|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML060190574 | | | number = ML060190574 |
| | issue date = 01/19/2006 | | | issue date = 01/19/2006 |
| | title = 02/03/2006 - Notice of Meeting with Energy Northwest | | | title = Notice of Meeting with Energy Northwest |
| | author name = Johnson C E | | | author name = Johnson C |
| | author affiliation = NRC/RGN-IV | | | author affiliation = NRC/RGN-IV |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| MEETING WITH ENERGY NORTHWESTFACILITY:Columbia Generating Station DOCKET:50-397 DATE AND TIME:February 3, 20068:00 a.m.LOCATION:U.S. Nuclear Regulatory Commission Training Conference Room Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005PURPOSE:This is a public meeting between the NRC and Energy Northwestto discuss issues at the Columbia Generating Station. The issues to be discussed include lessons learned from licensee's review of the handling of service water pump shaft coupling failures at the facility, planned corrective actions from the review, and long termplans to ensure service water pump reliability and other equipmentreliability at the facility.CATEGORY 1:Members of the public are invited to observe the meeting and willhave the opportunity to communicate with the NRC after thebusiness portion of the meeting, but before the meeting is adjourned.The NRC provides reasonable accommodation to individuals withdisabilities where appropriate. If you need a reasonableaccommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC'smeeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.A telecommunications bridge will be available for the public. Callers will dial (800) 952-9677 to access the bridge for themeeting between the NRC and Energy Northwest . | | MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKET: 50-397 DATE AND TIME: February 3, 2006 8:00 a.m. |
| Energy Northwest-2-PARTICIPANTS:NRCB. Mallett, Regional Administrator, Region IVD. Chamberlain, Director, Division of Reactor Safety (DRS) | | LOCATION: U.S. Nuclear Regulatory Commission Training Conference Room Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 PURPOSE: This is a public meeting between the NRC and Energy Northwest to discuss issues at the Columbia Generating Station. The issues to be discussed include lessons learned from licensee's review of the handling of service water pump shaft coupling failures at the facility, planned corrective actions from the review, and long term plans to ensure service water pump reliability and other equipment reliability at the facility. |
| | CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned. |
| | The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. |
| | A telecommunications bridge will be available for the public. |
| | Callers will dial (800) 952-9677 to access the bridge for the meeting between the NRC and Energy Northwest . |
| | |
| | Energy Northwest PARTICIPANTS: NRC B. Mallett, Regional Administrator, Region IV D. Chamberlain, Director, Division of Reactor Safety (DRS) |
| A. Howell, Director, Division of Reactor Projects (DRP) | | A. Howell, Director, Division of Reactor Projects (DRP) |
| T. Vegel, Deputy Director, DRP C. Johnson, Chief, Project Branch A, DRP J. Clark, Chief, Engineering Branch 1 L. Smith, Chief, Engineering Branch 2 Z. Dunham, Senior Resident Inspector, DRP R. Cohen, Resident Inspector, DRP T. Farnholtz, Senior Project Engineer, DRP M. Brown, Project Engineer, DRPLICENSEED. Atkinson, Vice President, Nuclear GenerationS. Oxenford, Vice President, Technical Services A. Khanpour, General Manager, Engineering S. Boynton, Manager, Systems Engineering D. Coleman, Manager, Regulatory Programs G. Cullen, Supervisor, LicensingMEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 | | T. Vegel, Deputy Director, DRP C. Johnson, Chief, Project Branch A, DRP J. Clark, Chief, Engineering Branch 1 L. Smith, Chief, Engineering Branch 2 Z. Dunham, Senior Resident Inspector, DRP R. Cohen, Resident Inspector, DRP T. Farnholtz, Senior Project Engineer, DRP M. Brown, Project Engineer, DRP LICENSEE D. Atkinson, Vice President, Nuclear Generation S. Oxenford, Vice President, Technical Services A. Khanpour, General Manager, Engineering S. Boynton, Manager, Systems Engineering D. Coleman, Manager, Regulatory Programs G. Cullen, Supervisor, Licensing MEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 CEJ@nrc.gov cc: |
| | | J. V. Parrish (Mail Drop 1023) |
| CEJ@nrc.gov cc:J. V. Parrish (Mail Drop 1023) | | Chief Executive Officer Energy Northwest P.O. Box 968 Richland, WA 99352-0968 W. Scott Oxenford (Mail Drop PE04) |
| Chief Executive Officer Energy Northwest | | Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Albert E. Mouncer (Mail Drop PE01) |
| | Vice President, Corporate Services/ |
| | General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 |
|
| |
|
| P.O. Box 968 Richland, WA 99352-0968W. Scott Oxenford (Mail Drop PE04)Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968Albert E. Mouncer (Mail Drop PE01)Vice President, Corporate Services/ | | Energy Northwest Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20) |
| General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Energy Northwest-3-ChairmanEnergy Facility Site Evaluation CouncilP.O. Box 43172 Olympia, WA 98504-3172Douglas W. Coleman (Mail Drop PE20)Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968Gregory V. Cullen (Mail Drop PE20)Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968ChairmanBenton County Board of Commissioners
| | Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Gregory V. Cullen (Mail Drop PE20) |
| | Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Dale K. Atkinson (Mail Drop PE08) |
| | Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Cheryl M. Whitcomb (Mail Drop PE03) |
| | Vice President, Organizational Performance & Staffing/CKO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 William A. Horin, Esq. |
| | Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 |
|
| |
|
| P.O. Box 190 Prosser, WA 99350-0190Dale K. Atkinson (Mail Drop PE08)Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968Cheryl M. Whitcomb (Mail Drop PE03)Vice President, Organizational Performance & Staffing/CKO Energy Northwest
| | Energy Northwest Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 |
|
| |
|
| P.O. Box 968 Richland, WA 99352-0968William A. Horin, Esq.Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817Matt SteuerwaltExecutive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113 Energy Northwest-4-Lynn Albin, Radiation PhysicistWashington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827 Energy Northwest-5-E-Mail To:( )NRC Attendees OEWEBS. Bogle (for predecisional enf. or regulatory conferences)
| | Energy Northwest E-Mail To: |
| PMNS Mtg Announcement Coordinator BWSB. Sheron, ADPT OEMAILD/OE EJB1E. Benner JLDJennifer Dixon-Herrity, RIV EDO Coordinator BJBProject Manager, NRR ZKDSenior Resident Inspector FPBP. Bonnett VLDV. Dricks, PAO WAMW. Maier, RSLO GMVM. Vasquez, ES CJG, JAKRA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLPJ. Pellet, IRMB LPLP. Longdo, Receptionist AMMAnn Mattila, Security Advisor SUNSI Review Completed: CEJ ADAMS: Yes G No Initials: __CEJ_ Publicly Available G Non-Publicly Available G Sensitive Non-SensitiveR:_REACTORS/_COL/2006/CGS MN 2-3-06.wpdRIV:SPE:DRP/APAORSLOD:DRSDD:DRPTRFarnholtzVDricksWMaier DDChamberlainAXVegel/RA//RA/AVegel for/RA//RA/ | | ( ) NRC Attendees OEWEB S. Bogle (for predecisional enf. or regulatory conferences) |
| 1/18/061/18/061/19/061/19/061/19/06C:DRP/ACEJohnson | | PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE EJB1 E. Benner JLD Jennifer Dixon-Herrity, RIV EDO Coordinator BJB Project Manager, NRR ZKD Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, JAK RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2 DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SUNSI Review Completed: CEJ ADAMS: / Yes G No Initials: __CEJ_ |
| /RA/ | | / Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:_REACTORS/_COL/2006/CGS MN 2-3-06.wpd RIV:SPE:DRP/A PAO RSLO D:DRS DD:DRP TRFarnholtz VDricks WMaier DDChamberlain AXVegel |
| 1/19/06OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} | | /RA/ /RA/ AVegel for /RA/ /RA/ |
| | 1/18/06 1/18/06 1/19/06 1/19/06 1/19/06 C:DRP/A CEJohnson |
| | /RA/ |
| | 1/19/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax}} |
|
---|
Category:Meeting Notice
MONTHYEARPMNS20240699, Presentation to the City Council of Richland, Washington of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at the Columbia Generating Station2024-05-28028 May 2024 Presentation to the City Council of Richland, Washington of the Nuclear Regulatory Commissions 2023 Annual Assessment of Safety Performance at the Columbia Generating Station PMNS20240266, Partially Closed Preapplication Meeting with Energy Northwest to Discuss a Future Amendment Request to Approve an Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus for the Columbia Generating Station (L-2024-LRM-02024-02-28028 February 2024 Partially Closed Preapplication Meeting with Energy Northwest to Discuss a Future Amendment Request to Approve an Extended Power Uprate and Maximum Extended Load Line Limit Analysis Plus for the Columbia Generating Station (L-2024-LRM-0006) ML23264A1422023-09-21021 September 2023 Presubmittal Teleconference with Energy Northwest Regarding Proposed Request for U.S. Nuclear Regulatory Commission Approval to Revise the Emergency Plan in Its Entirety for Columbia Generating Station PMNS20230360, Public Open House to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station2023-04-0303 April 2023 Public Open House to Discuss the Nuclear Regulatory Commission'S (NRC) 2022 Annual Assessment of Safety Performance at Columbia Generating Station ML23090A1652023-03-31031 March 2023 2023 CGS Public Meeting Notice PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants2022-05-0303 May 2022 Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants ML22040A3522022-02-15015 February 2022 Notice of Public Meeting to Discuss Safety Significance of Preliminary Finding of Low to Moderate Safety Significance and Associated Apparent Violations of NRC Requirements ML21280A1332021-10-0707 October 2021 Pre-Application Teleconference with Energy Northwest to Discuss Planned License Amendment Requests for Columbia Generating Station (EPID L--2021-LRM-0102) PMNS20210563, Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek2021-04-29029 April 2021 Public Webinar to Discuss the NRCs 2020 Annual Assessment of Safety Performance at Arkansas Nuclear One, Columbia, Comanche Peak, Cooper, Diablo Canyon, Palo Verde, River Bend Station, South Texas Project, Waterford, and Wolf Creek ML21084A1392021-03-25025 March 2021 Pre-Application Teleconference with Energy Northwest to Discuss a Planned License Amendment Request for Columbia Generating Station ML20276A3302020-10-0202 October 2020 Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20170B1872020-06-19019 June 2020 Public Webinar to Discuss the Nrc'S Assessment of Safety Performance at Region IV Plants for 2019 ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML15183A0752015-07-0202 July 2015 Open House July 21, 2015 ML15153A2252015-06-0202 June 2015 Meeting Notice with Columbia Generating Station to Discuss an Apparent Violation Identified at Columbia Generating Station Concerning the Failure of Emergency Plan Implementing Procedures to Implement Requirements of the Columbia.. ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station ML14101A0822014-04-10010 April 2014 Notice of Meeting with Energy Northwest to Discuss Nuclear Regulatory Commission'S Assessment of Safety Performance at the Columbia Generating Station During Calendar Year 2013 ML13303C0002013-10-30030 October 2013 12/2/2013 Notice of Public Meeting with Energy Northwest to Discuss Initiatives and Progress Associated with Improving Human Performance at the Columbia Generating Station ML13134A1322013-05-14014 May 2013 Meeting Notice with NRC & Energy Northwest to Present and Discuss the Performance and Annual Assessment Results for Columbia Generating Station for the Period of January 1 Though December 31, 2012 ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12264A4812012-09-20020 September 2012 Notice of Public Meeting with Energy Northwest to Discuss Licensee Initiatives and Progress in Improving Human Performance ML12249A0672012-09-0505 September 2012 Notice of Public Meeting with Energy Northwest'S Columbia Generating Station to Discuss Three Inspection Findings Associated with the Site Emergency Preparedness Program ML1135502462011-12-21021 December 2011 1/9/2011 - Public Meeting with Energy Northwest to Provide Columbia Generating Station an Opportunity to Discuss Their Performance Improvement Initiatives ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1115205492011-06-0101 June 2011 Notice of Public Meeting with Energy Northwest to Discuss the End-of-Cycle Results for Columbia Generating Station for the Period of January 1 Through December 31, 2010 ML1106805872011-03-0909 March 2011 Notice of Public Meeting with Energy Northwest to Discuss Performance Improvement Initiatives and Introduce Management Team ML1100300742010-12-14014 December 2010 Correction to Forthcoming Pre-Licensing Meeting with Energy Northwest(Tac No. ME5129), to Discuss Proposed Installation of a Digital Power Range Neutron Monitoring System, Average Power Range Monitor/Rod Block Monitor/Technical Specificatio ML1034003172010-12-14014 December 2010 Notice of Forthcoming Pre-application Meeting on 1/18/2011 with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request ML1019300832010-07-12012 July 2010 Notice of Meeting with Energy Northwest, Columbia Generating Station to Discuss the Acceptance Review and Request for Supplemental Information Regarding the Licensee'S Application Dated 05/11/10 to Install a Digital Neutron Monitoring Syste ML1008104032010-03-25025 March 2010 04/06/2010 Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for Columbia Generating Station License Renewal Application Review ML1003511792010-02-0404 February 2010 Notice of Public Meeting with Energy Northwest to Discuss Performance and Improvement Initiatives ML0935700732009-12-23023 December 2009 Notice of Conference Call with Energy Northwest to Discuss Columbia Generating Station'S Planned Emergency Action Level Changes ML0926705872009-10-0101 October 2009 Notice of Meeting with Energy Northwest to Discuss Pre-licensing Activities Associated with Proposed Department of Energy Remediation of the 618-11 Burial Grounds for the Columbia Generating Station ML0914606382009-05-26026 May 2009 Public Meeting Notice to Discuss Performance Results of Columbia Generating Station for the Period of January 1 Through December 31, 2008 ML0814403912008-05-20020 May 2008 Notice of End-of-Cycle Public Meeting with Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2007 ML0810300162008-04-11011 April 2008 Meeting with Energy Northwest ML0710205182007-04-12012 April 2007 Notice of End-of-Cycle Public Meeting Between the NRC and Energy Northwest to Present and Discuss Performance Results of the Columbia Generating Station for the Period of January 1 Through December 31, 2006 ML0713300012007-04-0202 April 2007 Notice of Upcoming Meeting for Columbia Generating Station, to Discuss Results of Annual Assessment Associated with the 2006 Inspections and Performance Indicators ML0627501962006-10-0202 October 2006 Notice of Regulatory Conference with Energy Northwest to Discuss Three Apparent Violations Involving the Intrusion Detection System ML0615100302006-05-30030 May 2006 Notice of Public Meeting with Energy Northwest Columbia Generating Station ML0613105062006-05-11011 May 2006 Notice of Meeting with Energy Northwest Columbia Generating Station end-of-cycle Performance Assessment ML0601905742006-01-19019 January 2006 Notice of Meeting with Energy Northwest ML0533503522005-12-0101 December 2005 Notice of Meeting with Energy Northwest to Discuss Issues at the Columbia Generating Station. the Specific Issue the Licensee Requested to Discuss Include Overall Human Performance Issues ML0532504282005-11-21021 November 2005 12/6-7/05 Notice of Meeting with Energy Northwest to Conduct a Working - Level Discussion Related to the Schedule and Approach of the Alternative Source Term Amendment for Columbia Generating Station ML0532504432005-11-21021 November 2005 12/8/05 Notice of Columbia Generating Meeting with Energy Northwest to Discuss Information Related to Diesel Generating Allowed Completion Time ML0506000272005-03-0101 March 2005 Notice of Meeting with Energy Northwest (Columbia Generating Station) to Discuss RAI Questions Provided by NRC for the Proposed TS Application License Amendment for Diesel Generator Completion Time Extension at Columbia Generating Station ML0426704182004-09-23023 September 2004 Notice of Meeting with Columbia Generating Station to Discuss Operational Issues Related to Reactor Scrams in July and August 2004 ML0418403962004-07-0202 July 2004 Forthcoming Meeting with Licensees to Discuss Operator Licensing Program Policies and Recent Revisions 2024-05-28
[Table view] |
Text
January 19, 2006
SUBJECT:
MEETING WITH ENERGY NORTHWEST FACILITY: Columbia Generating Station DOCKET: 50-397 DATE AND TIME: February 3, 2006 8:00 a.m.
LOCATION: U.S. Nuclear Regulatory Commission Training Conference Room Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 PURPOSE: This is a public meeting between the NRC and Energy Northwest to discuss issues at the Columbia Generating Station. The issues to be discussed include lessons learned from licensee's review of the handling of service water pump shaft coupling failures at the facility, planned corrective actions from the review, and long term plans to ensure service water pump reliability and other equipment reliability at the facility.
CATEGORY 1: Members of the public are invited to observe the meeting and will have the opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC's meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
A telecommunications bridge will be available for the public.
Callers will dial (800) 952-9677 to access the bridge for the meeting between the NRC and Energy Northwest .
Energy Northwest PARTICIPANTS: NRC B. Mallett, Regional Administrator, Region IV D. Chamberlain, Director, Division of Reactor Safety (DRS)
A. Howell, Director, Division of Reactor Projects (DRP)
T. Vegel, Deputy Director, DRP C. Johnson, Chief, Project Branch A, DRP J. Clark, Chief, Engineering Branch 1 L. Smith, Chief, Engineering Branch 2 Z. Dunham, Senior Resident Inspector, DRP R. Cohen, Resident Inspector, DRP T. Farnholtz, Senior Project Engineer, DRP M. Brown, Project Engineer, DRP LICENSEE D. Atkinson, Vice President, Nuclear Generation S. Oxenford, Vice President, Technical Services A. Khanpour, General Manager, Engineering S. Boynton, Manager, Systems Engineering D. Coleman, Manager, Regulatory Programs G. Cullen, Supervisor, Licensing MEETING CONTACT: Claude E. Johnson, NRC, RIV 817/860-8148 CEJ@nrc.gov cc:
J. V. Parrish (Mail Drop 1023)
Chief Executive Officer Energy Northwest P.O. Box 968 Richland, WA 99352-0968 W. Scott Oxenford (Mail Drop PE04)
Vice President, Technical Services Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Albert E. Mouncer (Mail Drop PE01)
Vice President, Corporate Services/
General Counsel/CFO Energy Northwest P.O. Box 968 Richland, WA 99352-0968
Energy Northwest Chairman Energy Facility Site Evaluation Council P.O. Box 43172 Olympia, WA 98504-3172 Douglas W. Coleman (Mail Drop PE20)
Manager, Regulatory Programs Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Gregory V. Cullen (Mail Drop PE20)
Supervisor, Licensing Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Chairman Benton County Board of Commissioners P.O. Box 190 Prosser, WA 99350-0190 Dale K. Atkinson (Mail Drop PE08)
Vice President, Nuclear Generation Energy Northwest P.O. Box 968 Richland, WA 99352-0968 Cheryl M. Whitcomb (Mail Drop PE03)
Vice President, Organizational Performance & Staffing/CKO Energy Northwest P.O. Box 968 Richland, WA 99352-0968 William A. Horin, Esq.
Winston & Strawn 1700 K Street, NW Washington, DC 20006-3817 Matt Steuerwalt Executive Policy Division Office of the Governor P.O. Box 43113 Olympia, WA 98504-3113
Energy Northwest Lynn Albin, Radiation Physicist Washington State Department of Health P.O. Box 7827 Olympia, WA 98504-7827
Energy Northwest E-Mail To:
( ) NRC Attendees OEWEB S. Bogle (for predecisional enf. or regulatory conferences)
PMNS Mtg Announcement Coordinator BWS B. Sheron, ADPT OEMAIL D/OE EJB1 E. Benner JLD Jennifer Dixon-Herrity, RIV EDO Coordinator BJB Project Manager, NRR ZKD Senior Resident Inspector FPB P. Bonnett VLD V. Dricks, PAO WAM W. Maier, RSLO GMV M. Vasquez, ES CJG, JAK RA Secretaries LAO, DLF, MJS DRP Secretaries NLH, LMB, JLH2 DRS Secretaries CMS, AMT, BST1 DNMS Secretaries JLP J. Pellet, IRMB LPL P. Longdo, Receptionist AMM Ann Mattila, Security Advisor SUNSI Review Completed: CEJ ADAMS: / Yes G No Initials: __CEJ_
/ Publicly Available G Non-Publicly Available G Sensitive / Non-Sensitive R:_REACTORS/_COL/2006/CGS MN 2-3-06.wpd RIV:SPE:DRP/A PAO RSLO D:DRS DD:DRP TRFarnholtz VDricks WMaier DDChamberlain AXVegel
/RA/ /RA/ AVegel for /RA/ /RA/
1/18/06 1/18/06 1/19/06 1/19/06 1/19/06 C:DRP/A CEJohnson
/RA/
1/19/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax