ML080110665: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML080110665
| number = ML080110665
| issue date = 01/11/2008
| issue date = 01/11/2008
| title = Donald C. Cook, Units 1 and 2 - Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip
| title = Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip
| author name =  
| author name =  
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLIII-1
Line 9: Line 9:
| docket = 05000315, 05000316
| docket = 05000315, 05000316
| license number = DPR-058, DPR-074
| license number = DPR-058, DPR-074
| contact person = tam P S, NRR/ADRO/DORL, 415-1451
| contact person = tam P, NRR/ADRO/DORL, 415-1451
| case reference number = TAC MD5613, TAC MD5614
| case reference number = TAC MD5613, TAC MD5614
| package number = ML080110307
| package number = ML080110307
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:rr"Z1S. instr~LIUI It-ai dLU-1 3.31.1 SURVEILLANCE REQUIREMENTS (continued)
{{#Wiki_filter:rr"Z1S.instr~LIUI It-aidLU-1 3.31.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.18 ------ ------NOTE--- ----------
SURVEILLANCE                                 FREQUENCY SR 3.3.1.18           ------     ------   NOTE---         ----------
Verification of setpoint is not required.Perform TADOT. Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days SR 3.3.1.19 NOTE Neutron detectors are excluded from response time testing.Verify RTS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit I 3.3.1-10 Amendment No. 2-8-7-, 301 RTS Instrumentation
Verification of setpoint is not required.
Perform TADOT.                                       Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days SR 3.3.1.19                             NOTE Neutron detectors are excluded from response time testing.
Verify RTS RESPONSE TIME is within limits.           24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit I                   3.3.1-10                   Amendment No. 2-8-7-, 301


====3.3.1 SURVEILLANCE====
RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)
 
SURVEILLANCE                                   FREQUENCY SR 3.3.1.18       --- -.--.-------   -.-- NOTE -----
REQUIREMENTS (continued)
Verification of setpoint is not required.
SURVEILLANCE FREQUENCY SR 3.3.1.18--- -.--.-------  
Perform TADOT.                                       Prior to exceeding the P-8 interlock whenever the unit I
-.--NOTE -----Verification of setpoint is not required.Perform TADOT.Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days I-4 SR 3.3 1.19 Neutron detectors are excluded from response time testing.Verify RTS RESPONSE TIME is within limits.24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit 2 3.3.1-10 Amendment No. 2-6-, 2,.4}}
has been in MODE 3, if not performed within the previous 31 days
                                                                    -4 SR 3.3 1.19 Neutron detectors are excluded from response time testing.
Verify RTS RESPONSE TIME is within limits.           24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit 2                   3.3.1-10                   Amendment No. 2-6-,   2,.4}}

Latest revision as of 21:35, 14 November 2019

Tech Spec Pages for Amendments 301 and 284 Regarding Operational Test of the Reactor Trip on Turbine Trip
ML080110665
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/11/2008
From:
NRC/NRR/ADRO/DORL/LPLIII-1
To:
tam P, NRR/ADRO/DORL, 415-1451
Shared Package
ML080110307 List:
References
TAC MD5613, TAC MD5614
Download: ML080110665 (2)


Text

rr"Z1S.instr~LIUI It-aidLU-1 3.31.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.18 ------ ------ NOTE--- ----------

Verification of setpoint is not required.

Perform TADOT. Prior to exceeding the P-8 interlock whenever the unit has been in MODE 3, if not performed within the previous 31 days SR 3.3.1.19 NOTE Neutron detectors are excluded from response time testing.

Verify RTS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit I 3.3.1-10 Amendment No. 2-8-7-, 301

RTS Instrumentation 3.3.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.3.1.18 --- -.--.------- -.-- NOTE -----

Verification of setpoint is not required.

Perform TADOT. Prior to exceeding the P-8 interlock whenever the unit I

has been in MODE 3, if not performed within the previous 31 days

-4 SR 3.3 1.19 Neutron detectors are excluded from response time testing.

Verify RTS RESPONSE TIME is within limits. 24 months on a STAGGERED TEST BASIS Cook Nuclear Plant Unit 2 3.3.1-10 Amendment No. 2-6-, 2,.4