ML071660013: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML071660013
| number = ML071660013
| issue date = 06/28/2007
| issue date = 06/28/2007
| title = Edwin I. Hatch Nuclear Plant Unit Nos. 1 and 2 (Hnp), RAI, Unit Staff Qualifications (TAC Nos. MD3431 and MD3432)
| title = (Hnp), RAI, Unit Staff Qualifications
| author name = Martin R E
| author name = Martin R
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLII-1
| addressee name = Madison D R
| addressee name = Madison D
| addressee affiliation = Southern Nuclear Operating Co, Inc
| addressee affiliation = Southern Nuclear Operating Co, Inc
| docket = 05000321, 05000366
| docket = 05000321, 05000366
| license number = DPR-057, NPF-005
| license number = DPR-057, NPF-005
| contact person = Martin R E,  NRR/DORL, 415-1493
| contact person = Martin R,  NRR/DORL, 415-1493
| case reference number = TAC MD3431, TAC MD3432
| case reference number = TAC MD3431, TAC MD3432
| document type = Letter, Request for Additional Information (RAI)
| document type = Letter, Request for Additional Information (RAI)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:June 28, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513
 
==SUBJECT:==
EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (HNP) - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING UNIT STAFF QUALIFICATIONS (TAC NOS. MD3431 AND MD3432)
 
==Dear Mr. Madison:==
 
By letter to the Nuclear Regulatory Commission (NRC) dated October 30, 2006, Southern Nuclear Operating Company, Inc., proposed to revise the Hatch Nuclear Plant, Unit Nos. 1 and 2 (HNP), Technical Specification 5.3.1 to add a statement that will allow unit staff positions to be filled by personnel who have completed an accredited program that has been endorsed by the NRC.
The NRC staff notes that American National Standards Institute (ANSI) Standard N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, contains job-related experience criteria, i.e., 4 years of responsible power plant experience for licensed senior operators and 2 years of power plant experience for licensed operators. In addition, technicians and repairmen are to have 2 years of power plant experience in their area of speciality.
The accredited training programs endorsed by the NRC contain words similar to the following when discussing experience to enter the program:
A.      "Entry into the training and qualification programs should be consistent with the educational and experience requirements stipulated in industry standards ..."
B.      "Educational and experience requirements should be consistent with those stipulated in applicable industry standards ..."
C.      "Educational prerequisites should be consistent with those stipulated in industry standard commitments ..."
D.      "Establish educational prerequisites that are consistent with those stipulated in industry standard commitments..."
Example A, for maintenance personnel, mentions entry into the program and requires education and experience consistent with industry standards. Example B, for non-licensed operators, requires education and experience consistent with industry standards. The training programs in Examples C, for radiation protection technicians, and D, chemistry technicians, do not mention,
 
D. Madison                                      or require, job-related experience. All examples refer to "industry standards." The industry standard for Hatch is ANSI N18.1-1971.
We discussed this issue with your staff on June 14, 2007, and we posed the question that, if the accredited training program points to industry standards and the HNP TSs are changed to state that the accredited program is equivalent to the industry standard, what would the standard for job-related experience be? Please address this issue at your earliest opportunity so that we may complete our review of this issue.
Sincerely,
                                                /RA/
Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page
 
ML071660013 OFFICE        NRR/LPL2-1/PM      NRR/LPL2-1/LA    NRR/IOLB/BC        NRR/LPL2-1/BC NAME          RMartin:nc          MOBrien          NSalgado          EMarinos DATE          06 /26 /07          06 / 26 /07      06 / 26 /07        06 / 28 /07 Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:
Laurence Bergen                          Mr. Jeffrey T. Gasser Oglethorpe Power Corporation              Executive Vice President 2100 E. Exchange Place                    Southern Nuclear Operating Company, Inc.
P.O. Box 1349                            P.O. Box 1295 Tucker, GA 30085-1349                    Birmingham, AL 35201-1295 Mr. R. D. Baker                          General Manager Manager - Licensing                      Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
P.O. Box 1295                            U.S. Highway 1 North Birmingham, AL 35201-1295                P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch                              Mr. K. Rosanski 11030 Hatch Parkway N.                    Resident Manager Baxley, GA 31531                          Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Harold Reheis, Director                  P.O. Box 2010 Department of Natural Resources          Baxley, GA 31515 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.
Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513}}

Latest revision as of 19:09, 22 March 2020

(Hnp), RAI, Unit Staff Qualifications
ML071660013
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 06/28/2007
From: Martin R
NRC/NRR/ADRO/DORL/LPLII-1
To: Madison D
Southern Nuclear Operating Co
Martin R, NRR/DORL, 415-1493
References
TAC MD3431, TAC MD3432
Download: ML071660013 (4)


Text

June 28, 2007 Mr. Dennis R. Madison Vice President - Hatch Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (HNP) - REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING UNIT STAFF QUALIFICATIONS (TAC NOS. MD3431 AND MD3432)

Dear Mr. Madison:

By letter to the Nuclear Regulatory Commission (NRC) dated October 30, 2006, Southern Nuclear Operating Company, Inc., proposed to revise the Hatch Nuclear Plant, Unit Nos. 1 and 2 (HNP), Technical Specification 5.3.1 to add a statement that will allow unit staff positions to be filled by personnel who have completed an accredited program that has been endorsed by the NRC.

The NRC staff notes that American National Standards Institute (ANSI) Standard N18.1-1971, Selection and Training of Nuclear Power Plant Personnel, contains job-related experience criteria, i.e., 4 years of responsible power plant experience for licensed senior operators and 2 years of power plant experience for licensed operators. In addition, technicians and repairmen are to have 2 years of power plant experience in their area of speciality.

The accredited training programs endorsed by the NRC contain words similar to the following when discussing experience to enter the program:

A. "Entry into the training and qualification programs should be consistent with the educational and experience requirements stipulated in industry standards ..."

B. "Educational and experience requirements should be consistent with those stipulated in applicable industry standards ..."

C. "Educational prerequisites should be consistent with those stipulated in industry standard commitments ..."

D. "Establish educational prerequisites that are consistent with those stipulated in industry standard commitments..."

Example A, for maintenance personnel, mentions entry into the program and requires education and experience consistent with industry standards. Example B, for non-licensed operators, requires education and experience consistent with industry standards. The training programs in Examples C, for radiation protection technicians, and D, chemistry technicians, do not mention,

D. Madison or require, job-related experience. All examples refer to "industry standards." The industry standard for Hatch is ANSI N18.1-1971.

We discussed this issue with your staff on June 14, 2007, and we posed the question that, if the accredited training program points to industry standards and the HNP TSs are changed to state that the accredited program is equivalent to the industry standard, what would the standard for job-related experience be? Please address this issue at your earliest opportunity so that we may complete our review of this issue.

Sincerely,

/RA/

Robert E. Martin, Senior Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366 cc: See next page

ML071660013 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/IOLB/BC NRR/LPL2-1/BC NAME RMartin:nc MOBrien NSalgado EMarinos DATE 06 /26 /07 06 / 26 /07 06 / 26 /07 06 / 28 /07 Edwin I. Hatch Nuclear Plant, Units 1 & 2 cc:

Laurence Bergen Mr. Jeffrey T. Gasser Oglethorpe Power Corporation Executive Vice President 2100 E. Exchange Place Southern Nuclear Operating Company, Inc.

P.O. Box 1349 P.O. Box 1295 Tucker, GA 30085-1349 Birmingham, AL 35201-1295 Mr. R. D. Baker General Manager Manager - Licensing Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.

P.O. Box 1295 U.S. Highway 1 North Birmingham, AL 35201-1295 P.O. Box 2010 Baxley, GA 31515 Resident Inspector Plant Hatch Mr. K. Rosanski 11030 Hatch Parkway N. Resident Manager Baxley, GA 31531 Oglethorpe Power Corporation Edwin I. Hatch Nuclear Plant Harold Reheis, Director P.O. Box 2010 Department of Natural Resources Baxley, GA 31515 205 Butler Street, SE., Suite 1252 Atlanta, GA 30334 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW Atlanta, GA 30328-4684 Mr. Reece McAlister Executive Secretary Georgia Public Service Commission 244 Washington St., SW Atlanta, GA 30334 Arthur H. Domby, Esq.

Troutman Sanders Nations Bank Plaza 600 Peachtree St, NE, Suite 5200 Atlanta, GA 30308-2216 Chairman Appling County Commissioners County Courthouse Baxley, GA 31513