 14.: [k] CLOSE [HCV-74-530] RHR Hx A-A to Letdown Hx. - SAT NOTE : Console operator needs to modify remote function RHR03 to O. - UNSAT Cue: Close HCV-74*530 as an AUO locally (including IV).

STANDARD: Operator directs an AUO to close HCV-74-530. This step is critical to isolate the A train RHR flow path to CVCS letdown.

COMMENTS:

STEP 15.: [I] ENSURE [FCV*63-93] CLOSED. - SAT

- UNSAT STANDARD: Operator ensures FCV-63-93 CLOSED. This step is critical to isolate Critical Step the A train RHR RCS injection low path.

.COMMENTS :

(

JPM B.1.h Page 10 of 12 Rev . 2 Job Performance Checklist:

( STEP/STANDARD SAT /UNSAT STEP 16.: [6] IF aligning RHR cooling to loops 2 and 3, THEN PERFORM the - SAT following:

- UNSAT NOTE: Step is NA'd, initiating Cues direct alignment to loops 1 &4.

STANDARD: Ope rator NA's the step.

COMMENTS:

STEP 17.: [7] THROTTLE one or both of the following to maintain desired cooling - SAT rate: (N/A if not throttled) :

- UNSAT FCV-74-28, RHR Hx B Outlet, FCV-74-32, RHR Hx Bypass.

Critical Step STAI\!DARD : Operator throttles open FCV-74-28 and/or FCV-74-32 to stabilize RCS temperature and estab lish RHR flowrates at approximately the same values that were present prior to the flowpath realignment. This step is critical to control RCS cooldown rate.

c COMMENTS:

I I STEP 18.~~] WHEN injection flow is > 1250 gpm, THEN VERIFY [FCV-74-24] RHR Pump B-B miniflow is CLOSED.

- SAT

- UNSAT STANDARD: Operator verifies FCV-74-24 closed, GREEN light LIT on handswitch .

COMMENTS:

JPM B.1.h Page 11 of 12 Rev . 2 Job Performance Checklist:

( STEP/STANDARD SAT/UNSAT STEP 19.: [9] IF cooling water is to be removed from Train A Hx, THEN - SAT CLOSE [FCV-70-1561. - UNSAT Cue: Lea ve cooling water aligned to A Train at its current fJowrate.

STANDARD: Operator NA's step.

COMMENTS:

STEP 20.: Notify U1 US that B train of RHR Is in service to loops 1&4 and A train of - SAT RHR has been removed from service.

- UNSAT STANDARD: None. Stop Time__

90MMENTS:

c End of JPM

(

SQN RESIDUAL HEAT 0-50-74-1

(

[---l--_ _---'------------'

Unit 1,2 REMOVAL SYSTEM Rev: 61 Page 132 of 204 Date _

8.3.2 Placing Train B in Service and Removing Train A from Service.

CAUTION CCS flow should be adjusted to provide adequate flow through the RHR Hx to prevent RHR Hx CCS outlet temperature from exceeding 145°F. The RHR Hx CCS outlet temperature alarm will come in a 115°F.

NOTE The following steps may require operators in both heat exchanger rooms and one outside the pump rooms.

[1] IF adjustment is required on CCS flow through RHR Hxs, THEN ENSURE [FCV-70-153] RHR Hx s ccs outlet is THROTTLED.

[2] ENSURE [FCV-74-28] RHR Hx B Outlet is CLOSED.

CAUTION 1 Failure to maintain shutdown cooling flow rate for an RHR pump at the maximum possible could result in reduced thrust bearing life.

[C.3]

CAUTION 2 If RHR pressure downstream of pumps exceeds 600 psig, then RHR discharge pressure must be reduced below 600 psig or RHR isolated from the RCS within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

NOTE RHR motor lower bearing oil level will increase after pump is started and may increase above sightglass. The presence of oil can be verified by a golden tint in sightglass.

[3] START RHR Pump B-B with [HS-74-20Al

[4] VERIFY [FCV-74-24] RHR Pump B-B miniflow OPENS OR greater than 500 gpm is indicated on FI-74-24.

SQN RESIDUAL HEAT 0-SO-74-1 REMOVAL SYSTEM

( 1,2 Rev: 61 Page 133 of 204 Unit _ Date _

8.3.2 Placing Train B in Service and Removing Train A from Service (Continued)

CAUTION 1 To reduce vibration across FCV*74-16 and FCV-74-28 (RHR Hx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.

CAUTION 2 Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74-531 OPEN) and on miniflow for > 10 minutes may result in pump damage due to one pump dead-heading. [C.2] [C.13]

NOTE Step 5[b] and [c] may be performed together to ensure continuous flow delivered to RCS.

[5] IF aligning Train B RHR cooling to loops 1 and 4, THEN PERFORM the following:

(

[a] ENSURE [FCV*63-94] OPEN.

[b] ADJUST [FCV-74-28] to establish flow from Train B RHR.

[c] ADJUST [FCV-74-16] AND [FCV-74-32] to reduce Train A RHR flow.

[d] VERIFY [FCV-74-12] RHR Pump A-A miniflow OPENS OR greater than 500 gpm is indicated on FI-74-24.

(

SQN RESIDUAL HEAT 0-SO-74-1

( 1,2 REMOVAL SYSTEM Rev: 61 Page 134 of 204 Unit _ Date _

8.3.2 Placing Train B in Service and Removing Train A from Service (Continued) tel CLOSE [FCV-74-331 RHR Hx A Outlet.

[f) ENSURE [FCV-74-35] RHR Hx B Outlet OPEN.

[g) OPEN [VLV-74-531] RHR Hx B to Letdown Hx.

1~ CV

[h) STOP RHR Pump A-A with [HS-74-10AJ.

[i) OPEN [HCV-74-37] RHR Hx B Bypass.

1~ CV

[j] CLOSE [HCV-74-36] RHR Hx A Bypass.

1~ CV

[k] CLOSE [VLV-74-530] RHR Hx A to Letdown Hx.

1" CV

[I] ENSURE [FCV-63-93] CLOSED.

(

SQN RESIDUAL HEAT 0-50-74-1

( REMOVAL SYSTEM Rev: 61 1,2 Page 135 of 204 Unit _ Date _

8.3.2 Placing Train B in Serv ice and Removing Train A from Service (Continued)

CAUTION 1 To reduce vibration across FCV-74-16 and FCV-74-28 (RHR Hx Outlet Valves), RHR must be aligned to only two cold legs with one train in service.

CAUTION 2 Operating RHR pumps in parallel (HCV-74-36 and HCV-74-37 OPEN OR 74-530 and 74-531 OPEN) and on miniflow for> 10 minutes may result in pump damage due to one pump dead-heading. [C.2) [C.13)

NOTE Step 6[d) and [e) may be performed together to ensure continuous flow delivered to RCS.

[6] IF aligning Train B RHR cooling to loops 2 and 3, THEN PERFORM the following:

[a) ENSURE [FCV-63-93) OPEN.

[b] ENSURE [FCV-74-33] RHR Hx A Outlet OPEN.

[c] ENSURE [FCV-74-35) RHR Hx B Outlet OPEN.

[d] A DJ UST [FCV-74-28) to establish Train B RHR flow.

[e] ADJUST [FCV-74-161 and [FCV-74-321 to reduce Train A RHR flow.

[f] VERIFY [FCV-74-12] RHR Pump A-A miniflow OPENS or greater than 500 gpm is indicated on FI-74-24.

[g) OPEN [VLV-74-5311 RHR Hx B to Letdown Hx.

( 1" CV

C~

N RESIDUAL HEAT 0-SO-74-1

( REMOVAL SYSTEM Rev: 61 1,2 Page 136 of 204 Unit _ Date _

8.3.2 Placing Train B in Service and Removing Train A from Service (Continued)

[h] STOP RHR Pump A-A with [HS-74-10A].

[i] OPEN [HCV-74-37] RHR Hx B Bypass.

st 1 cv

[j] CLOSE [HCV-74-361 RHR Hx A Bypass.

1" cv

[k] CLOSE [VLV-74*530] RHR Hx A to Letdown Hx.

st 1 cv c [I] ENSURE [FCV-63-94] CLOSED.

NOTE One or both of the valves in the next step may be throttled to maintain RCS at desired temperature.

[7] THROTTLE one or both of the following to maintain desired cooling rate (N/A if not throttled):

VALVE NO. FUNCTION INITIALS FCV-74-28 RHR Hx B Outlet FCV*74*32 RHR Hx Bypass

[8] WHEN injection flow is > 1250 gpm, THEN VERIFY [FCV-74-24] RHR Pump B-B miniflow is CLOSED.

[9] IF cooling water is to be removed from Train A Hx, THEN CLOSE [FCV 156].

( END OF TEXT