ML12021A023: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/29/2011 | | issue date = 03/29/2011 | ||
| title = 2011 Dresden Nuclear Power Station Initial License Examination Administered Job Performance Measures | | title = 2011 Dresden Nuclear Power Station Initial License Examination Administered Job Performance Measures | ||
| author name = Bielby M | | author name = Bielby M | ||
| author affiliation = NRC/RGN-III/DRS/OB | | author affiliation = NRC/RGN-III/DRS/OB | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:A-N-1-R | {{#Wiki_filter:Exelon Nuclear Job Performance Measure PERFORM CALCULATED DRYWELL LEAKRATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date A-N-1-R | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
A-N-1-R | Revision Record (Summary) | ||
Revision 00 Modified for 2010 NRC exam. | |||
A-N-1-R Page 2 of 7 | |||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION Markup a copy of Appendix | DOCUMENT PREPARATION Markup a copy of Appendix A. | ||
A-N-1-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 NSO. 2. Unit 3 is operating at rated conditions. | : 1. You are the Unit 3 NSO. | ||
: 3. The previous shift | : 2. Unit 3 is operating at rated conditions. | ||
-performed. | : 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed. | ||
INITIATING CUES | |||
: 1. Perform the required calculations and ensure the acceptance criteria have been met. | |||
: 2. When complete, give the completed paperwork to the Unit Supervisor for approval. | : 2. When complete, give the completed paperwork to the Unit Supervisor for approval. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | |||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-1-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment # | |||
PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
* 1. Complete Appendix A, page(s) | Provide the examinee the copy of Appendix X, with the times and gallons pumped completed. | ||
_____ | * 1. Complete Appendix A, Completes Appendix A, page(s) page(s), with the results matching those on the provided KEY. _____ _____ _____ | ||
* 2. Informs the Unit Supervisor that Acceptance Criteria has been exceeded for Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm). | * 2. Informs the Unit Notifies Unit Supervisor. | ||
Supervisor that Acceptance Criteria has been exceeded for _____ _____ _____ | |||
Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm). | |||
CUE: | |||
Acknowledge report. | Acknowledge report. | ||
END JPM Stop Time:_________ | |||
: _________ | A-N-1-R Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO JPM | |||
answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover | ==Title:== | ||
. | Perform Calculated Drywell Leak Rate JPM Number: A-N-1-R Revision Number: 01 Task Number and | ||
K/A Number and Importance: Generic.2.1. | |||
18 | ==Title:== | ||
Simulator | 29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover. | ||
Simulate Alternate Path | K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment:Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes | ||
: | |||
Yes | |||
16 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
Appendix A, Rev 124 EVALUATION | |||
Appendix A, Rev | |||
==SUMMARY== | ==SUMMARY== | ||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Were all the Critical Elements performed satisfactorily? | Evaluators Name: (Print) | ||
Yes | Evaluators Signature: Date: | ||
Satisfactory Unsatisfactory Comments: | A-N-1-R Page 6 of 7 | ||
Date: | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 NSO. | : 1. You are the Unit 3 NSO. | ||
: 2. Unit 3 is operating at rated conditions. | : 2. Unit 3 is operating at rated conditions. | ||
: 3. The previous shift | : 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed. | ||
-performed. | INITIATING CUES | ||
INITIATING | : 1. Perform the required calculations and ensure the acceptance criteria have been met. | ||
Exelon Nuclear Job Performance Measure | : 2. When complete, give the completed paperwork to the Unit Supervisor for approval. | ||
A-N-1-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-2-R | Revision Record (Summary) | ||
Revision 04 Bank JPM. | |||
Revision 05 Revised for 2010 NRC exam. | |||
A-N-2-R Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. 2. Insert the following override: | : 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. | ||
IOR acd231ab OFF DOCUMENT PREPARATION | : 2. Insert the following override: | ||
* IOR acd231ab OFF DOCUMENT PREPARATION | |||
: 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3. | : 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3. | ||
A-N-2-R Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit 2 and Unit 3 are operating at near rated power | : 2. Unit 2 and Unit 3 are operating at near rated power. | ||
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has just directed you to verify off | : 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1. | ||
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X ONLY, as required by T.S 3.8.1 action condition B.1 | : 2. The Unit 3 assist NSO has already collected the data for Unit 3. | ||
: 3. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-2-R Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of Appendix X. | |||
: 1. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position. | |||
-1 & Bus 34-1 Tie ACB (902 | position. _____ _____ _____ | ||
-8) position. | : 2. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position. | ||
: 2. Record & initial Bus 24 & Bus 24-1 Tie GCB (902 | position. _____ _____ _____ | ||
-8) position. | : 3. Record & initial TR 22 to Bus Examinee records 24 GCB (902-8) position. CLOSED position. | ||
_____ | : 4. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position. | ||
: 3. Record & initial TR 22 to Bus 24 GCB (902 | position. _____ _____ _____ | ||
-8) position. | : 5. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position. | ||
Examinee records | position. _____ _____ _____ | ||
_____ _____ _____ | * 6. Record & initial Bus 23-1 & Examinee records actual Bus 24-1 Volts, by selecting voltage (~4160 Volts). | ||
: | Bus 23-1. _____ _____ _____ | ||
NOTE: | |||
The candidate may select the A/B phase in any of the three flowing steps. | |||
When the A/B phase is selected, it will read 0 (malfunction in setup). | |||
* 7. Record & initial Bus 23-1 & Examinee discovers that Bus 24-1 Volts, by selecting the A/B phase reads 0 Bus 24-1. and reports to the Unit Supervisor that a local _____ _____ _____ | |||
reading will be required. | |||
CUE: | |||
The local voltage reading for Bus 23-1 & Bus 24-1 Volts, phase A/B, is 4155 volts. | |||
A-N-2-R Page 5 of 8 | |||
Job Performance Measure (JPM) | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 8. Directs EO or Field Directs EO or Field Supervisor to take local Supervisor to take local reading for Bus 23-1 & Bus reading. _____ _____ _____ | |||
: | 24-1 Volts, phase A/B. | ||
-1 & Bus | * 9. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 23. voltage (~4160 Volts). | ||
* 10. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 24. voltage (~4160 Volts). | |||
* | * 11. Indicate acceptance criteria Examinee circles YES for met. acceptance criteria. | ||
: 12. Enter signature, date, and Examinee enters time, for Performed By. signature, current date, and current time, for _____ _____ _____ | |||
Performed By. | |||
: 13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
* | |||
_____ | |||
CUE: | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | A-N-2-R Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
Suggested Testing Environment: | ==Title:== | ||
Simulator | RO JPM | ||
Simulator | |||
Simulate Alternate Path | ==Title:== | ||
: | PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and | ||
Yes | |||
20 minutes Actual Time Used: | ==Title:== | ||
minutes | 299L044 Perform administrative duties for a malfunction of a piece of safety related equipment. | ||
K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes | |||
==References:== | ==References:== | ||
Appendix X, rev 30 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-2-R Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit 2 and Unit 3 are operating at near rated power | : 2. Unit 2 and Unit 3 are operating at near rated power. | ||
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has just directed you to verify off | : 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1. | ||
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1 | : 2. The Unit 3 assist NSO has already collected the data for Unit 3. | ||
: 3. Inform the Unit Supervisor when the task is complete. | |||
A-N-2-R Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-3-R | Revision Record (Summary) | ||
Revision 01 Bank JPM. | |||
Revision 02 Revised for 2010 NRC exam. | |||
A-N-3-R Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 6600-02. | : 1. Provide a marked up copy of DOS 6600-02. | ||
A-N-3-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you. 4. The NLO reported all surveillance requirements were within specifications | : 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | ||
: 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you. | |||
: 1. Perform calculation verification and ensure paperwork is correct | : 4. The NLO reported all surveillance requirements were within specifications. | ||
INITIATING CUE | |||
: 1. Perform calculation verification and ensure paperwork is correct. | |||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | |||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-3-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of DOS 6600-02. | |||
* 1. Candidate should identify step I.5 has a mathematical | * 1. Candidate should identify Identifies differential step I.5 has a mathematical pressure should read 4. | ||
* 2. Candidate should identify step I.15 OR step I.16 is signed off as verified dP of <6 (actual is 7). | error. _____ _____ _____ | ||
* 2. Candidate should identify Identifies incorrect step I.15 OR step I.16 is verification of dP <6. | |||
signed off as verified dP of <6 _____ _____ _____ | |||
* 3. Candidate should identify that steps I.21.a & b have been initialed by the same person performing the surveillance and were | (actual is 7). | ||
* 3. Candidate should identify that Identifies step NOT steps I.21.a & b have been independently verified. | |||
: 4. Notify Unit Supervisor of | initialed by the same person _____ _____ _____ | ||
Notifies Unit Supervisor, may dispatch Operators to verify/correct issues, also may initiate IR. | performing the surveillance and were NOT independently verified. | ||
: 4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____ | |||
may initiate IR. | |||
CUE: | |||
:_________ | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
A-N-3-R Page 5 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
JPM Number: | |||
299L080 | ==Title:== | ||
7 / 4.1 Suggested Testing Environment: | RO JPM | ||
Simulator | |||
Simulator | ==Title:== | ||
Simulate Alternate Path | VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and | ||
: | |||
Yes | ==Title:== | ||
10 minutes Actual Time Used: | 299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | ||
minutes | |||
==References:== | ==References:== | ||
DOS 6600-02, rev 19 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-3-R Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you | : 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal. | ||
: 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you. | |||
: 4. The NLO reported all surveillance requirements were within specifications. | |||
: 1. Perform calculation verification and ensure paperwork is | INITIATING CUE | ||
: 1. Perform calculation verification and ensure paperwork is correct. | |||
: 2. Inform the Unit Supervisor when the task is complete. | |||
A-N-3-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-4-R | Revision Record (Summary) | ||
Revision 00 New JPM. | |||
Revision 01 Revised for 2010 NRC exam. | |||
A-N-4-R Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
Line 314: | Line 316: | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
A-N-4-R Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an on-shift Operator | : 1. You are an on-shift Operator. | ||
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. Complete DOS 1500 | : 1. Complete DOS 1500-08. | ||
-08. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. Number any comments in the | * Denotes critical elements of a critical step. | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | |||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-4-R Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of DOS 1500-08. | |||
* 1. Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). | The following steps can be performed in any order. | ||
_____ | * 1. Examinee fills out running See attached key. | ||
* 2. Examinee calculates Dilution flow (1,017,000 gpm). | pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____ | ||
* 2. Examinee calculates Dilution See attached key. | |||
flow (1,017,000 gpm). | |||
: 3. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit. | : 3. Examinee enters dilution flow See attached key. | ||
(from above) to calculate CCSW Activity Limit. _____ _____ _____ | |||
_____ | * 4. Examinee calculates CCSW See attached key. | ||
* 4. Examinee calculates CCSW Activity Limit (2.91 x 10 | -5 Activity Limit (2.91 x 10 ). | ||
: 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor. | |||
sample limit exceeds the allowable discharge. _____ _____ _____ | |||
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. | : 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | ||
_____ | CUE: | ||
: 6. Informs Unit Supervisor task | |||
Examinee notifies the Unit Supervisor. | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | A-N-4-R Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
JPM Number: | |||
==Title:== | |||
RO JPM | |||
==Title:== | |||
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | ||
Simulator | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
15 | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1500-08, rev 17 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-4-R Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an on | : 1. You are an on-shift Operator. | ||
-shift Operator. | : 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. | ||
: 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. INITIATING CUE | INITIATING CUE | ||
: 1. Complete DOS 1500 | : 1. Complete DOS 1500-08. | ||
-08. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
A-N-4-R Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-1-S | Revision Record (Summary) | ||
Revision 00 New JPM developed for2010 NRC exam. | |||
A-N-1-S Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. None. | : 1. None. | ||
A-N-1-S Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 Unit Supervisor | : 1. You are the Unit 3 Unit Supervisor. | ||
: 2. The following timeline occurred: | |||
-site facility. 1600 - at the | * 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility. | ||
-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination. 1700 - corporate issues a press release to notify the public of the released contaminated backhoe | * 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination. | ||
* 1700 - corporate issues a press release to notify the public of the released contaminated backhoe. | |||
: 1. Utilizing the Reportability Manual, determine the reportability requirements | : 3. The time is now 1715 hours. | ||
INITIATING CUE | |||
Information For | : 1. Utilizing the Reportability Manual, determine the reportability requirements. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | |||
Information For Evaluators Use: | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | |||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-1-S Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Candidate locates a copy of Reportability Manual LS-AA-1110. | |||
-AA-1110. | * 1. Determines the event is Determines the event is reportable per SAF 1.9. reportable per SAF 1.9, News Release or Notification of Other _____ _____ _____ | ||
* 1. Determines the event is reportable per SAF | Government Agency. | ||
* 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS within Operations Center via the four hours of the occurrence. ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has _____ _____ _____ | |||
been or will be made. | |||
END JPM Stop Time:_________ | |||
A-N-1-S Page 5 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | |||
==Title:== | |||
JPM | SRO JPM | ||
==Title:== | |||
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 299L001, Determine Reportability requirements as outlined in station Reportability manual. | ||
Simulator | K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes | ||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
Reportability Manual LS-AA-1110, rev 15 EVALUATION | |||
==SUMMARY== | |||
- | Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | ||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-1-S Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 3 Unit Supervisor. | |||
: 2. The following timeline occurred: | : 2. The following timeline occurred: | ||
1500 - a rented backhoe was released by Dresden station to the | * 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility. | ||
1600 - at the | * 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination. | ||
-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination | * 1700 - corporate issues a press release to notify the public of the released contaminated backhoe. | ||
: 3. The time is now 1715 hours. | : 3. The time is now 1715 hours. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Utilizing the Reportability Manual, determine the reportability requirements | : 1. Utilizing the Reportability Manual, determine the reportability requirements. | ||
A-N-1-S Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure | |||
Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 03 Bank JPM. | |||
Revision 04 Revised for 2010 NRC exam. | |||
A-N-2-S Page 2 of 7 | |||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. | |||
DOCUMENT PREPARATION | |||
: 1. Reset the simulator to IC 12, or any similar IC that has a normal full power electrical lineup. DOCUMENT PREPARATION | |||
: 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in. | : 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in. | ||
A-N-2-S Page 3 of 7 | |||
Job Performance Measure (JPM | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Supervisor | : 1. You are the Unit 2 Supervisor. | ||
: 2. Unit 2 and Unit 3 are at near rated power. | |||
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance. | |||
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE | |||
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X | : 1. Review the data and complete the paperwork. | ||
: 1. Review the data and complete the paperwork | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For Evaluators Use: | |||
Information For | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-2-S Page 4 of 7 | |||
Job Performance Measure (JPM | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of Appendix X with a completed Attachment 3. | |||
. | * 1. Verifies data all entered. Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT | ||
* 1. Verifies data all entered. | > 3851 Volts. _____ _____ _____ | ||
Notes Bus 23-1 & Bus 24-1 Volts, (Bus | * 2. Verifies data all entered. Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT > | ||
_____ | 3851 Volts. _____ _____ _____ | ||
* 2. Verifies data all entered. | * 3. Verify data is accurate, by Verifies Voltmeter Bus 23-reading Voltmeter. 1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus _____ _____ _____ | ||
Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT > 3851 Volts. | 23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct value, CUE: | ||
_____ | If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections. | ||
* 3. Verify data is accurate, by | END JPM Stop Time:_________ | ||
Verifies Voltmeter Bus 23 | A-N-2-S Page 5 of 7 | ||
- | |||
1 & Bus 24-1 Volts (Bus | Job Performance Measure (JPM) | ||
If Candidate states the he/she would return surveillance to the NSO for corrections, | Operators Name: | ||
Job | |||
:_________ | |||
==Title:== | |||
SRO JPM | |||
Job Title: | |||
SRO | |||
JPM | |||
==Title:== | |||
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 299L044, Perform administrative duties for a malfunction of a piece of safety related equipment. | ||
Simulator | K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
15 | |||
minutes | |||
==References:== | ==References:== | ||
Appendix X, rev 30 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-2-S Page 6 of 7 | |||
Job Performance Measure (JPM) | |||
INITIAL CONDITIONS | |||
Job Performance Measure (JPM | |||
: 1. You are the Unit 2 Supervisor. | : 1. You are the Unit 2 Supervisor. | ||
: 2. Unit 2 and Unit 3 are at near rated power | : 2. Unit 2 and Unit 3 are at near rated power. | ||
: 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance. | |||
: 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE | |||
-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X | |||
: 1. Review the data and complete the paperwork. | : 1. Review the data and complete the paperwork. | ||
A-N-2-S Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-3-S | Revision Record (Summary) | ||
Revision 00 Modified for 2010 NRC exam. | |||
A-N-3-S Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of Appendix | : 1. Provide a marked up copy of Appendix A. | ||
A-N-3-S Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Unit Supervisor | : 1. You are the Unit 2 Unit Supervisor. | ||
: 2. Unit 2 is operating at rated conditions. | |||
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG | : 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG. | ||
INITIATING CUE | |||
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG | : 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG. | ||
: 2. Correct any discrepancies noted (if any). | |||
Information For | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For Evaluators Use: | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | |||
A-N-3-S Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of Appendix A. | |||
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up. | |||
* 1. Determine Calculated Floor Drain Leakage is correct. | * 1. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for THU 1200 hours should be 4.50 gpm. _____ _____ _____ | ||
* 2. Determine Calculated Floor Determines TOTAL leakage Drain Leakage is correct. for FRI 2000 hours should be 12.13 gpm. | |||
* 2. Determine Calculated Floor Drain Leakage is correct. | NOTE: | ||
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given. | If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given. | ||
* 3. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for FRI 1200 hours should be 5.15 gpm (TS). _____ _____ _____ | |||
* 3. Determine Calculated Floor Drain Leakage is correct | * 4. References Tech Specs. References Tech Spec 3.4.4 and recognizes | ||
. | * >5 gpm unidentified leakage for FRI 1600 hours. | ||
* 4. References Tech Specs. | Recognizes in Cond A. | ||
References Tech Spec 3.4.4 and recognizes | : 5. Reports discrepancies. Examinee reports discrepancies noted. | ||
CUE: | |||
: 5. Reports discrepancies | Acknowledge report of task completion. | ||
. Examinee reports discrepancies noted. | END JPM Stop Time:_________ | ||
A-N-3-S Page 5 of 7 | |||
Acknowledge report of task | |||
:_________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
SRO JPM | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and | ||
Simulator | |||
Simulate Alternate Path | ==Title:== | ||
: | 29900LK108, Discuss the Unit Supervisors responsibilities for plant operation. | ||
15 | K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
minutes | |||
==References:== | ==References:== | ||
Appendix A, rev 124 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-3-S Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Unit Supervisor. | : 1. You are the Unit 2 Unit Supervisor. | ||
: 2. Unit 2 is operating at rated conditions. | : 2. Unit 2 is operating at rated conditions. | ||
: 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG | : 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , | ||
AND 3 REACTOR COOLANT LEAKAGE LOG. | |||
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG. 2. Correct any discrepancies noted (if any). | INITIATING CUE | ||
: 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG. | |||
: 2. Correct any discrepancies noted (if any). | |||
A-N-3-S Page 7 of 7 | |||
PERFORM CCSW ACTIVITY CALCULATION JPM Number: | Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By: | ||
A-N-4-S | Instructor Date Approved By: | ||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM. | |||
Revision 01 Revised for 2010 NRC exam. | |||
A-N-4-S Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
Line 672: | Line 660: | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Provide a marked up copy of DOS 1500-08. | : 1. Provide a marked up copy of DOS 1500-08. | ||
A-N-4-S Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an on | : 1. You are an on-shift Operator. | ||
-shift Operator. | : 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. | ||
: 2. The Unit 2 NSO started DOS 1500 | |||
-08, then had to leave shift for medical reasons. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. Complete DOS 1500 | : 1. Complete DOS 1500-08. | ||
-08. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. Number any comments in the | * Denotes critical elements of a critical step. | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | |||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-4-S Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the examinee with the provided copy of DOS 1500-08. | |||
* 1. Examinee fills out running pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). | The following steps can be performed in any order. | ||
_____ | * 1. Examinee fills out running See attached key. | ||
* 2. Examinee calculates Dilution flow (1,017,000 gpm). | pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____ | ||
* 2. Examinee calculates Dilution See attached key. | |||
flow (1,017,000 gpm). | |||
: 3. Examinee enters dilution flow (from above) to calculate CCSW Activity Limit. | : 3. Examinee enters dilution flow See attached key. | ||
(from above) to calculate CCSW Activity Limit. _____ _____ _____ | |||
_____ | * 4. Examinee calculates CCSW See attached key. | ||
* 4. Examinee calculates CCSW Activity Limit (2.91 x 10 | -5 Activity Limit (2.91 x 10 ). | ||
: 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor. | |||
sample limit exceeds the allowable discharge. _____ _____ _____ | |||
: 5. Recommends to the Unit Supervisor that the calculated sample limit exceeds the allowable discharge. | : 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | ||
CUE: | |||
: 6. Informs Unit Supervisor task | |||
Examinee notifies the Unit Supervisor. | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | A-N-4-S Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
SRO | |||
JPM Number: | ==Title:== | ||
SRO JPM | |||
==Title:== | |||
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance. | ||
Simulator | K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
15 | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1500-08, rev 16 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-4-S Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an on | : 1. You are an on-shift Operator. | ||
-shift Operator. | : 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons. | ||
: 2. The Unit 2 NSO started DOS 1500 | INITIATING CUE | ||
-08, then had to leave shift for medical reasons. INITIATING CUE | : 1. Complete DOS 1500-08. | ||
: 1. Complete DOS 1500 | : 2. Inform the Unit Supervisor when the task is complete. | ||
-08. 2. Inform the Unit Supervisor when the task is complete. | A-N-4-S Page 7 of 7 | ||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
A-N-5-S | Revision Record (Summary) | ||
Revision 00 Bank JPM. | |||
Revision 01 Revised for 2010 NRC exam. | |||
A-N-5-S Page 2 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. This is a tabletop JPM utilizing simulator procedures. | : 1. This is a tabletop JPM utilizing simulator procedures. | ||
: 2. No Simulator setup needed. | : 2. No Simulator setup needed. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Two (2) marked up copies of EP | : 1. Two (2) marked up copies of EP-AA-113-F-02. | ||
-AA-113-F-02. 2. Blank copy of EP | : 2. Blank copy of EP-AA-113. | ||
-AA- | : 3. Blank copy of EP-AA-113-F-03. | ||
-AA-113-F-03. | A-N-5-S Page 3 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Station Emergency Director. | : 1. You are the Station Emergency Director. | ||
: 2. A General Emergency has been declared. | : 2. A General Emergency has been declared. | ||
: 3. There is an offsite release in progress. | : 3. There is an offsite release in progress. | ||
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS | : 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. | ||
: 5. Containment is currently being challenged. | |||
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared. | : 6. The TSC has NOT been activated, but the appropriate EAL has been declared. | ||
: 7. An Emergency life saving operation MUST be performed. | : 7. An Emergency life saving operation MUST be performed. | ||
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room. | : 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room. | ||
: 9. The operation requires two people to enter the field. | : 9. The operation requires two people to enter the field. | ||
: 10. Clay Morrow , Employee ID | : 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered. | ||
# 123456 and Jax Teller Employee ID | : 11. Clay and Jax have NEVER received an emergency exposure before. | ||
# 891011 have volunteered. | : 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax. | ||
: 11. Clay and Jax have NEVER received an emergency exposure before. 12. Authorization for Emergency Exposure (EP | INITIATING CUES | ||
-AA-113-F-02 forms) have been filled out for | : 1. Execute section 4.4 of EP-AA-113. | ||
: 1. Execute section 4.4 of EP | A-N-5-S Page 4 of 9 | ||
-AA-113. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | |||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
A-N-5-S Page 5 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee the provided copies of: | |||
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03 | |||
: 1. Applicant determines need for Emergency action is emergency action. needed per initiating cue. | |||
CUE: | |||
If asked, Clay and Jax do NOT have any adverse reactions to KI. | If asked, Clay and Jax do NOT have any adverse reactions to KI. | ||
: 2. Applicant recognizes per the Recognizes that initiating cue that authorization to take KI authorization to take KI must must also be completed. | |||
also be completed prior to the _____ _____ _____ | |||
emergency workers entering the space. | |||
* 3. Determines there is or has been a Loss of Fuel Clad Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, | * 3. Determines there is or has Determines KI must be been a Loss of Fuel Clad issued. | ||
Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued. | |||
* 4. Documents the decision to issue KI using THYROID BLOCKING AGENT AUTHORIZATION Form | * 4. Documents the decision to BOTH individuals being issue KI using THYROID authorized for KI and BLOCKING AGENT entering the space must be AUTHORIZATION Form listed with their correct (EP-AA-113-F-03). names and employee ID numbers: | ||
* Clay Morrow _____ _____ _____ | |||
123456 | |||
* Jax Teller 891011 A-N-5-S Page 6 of 9 | |||
Job Performance Measure (JPM) | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks. | |||
: 5. Notifies Occupational Health Examinee states that (Medical) Services he/she would notify OHS. | |||
Department promptly that KI _____ _____ _____ | |||
is to be issued to Exelon Nuclear personnel or contractors. | |||
NOTE: | |||
JPM is complete when applicant notifies OHS of KI use. | |||
END JPM Stop Time:_________ | |||
A-N-5-S Page 7 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | |||
==Title:== | |||
SRO JPM | |||
==Title:== | |||
AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and | |||
JPM | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications. | ||
Simulator | K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
20 minutes | |||
minutes | |||
==References:== | ==References:== | ||
EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
A-N-5-S Page 8 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Station Emergency Director. | : 1. You are the Station Emergency Director. | ||
: 2. A General Emergency has been declared. | : 2. A General Emergency has been declared. | ||
: 3. There is an offsite release in progress. | : 3. There is an offsite release in progress. | ||
: 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. 5. Containment is currently being challenged. | : 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS. | ||
: 6. The TSC has NOT been activated, but the appropriate EAL has been declared. 7. An Emergency life saving operation MUST be performed. | : 5. Containment is currently being challenged. | ||
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room. | : 6. The TSC has NOT been activated, but the appropriate EAL has been declared. | ||
: 7. An Emergency life saving operation MUST be performed. | |||
: 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room. | |||
: 9. The operation requires two people to enter the field. | : 9. The operation requires two people to enter the field. | ||
: 10. Clay Morrow , Employee ID | : 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered. | ||
# 123456 and Jax Teller Employee ID | : 11. Clay and Jax have NEVER received an emergency exposure before. | ||
# 891011 have volunteered. | : 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax. | ||
: 11. Clay and Jax have NEVER received an emergency exposure before. | INITIATING CUES | ||
: 12. Authorization for Emergency Exposure (EP | : 1. Execute section 4.4 of EP-AA-113. | ||
-AA-113-F-02 forms) have been filled out for | A-N-5-S Page 9 of 9 | ||
: 1. Execute section 4.4 of EP | |||
-AA-113. | Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By: | ||
Exelon Nuclear Job Performance Measure | Instructor Date Approved By: | ||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 Modified for 2010 NRC exam. | |||
S-N-a Page 2 of 8 | |||
Revision | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12. | : 1. Reset the simulator to IC 12. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Insert following Malfunctions and/or Remotes: | : 2. Insert following Malfunctions and/or Remotes: | ||
IMF CIRWCUAP (2-1201-1 valve failure to close | * IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure). | ||
* IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure). | |||
: 3. Setup the following Triggers: | |||
None. DOCUMENT PREPARATION DOP 1100-02 hardcard | * None. | ||
DOCUMENT PREPARATION DOP 1100-02 hardcard. | |||
S-N-a Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred, resulting in an ATWS | : 2. A transient has occurred, resulting in an ATWS. | ||
: 3. The Unit Supervisor has authorized the use of Hard Cards. | |||
INITIATING CUE | |||
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card | : 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-a Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Examinee should locate the hard card, then provide the included copy. | |||
. | * 1. Place the SBLC INJECTION Turns the SBLC CONTROL keylock switch to INJECTION CONTROL the SYS 1 OR SYS 2 keylock switch to either the position. intermediate right OR _____ _____ _____ | ||
* 1. Place the SBLC INJECTION CONTROL keylock switch to the SYS 1 | intermediate left position. | ||
: 2. Verifies applicable SQUIB SQUIB A or B light off. | |||
: 2. Verifies applicable SQUIB | pilot light NOT lit. | ||
: 3. Verifies applicable PUMP PUMP 1 or PUMP 2 light pilot light lit. on. | |||
: 3. Verifies applicable PUMP | : 4. Verifies FLOW pilot light lit. WHITE light illuminated. | ||
PUMP 1 or PUMP 2 light | : 5. SBLC SQUIB VLV CKT Annunciator 902-5 H-6 FAILURE annunciator alarms illuminated. | ||
(902-5 H-6). _____ _____ _____ | |||
on. | |||
: 4. Verifies FLOW pilot light lit. | |||
WHITE light illuminated. | |||
: 5. SBLC SQUIB VLV CKT | |||
-5 H-6 | |||
_____ | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
* 6. Verifies RWCU valve 2-1201-1 closed. | * 6. Verifies RWCU valve Examinee recognizes that 2-1201-1 closed. valve 2-1201-1 valve did NOT close. _____ _____ _____ | ||
* 7. Verifies RWCU valve | * 7. Verifies RWCU valve Takes manual action for a 2-1201-1 closed. failed automatic action and closes 2-1201-1 valve, by _____ _____ _____ | ||
placing c/s in the CLOSED position. | |||
: 8. Verifies RWCU valve GREEN light illuminated. | |||
2-1201-1A closed. | |||
* 9. Verifies RWCU valve Examinee recognizes that 2-1201-2 closed. valve 2-1201-2 valve did NOT close. _____ _____ _____ | |||
S-N-a Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 10. Closes RWCU valve 2-1201-2 closed. | * 10. Closes RWCU valve Takes manual action for a 2-1201-2 closed. failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED _____ _____ _____ | ||
: 11. Verifies RWCU valve 2- | position. | ||
: 11. Verifies RWCU valve GREEN light illuminated. | |||
: 12. Verifies RWCU valve 2-1201-7 closed. | 2-1201-3 closed. | ||
: 12. Verifies RWCU valve RED light illuminated. | |||
: 13. Informs Unit Supervisor task | 2-1201-7 closed. | ||
Reports SBLC is injecting and valves 2 | : 13. Informs Unit Supervisor task Reports SBLC is injecting is complete. and valves 2-1201-2 and 2-1201-3 failed to close automatically. _____ _____ _____ | ||
-1201-2 and 2-1201-3 failed to close automatically. | CUE: | ||
_____ | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-a Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO SRO JPM | |||
==Title:== | |||
SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 9 minutes Actual Time Used: minutes | ||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
9 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DOP 1100-02, rev 18 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-a Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred, resulting in an ATWS. | : 2. A transient has occurred, resulting in an ATWS. | ||
Line 981: | Line 958: | ||
: 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card. | : 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-a Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 04 Bank JPM. | |||
Revision 05 Revised for 2010 NRC exam. | |||
S-N-b Page 2 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12. | : 1. Reset the simulator to IC 12. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Start the LPCI/CS room cooler fans. | : 2. Start the LPCI/CS room cooler fans. | ||
: 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened: | : 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened: | ||
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs. | NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs. | ||
trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402 | * trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON) | ||
-4B OPEN light turns ON | * ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip) | ||
* ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip) | |||
* trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running) | |||
* trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip) | |||
DOCUMENT PREPARATION | |||
: 1. Markup a copy of DOS 1400-05 as complete up through Step I. | : 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8). | ||
S-N-b Page 3 of 10 | |||
8). | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. The Unit 2 Core Spray | : 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance. | ||
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed. | : 3. The operability surveillance for the 2A Core Spray pump is NOT needed. | ||
: 4. The system is filled and vented. | : 4. The system is filled and vented. | ||
Line 1,018: | Line 997: | ||
: 8. The LPCI/Core Spray Room Coolers are running. | : 8. The LPCI/Core Spray Room Coolers are running. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor directs you to perform DOS 1400 | : 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump. | ||
-05 step I.8 for the 2B Core Spray pump. 2. All applicable Prerequisites have been met. | : 2. All applicable Prerequisites have been met. | ||
: 3. Inform the Unit Supervisor upon completion of step I.8. | : 3. Inform the Unit Supervisor upon completion of step I.8. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
S-N-b Page 4 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Information For Evaluators Use: | |||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-b Page 5 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide Examinee a copy of DOS 1400-05. | |||
Green light illuminated | : 1. Verify the following valve line Verifies the following: | ||
. | up: | ||
* MO 2-1402-4B Closed | |||
* Green light illuminated. | |||
* MO 2-1402-38B Open | |||
* Green light illuminated. | |||
* 2-1402-6B Open | |||
* Directs NLO to Verify 2-1402-6B-SV Closed. | |||
* MO 2-1402-25B Closed | |||
* Green light illuminated. | |||
* MO 2-1402-3B Open | |||
* Green light illuminated. | |||
* 2-1402-40B-SV Closed | |||
* Directs NLO to Verify 2-1402-40B-SV Closed _____ _____ _____ | |||
CUE: | |||
2-1402-40B-SV, INST SV is closed. | 2-1402-40B-SV, INST SV is closed. | ||
NOTE: | |||
The next three (3) actions may be requested to be performed at the same time. | |||
: 2. Verify 2B CORE SPRAY Contacts NLO to verify 2B MOTOR has adequate CORE SPRAY MOTOR lubrication. has adequate lubrication _____ _____ _____ | |||
per step I.8.b.(1). | |||
2B Core Spray motor oil level is normal (within +0 to | CUE: | ||
-1/8 inch band). | 2B Core Spray motor oil level is normal (within +0 to -1/8 inch band). | ||
: 3. Verify 2B LPCI/CS Room Contacts NLO to verify Cooler is operating properly. proper room cooler operation per step I.8.c. _____ _____ _____ | |||
CUE: | |||
. _____ | |||
2B LPCI/CS room cooler is operating normally. | 2B LPCI/CS room cooler is operating normally. | ||
S-N-b Page 6 of 10 | |||
Job Performance Measure (JPM) | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 4. Direct NLO to open 2-1402- Directs 2-1402-40B-SV 40B-SV and report pressure. Open. | |||
CUE: | CUE: | ||
When asked, report: 2-1402-40B-SV Inst SV is Open. | |||
: 5. Record suction pressure Pressure of 7 psig provided by NLO. recorded on Data Sheet 1. | |||
CUE: | |||
When asked, report: suction pressure is 7 psig. | |||
: 6. Calculate 2-1402-8B initial DP Calculated: | |||
-1402-40B-SV Inst SV is Open | closed DP. | ||
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 _____ _____ _____ | |||
psig) | |||
CUE: | |||
When asked, report: | If examinee requests the above calculation to be verified, sign the verified by line. | ||
If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report. | |||
-1402-8B initial closed DP. | NOTE: | ||
Candidate will N/A step I.8.g. | |||
2-1450-1B | : 7. Start 2B CORE SPRAY Red light illuminated and Pump. annunciators H-13 and A-5 alarm. _____ _____ _____ | ||
If examinee requests the above calculation to be verified, | |||
-13 and A-5 alarm. _____ | |||
NOTE: | NOTE: | ||
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication. | |||
S-N-b Page 7 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 8. Open FLOW TEST VLV MO 2-1402-4B. | * 8. Open FLOW TEST VLV MO Rotates and holds MO 2-2-1402-4B. 1402-4B Control switch CW to Open. _____ _____ _____ | ||
_____ | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
: 9. Acknowledge and report alarm for 2B CS pump trip. | : 9. Acknowledge and report Acknowledges annunciator alarm for 2B CS pump trip. H-5 and makes report. | ||
CUE: | |||
Acknowledge report. | Acknowledge report. | ||
* 10. Immediately Close Green light illuminated. | |||
2-1402-4B. | |||
Red light illuminated. _____ _____ _____ | |||
CUE: | CUE: | ||
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure. | |||
CUE: | |||
If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue: | |||
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal. | |||
: 11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
CUE: | |||
Acknowledge report of task completion. | |||
END JPM Stop Time:_________ | |||
S-N-b Page 8 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
- PERFORM PUMP TEST WITH PUMP TRIP Revision Number: | |||
JPM Number: | ==Title:== | ||
RO SRO JPM | |||
==Title:== | |||
CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 22 minutes Actual Time Used: minutes | ||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
22 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DOS 1400-05, rev 41 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-b Page 9 of 10 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. The Unit 2 Core Spray | : 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance. | ||
: 3. The operability surveillance for the 2A Core Spray pump is NOT needed. | : 3. The operability surveillance for the 2A Core Spray pump is NOT needed. | ||
: 4. The system is filled and vented. 5. The required valve operability surveillance has been completed. | : 4. The system is filled and vented. | ||
: 5. The required valve operability surveillance has been completed. | |||
: 6. Vibration data is NOT required. | : 6. Vibration data is NOT required. | ||
: 7. The Unit 2 NLO is standing by in the corner room. | : 7. The Unit 2 NLO is standing by in the corner room. | ||
: 8. The LPCI/Core Spray Room Coolers are running. | : 8. The LPCI/Core Spray Room Coolers are running. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor directs you to perform DOS 1400 | : 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump. | ||
-05 step I.8 for the 2B Core Spray pump. | |||
: 2. All applicable Prerequisites have been met. | : 2. All applicable Prerequisites have been met. | ||
: 3. Notify the Unit Supervisor upon completion of step I.8. | : 3. Notify the Unit Supervisor upon completion of step I.8. | ||
S-N-b Page 10 of 10 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM. | |||
Revision 01 Revised for 2010 NRC exam S-N-c Page 2 of 8 | |||
Job Performance Measure (JPM) | |||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure. | |||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Ensure that Both DEHC monitors are displaying the STATUS screen . | : 2. Ensure that Both DEHC monitors are displaying the STATUS screen . | ||
: 3. Insert following Malfunctions and/or Remotes: | : 3. Insert following Malfunctions and/or Remotes: | ||
None. 4. Setup the following Triggers: | * None. | ||
None. 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902 | : 4. Setup the following Triggers: | ||
-7 panel only). | * None. | ||
DOCUMENT PREPARATION Markup a copy of DGP 02 | : 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only). | ||
-03. | DOCUMENT PREPARATION Markup a copy of DGP 02-03. | ||
S-N-c Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required. 3. Another NSO will acknowledge annunciators not associated with this task | : 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required. | ||
: 3. Another NSO will acknowledge annunciators not associated with this task. | |||
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02 | INITIATING CUE | ||
-03 | : 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. The timeclock starts when the candidate acknowledges the initiating cue. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | |||
S-N-c Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee with the provided copy of DGP 02-03. | |||
All the below actions can be performed on either of the Digital EHC control stations. | |||
Utilizing the trackball controller, clicks on <CONTROL>. | * 1. Select <CONTROL>. Utilizing the trackball controller, clicks on | ||
_____ | <CONTROL>. _____ _____ _____ | ||
* 2. Select <RX COOLDOWN>. | * 2. Select <RX COOLDOWN>. Utilizing the trackball controller, clicks on | ||
Utilizing the trackball controller, clicks on | <RX COOLDOWN>. _____ _____ _____ | ||
: 3. Verify REACTOR COOLDOWN is OFF. | : 3. Verify REACTOR Observes the REACTOR COOLDOWN is OFF. COOLDOWN OFF select button is orange. _____ _____ _____ | ||
* 4. Select STPT/RAMP. Utilizing the trackball controller, clicks on the | |||
_____ | <STPT/RAMP>. _____ _____ _____ | ||
* 4. Select STPT/RAMP. | * 5. Enter desired target Clicks in the Set Point box. | ||
Utilizing the trackball controller, clicks on the <STPT/RAMP>. | temperature setpoint. Utilizing the keyboard, enters 400.0. _____ _____ _____ | ||
_____ | * 6. Enter desired cooldown rate Clicks in the Ramp Rate in the Ramp box. box. Utilizing the keyboard, enters 75.0. _____ _____ _____ | ||
* 5. Enter desired target | * 7. Select <OK>. Utilizing the trackball controller, clicks on <OK>. | ||
Clicks in the Set Point box. | Clicks <OK> on the Confirm Setpoint pop up _____ _____ _____ | ||
Utilizing the keyboard, enters 400.0. | window. | ||
_____ | * 8. Initiate Reactor cooldown by Utilizing the trackball selecting ON for REACTOR controller, clicks on <ON>. | ||
* 6. Enter desired cooldown rate in the Ramp | COOLDOWN. | ||
Clicks <OK> on the Begin Reactor Cooldown pop up _____ _____ _____ | |||
window. | |||
box. Utilizing the keyboard, enters 75.0. | S-N-c Page 5 of 8 | ||
_____ | |||
* 7. Select <OK>. | |||
Utilizing the trackball controller, clicks on <OK>. | |||
Clicks <OK> on the Confirm Setpoint pop up | |||
* 8. Initiate Reactor cooldown by selecting ON for REACTOR | |||
Clicks <OK> on the | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 9. On <CONTROL> Utilizing the trackball | |||
<PRESSURE CONTROL> controller, clicks on screen, adjust pressure <PRESSURE setpoint as necessary to CONTROL>. | |||
maintain at least 50 psig above Reactor pressure. _____ _____ _____ | |||
NOTE: | |||
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig. | The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig. | ||
: 10. Select STPT/RAMP and input Utilizing the trackball value of 50.0. controller, clicks on | |||
<STPT/RAMP > and input 50.0. | |||
NOTE: | |||
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig. | The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig. | ||
: 11. On <CONTROL> <BPV If uses other DEHC JACK> screen, verify BPV screen, utilizing the Jack position setpoint is trackball controller, clicks | |||
BPV JACK> screen, verify BPV Jack position setpoint is | -5.0%. on <CONTROL>. | ||
-5.0%. | Utilizing the trackball controller, clicks on < BPV JACK >. _____ _____ _____ | ||
Utilizing the trackball controller, clicks on < BPV JACK >. Observes BPV Jack position setpoint is | Observes BPV Jack position setpoint is -5.0%. | ||
-5.0%. | : 12. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | ||
CUE: | |||
: 12. Informs Unit Supervisor task | |||
Examinee notifies the Unit Supervisor. | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-c Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
==Title:== | |||
RO SRO JPM | |||
JPM Number: | ==Title:== | ||
-N-c | DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and | ||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 29501LP040, Respond to a Reactor Scram IAW DGP 02-03. | ||
Simulator | K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
12 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DGP 02-03, rev 89 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-c Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required. | : 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required. | ||
: 3. Another NSO will acknowledge annunciators not associated with this task | : 3. Another NSO will acknowledge annunciators not associated with this task. | ||
INITIATING CUE | |||
: 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. | : 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29. | ||
utilizing the Turbine Bypass valves by performing DGP 02-03 steps E. | : 2. Inform the Unit Supervisor when the task is complete. | ||
: | S-N-c Page 8 of 8 | ||
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 06 Bank JPM. | |||
Revision 07 Revised for 2010 NRC exam. | |||
S-N-d Page 2 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12. | : 1. Reset the simulator to IC 12. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Verify NO LPCI pumps operating | : 2. Verify NO LPCI pumps operating . | ||
: 3. Insert following Malfunctions and/or Remotes: | |||
None. 4. Setup the following Triggers: | * None. | ||
None. DOCUMENT PREPARATION Markup a copy of DEOP 0500 | : 4. Setup the following Triggers: | ||
-03. | * None. | ||
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03. | |||
S-N-d Page 3 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection | : 2. A transient has occurred requiring Alternate Water Injection. | ||
: 3. RPV level is -65 inches and slowly dropping. | |||
-65 inches and slowly dropping. | |||
: 4. RPV pressure is 375 psig and slowly dropping. | : 4. RPV pressure is 375 psig and slowly dropping. | ||
: 5. An EO has been briefed and is in the field. | : 5. An EO has been briefed and is in the field. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500 | : 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12. | ||
-03, step G.12. | |||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-d Page 4 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee with the provided copy of DEOP 0500-03. | |||
-03. | * 1. Place 2A LPCI PP control ALL lights extinguished. | ||
* 1. Place 2A LPCI PP control switch in Pull | switch in Pull-to-Lock. | ||
-to-Lock. | * 2. Place PP SUCT VLV MO 2- RED light illuminated. | ||
1501-5A control switch in Manual Bypass and verify _____ _____ _____ | |||
* 2. Place PP SUCT VLV MO 2 | closed. | ||
: 3. Verify MIN FLOW VLV 2- RED light illuminated. | |||
1501-13A closed if not needed. _____ _____ _____ | |||
: 3. Verify MIN FLOW VLV 2 | CUE: | ||
_____ | |||
2-1501-13A is not required for 2B LPCI pump. | 2-1501-13A is not required for 2B LPCI pump. | ||
NOTE: | |||
The following valves may be verified in any order | |||
_____ | : 4. Verify TORUS CLG/TEST GREEN lights illuminated. | ||
: 5. Verify TORUS SPRAY VLVs 2-1501-19A and 2-1501-18A closed. | valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____ | ||
_____ | : 5. Verify TORUS SPRAY VLVs GREEN lights illuminated. | ||
: 6. Verify DW SPRAY VLVs 2 | 2-1501-19A and 2-1501-18A closed. _____ _____ _____ | ||
: 6. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | |||
_____ | 1501-28A and 2-1501-27A closed. _____ _____ _____ | ||
: 7. Verify TORUS CLG/TEST valves 2-1501-20B and 2-1501-38B closed. | : 7. Verify TORUS CLG/TEST GREEN lights illuminated. | ||
valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____ | |||
_____ | : 8. Verify TORUS SPRAY VLVs GREEN lights illuminated. | ||
: 8. Verify TORUS SPRAY VLVs 2-1501-19B and 2-1501-18B closed. | 2-1501-19B and 2-1501-18B closed. _____ _____ _____ | ||
_____ | S-N-d Page 5 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
: 9. Verify DW SPRAY VLVs 2- GREEN lights illuminated. | |||
_____ | 1501-28B and 2-1501-27B closed. _____ _____ _____ | ||
For bleeding off the pressure in the suction piping, | NOTE: | ||
-03 step G.12.c.(5 thru 8). | For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8). | ||
CUE: | |||
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed. | |||
-1501-74A, U2 LPCI A PMP | : 10. Unlock AND open 2-1501- Instructs NLO to complete 74A, U2 LPCI A PMP step G.12.c.(5).(a). | ||
VENT VLV. | |||
: 11. Crack open 2 | : 11. Crack open 2-1501-15A, U2 Instructs NLO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b). | ||
-1501-15A, U2 LPCI A PMP VENT VLV until | flow is observed from pipe. _____ _____ _____ | ||
: 12. Close 2(3)-1501-15A, U2 Instructs NLO to complete LPCI A PMP VENT VLV. step G.12.c.(5).(c). | |||
_____ | : 13. Close AND lock 2-1501-74A, Instructs NLO to complete U2(3) LPCI A PMP step G.12.c.(5).(d). | ||
: 12. Close 2(3) | VENT VLV. | ||
-1501-15A, U2 LPCI A PMP VENT VLV. | * 14. Open 2-1501-47A-R, U2 Instructs NLO to obtain PI LPCI A PUMP SUCT PI 2-1501-47A reading per 2-1501-47A ROOT VLV (at step G.12.c.(6). _____ _____ _____ | ||
pump) and verify PI 2-1501-47A indicates less than 15 psig. | |||
CUE: | |||
: 13. Close AND lock 2 | |||
-1501-74A, U2(3) LPCI A PMP | |||
* 14. Open 2-1501-47A-R, U2 LPCI A PUMP SUCT PI | |||
2-1501-47A ROOT VLV (at pump) and verify PI 2 | |||
-1501-47A indicates less than 15 psig | |||
PI 2-1501-47A indicates 15.5 psig. | PI 2-1501-47A indicates 15.5 psig. | ||
* 15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig. | |||
* 15. Recognizes reading is NOT less than 15 psig. | S-N-d Page 6 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
Instructs NLO to close 2 | : 16. Close 2-1501-47A-R, U2 Instructs NLO to close 2-LPCI A PUMP SUCT PI 1501-47A per step G.12.c.(8). _____ _____ _____ | ||
-1501-47A per step G.12.c.(8). | 2-1501-47A ROOT VLV. | ||
_____ | CUE: | ||
2-1501-47A-R is Closed. | 2-1501-47A-R is Closed. | ||
BEGIN ALTERNATE PATH | |||
* 17. Open PP SUCT VLV MO 2- | * 17. Open PP SUCT VLV MO 2- GREEN light illuminated. | ||
1501-5A. | |||
* 18. Place 2A LPCI PP control switch in AUTO. | * 18. Place 2A LPCI PP control Depresses and places 2A switch in AUTO. LPCI PP c/s to center (AUTO) position. _____ _____ _____ | ||
: 19. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI with suction from the CST. pump suction pressure _____ _____ _____ | |||
_____ | problem when aligned to CST. May recommend using another LPCI pump. | ||
: 19. Notify Unit Supervisor that 2A | CUE: | ||
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected Acknowledge report of task completion. | |||
LPCI pump cannot be used with suction from the CST. | END JPM Stop Time:_________ | ||
S-N-d Page 7 of 9 | |||
Before examinee proceeds, | |||
END | |||
: _________ | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO SRO JPM | |||
==Title:== | |||
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | 29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
Simulator | |||
Simulate Alternate Path | |||
: | |||
Yes | |||
12 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DEOP 0500-03, rev 20 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-d Page 8 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. A transient has occurred requiring Alternate Water Injection | : 2. A transient has occurred requiring Alternate Water Injection. | ||
: 3. RPV level is -65 inches and slowly dropping. | |||
-65 inches and slowly dropping. | |||
: 4. RPV pressure is 375 psig and slowly dropping. | : 4. RPV pressure is 375 psig and slowly dropping. | ||
: 5. An EO has been briefed and is in the field. | : 5. An EO has been briefed and is in the field. | ||
INITIATING CUE 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500 | INITIATING CUE | ||
-03, step G.12. | : 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12. | ||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-d Page 9 of 9 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 04 Bank JPM. | |||
Revision 05 Revised for 2010 NRC exam. | |||
S-N-e Page 2 of 8 | |||
Revision | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work | : 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work. | ||
: 2. Ensure Torus water level is 20 feet. | |||
IMF CIGP2I | : 3. Insert following Malfunctions and/or Remotes. | ||
IOR PCDOOP61 OFF (prevents the 1601 | * IMF CIGP2I (Spurious Group II Isolation) | ||
-61 valve from opening) | * IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening) | ||
Adjusts Torus Level indications to ~20 feet. ior atl10 25.0 ior pcltr10a 20 | * Adjusts Torus Level indications to ~20 feet. | ||
Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts. | ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20 | ||
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled Adjusts Drywell & Torus pressures to 50.0 psig. | * ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig) | ||
* Pulls ECCS Initiation Logic fuses so when Drywell pressure is forced high, NO ECCS starts. | |||
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled | |||
* Adjusts Drywell & Torus pressures to 50.0 psig. | |||
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0 | ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0 | ||
: 4. Verify the SBGT system operating and verify flow ~4000 scfm. | : 4. Verify the SBGT system operating and verify flow ~4000 scfm. | ||
: 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans. | : 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans. | ||
: 6. Place CRM ISOL switch to ISOLATE | : 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running. | ||
- wait 10 seconds then verify a C/R Booster Fan is running. | DOCUMENT PREPARATION Markup a copy of DEOP 500-04. | ||
DOCUMENT PREPARATION Markup a copy of DEOP 500 | S-N-e Page 3 of 8 | ||
-04. | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Aux NSO. | : 1. You are the Aux NSO. | ||
: 2. A break inside the Primary Containment has occurred. | : 2. A break inside the Primary Containment has occurred. | ||
: 3. Torus bottom pressure is about to exceed the | : 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01. | ||
-01. 4. Torus water level is 20' 5. Control Room ventilation has been isolated. | : 4. Torus water level is 20' | ||
: 5. Control Room ventilation has been isolated. | |||
: 6. Reactor Building and Turbine Building have been evacuated. | : 6. Reactor Building and Turbine Building have been evacuated. | ||
: 7. The Instrument Bus and ESS Bus are energized. | : 7. The Instrument Bus and ESS Bus are energized. | ||
: 8. The Instrument Air System is available. | : 8. The Instrument Air System is available. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure | : 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. Number any comments in the | * Denotes critical elements of a critical step. | ||
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | |||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-e Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide examinee the marked up copy of DEOP 0500-04. | |||
-04. | Annunciator 902-3 A-15 may be received during this JPM. | ||
-3 A-15 may be received during this JPM. | : 1. Verify SBGT is operating and Verifies 2/3A SBGT train flow is ~ 4000 scfm. FI 7540-13 is reading | ||
: 1. Verify SBGT is operating and flow is ~ 4000 scfm. | ~4000 scfm. _____ _____ _____ | ||
: 2. Verify Reactor Mode switch Verifies Reactor Mode NOT in RUN. switch NOT in RUN. | |||
_____ | : 3. Place VENT ISOL SIGNAL Momentarily places BYPASS switch on 902-5 Bypass switch to Torus panel to TORUS. Position. _____ _____ _____ | ||
: 2. Verify Reactor Mode switch | NOTE: | ||
: 3. Place VENT ISOL SIGNAL BYPASS switch on 902 | The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open. | ||
-5 panel to TORUS. | : 4. Open AO 2-1601-61, TORUS Places AO 2-1601-61 2-INCH VENT VLV. control switch to OPEN position and determines _____ _____ _____ | ||
that the valve will not open. | |||
_____ | NOTE: | ||
The AO 2-1601-61, TORUS 2 | IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task. | ||
-INCH VENT VLV, will | BEGIN ALTERNATE PATH | ||
Places AO 2 | * 5. Place VENT ISOL SIGNAL Momentarily places Vent BYPASS switch on 902-5 Isol Signal Bypass switch panel to DRYWELL. to Drywell position. _____ _____ _____ | ||
-1601-61 control switch to OPEN position and determines that the valve will not open. | |||
IF candidate states that the 2 | |||
-1601-61 valve will not open, direct him/her to complete the task | |||
* 5. Place VENT ISOL SIGNAL BYPASS switch on 902 | |||
-5 panel to DRYWELL. | |||
_____ | |||
CUE: | CUE: | ||
* 6. Open AO 2-1601-62, DW 2-INCH Vent. | If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly. | ||
* 6. Open AO 2-1601-62, DW Red Open light illuminated. | |||
2-INCH Vent. | |||
S-N-e Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 7. Open AO 2-1601-63, VENT | * 7. Open AO 2-1601-63, VENT Red Open light illuminated. | ||
TO SBGT. | |||
: 8. Start as many Turbine Building and Radwaste Exhaust fans as possible. | : 8. Start as many Turbine Initiates action to start All Building and Radwaste available Turbine Building Exhaust fans as possible. and Radwaste Exhaust fans. _____ _____ _____ | ||
: 9. Determine if SBGT flow is Containment pressure adequate to control and stable or decreasing. | |||
: 9. Determine if SBGT flow is adequate to control and maintain DW pressure below the Primary Containment | maintain DW pressure below the Primary Containment _____ _____ _____ | ||
Pressure Limit. | |||
CUE: | |||
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit. | DW pressure is being controlled and maintained below the Primary Containment Pressure Limit. | ||
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report). | |||
-1640-103, | : 10. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | ||
Examinee notifies the Unit Supervisor. | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-e Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO SRO JPM | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and | ||
Simulator | |||
Simulate Alternate Path | ==Title:== | ||
: | 295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit. | ||
Yes | K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes | ||
17 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DEOP 0500-04, rev 12 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-e Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Aux NSO. | : 1. You are the Aux NSO. | ||
: 2. A break inside the Primary Containment has occurred. | : 2. A break inside the Primary Containment has occurred. | ||
: 3. Torus bottom pressure is about to exceed the | : 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01. | ||
-01. 4. Torus water level is 20' 5. Control Room ventilation has been isolated. | : 4. Torus water level is 20' | ||
: 5. Control Room ventilation has been isolated. | |||
: 6. Reactor Building and Turbine Building have been evacuated. | : 6. Reactor Building and Turbine Building have been evacuated. | ||
: 7. The Instrument Bus and ESS Bus are energized. | : 7. The Instrument Bus and ESS Bus are energized. | ||
: 8. The Instrument Air System is available. | : 8. The Instrument Air System is available. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500 | : 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure. | ||
-04, attachment 1 to control Primary Containment pressure. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-e Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM. | |||
Revision 01 Revised for 2010 NRC exam. | |||
S-N-f Page 2 of 9 | |||
Revision | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating. NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | : 1. Reset the simulator any IC with only 2 RFPs and 3 Cond/Cond Booster Pumps operating. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | |||
: 2. Insert following Malfunctions and/or Remotes: | : 2. Insert following Malfunctions and/or Remotes: | ||
M63 (to prevent TR | * M63 (to prevent TR-22 to Bus 23 breaker from closing). | ||
-22 to Bus 23 breaker from closing). | |||
: 3. Setup the following Triggers: | : 3. Setup the following Triggers: | ||
None. 4. Ensure ONLY 2 RFPs operating. | * None. | ||
: 4. Ensure ONLY 2 RFPs operating. | |||
: 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating. | : 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating. | ||
DOCUMENT PREPARATION | DOCUMENT PREPARATION | ||
: 1. Marked up copy of DOP 6500-01. | : 1. Marked up copy of DOP 6500-01. | ||
S-N-f Page 3 of 9 | |||
Job Performance Measure (JPM) | |||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. Unit 2 was operating at rated power when the TR | : 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received. | ||
-21 trouble alarm is received. | : 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising. | ||
: 3. The NLO, dispatched to TR | : 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22. | ||
-21, | : 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure. | ||
-21 cooling fans are not all operating and the transformer temperature is rising | |||
-21 by transferring auxiliary power to | |||
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure. | |||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR- | : 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01. | ||
-01. 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-f Page 4 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
IF the incoming and running voltages are NOT approximately equal, | Provide the examinee with the provided copy of DOP 6500-01. | ||
This task has two parts, which can be performed in any order. | |||
-22 | CUE: | ||
* 1. Position TR-22 to Bus 21 | IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal. | ||
TRANSFER BUS 21 TO TR-22 | |||
: 2. Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal. | * 1. Position TR-22 to Bus 21 Switch in ON position. | ||
SYNCHRONIZING meter at 12 | SYNCHROSCOPE selector switch to ON. _____ _____ _____ | ||
: 2. Verify: | |||
* 3. Position TR-22 to Bus 21 breaker control switch to CLOSE. | INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal. | ||
_____ _____ | approximately equal. | ||
: 4. Verify: SYNCHRONIZING meter at 12 | Meter NOT rotating. | ||
Annunciator 902 | SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished. | ||
-8 D-1 in | rotating. | ||
Annunciator 902 | SYNCHRONIZING meter _____ _____ _____ | ||
-8 D-1 illuminated. | lights NOT glowing. | ||
* 3. Position TR-22 to Bus 21 RED light illuminated. | |||
breaker control switch to CLOSE. _____ _____ _____ | |||
: 4. Verify: | |||
SYNCHRONIZING meter at Meter NOT rotating. | |||
12 oclock position. | |||
TR-22 to Bus 21 breaker RED light illuminated. | |||
indicates CLOSED. | |||
Annunciator 902-8 D-1 in Annunciator 902-8 D-1 alarm. illuminated. | |||
S-N-f Page 5 of 9 | |||
Job Performance Measure (JPM) | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
Job Performance Measure (JPM) | * 5. Position TR-21 to Bus 21 GREEN light illuminated. | ||
* 5. Position TR-21 to Bus 21 breaker control switch to TRIP. | breaker control switch to TRIP. _____ _____ _____ | ||
_____ | : 6. Verify: | ||
: 6. Verify: TR-21 to Bus 21 breaker indicates OPEN. | TR-21 to Bus 21 breaker GREEN light illuminated. | ||
Annunciator 902 | indicates OPEN. | ||
-8 D-1 | Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears. | ||
Annunciator 902 | extinguished. | ||
-8 D-1 extinguished. | : 7. Position TR-22 to Bus 21 Switch in OFF position. | ||
synchroscope selector switch to OFF. _____ _____ _____ | |||
: 8. Verify Bus 21 AMMETER and Verifies Bus 21 amps and VOLTMETER indications are volts are normal. | |||
: 7. Position TR-22 to Bus 21 | normal. _____ _____ _____ | ||
. _____ | NOTE: | ||
: 8. Verify Bus 21 AMMETER and | Amps may vary depending on conditions, and volts are normally ~ 4160. | ||
Amps may vary depending on conditions, and volts are normally ~ 4160 | TRANSFER BUS 23 TO TR-22 | ||
* 9. Position TR-22 to Bus 23 Switch in ON position. | |||
-22 | SYNCHROSCOPE selector switch to ON. _____ _____ _____ | ||
* 9. Position TR-22 to Bus 23 | : 10. Verify: | ||
INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal. | |||
: 10. Verify: INCOMING VOLTS and RUNNING VOLTS meters approximately equal. | approximately equal. | ||
SYNCHRONIZING meter at 12 | Meter NOT rotating. | ||
rotating. | SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished. | ||
rotating. | |||
SYNCHRONIZING meter _____ _____ _____ | |||
lights NOT glowing. | |||
BEGIN ALTERNATE PATH | BEGIN ALTERNATE PATH | ||
* 11. Position TR-22 to Bus 23 breaker control switch to CLOSE. | * 11. Position TR-22 to Bus 23 Breaker does NOT close. | ||
breaker control switch to CLOSE. _____ _____ _____ | |||
S-N-f Page 6 of 9 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
* 12. IMMEDIATELY | UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | ||
* 12. IMMEDIATELY positions TR- GREEN light illuminated. | |||
IF an Operator is dispatched to check the tripped breaker, report: | 22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor. _____ _____ _____ | ||
CUE: | |||
-energize Bus 23 | IF an Operator is dispatched to check the tripped breaker, report: | ||
the breaker is open, with NO flags up. | |||
Examinee notifies the Unit Supervisor. | NOTE: | ||
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23. | |||
: 13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
CUE: | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
: _________ | S-N-f Page 7 of 9 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Job | Operators Name: | ||
Job | |||
==Title:== | |||
RO SRO JPM | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and | ||
Simulator | |||
Simulate Alternate Path | ==Title:== | ||
: | 262L024, Transfer a 4160 volt bus between power supplies. | ||
Yes | K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes | ||
14 minutes Actual Time Used: | |||
minutes | |||
==References:== | ==References:== | ||
DOP 6500-01, rev 10 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-f Page 8 of 9 | |||
Job Performance Measure (JPM) | |||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | |||
: 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received. | |||
: 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising. | |||
: 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22. | |||
Job Performance Measure (JPM) | : 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure. | ||
: 2. Unit 2 was operating at rated power when the TR | INITIATING CUE | ||
-21 trouble alarm is received. 3. The NLO, dispatched to TR | : 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01. | ||
-21, | : 2. Inform the Unit Supervisor when the task is complete. | ||
-21 cooling fans are not all operating and the transformer temperature is rising | S-N-f Page 9 of 9 | ||
-21 by transferring auxiliary power to TR | |||
-22. 5. Another operator will verify TR | |||
-86 Load Tap Changer positions and loading remains below the restrictions of the procedure | |||
: 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR- | |||
-01. 2. Inform the Unit Supervisor when the task is complete. | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 04 Bank JPM. | |||
Revision 05 Revised for 2010 NRC exam. | |||
S-N-g Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12. | : 1. Reset the simulator to IC 12. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Desired substitute position for control rod N | : 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below). | ||
-07 is 48. (Check prior to inserting the malfunction below) | : 3. Enter the following Expert Command prior to starting this JPM. | ||
* IMF RDFAILN7 (RPIS failure for control rod N-07) | |||
IMF RDFAILN7 (RPIS failure for control rod N | : 4. Acknowledge alarms and reset alarms. | ||
-07) 4. Acknowledge alarms and reset alarms. | |||
: 5. Verify RWM operational and on Main Screen. | : 5. Verify RWM operational and on Main Screen. | ||
DOCUMENT PREPARATION Markup a copy of DOP 0400-02. | DOCUMENT PREPARATION Markup a copy of DOP 0400-02. | ||
S-N-g Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 NSO | : 1. You are the Unit 2 NSO. | ||
: 2. Control Rod N-07 rod position has failed. | |||
: 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved. | : 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved. | ||
: 4. The Control Rod has been currently verified to be at position 48. | : 4. The Control Rod has been currently verified to be at position 48. | ||
: 5. The Rod Worth Minimizer is operational. | : 5. The Rod Worth Minimizer is operational. | ||
: 6. No other rods have had a substitute position assigned. | : 6. No other rods have had a substitute position assigned. | ||
INITIATING CUE 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400 | INITIATING CUE | ||
-02, step G.3.c. | : 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c. | ||
: 2. Notify Unit Supervisor when the substitute position has been entered. | : 2. Notify Unit Supervisor when the substitute position has been entered. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | |||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-g Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment # | |||
PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
-02. | Provide examinee a copy of DOP 0400-02. | ||
: 1. Proceed to Step Proceeds to Step G.3.c.(1) of G.3.c.(1) of DOP 0400- DOP 0400-02. | |||
* 2. Selects Secondary Functions, then Substitute Position screen | 02. | ||
* 3. Selects control rod N | * 2. Selects Secondary Substitute Position screen Functions, then SELECTED. | ||
-07 | Substitute Position screen | ||
Control Rod N | * 3. Selects control rod N-07 Control Rod N-07 outlined with on the touch screen. blue box and shown on screen as SELECTED. | ||
-07 outlined with blue box and shown on screen as SELECTED. | * 4. Sets the desired Control POSITION SHOWN on top of Rod position on the bar position bar graph, reads 48. | ||
graph on the left side of the screen. | |||
* 4. Sets the desired Control Rod position on the bar graph on the left side of the screen. | * 5. Touches the ENTER RWM accepts the request, rod REQUEST box. N-07 position indication changes from ?? to substituted 48 position. | ||
: 6. Touches the EXIT RWM returns to the Main FUNCTION box to Display return to the Main Display CUE: | |||
* 5. Touches the ENTER REQUEST box. | Respond as US when examinee informs you they have completed the task END JPM Stop Time:_________ | ||
RWM | S-N-g Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO SRO JPM | |||
K/A Number and Importance: 201006.A4.06 | ==Title:== | ||
Simulator | RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and | ||
Simulator | |||
Simulate Alternate | ==Title:== | ||
Yes | 201L027, Enter Substitute Rod Position. | ||
12 minutes Actual Time Used: | K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
minutes | |||
==References:== | ==References:== | ||
DOP 0400-02, rev 23 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-g Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 NSO. | : 1. You are the Unit 2 NSO. | ||
: 2. Control Rod N-07 rod position has failed. 3. Control Rod N | : 2. Control Rod N-07 rod position has failed. | ||
-07 was verified to be at position 48 prior to failure, and has NOT been moved. | : 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved. | ||
: 4. The Control Rod has been currently verified to be at position 48. | : 4. The Control Rod has been currently verified to be at position 48. | ||
: 5. The Rod Worth Minimizer is operational. | : 5. The Rod Worth Minimizer is operational. | ||
: 6. No other rods have had a substitute position assigned | : 6. No other rods have had a substitute position assigned. | ||
INITIATING CUE | |||
: 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N | : 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c. | ||
-07 in accordance with DOP 0400 | |||
-02, step G.3.c. | |||
: 2. Notify Unit Supervisor when the substitute position has been entered. | : 2. Notify Unit Supervisor when the substitute position has been entered. | ||
S-N-g Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 00 New JPM developed for 2010 NRC exam. | |||
S-N-h Page 2 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. Reset the simulator to IC 12. | : 1. Reset the simulator to IC 12. | ||
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently. | ||
: 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation | : 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation. | ||
: 3. Setup the following Triggers: | |||
* None. | |||
DOCUMENT PREPARATION Markup a copy of DOP 5400-05. | |||
S-N-h Page 3 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation | : 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation. | ||
INITIATING CUE | |||
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400 | : 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4. | ||
-05, step G.4 | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-h Page 4 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment # | |||
PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
_____ | Provide the Examinee with the provided copy of DOP 5400-05. | ||
: 2. Determines the correct step to utilize is step G. | : 1. Proceeds to step G.4 of Locates step G.4 of the DOP 5400-05. procedure (which then directs next step). _____ _____ _____ | ||
-05. | : 2. Determines the correct Proceeds to step G.21 of the step to utilize is step procedure. | ||
_____ | G.21 of DOP 5400-05. _____ _____ _____ | ||
* 3. Close AO 2-5417, ADSORBER TRN 2 BYPASS VLV | * 3. Close AO 2-5417, GREEN light illuminated. | ||
ADSORBER TRN 2 BYPASS VLV. | |||
* 4. Close AO 2-5423, GREEN light illuminated. | |||
* 4. Close AO 2-5423, ADSORBER TRN 3 BYPASS VLV | ADSORBER TRN 3 BYPASS VLV. | ||
. | * 5. Open AO 2-5415, GREEN light illuminated. | ||
ADSORBER TRN 1 DISCH VLV. | |||
* 5. Open AO 2-5415, ADSORBER TRN 1 DISCH VLV. | * 6. Open AO 2-5421, GREEN light illuminated. | ||
ADSORBER TRN 2 DISCH VLV. | |||
* 6. Open AO 2-5421, ADSORBER TRN 2 DISCH VLV. | * 7. Close AO 2-5416, GREEN light illuminated. | ||
ADSORBER TRN 1 BYPASS VLV. | |||
* 7. Close AO 2-5416, ADSORBER TRN 1 BYPASS VLV | * 8. Close AO 2-5422, GREEN light illuminated. | ||
. | ADSORBER TRN 2 BYPASS VLV. | ||
* 8. Close AO 2-5422, ADSORBER TRN 2 BYPASS VLV | : 9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion. | ||
. | CUE: | ||
: 9. Notify Unit Supervisor of | |||
Unit Supervisor notified of task completion. | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-h Page 5 of 7 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
==Title:== | |||
RO SRO JPM | |||
Suggested Testing Environment: | ==Title:== | ||
Simulator | OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and | ||
Simulator | |||
Simulate Alternate Path | ==Title:== | ||
: | 271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
DOP 5400-05, rev 32 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-h Page 6 of 7 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are the Unit 2 Aux NSO. | : 1. You are the Unit 2 Aux NSO. | ||
: 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation. | : 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400 | : 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4. | ||
-05, step G.4 | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-h Page 7 of 7 | |||
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By: | |||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 09 Bank JPM. | |||
Revision 10 Revised for 2010 NRC Exam. | |||
S-N-i Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this JPM is performed in the plant. | : 1. None, this JPM is performed in the plant. | ||
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03. | DOCUMENT PREPARATION Markup a copy of DEOP 0500-03. | ||
S-N-i Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. Unit 2 has just scrammed. | : 1. You are an extra NSO. | ||
: 2. Unit 2 has just scrammed. | |||
: 3. A LOCA is causing RPV level to lower. | : 3. A LOCA is causing RPV level to lower. | ||
: 4. The Clean Demin Water system is operating normally. | : 4. The Clean Demin Water system is operating normally. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500 | : 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4. | ||
-03, step G.4. | |||
: 2. Inform the Unit Supervisor when the task is complete. | : 2. Inform the Unit Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | |||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-i Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee with the supplied copy of DEOP 0500-03. | |||
The examinee is required only to identify which type of key is required to open the valve | The examinee is NOT required to obtain a key to open or close locked valves. | ||
The examinee is required only to identify which type of key is required to open the valve. | |||
: 1. Proceeds to the Unit 2 Proceeds to the U2 SBLC Standby Liquid Control area. | |||
* 2. Unlock and close 2-1101-4, | (SBLC) area. _____ _____ _____ | ||
_____ | * 2. Unlock and close 2-1101-4, Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. hand wheel full clockwise. _____ _____ _____ | ||
The component is in the condition you have described | CUE: | ||
. | The component is in the condition you have described. | ||
* 3. Unlock and close 2-1199-37 | * 3. Unlock and close 2-1199-37 Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. handle 1/4 turn clockwise. _____ _____ _____ | ||
_____ | CUE: | ||
The component is in the condition you have described | The component is in the condition you have described. | ||
. | * 4. Open 2-4315-500, CLEAN Rotates valve hand wheel DEMIN WTR SUPPLY TO full counter-clockwise. | ||
* 4. Open 2-4315-500, CLEAN DEMIN WTR SUPPLY TO | SBLC SV. _____ _____ _____ | ||
-clockwise. | CUE: | ||
_____ | The component is in the condition you have described. | ||
The component is in the condition you have described | * 5. Open 2-1101-7, CLEAN Rotates valve hand wheel DEMIN WTR TO SBLC TEST full counter-clockwise. | ||
. | TK SV. _____ _____ _____ | ||
* 5. Open 2-1101-7, CLEAN DEMIN WTR TO SBLC TEST | CUE: | ||
-clockwise. | The component is in the condition you have described. | ||
_____ | S-N-i Page 5 of 8 | ||
The component is in the condition you have described | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 6. Unlock and open 2-1101-8, SBLC TEST TK OUTLET SV | * 6. Unlock and open 2-1101-8, Unlock lock and removes SBLC TEST TK OUTLET SV. chain, then rotates valve hand wheel full counter- _____ _____ _____ | ||
. | clockwise. | ||
- | CUE: | ||
_____ | The component is in the condition you have described. | ||
The component is in the condition you have described | NOTE: | ||
* 7. Start both SBLC pumps from Contacts the Unit 2 Control the main Control Room. Room Operator to start the SBLC pumps. _____ _____ _____ | |||
* 7. Start both SBLC pumps from the main Control Room. | CUE: | ||
_____ | |||
I have started both Unit 2 Standby Liquid Control pumps. | I have started both Unit 2 Standby Liquid Control pumps. | ||
: 8. Throttle 2-1101-7, CLEAN Opens / closes valve to DEMIN WTR TO SBLC TEST maintain test tank level. | |||
TK SV, to stabilize level in _____ _____ _____ | |||
tank. | |||
CUE: | |||
The test tank level is now stabilized (as much going in as is going out). | The test tank level is now stabilized (as much going in as is going out). | ||
: 9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
Examinee notifies the Unit | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-i Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
. | ==Title:== | ||
K/A Number and Importance: | RO SRO JPM | ||
295031.A1.08 | |||
: | ==Title:== | ||
Simulator | LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and | ||
Simulate Alternate Path | |||
: | ==Title:== | ||
Yes | 295L088, Line Up SBLC Test Tank for Alternate Water Injection. | ||
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes | |||
minutes | |||
==References:== | ==References:== | ||
DEOP 0500-03, rev 19 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-i Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. | : 1. You are an extra NSO. | ||
: 2. Unit 2 has just scrammed. | : 2. Unit 2 has just scrammed. | ||
Line 2,019: | Line 1,974: | ||
: 4. The Clean Demin Water system is operating normally. | : 4. The Clean Demin Water system is operating normally. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500 | : 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4. | ||
-03, | : 2. Inform the Unit Supervisor when the task is complete. | ||
S-N-i Page 8 of 8 | |||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 01 Bank JPM. | |||
Revision 02 Revised for 2010 NRC exam. | |||
S-N-j Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this JPM is performed in the plant. | : 1. None, this JPM is performed in the plant. | ||
DOCUMENT PREPARATION Markup a copy of DOA 6600-01. | DOCUMENT PREPARATION Markup a copy of DOA 6600-01. | ||
S-N-j Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. Annunciator | : 1. You are an extra NSO. | ||
: 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated. | |||
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600 | INITIATING CUE | ||
-01, attachment A | : 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A. | ||
: 2. Inform the Unit Supervisor when the task is complete. | |||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | |||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-j Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee with the supplied copy of DOA 6600-01. | |||
. | : 1. Proceeds to the 2/3 Diesel Proceeds to the 2/3 Diesel Generator Room. Generator Room. | ||
* 2. Examinee checks the level in Observes day tank the D/G Fuel Oil Day Tank. sightglass and determines day tank needs filling. | |||
* 2. Examinee checks the level in the D/G Fuel Oil Day Tank. | CUE: | ||
Point to the lower third area on the local sightglass measuring stick and state: the level is here. | |||
NOTE: | |||
Point to the lower third area on the local sightglass measuring stick and state: | Normal level is 30 - 38". | ||
: 3. Verify that power is available Verifies power available, to the DIESEL FUEL OIL by local indicating lights TRANSFER PUMP 2/3. illuminated. | |||
CUE: | |||
The GREEN LIGHT is illuminated. | The GREEN LIGHT is illuminated. | ||
* 4. Start the Fuel Oil Transfer Holds 2/3-5203 U2 Diesel Pump by holding local Test Oil Transfer Pp c/s in ON Switch in the ON position. position. | |||
CUE: | CUE: | ||
The pump is running. | The pump is running. | ||
You have held the switch for approximately 5 minutes. | |||
S-N-j Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 5. Checks the level in the fuel oil day tank. | * 5. Checks the level in the fuel oil OBSERVES sight glass day tank. and/or REQUESTS annunciator 902-8 G-4 status. _____ _____ _____ | ||
-8 G-4 status. _____ | CUE: | ||
Point to the 35 inch mark on the local sightglass measuring stick and state: | Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here. | ||
-8 G-4 has reset. | AND/OR the NSO says Control Room alarm 902-8 G-4 has reset. | ||
: 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
Examinee notifies the Unit Supervisor. | CUE: | ||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
S-N-j Page 6 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job | Job | ||
K/A Number and Importance: | ==Title:== | ||
264000.G.1.30 | RO SRO JPM | ||
In-Plant | |||
Simulator | ==Title:== | ||
Simulate Alternate Path | : EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK Revision Number: 02 JPM Number: S-N-j Task Number and | ||
: | |||
Yes | ==Title:== | ||
12 minutes Actual Time Used: | 264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps. | ||
minutes | K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes | ||
==References:== | ==References:== | ||
DOA 6600-01, rev 15 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-j Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO. 2. Annunciator 902 | : 1. You are an extra NSO. | ||
-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated. | : 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated. | ||
INITIATING CUE | INITIATING CUE | ||
: 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600 | : 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A. | ||
-01, attachment A. | : 2. Inform the Unit Supervisor when the task is complete. | ||
: 2. Inform the Unit Supervisor when the task is complete | S-N-j Page 8 of 8 | ||
Exelon Nuclear Job Performance Measure | Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By: | ||
Instructor Date Approved By: | |||
Facility Representative Date | |||
Job Performance Measure (JPM) | |||
Revision Record (Summary) | |||
Revision 10 Bank JPM. | |||
Revision 11 Revised for 2010 NRC Exam. | |||
S-N-k Page 2 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
SIMULATOR SETUP INSTRUCTIONS | |||
: 1. None, this JPM is performed in the plant. | : 1. None, this JPM is performed in the plant. | ||
DOCUMENT PREPARATION Markup a copy of DOP 4650-01. | DOCUMENT PREPARATION Markup a copy of DOP 4650-01. | ||
S-N-k Page 3 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO | : 1. You are an extra NSO. | ||
: 2. Control Room personnel have noticed a pungent odor in the Control Room. | |||
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse. | : 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse. | ||
: 4. The Unit 3 Supervisor has evacuated ALL non | : 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs. | ||
-essential personnel from the Control Room and has directed all NSOs to don SCBAs | : 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01. | ||
INITIATING CUE | |||
-01. INITIATING CUE | : 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3. | ||
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650 | |||
-01, step G.3. | |||
: 2. Inform the Unit 3 Supervisor when the task is complete. | : 2. Inform the Unit 3 Supervisor when the task is complete. | ||
Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | Fill in the JPM Start Time when the student acknowledges the Initiating Cue. | ||
Information For | Information For Evaluators Use: | ||
UNSAT requires written comments on respective step. | UNSAT requires written comments on respective step. | ||
* Denotes critical steps. | * Denotes critical steps. | ||
Denotes critical elements of a critical step. | * Denotes critical elements of a critical step. | ||
Number any comments in the | Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations. | ||
Some operations that are performed from outside of the control room may require multiple steps. | Some operations that are performed from outside of the control room may require multiple steps. | ||
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed. | ||
The timeclock starts when the candidate acknowledges the initiating cue. | The timeclock starts when the candidate acknowledges the initiating cue. | ||
S-N-k Page 4 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
JPM Start Time: _________ | |||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE: | |||
Provide the Examinee with the supplied copy of DOP 4650-01. | |||
-01. | : 1. Proceeds to Emergency Proceeds to Emergency Breathing Air manifold in Unit Breathing Air manifold in 2 Battery Room. Unit 2 Battery Room. _____ _____ _____ | ||
. | : 2. Verify the following: Verifies valve handle perpendicular to valve body for: | ||
_____ | * LP-1 CLOSED | ||
: 2. Verify the following: | * LP-1 | ||
LP-1 CLOSED | * LP-2 CLOSED | ||
* 3. OPEN all Main Bank Cylinder shutoff valves (Cylinders 7 | * LP-2 _____ _____ _____ | ||
* LP-3 CLOSED | |||
-13 full counter clockwise. | * LP-3 | ||
_____ | * LP-4 CLOSED | ||
* LP-4 | |||
* 3. OPEN all Main Bank Cylinder Turns hand wheels on shutoff valves (Cylinders 7 cylinders 7-13 full counter through 13). clockwise. _____ _____ _____ | |||
CUE: | |||
The component is in the condition you have described. | The component is in the condition you have described. | ||
NOTE: | |||
-13. | Count cylinders from left to right to find cylinders 7-13. | ||
* 4. Check Main Bank pressure | * 4. Check Main Bank pressure. Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side _____ _____ _____ | ||
. Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. | gauge). | ||
NOTE: | |||
Have examinee read actual pressure. | Have examinee read actual pressure. | ||
CUE: | CUE: | ||
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here. | |||
S-N-k Page 5 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT | |||
* 5. Pressurize the supply manifold from the Main Bank by opening LP | * 5. Pressurize the supply OPENS valve LP-3 by manifold from the Main Bank turning valve handle by opening LP-3, CR EMERG counter clockwise 1/4 turn _____ _____ _____ | ||
-3, CR EMERG | AIR BREATHING CYL SV. so handle is in-line with valve body CUE: | ||
-line with valve body | |||
The component is in the condition you have described. | The component is in the condition you have described. | ||
: 6. Verify pressure regulator VERIFIES manifold PRV-3 is maintaining pressure between 65 and manifold pressure >65 psig 80 psig as read on CR _____ _____ _____ | |||
and <80 psig. EMER AIR BREATHING CYL OUTLET PRV. (left side gauge). | |||
CUE: | |||
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here. | If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here. | ||
NOTE: | |||
Examinee notifies the Unit Supervisor. | Have examinee read actual pressure. | ||
: 7. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor. | |||
CUE: | |||
Acknowledge report of task completion. | Acknowledge report of task completion. | ||
END JPM Stop Time:_________ | |||
:_________ | S-N-k Page 6 of 8 | ||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
Operators Name: | |||
Job Title: | Job | ||
==Title:== | |||
RO SRO JPM | |||
==Title:== | |||
VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and | |||
Suggested Testing Environment | ==Title:== | ||
: | 279M001, Valve in Control Room Breathing Air Supply. | ||
Simulator | K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes | ||
Simulate Alternate Path | |||
: | |||
Yes | |||
minutes | |||
==References:== | ==References:== | ||
DOP 4650-01, rev 09 EVALUATION | |||
==SUMMARY== | |||
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments: | |||
Evaluators Name (Print): | |||
Evaluators Signature: Date: | |||
S-N-k Page 7 of 8 | |||
Job Performance Measure (JPM) | Job Performance Measure (JPM) | ||
INITIAL CONDITIONS | |||
: 1. You are an extra NSO | : 1. You are an extra NSO. | ||
: 2. Control Room personnel have noticed a pungent odor in the Control Room. | |||
: 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse. | : 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse. | ||
: 4. The Unit 3 Supervisor has evacuated ALL non | : 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs. | ||
-essential personnel from the Control Room and has directed all NSOs to don SCBAs | : 5. The Control Room Emergency Air system is currently in STANDBY IAW DOP 4650-01. | ||
INITIATING CUE | |||
: 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3. | : 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3. | ||
: 2. Inform the Unit 3 Supervisor when the task is complete.}} | : 2. Inform the Unit 3 Supervisor when the task is complete. | ||
S-N-k Page 8 of 8}} |
Latest revision as of 19:29, 20 March 2020
ML12021A023 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 03/29/2011 |
From: | Bielby M Operations Branch III |
To: | Exelon Generation Co |
Shared Package | |
ML11104A072 | List: |
References | |
Download: ML12021A023 (156) | |
Text
Exelon Nuclear Job Performance Measure PERFORM CALCULATED DRYWELL LEAKRATE JPM Number: A-N-1-R Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date A-N-1-R
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-1-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION Markup a copy of Appendix A.
A-N-1-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 NSO.
- 2. Unit 3 is operating at rated conditions.
- 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.
INITIATING CUES
- 1. Perform the required calculations and ensure the acceptance criteria have been met.
- 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment #
PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee the copy of Appendix X, with the times and gallons pumped completed.
- 1. Complete Appendix A, Completes Appendix A, page(s) page(s), with the results matching those on the provided KEY. _____ _____ _____
- 2. Informs the Unit Notifies Unit Supervisor.
Supervisor that Acceptance Criteria has been exceeded for _____ _____ _____
Floor Drain Leakage on FRI 1600 HOURS (5.10 gpm).
CUE:
Acknowledge report.
END JPM Stop Time:_________
A-N-1-R Page 5 of 7
Operators Name:
Job
Title:
Title:
Perform Calculated Drywell Leak Rate JPM Number: A-N-1-R Revision Number: 01 Task Number and
Title:
29800LP013, Perform the duties of a Unit NSO including monitoring the unit, answering the phones and radio, completing logs, surveillances, and daily sheets, and filling out and conducting a shift turnover.
K/A Number and Importance: Generic.2.1.18 3.6 / 3.8 Suggested Testing Environment:Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 16 minutes Actual Time Used: minutes
References:
Appendix A, Rev 124 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name: (Print)
Evaluators Signature: Date:
A-N-1-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 NSO.
- 2. Unit 3 is operating at rated conditions.
- 3. The previous shift NSOs have completed the Appendix A MODE 1, 2, AND 3 REACTOR COOLANT LEAKAGE LOG through Saturday 0000, but some calculations need to be re-performed.
INITIATING CUES
- 1. Perform the required calculations and ensure the acceptance criteria have been met.
- 2. When complete, give the completed paperwork to the Unit Supervisor for approval.
A-N-1-R Page 7 of 7
Exelon Nuclear Job Performance Measure PERFORM OFF-SITE SOURCES AVAILABLE JPM Number: A-N-2-R Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
A-N-2-R Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 2. Insert the following override:
- IOR acd231ab OFF DOCUMENT PREPARATION
- 1. Copy of Appendix X, with data filled out for Unit 3 on attachment 3.
A-N-2-R Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 and Unit 3 are operating at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
INITIATING CUE
- 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
- 2. The Unit 3 assist NSO has already collected the data for Unit 3.
- 3. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-R Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of Appendix X.
- 1. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position.
position. _____ _____ _____
- 2. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position.
position. _____ _____ _____
- 3. Record & initial TR 22 to Bus Examinee records 24 GCB (902-8) position. CLOSED position.
- 4. Record & initial Bus 24 & Bus Examinee records 24-1 Tie GCB (902-8) CLOSED position.
position. _____ _____ _____
- 5. Record & initial Bus 24-1 & Examinee records OPEN Bus 34-1 Tie ACB (902-8) position.
position. _____ _____ _____
- 6. Record & initial Bus 23-1 & Examinee records actual Bus 24-1 Volts, by selecting voltage (~4160 Volts).
Bus 23-1. _____ _____ _____
NOTE:
The candidate may select the A/B phase in any of the three flowing steps.
When the A/B phase is selected, it will read 0 (malfunction in setup).
- 7. Record & initial Bus 23-1 & Examinee discovers that Bus 24-1 Volts, by selecting the A/B phase reads 0 Bus 24-1. and reports to the Unit Supervisor that a local _____ _____ _____
reading will be required.
CUE:
The local voltage reading for Bus 23-1 & Bus 24-1 Volts, phase A/B, is 4155 volts.
A-N-2-R Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 8. Directs EO or Field Directs EO or Field Supervisor to take local Supervisor to take local reading for Bus 23-1 & Bus reading. _____ _____ _____
24-1 Volts, phase A/B.
- 9. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 23. voltage (~4160 Volts).
- 10. Record & initial Bus 23 & Bus Examinee records actual 24 Volts, by selecting Bus 24. voltage (~4160 Volts).
- 11. Indicate acceptance criteria Examinee circles YES for met. acceptance criteria.
- 12. Enter signature, date, and Examinee enters time, for Performed By. signature, current date, and current time, for _____ _____ _____
Performed By.
- 13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-2-R Page 6 of 8
Operators Name:
Job
Title:
Title:
PERFORM OFF-SITE SOURCES AVAILABLE Revision Number: 05 JPM Number: A-N-2-R Task Number and
Title:
299L044 Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31 4.6 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes
References:
Appendix X, rev 30 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-2-R Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 and Unit 3 are operating at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
INITIATING CUE
- 1. The Unit Supervisor has just directed you to verify off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X, Attachment 3 ONLY, as required by T.S 3.8.1 action condition B.1.
- 2. The Unit 3 assist NSO has already collected the data for Unit 3.
- 3. Inform the Unit Supervisor when the task is complete.
A-N-2-R Page 8 of 8
Exelon Nuclear Job Performance Measure VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE JPM Number: A-N-3-R Revision Number: 02 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
A-N-3-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 6600-02.
A-N-3-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The NLO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 6600-02.
- 1. Candidate should identify Identifies differential step I.5 has a mathematical pressure should read 4.
error. _____ _____ _____
- 2. Candidate should identify Identifies incorrect step I.15 OR step I.16 is verification of dP <6.
signed off as verified dP of <6 _____ _____ _____
(actual is 7).
- 3. Candidate should identify that Identifies step NOT steps I.21.a & b have been independently verified.
initialed by the same person _____ _____ _____
performing the surveillance and were NOT independently verified.
- 4. Notify Unit Supervisor of Notifies Unit Supervisor, discrepancies. may dispatch Operators to verify/correct issues, also _____ _____ _____
may initiate IR.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-R Page 5 of 7
Operators Name:
Job
Title:
Title:
VERIFY REVERSAL OF EDG COOLING WATER FLOW SURVEILLANCE Revision Number: 02 JPM Number: A-N-3-R Task Number and
Title:
299L080 Perform the administrative duties for conduct of surveillance, special, or complex procedures K/A Number and Importance: Generic.2.2.12 3.7 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
DOS 6600-02, rev 19 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-3-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. DOS 6600-02 was performed last shift, for the U2 Diesel Generator Cooling Water Flow Reversal.
- 3. The off-going Field Supervisor was unable to verify the paperwork, and has turned it over to you.
- 4. The NLO reported all surveillance requirements were within specifications.
INITIATING CUE
- 1. Perform calculation verification and ensure paperwork is correct.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-3-R Page 7 of 7
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-R Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-R Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
- 3. Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-R Page 3 of 7
INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-R Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
- 1. Examinee fills out running See attached key.
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____
- 2. Examinee calculates Dilution See attached key.
flow (1,017,000 gpm).
- 3. Examinee enters dilution flow See attached key.
(from above) to calculate CCSW Activity Limit. _____ _____ _____
- 4. Examinee calculates CCSW See attached key.
-5 Activity Limit (2.91 x 10 ).
- 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.
sample limit exceeds the allowable discharge. _____ _____ _____
- 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-R Page 5 of 7
Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-R Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOS 1500-08, rev 17 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-4-R Page 6 of 7
INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-4-R Page 7 of 7
Exelon Nuclear Job Performance Measure REPORTABILITY DETERMINATION JPM Number: A-N-1-S Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for2010 NRC exam.
A-N-1-S Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. None.
A-N-1-S Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The following timeline occurred:
- 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
- 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
- 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
- 3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the reportability requirements.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-1-S Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Candidate locates a copy of Reportability Manual LS-AA-1110.
- 1. Determines the event is Determines the event is reportable per SAF 1.9. reportable per SAF 1.9, News Release or Notification of Other _____ _____ _____
Government Agency.
- 2. Determines the time limit to Determines the time limit Notify the NRC Operations to Notify the NRC Center via the ENS within Operations Center via the four hours of the occurrence. ENS within four hours of the occurrence of any event or situation related to the health and safety of the public or onsite personnel, or protection of the environment, for which a news release is planned or notification to other government agencies has _____ _____ _____
been or will be made.
END JPM Stop Time:_________
A-N-1-S Page 5 of 7
Operators Name:
Job
Title:
Title:
REPORTABILITY DETERMINATION Revision Number: 00 JPM Number: A-N-1-S Task Number and
Title:
299L001, Determine Reportability requirements as outlined in station Reportability manual.
K/A Number and Importance: Generic.2.1.2 4.1 / 4.4 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 10 minutes Actual Time Used: minutes
References:
Reportability Manual LS-AA-1110, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-1-S Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 3 Unit Supervisor.
- 2. The following timeline occurred:
- 1500 - a rented backhoe was released by Dresden station to the vendors off-site facility.
- 1600 - at the vendors off-site facility, it was discovered that the released backhoe had a LOW LEVEL contamination.
- 1700 - corporate issues a press release to notify the public of the released contaminated backhoe.
- 3. The time is now 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br />.
INITIATING CUE
- 1. Utilizing the Reportability Manual, determine the reportability requirements.
A-N-1-S Page 7 of 7
Exelon Nuclear Job Performance Measure REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK JPM Number: A-N-2-S Revision Number: 04 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 03 Bank JPM.
Revision 04 Revised for 2010 NRC exam.
A-N-2-S Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
DOCUMENT PREPARATION
- 1. Provide a marked up copy of Appendix X, with pages 9 and 10 filled in.
A-N-2-S Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
- 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
- 1. Review the data and complete the paperwork.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-2-S Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of Appendix X with a completed Attachment 3.
- 1. Verifies data all entered. Notes Bus 23-1 & Bus 24-1 Volts, (Bus 24-1) is NOT
> 3851 Volts. _____ _____ _____
- 2. Verifies data all entered. Notes Bus 23 & Bus 24 Volts, (Bus 24) is NOT >
3851 Volts. _____ _____ _____
- 3. Verify data is accurate, by Verifies Voltmeter Bus 23-reading Voltmeter. 1 & Bus 24-1 Volts (Bus 24-1) and Voltmeter Bus _____ _____ _____
23 & Bus 24 Volts (Bus 24), for correct voltage and corrects paperwork, by lining out and initial/dating incorrect value (~4160) and replacing with correct value, CUE:
If Candidate states the he/she would return surveillance to the NSO for corrections, inform the Examinee to make any corrections.
END JPM Stop Time:_________
A-N-2-S Page 5 of 7
Operators Name:
Job
Title:
Title:
REVIEW OFF-SITE POWER SOURCES AVAILABLE PAPERWORK Revision Number: 04 JPM Number: A-N-2-S Task Number and
Title:
299L044, Perform administrative duties for a malfunction of a piece of safety related equipment.
K/A Number and Importance: Generic.2.1.31 4.2 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
Appendix X, rev 30 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-2-S Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Supervisor.
- 2. Unit 2 and Unit 3 are at near rated power.
- 3. The Unit 2 EDG was declared inoperable 10 minutes ago, following a failed surveillance.
- 4. An NSO collected data for verifying off-site power availability with the Unit 2 EDG inoperable, in accordance with Appendix X Attachment 3 INITIATING CUE
- 1. Review the data and complete the paperwork.
A-N-2-S Page 7 of 7
Exelon Nuclear Job Performance Measure REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS JPM Number: A-N-3-S Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
A-N-3-S Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of Appendix A.
A-N-3-S Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. Unit 2 is operating at rated conditions.
- 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
- 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
- 2. Correct any discrepancies noted (if any).
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-3-S Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of Appendix A.
If asked, leak check is in progress and/or Drywell samples and CAM results are trending up.
- 1. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for THU 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 4.50 gpm. _____ _____ _____
- 2. Determine Calculated Floor Determines TOTAL leakage Drain Leakage is correct. for FRI 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br /> should be 12.13 gpm.
NOTE:
If asked to correct Floor Drain leakage numbers and Total leakage, instruct the examinee to make corrections and perform calculation based on numbers given.
- 3. Determine Calculated Floor Determines Floor Drain Drain Leakage is correct. leakage for FRI 1200 hours0.0139 days <br />0.333 hours <br />0.00198 weeks <br />4.566e-4 months <br /> should be 5.15 gpm (TS). _____ _____ _____
- 4. References Tech Specs. References Tech Spec 3.4.4 and recognizes
- >5 gpm unidentified leakage for FRI 1600 hours0.0185 days <br />0.444 hours <br />0.00265 weeks <br />6.088e-4 months <br />.
Recognizes in Cond A.
- 5. Reports discrepancies. Examinee reports discrepancies noted.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-3-S Page 5 of 7
Operators Name:
Job
Title:
Title:
REVIEW CALCULATED DRYWELL LEAKRATE AND IDENTIFY TECH SPECS Revision Number: 01 JPM Number: A-N-3-S Task Number and
Title:
29900LK108, Discuss the Unit Supervisors responsibilities for plant operation.
K/A Number and Importance: Generic.2.2.40 3.4 / 4.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
Appendix A, rev 124 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-3-S Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Unit Supervisor.
- 2. Unit 2 is operating at rated conditions.
- 3. The Aux NSO has completed the Saturday 1200 Appendix A MODE 1, 2 ,
AND 3 REACTOR COOLANT LEAKAGE LOG.
INITIATING CUE
- 1. The Shift Manager has directed you to complete a record review of the past three days Appendix A MODE 1, 2 , AND 3 REACTOR COOLANT LEAKAGE LOG.
- 2. Correct any discrepancies noted (if any).
A-N-3-S Page 7 of 7
Exelon Nuclear Job Performance Measure PERFORM CCSW ACTIVITY CALCULATION JPM Number: A-N-4-S Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-4-S Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
- 3. Ensure a calculator is available and the memory/display has been cleared.
DOCUMENT PREPARATION
- 1. Provide a marked up copy of DOS 1500-08.
A-N-4-S Page 3 of 7
INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-4-S Page 4 of 7
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOS 1500-08.
The following steps can be performed in any order.
- 1. Examinee fills out running See attached key.
pumps for dilution flow (3 Circ pump per unit and 5 Service Water pumps). _____ _____ _____
- 2. Examinee calculates Dilution See attached key.
flow (1,017,000 gpm).
- 3. Examinee enters dilution flow See attached key.
(from above) to calculate CCSW Activity Limit. _____ _____ _____
- 4. Examinee calculates CCSW See attached key.
-5 Activity Limit (2.91 x 10 ).
- 5. Recommends to the Unit Makes recommendation to Supervisor that the calculated Unit Supervisor.
sample limit exceeds the allowable discharge. _____ _____ _____
- 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
A-N-4-S Page 5 of 7
Operators Name:
Job
Title:
Title:
PERFORM CCSW ACTIVITY CALCULATION Revision Number: 01 JPM Number: A-N-4-S Task Number and
Title:
277L003, Perform discharge of CCSW from contaminated LPCI heat exchanger during CCSW pump operation surveillance.
K/A Number and Importance: Generic.2.3.11 3.8 / 4.3 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOS 1500-08, rev 16 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-4-S Page 6 of 7
INITIAL CONDITIONS
- 1. You are an on-shift Operator.
- 2. The Unit 2 NSO started DOS 1500-08, then had to leave shift for medical reasons.
INITIATING CUE
- 1. Complete DOS 1500-08.
- 2. Inform the Unit Supervisor when the task is complete.
A-N-4-S Page 7 of 7
Exelon Nuclear Job Performance Measure AUTHORIZE USE OF KI JPM Number: A-N-5-S Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Bank JPM.
Revision 01 Revised for 2010 NRC exam.
A-N-5-S Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
- 1. This is a tabletop JPM utilizing simulator procedures.
- 2. No Simulator setup needed.
DOCUMENT PREPARATION
- 1. Two (2) marked up copies of EP-AA-113-F-02.
- 2. Blank copy of EP-AA-113.
- 3. Blank copy of EP-AA-113-F-03.
A-N-5-S Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Station Emergency Director.
- 2. A General Emergency has been declared.
- 3. There is an offsite release in progress.
- 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
- 5. Containment is currently being challenged.
- 7. An Emergency life saving operation MUST be performed.
- 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
- 9. The operation requires two people to enter the field.
- 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
- 11. Clay and Jax have NEVER received an emergency exposure before.
- 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
- 1. Execute section 4.4 of EP-AA-113.
A-N-5-S Page 4 of 9
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
A-N-5-S Page 5 of 9
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee the provided copies of:
EP-AA-113-F-02, EP-AA-113, and EP-AA-113-F-03
- 1. Applicant determines need for Emergency action is emergency action. needed per initiating cue.
CUE:
If asked, Clay and Jax do NOT have any adverse reactions to KI.
- 2. Applicant recognizes per the Recognizes that initiating cue that authorization to take KI authorization to take KI must must also be completed.
also be completed prior to the _____ _____ _____
emergency workers entering the space.
- 3. Determines there is or has Determines KI must be been a Loss of Fuel Clad issued.
Barrier (based on initiating cues). Determines from step 4.4.1.B, condition 1, that workers will be entering an unknown radiological atmosphere that is suspected to have a high iodine concentration. Determines KI must be issued.
- 4. Documents the decision to BOTH individuals being issue KI using THYROID authorized for KI and BLOCKING AGENT entering the space must be AUTHORIZATION Form listed with their correct (EP-AA-113-F-03). names and employee ID numbers:
- Clay Morrow _____ _____ _____
123456
- Jax Teller 891011 A-N-5-S Page 6 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
If asked for Radiation Protection Manager to sign and date EP-AA-113-F-03, enter name as TIG TRAGER and todays date in the appropriate blanks.
- 5. Notifies Occupational Health Examinee states that (Medical) Services he/she would notify OHS.
Department promptly that KI _____ _____ _____
is to be issued to Exelon Nuclear personnel or contractors.
NOTE:
JPM is complete when applicant notifies OHS of KI use.
END JPM Stop Time:_________
A-N-5-S Page 7 of 9
Operators Name:
Job
Title:
Title:
AUTHORIZE USE OF KI Revision Number: 01 JPM Number: A-N-5-S Task Number and
Title:
29900LK150, Discuss the responsibilities of the Shift Manager regarding Reportability determination and event notifications.
K/A Number and Importance: Generic.2.4.40 2.7 / 4.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 20 minutes Actual Time Used: minutes
References:
EP-AA-113, rev B; EP-AA-113-F-03, rev D; EP-AA-113, rev 10 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
A-N-5-S Page 8 of 9
INITIAL CONDITIONS
- 1. You are the Station Emergency Director.
- 2. A General Emergency has been declared.
- 3. There is an offsite release in progress.
- 4. A Loss of the Fuel Clad Barrier has occurred, together with a failure of the RCS.
- 5. Containment is currently being challenged.
- 7. An Emergency life saving operation MUST be performed.
- 8. The operation will take between 15 and 20 minutes in a 200 R/hr field (CDE) with unknown fission product gas concentration in the room.
- 9. The operation requires two people to enter the field.
- 10. Clay Morrow, Employee ID# 123456 and Jax Teller Employee ID# 891011 have volunteered.
- 11. Clay and Jax have NEVER received an emergency exposure before.
- 12. Authorization for Emergency Exposure (EP-AA-113-F-02 forms) have been filled out for Clay and Jax.
INITIATING CUES
- 1. Execute section 4.4 of EP-AA-113.
A-N-5-S Page 9 of 9
Exelon Nuclear Job Performance Measure SBLC - INJECTION WITH RWCU ISOLATION FAILURE JPM Number: S-N-a Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 Modified for 2010 NRC exam.
S-N-a Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- IMF CIRWCUAP (2-1201-1 valve failure to close - and allows manual closure).
- IMF CIRWCUBP (2-1201-2 valve failure to close - and allows manual closure).
- 3. Setup the following Triggers:
- None.
DOCUMENT PREPARATION DOP 1100-02 hardcard.
S-N-a Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-a Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Examinee should locate the hard card, then provide the included copy.
- 1. Place the SBLC INJECTION Turns the SBLC CONTROL keylock switch to INJECTION CONTROL the SYS 1 OR SYS 2 keylock switch to either the position. intermediate right OR _____ _____ _____
intermediate left position.
pilot light NOT lit.
- 3. Verifies applicable PUMP PUMP 1 or PUMP 2 light pilot light lit. on.
- 4. Verifies FLOW pilot light lit. WHITE light illuminated.
- 5. SBLC SQUIB VLV CKT Annunciator 902-5 H-6 FAILURE annunciator alarms illuminated.
(902-5 H-6). _____ _____ _____
BEGIN ALTERNATE PATH
- 6. Verifies RWCU valve Examinee recognizes that 2-1201-1 closed. valve 2-1201-1 valve did NOT close. _____ _____ _____
- 7. Verifies RWCU valve Takes manual action for a 2-1201-1 closed. failed automatic action and closes 2-1201-1 valve, by _____ _____ _____
placing c/s in the CLOSED position.
- 8. Verifies RWCU valve GREEN light illuminated.
2-1201-1A closed.
- 9. Verifies RWCU valve Examinee recognizes that 2-1201-2 closed. valve 2-1201-2 valve did NOT close. _____ _____ _____
S-N-a Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 10. Closes RWCU valve Takes manual action for a 2-1201-2 closed. failed automatic action and closes 2-1201-2 valve, by placing c/s in the CLOSED _____ _____ _____
position.
- 11. Verifies RWCU valve GREEN light illuminated.
2-1201-3 closed.
- 12. Verifies RWCU valve RED light illuminated.
2-1201-7 closed.
- 13. Informs Unit Supervisor task Reports SBLC is injecting is complete. and valves 2-1201-2 and 2-1201-3 failed to close automatically. _____ _____ _____
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-a Page 6 of 8
Operators Name:
Job
Title:
Title:
SBLC - INJECTION WITH RWCU ISOLATION FAILURE Revision Number: 00 JPM Number: S-N-a Task Number and
Title:
211L002, Injection of Standby Liquid Control System K/A Number and Importance: 211000.A4.08 4.2 / 4.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 9 minutes Actual Time Used: minutes
References:
DOP 1100-02, rev 18 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-a Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 3. The Unit Supervisor has authorized the use of Hard Cards.
INITIATING CUE
- 1. The Unit Supervisor has ordered you to inject SBLC, for an ATWS, per the Hard Card.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-a Page 8 of 8
Exelon Nuclear Job Performance Measure CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP JPM Number: S-N-b Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-b Page 2 of 10
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Start the LPCI/CS room cooler fans.
- 3. Enter the following Expert commands to set up an automatic trigger to trip the Core Spray pump after the test valve is opened:
NOTE:The trigger assignment can be changed to any other available trigger to accommodate running this JPM concurrently with other JPMs.
- trgset 1 "cssbkppb .and. cslop4b" (Trigger 1 Activates when 2B Core Spray pump is running AND when MO 1402-4B OPEN light turns ON)
- ior csdtpppb (1 10) trip (After 10 sec, inserts a 2B Core Spray pump trip)
- ior csdclppb (1 10) off (After 10 sec, inserts a 2B Core Spray pump trip)
- trgset 2 "(et_array(1) .and. (.not. cssbkppb))"l2 (Trigger 2 Activates when Trigger 1 is active AND when 2B Core Spray pump is NOT running)
- trg 2 "dor csdtpppb"l2 (Deletes 2B Core Spray pump trip)
DOCUMENT PREPARATION
- 1. Markup a copy of DOS 1400-05 as complete up through Step I.7. (Ready to start 2B Core Spray Pump per step I.8).
S-N-b Page 3 of 10
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
- 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
- 4. The system is filled and vented.
- 5. The required valve operability surveillance has been completed.
- 6. Vibration data is NOT required.
- 7. The Unit 2 NLO is standing by in the corner room.
- 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Inform the Unit Supervisor upon completion of step I.8.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
S-N-b Page 4 of 10
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-b Page 5 of 10
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide Examinee a copy of DOS 1400-05.
- 1. Verify the following valve line Verifies the following:
up:
- MO 2-1402-4B Closed
- Green light illuminated.
- MO 2-1402-38B Open
- Green light illuminated.
- 2-1402-6B Open
- Directs NLO to Verify 2-1402-6B-SV Closed.
- MO 2-1402-25B Closed
- Green light illuminated.
- MO 2-1402-3B Open
- Green light illuminated.
- 2-1402-40B-SV Closed
- Directs NLO to Verify 2-1402-40B-SV Closed _____ _____ _____
CUE:
2-1402-40B-SV, INST SV is closed.
NOTE:
The next three (3) actions may be requested to be performed at the same time.
- 2. Verify 2B CORE SPRAY Contacts NLO to verify 2B MOTOR has adequate CORE SPRAY MOTOR lubrication. has adequate lubrication _____ _____ _____
per step I.8.b.(1).
CUE:
2B Core Spray motor oil level is normal (within +0 to -1/8 inch band).
- 3. Verify 2B LPCI/CS Room Contacts NLO to verify Cooler is operating properly. proper room cooler operation per step I.8.c. _____ _____ _____
CUE:
2B LPCI/CS room cooler is operating normally.
S-N-b Page 6 of 10
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
CUE:
When asked, report: 2-1402-40B-SV Inst SV is Open.
- 5. Record suction pressure Pressure of 7 psig provided by NLO. recorded on Data Sheet 1.
CUE:
When asked, report: suction pressure is 7 psig.
- 6. Calculate 2-1402-8B initial DP Calculated:
closed DP.
2-1450-1B ________ psig Minus 2-1402-40B ___7____psig Records 2-1450-1B pressure as 75 psig (+ 5 _____ _____ _____
psig)
CUE:
If examinee requests the above calculation to be verified, sign the verified by line.
If the student informs the SRO that the Core Spray System should be declared inoperable, acknowledge the report.
NOTE:
Candidate will N/A step I.8.g.
- 7. Start 2B CORE SPRAY Red light illuminated and Pump. annunciators H-13 and A-5 alarm. _____ _____ _____
NOTE:
2B Core Spray Pump overcurrent trip malfunction is automatically inserted 10 seconds after the 2-1402-4B valve has dual indication.
S-N-b Page 7 of 10
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 8. Open FLOW TEST VLV MO Rotates and holds MO 2-2-1402-4B. 1402-4B Control switch CW to Open. _____ _____ _____
BEGIN ALTERNATE PATH
- 9. Acknowledge and report Acknowledges annunciator alarm for 2B CS pump trip. H-5 and makes report.
CUE:
Acknowledge report.
- 10. Immediately Close Green light illuminated.
2-1402-4B.
Red light illuminated. _____ _____ _____
CUE:
If examinee enters DOA 6500-10, respond that the assist NSO will execute that procedure.
CUE:
If examinee terminates, or requests permission to terminate the surveillance OR If examinee references the DAN for pump trip and has at least considered the actions to take, then provide the cue:
Terminate the surveillance. Leave the system in the current lineup. Someone else will be assigned to verify the system is restored to normal.
- 11. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-b Page 8 of 10
Operators Name:
Job
Title:
Title:
CORE SPRAY - PERFORM PUMP TEST WITH PUMP TRIP Revision Number: 05 JPM Number: S-N-b Task Number and
Title:
209L004, Perform a CS pump operability test and determine if the results meet the acceptance criteria as stated in DOS 1400-05 K/A Number and Importance: 209001.A4.01 3.8 / 3.6 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 22 minutes Actual Time Used: minutes
References:
DOS 1400-05, rev 41 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-b Page 9 of 10
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The Unit 2 Core Spray B Pump operability surveillance is required due to maintenance.
- 3. The operability surveillance for the 2A Core Spray pump is NOT needed.
- 4. The system is filled and vented.
- 5. The required valve operability surveillance has been completed.
- 6. Vibration data is NOT required.
- 7. The Unit 2 NLO is standing by in the corner room.
- 8. The LPCI/Core Spray Room Coolers are running.
INITIATING CUE
- 1. The Unit Supervisor directs you to perform DOS 1400-05 step I.8 for the 2B Core Spray pump.
- 2. All applicable Prerequisites have been met.
- 3. Notify the Unit Supervisor upon completion of step I.8.
S-N-b Page 10 of 10
Exelon Nuclear Job Performance Measure DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES JPM Number: S-N-c Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam S-N-c Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to any IC with the Reactor shutdown, but at full pressure.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Ensure that Both DEHC monitors are displaying the STATUS screen .
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
- 5. Be prepared to acknowledge various alarms on other panels during this JPM (candidate to acknowledge 902-7 panel only).
DOCUMENT PREPARATION Markup a copy of DGP 02-03.
S-N-c Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-c Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the provided copy of DGP 02-03.
All the below actions can be performed on either of the Digital EHC control stations.
- 1. Select <CONTROL>. Utilizing the trackball controller, clicks on
<CONTROL>. _____ _____ _____
- 2. Select <RX COOLDOWN>. Utilizing the trackball controller, clicks on
<RX COOLDOWN>. _____ _____ _____
- 3. Verify REACTOR Observes the REACTOR COOLDOWN is OFF. COOLDOWN OFF select button is orange. _____ _____ _____
- 4. Select STPT/RAMP. Utilizing the trackball controller, clicks on the
<STPT/RAMP>. _____ _____ _____
- 5. Enter desired target Clicks in the Set Point box.
temperature setpoint. Utilizing the keyboard, enters 400.0. _____ _____ _____
- 6. Enter desired cooldown rate Clicks in the Ramp Rate in the Ramp box. box. Utilizing the keyboard, enters 75.0. _____ _____ _____
- 7. Select <OK>. Utilizing the trackball controller, clicks on <OK>.
Clicks <OK> on the Confirm Setpoint pop up _____ _____ _____
window.
- 8. Initiate Reactor cooldown by Utilizing the trackball selecting ON for REACTOR controller, clicks on <ON>.
COOLDOWN.
Clicks <OK> on the Begin Reactor Cooldown pop up _____ _____ _____
window.
S-N-c Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 9. On <CONTROL> Utilizing the trackball
<PRESSURE CONTROL> controller, clicks on screen, adjust pressure <PRESSURE setpoint as necessary to CONTROL>.
maintain at least 50 psig above Reactor pressure. _____ _____ _____
NOTE:
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
- 10. Select STPT/RAMP and input Utilizing the trackball value of 50.0. controller, clicks on
<STPT/RAMP > and input 50.0.
NOTE:
The Examinee may wait to proceed until RPV pressure has decreased ~ 50 psig.
- 11. On <CONTROL> <BPV If uses other DEHC JACK> screen, verify BPV screen, utilizing the Jack position setpoint is trackball controller, clicks
-5.0%. on <CONTROL>.
Utilizing the trackball controller, clicks on < BPV JACK >. _____ _____ _____
Observes BPV Jack position setpoint is -5.0%.
- 12. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-c Page 6 of 8
Operators Name:
Job
Title:
Title:
DEHC - ESTABLISH RPV COOLDOWN WITH BYPASS VALVES Revision Number: 01 JPM Number: S-N-c Task Number and
Title:
29501LP040, Respond to a Reactor Scram IAW DGP 02-03.
K/A Number and Importance: 241000.A4.06 3.9 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DGP 02-03, rev 89 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-c Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred and the Unit Supervisor has determined a reactor cooldown is required.
- 3. Another NSO will acknowledge annunciators not associated with this task.
INITIATING CUE
- 1. The Unit Supervisor has directed you to begin a 75.0 Deg. F. / hr reactor cooldown to 400 Deg. F. utilizing the Turbine Bypass valves by performing DGP 02-03 steps E.29.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-c Page 8 of 8
Exelon Nuclear Job Performance Measure LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION JPM Number: S-N-d Revision Number: 07 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 06 Bank JPM.
Revision 07 Revised for 2010 NRC exam.
S-N-d Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify NO LPCI pumps operating .
- 3. Insert following Malfunctions and/or Remotes:
- None.
- 4. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-d Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
- 5. An EO has been briefed and is in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-d Page 4 of 9
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the provided copy of DEOP 0500-03.
- 1. Place 2A LPCI PP control ALL lights extinguished.
switch in Pull-to-Lock.
- 2. Place PP SUCT VLV MO 2- RED light illuminated.
1501-5A control switch in Manual Bypass and verify _____ _____ _____
closed.
- 3. Verify MIN FLOW VLV 2- RED light illuminated.
1501-13A closed if not needed. _____ _____ _____
CUE:
2-1501-13A is not required for 2B LPCI pump.
NOTE:
The following valves may be verified in any order
- 4. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20A and 2-1501-38A closed. _____ _____ _____
- 5. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19A and 2-1501-18A closed. _____ _____ _____
1501-28A and 2-1501-27A closed. _____ _____ _____
- 7. Verify TORUS CLG/TEST GREEN lights illuminated.
valves 2-1501-20B and 2-1501-38B closed. _____ _____ _____
- 8. Verify TORUS SPRAY VLVs GREEN lights illuminated.
2-1501-19B and 2-1501-18B closed. _____ _____ _____
S-N-d Page 5 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
1501-28B and 2-1501-27B closed. _____ _____ _____
NOTE:
For bleeding off the pressure in the suction piping, the examinee may communicate each of the following steps individually OR instruct the NLO to complete actions of DEOP 0500-03 step G.12.c.(5 thru 8).
CUE:
When directed, as the NLO in the field, communicate that the steps (either individually of as a whole) have been completed.
VENT VLV.
- 11. Crack open 2-1501-15A, U2 Instructs NLO to complete LPCI A PMP VENT VLV until step G.12.c.(5).(b).
flow is observed from pipe. _____ _____ _____
VENT VLV.
- 14. Open 2-1501-47A-R, U2 Instructs NLO to obtain PI LPCI A PUMP SUCT PI 2-1501-47A reading per 2-1501-47A ROOT VLV (at step G.12.c.(6). _____ _____ _____
pump) and verify PI 2-1501-47A indicates less than 15 psig.
CUE:
PI 2-1501-47A indicates 15.5 psig.
- 15. Recognizes reading is NOT Determines reading is less than 15 psig. greater than 15 psig.
S-N-d Page 6 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 16. Close 2-1501-47A-R, U2 Instructs NLO to close 2-LPCI A PUMP SUCT PI 1501-47A per step G.12.c.(8). _____ _____ _____
2-1501-47A ROOT VLV.
CUE:
2-1501-47A-R is Closed.
BEGIN ALTERNATE PATH
- 17. Open PP SUCT VLV MO 2- GREEN light illuminated.
1501-5A.
- 18. Place 2A LPCI PP control Depresses and places 2A switch in AUTO. LPCI PP c/s to center (AUTO) position. _____ _____ _____
- 19. Notify Unit Supervisor that 2A Examinee notifies Unit LPCI pump cannot be used Supervisor of 2A LPCI with suction from the CST. pump suction pressure _____ _____ _____
problem when aligned to CST. May recommend using another LPCI pump.
CUE:
Before examinee proceeds, inform him/her injection is no longer needed and another LPCI pump does NOT need to be selected Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-d Page 7 of 9
Operators Name:
Job
Title:
Title:
LPCI - MITIGATE HIGH SUCTION PRESSURE WHILE LINING UP TO CST SUCTION FOR INJECTION Revision Number: 07 JPM Number: S-N-d Task Number and
Title:
29502LK061, Lineup LPCI to the CST K/A Number and Importance: 203000.A4.02 4.1 / 4.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DEOP 0500-03, rev 20 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-d Page 8 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. A transient has occurred requiring Alternate Water Injection.
- 3. RPV level is -65 inches and slowly dropping.
- 4. RPV pressure is 375 psig and slowly dropping.
- 5. An EO has been briefed and is in the field.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up the 2A LPCI pump suction to the CST to prepare to raise RPV water level per DEOP 500-03, step G.12.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-d Page 9 of 9
Exelon Nuclear Job Performance Measure CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET JPM Number: S-N-e Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-e Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. 1.Reset the simulator to an IC with the mode switch NOT in run, so that the proper alarms and interlocks will work.
- 2. Ensure Torus water level is 20 feet.
- 3. Insert following Malfunctions and/or Remotes.
- IMF CIGP2I (Spurious Group II Isolation)
- IOR PCDOOP61 OFF (prevents the 1601-61 valve from opening)
- Adjusts Torus Level indications to ~20 feet.
ior atl10 25.0 ior pcltr10a 20 ior pcltr10b 20
- ior pcptr103 58.0 (Adjusts Torus Bottom Pressure to 58.0 psig)
irf lp1aaf1f pulled irf lp701af pulled irf lp1aaf2f pulled irf lp701bf pulled irf csalgoff pulled irf csblgoff pulled irf hp2a1f1 pulled irf hp2b1f1 pulled
- Adjusts Drywell & Torus pressures to 50.0 psig.
ior pcp8524 50.0 ior pcpdw102 50.0 ior pcp85401 5.0l ior pcptr1 5.0
- 5. Start ALL available U2 EAST T.B., Radwaste, and U3 T.B. exhaust fans.
- 6. Place CRM ISOL switch to ISOLATE - wait 10 seconds then verify a C/R Booster Fan is running.
DOCUMENT PREPARATION Markup a copy of DEOP 500-04.
S-N-e Page 3 of 8
INITIAL CONDITIONS
- 1. You are the Aux NSO.
- 2. A break inside the Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20'
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-e Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide examinee the marked up copy of DEOP 0500-04.
Annunciator 902-3 A-15 may be received during this JPM.
~4000 scfm. _____ _____ _____
- 2. Verify Reactor Mode switch Verifies Reactor Mode NOT in RUN. switch NOT in RUN.
- 3. Place VENT ISOL SIGNAL Momentarily places BYPASS switch on 902-5 Bypass switch to Torus panel to TORUS. Position. _____ _____ _____
NOTE:
The AO 2-1601-61, TORUS 2-INCH VENT VLV, will NOT open.
- 4. Open AO 2-1601-61, TORUS Places AO 2-1601-61 2-INCH VENT VLV. control switch to OPEN position and determines _____ _____ _____
that the valve will not open.
NOTE:
IF candidate states that the 2-1601-61 valve will not open, direct him/her to complete the task.
BEGIN ALTERNATE PATH
- 5. Place VENT ISOL SIGNAL Momentarily places Vent BYPASS switch on 902-5 Isol Signal Bypass switch panel to DRYWELL. to Drywell position. _____ _____ _____
CUE:
If examinee reads TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter displays 58 psig and is trending UP slowly.
2-INCH Vent.
S-N-e Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 7. Open AO 2-1601-63, VENT Red Open light illuminated.
TO SBGT.
- 8. Start as many Turbine Initiates action to start All Building and Radwaste available Turbine Building Exhaust fans as possible. and Radwaste Exhaust fans. _____ _____ _____
- 9. Determine if SBGT flow is Containment pressure adequate to control and stable or decreasing.
maintain DW pressure below the Primary Containment _____ _____ _____
Pressure Limit.
CUE:
DW pressure is being controlled and maintained below the Primary Containment Pressure Limit.
If examinee asks reading on TORUS BOTTOM PRESS PI 2-1640-103, inform him/her that the meter has decreased to 53 psig (5 psig less than original report).
- 10. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-e Page 6 of 8
Operators Name:
Job
Title:
Title:
CONTAINMENT - VENT THE TORUS WITH LEVEL LESS THAN 30 FEET Revision Number: 05 JPM Number: S-N-e Task Number and
Title:
295L099, Vent the primary containment to SBGT to stay below the Primary Containment Pressure Limit.
K/A Number and Importance: 295024.A1.14 3.4 / 3.5 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes
References:
DEOP 0500-04, rev 12 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-e Page 7 of 8
INITIAL CONDITIONS
- 1. You are the Aux NSO.
- 2. A break inside the Primary Containment has occurred.
- 3. Torus bottom pressure is about to exceed the PCP limit in DEOP 200-01.
- 4. Torus water level is 20'
- 5. Control Room ventilation has been isolated.
- 6. Reactor Building and Turbine Building have been evacuated.
- 7. The Instrument Bus and ESS Bus are energized.
- 8. The Instrument Air System is available.
INITIATING CUE
- 1. The Unit Supervisor has directed you to vent the Primary Containment in accordance with DEOP 500-04, attachment 1 to control Primary Containment pressure.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-e Page 8 of 8
Exelon Nuclear Job Performance Measure AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE JPM Number: S-N-f Revision Number: 01 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM.
Revision 01 Revised for 2010 NRC exam.
S-N-f Page 2 of 9
SIMULATOR SETUP INSTRUCTIONS
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Insert following Malfunctions and/or Remotes:
- M63 (to prevent TR-22 to Bus 23 breaker from closing).
- 3. Setup the following Triggers:
- None.
- 4. Ensure ONLY 2 RFPs operating.
- 5. Ensure ONLY 3 Cond/Cond Booster Pumps operating.
DOCUMENT PREPARATION
- 1. Marked up copy of DOP 6500-01.
S-N-f Page 3 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-f Page 4 of 9
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the examinee with the provided copy of DOP 6500-01.
This task has two parts, which can be performed in any order.
CUE:
IF the incoming and running voltages are NOT approximately equal, inform examinee that they ARE approximately equal.
TRANSFER BUS 21 TO TR-22
- 1. Position TR-22 to Bus 21 Switch in ON position.
SYNCHROSCOPE selector switch to ON. _____ _____ _____
- 2. Verify:
INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.
approximately equal.
Meter NOT rotating.
SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.
rotating.
SYNCHRONIZING meter _____ _____ _____
lights NOT glowing.
- 3. Position TR-22 to Bus 21 RED light illuminated.
breaker control switch to CLOSE. _____ _____ _____
- 4. Verify:
SYNCHRONIZING meter at Meter NOT rotating.
12 oclock position.
TR-22 to Bus 21 breaker RED light illuminated.
indicates CLOSED.
Annunciator 902-8 D-1 in Annunciator 902-8 D-1 alarm. illuminated.
S-N-f Page 5 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Position TR-21 to Bus 21 GREEN light illuminated.
breaker control switch to TRIP. _____ _____ _____
- 6. Verify:
TR-21 to Bus 21 breaker GREEN light illuminated.
indicates OPEN.
Annunciator 902-8 D-1 Annunciator 902-8 D-1 clears.
extinguished.
- 7. Position TR-22 to Bus 21 Switch in OFF position.
synchroscope selector switch to OFF. _____ _____ _____
- 8. Verify Bus 21 AMMETER and Verifies Bus 21 amps and VOLTMETER indications are volts are normal.
normal. _____ _____ _____
NOTE:
Amps may vary depending on conditions, and volts are normally ~ 4160.
TRANSFER BUS 23 TO TR-22
- 9. Position TR-22 to Bus 23 Switch in ON position.
SYNCHROSCOPE selector switch to ON. _____ _____ _____
- 10. Verify:
INCOMING VOLTS and Voltages approximately RUNNING VOLTS meters equal.
approximately equal.
Meter NOT rotating.
SYNCHRONIZING meter at 12 oclock position and NOT White lights extinguished.
rotating.
SYNCHRONIZING meter _____ _____ _____
lights NOT glowing.
BEGIN ALTERNATE PATH
- 11. Position TR-22 to Bus 23 Breaker does NOT close.
breaker control switch to CLOSE. _____ _____ _____
S-N-f Page 6 of 9
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 12. IMMEDIATELY positions TR- GREEN light illuminated.
22 to Bus 23 breaker control switch to OPEN (trip) AND notifies Unit Supervisor. _____ _____ _____
CUE:
IF an Operator is dispatched to check the tripped breaker, report:
the breaker is open, with NO flags up.
NOTE:
Candidate should NOT proceed and trip TR-21 to Bus 23 breaker, as this will de-energize Bus 23.
- 13. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-f Page 7 of 9
Operators Name:
Job
Title:
Title:
AUX POWER - TRANSFER POWER TO TR-22 FROM TR-21 WITH BREAKER FAILURE Revision Number: 01 JPM Number: S-N-f Task Number and
Title:
262L024, Transfer a 4160 volt bus between power supplies.
K/A Number and Importance: 262001.A4.04 3.6 / 3.7 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 14 minutes Actual Time Used: minutes
References:
DOP 6500-01, rev 10 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-f Page 8 of 9
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. Unit 2 was operating at rated power when the TR-21 trouble alarm is received.
- 3. The NLO, dispatched to TR-21, reported that the TR-21 cooling fans are not all operating and the transformer temperature is rising.
- 4. The Unit Supervisor has decided to unload TR-21 by transferring auxiliary power to TR-22.
- 5. Another operator will verify TR-86 Load Tap Changer positions and loading remains below the restrictions of the procedure.
INITIATING CUE
- 1. The Unit Supervisor has directed you to transfer Bus 21 and Bus 23 to TR-22 from TR-21 in accordance with DOP 6500-01.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-f Page 9 of 9
Exelon Nuclear Job Performance Measure RWM - ENTER SUBSTITUTE ROD POSITION JPM Number: S-N-g Revision Number: 05 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 04 Bank JPM.
Revision 05 Revised for 2010 NRC exam.
S-N-g Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Desired substitute position for control rod N-07 is 48. (Check prior to inserting the malfunction below).
- 3. Enter the following Expert Command prior to starting this JPM.
- IMF RDFAILN7 (RPIS failure for control rod N-07)
- 4. Acknowledge alarms and reset alarms.
- 5. Verify RWM operational and on Main Screen.
DOCUMENT PREPARATION Markup a copy of DOP 0400-02.
S-N-g Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod N-07 rod position has failed.
- 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
- 4. The Control Rod has been currently verified to be at position 48.
- 5. The Rod Worth Minimizer is operational.
- 6. No other rods have had a substitute position assigned.
INITIATING CUE
- 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
- 2. Notify Unit Supervisor when the substitute position has been entered.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-g Page 4 of 7
JPM Start Time: _________
UNSAT Comment #
PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide examinee a copy of DOP 0400-02.
02.
- 2. Selects Secondary Substitute Position screen Functions, then SELECTED.
Substitute Position screen
- 3. Selects control rod N-07 Control Rod N-07 outlined with on the touch screen. blue box and shown on screen as SELECTED.
- 4. Sets the desired Control POSITION SHOWN on top of Rod position on the bar position bar graph, reads 48.
graph on the left side of the screen.
- 5. Touches the ENTER RWM accepts the request, rod REQUEST box. N-07 position indication changes from ?? to substituted 48 position.
- 6. Touches the EXIT RWM returns to the Main FUNCTION box to Display return to the Main Display CUE:
Respond as US when examinee informs you they have completed the task END JPM Stop Time:_________
S-N-g Page 5 of 7
Operators Name:
Job
Title:
Title:
RWM - ENTER SUBSTITUTE ROD POSITION Revision Number: 05 JPM Number: S-N-g Task Number and
Title:
201L027, Enter Substitute Rod Position.
K/A Number and Importance: 201006.A4.06 3.2 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DOP 0400-02, rev 23 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-g Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 NSO.
- 2. Control Rod N-07 rod position has failed.
- 3. Control Rod N-07 was verified to be at position 48 prior to failure, and has NOT been moved.
- 4. The Control Rod has been currently verified to be at position 48.
- 5. The Rod Worth Minimizer is operational.
- 6. No other rods have had a substitute position assigned.
INITIATING CUE
- 1. Unit Supervisor has directed you to enter a substitute position of 48 for Control Rod N-07 in accordance with DOP 0400-02, step G.3.c.
- 2. Notify Unit Supervisor when the substitute position has been entered.
S-N-g Page 7 of 7
Exelon Nuclear Job Performance Measure OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE JPM Number: S-N-h Revision Number: 00 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 00 New JPM developed for 2010 NRC exam.
S-N-h Page 2 of 7
SIMULATOR SETUP INSTRUCTIONS
- 1. Reset the simulator to IC 12.
NOTE: It is acceptable to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2. Verify the Charcoal Adsorbers are in PARALLEL mode of operation.
- 3. Setup the following Triggers:
- None.
DOCUMENT PREPARATION Markup a copy of DOP 5400-05.
S-N-h Page 3 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
- 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-h Page 4 of 7
JPM Start Time: _________
UNSAT Comment #
PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the provided copy of DOP 5400-05.
- 1. Proceeds to step G.4 of Locates step G.4 of the DOP 5400-05. procedure (which then directs next step). _____ _____ _____
- 2. Determines the correct Proceeds to step G.21 of the step to utilize is step procedure.
G.21 of DOP 5400-05. _____ _____ _____
- 3. Close AO 2-5417, GREEN light illuminated.
ADSORBER TRN 2 BYPASS VLV.
- 4. Close AO 2-5423, GREEN light illuminated.
ADSORBER TRN 3 BYPASS VLV.
- 5. Open AO 2-5415, GREEN light illuminated.
ADSORBER TRN 1 DISCH VLV.
- 6. Open AO 2-5421, GREEN light illuminated.
ADSORBER TRN 2 DISCH VLV.
- 7. Close AO 2-5416, GREEN light illuminated.
ADSORBER TRN 1 BYPASS VLV.
- 8. Close AO 2-5422, GREEN light illuminated.
ADSORBER TRN 2 BYPASS VLV.
- 9. Notify Unit Supervisor of Unit Supervisor notified of task task completion. completion.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-h Page 5 of 7
Operators Name:
Job
Title:
Title:
OFF GAS - ALIGN CHARCOAL ADSORBER FILTERS IN SERIES MODE Revision Number: 00 JPM Number: S-N-h Task Number and
Title:
271L005, Startup the Offgas Charcoal Adsorber system K/A Number and Importance: 271000.A4.09 3.3 / 3.2 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DOP 5400-05, rev 32 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-h Page 6 of 7
INITIAL CONDITIONS
- 1. You are the Unit 2 Aux NSO.
- 2. The system engineer has completed data collection for the offgas system and requests returning the charcoal adsorbers to the series mode of operation from the parallel mode of operation.
INITIATING CUE
- 1. Unit Supervisor has directed you to align the charcoal adsorbers to the SERIES mode of operation in accordance with DOP 5400-05, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-h Page 7 of 7
Exelon Nuclear Job Performance Measure LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION JPM Number: S-N-i Revision Number: 10 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 09 Bank JPM.
Revision 10 Revised for 2010 NRC Exam.
S-N-i Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DEOP 0500-03.
S-N-i Page 3 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-i Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DEOP 0500-03.
The examinee is NOT required to obtain a key to open or close locked valves.
The examinee is required only to identify which type of key is required to open the valve.
- 1. Proceeds to the Unit 2 Proceeds to the U2 SBLC Standby Liquid Control area.
(SBLC) area. _____ _____ _____
- 2. Unlock and close 2-1101-4, Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. hand wheel full clockwise. _____ _____ _____
CUE:
The component is in the condition you have described.
- 3. Unlock and close 2-1199-37 Unlock lock and removes SBLC STORAGE TK chain, then rotates valve OUTLET SV. handle 1/4 turn clockwise. _____ _____ _____
CUE:
The component is in the condition you have described.
- 4. Open 2-4315-500, CLEAN Rotates valve hand wheel DEMIN WTR SUPPLY TO full counter-clockwise.
SBLC SV. _____ _____ _____
CUE:
The component is in the condition you have described.
- 5. Open 2-1101-7, CLEAN Rotates valve hand wheel DEMIN WTR TO SBLC TEST full counter-clockwise.
TK SV. _____ _____ _____
CUE:
The component is in the condition you have described.
S-N-i Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 6. Unlock and open 2-1101-8, Unlock lock and removes SBLC TEST TK OUTLET SV. chain, then rotates valve hand wheel full counter- _____ _____ _____
clockwise.
CUE:
The component is in the condition you have described.
NOTE:
- 7. Start both SBLC pumps from Contacts the Unit 2 Control the main Control Room. Room Operator to start the SBLC pumps. _____ _____ _____
CUE:
I have started both Unit 2 Standby Liquid Control pumps.
- 8. Throttle 2-1101-7, CLEAN Opens / closes valve to DEMIN WTR TO SBLC TEST maintain test tank level.
TK SV, to stabilize level in _____ _____ _____
tank.
CUE:
The test tank level is now stabilized (as much going in as is going out).
- 9. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-i Page 6 of 8
Operators Name:
Job
Title:
Title:
LINEUP SBLC TEST TANK FOR ALTERNATE WATER INJECTION Revision Number: 10 JPM Number: S-N-i Task Number and
Title:
295L088, Line Up SBLC Test Tank for Alternate Water Injection.
K/A Number and Importance: 295031.A1.08 3.8 / 3.9 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 17 minutes Actual Time Used: minutes
References:
DEOP 0500-03, rev 19 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-i Page 7 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Unit 2 has just scrammed.
- 4. The Clean Demin Water system is operating normally.
INITIATING CUE
- 1. The Unit Supervisor has directed you to line up and inject using the Standby Liquid Control Test Tank with Clean Demin water per DEOP 0500-03, step G.4.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-i Page 8 of 8
Exelon Nuclear Job Performance Measure EDG - MANUALLY FILL UNIT 2/3 EDG DAY TANK JPM Number: S-N-j Revision Number: 02 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 01 Bank JPM.
Revision 02 Revised for 2010 NRC exam.
S-N-j Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOA 6600-01.
S-N-j Page 3 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-j Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DOA 6600-01.
- 1. Proceeds to the 2/3 Diesel Proceeds to the 2/3 Diesel Generator Room. Generator Room.
- 2. Examinee checks the level in Observes day tank the D/G Fuel Oil Day Tank. sightglass and determines day tank needs filling.
CUE:
Point to the lower third area on the local sightglass measuring stick and state: the level is here.
NOTE:
Normal level is 30 - 38".
- 3. Verify that power is available Verifies power available, to the DIESEL FUEL OIL by local indicating lights TRANSFER PUMP 2/3. illuminated.
CUE:
The GREEN LIGHT is illuminated.
- 4. Start the Fuel Oil Transfer Holds 2/3-5203 U2 Diesel Pump by holding local Test Oil Transfer Pp c/s in ON Switch in the ON position. position.
CUE:
The pump is running.
You have held the switch for approximately 5 minutes.
S-N-j Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Checks the level in the fuel oil OBSERVES sight glass day tank. and/or REQUESTS annunciator 902-8 G-4 status. _____ _____ _____
CUE:
Point to the 35 inch mark on the local sightglass measuring stick and state: the level is here.
AND/OR the NSO says Control Room alarm 902-8 G-4 has reset.
- 6. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-j Page 6 of 8
Operators Name:
Job
Title:
Title:
Title:
264LN00414, Discuss the steps involved in filling of Diesel Generator Day Tanks with Diesel Fuel Oil Storage Tank Transfer Pumps.
K/A Number and Importance: 264000.G.1.30 4.4 / 4.0 Suggested Testing Environment: In-Plant Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 12 minutes Actual Time Used: minutes
References:
DOA 6600-01, rev 15 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-j Page 7 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Annunciator 902-8 G-4, Unit 2/3 Diesel Generator Day Tank Level HI / LO, has just annunciated.
INITIATING CUE
- 1. The Unit Supervisor has directed you to check the Unit 2/3 Diesel Generator Fuel Oil Day Tank level AND refill if necessary utilizing DOA 6600-01, attachment A.
- 2. Inform the Unit Supervisor when the task is complete.
S-N-j Page 8 of 8
Exelon Nuclear Job Performance Measure HVAC - VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR JPM Number: S-N-k Revision Number: 11 Date: 09/10 Developed By:
Instructor Date Approved By:
Facility Representative Date
Revision Record (Summary)
Revision 10 Bank JPM.
Revision 11 Revised for 2010 NRC Exam.
S-N-k Page 2 of 8
SIMULATOR SETUP INSTRUCTIONS
- 1. None, this JPM is performed in the plant.
DOCUMENT PREPARATION Markup a copy of DOP 4650-01.
S-N-k Page 3 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Control Room personnel have noticed a pungent odor in the Control Room.
- 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
- 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
INITIATING CUE
- 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
- 2. Inform the Unit 3 Supervisor when the task is complete.
Fill in the JPM Start Time when the student acknowledges the Initiating Cue.
Information For Evaluators Use:
UNSAT requires written comments on respective step.
- Denotes critical steps.
- Denotes critical elements of a critical step.
Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section at the bottom of the page. The comment section should be used to document the reason that a step is marked as unsatisfactory and to document unsatisfactory performance relating to management expectations.
Some operations that are performed from outside of the control room may require multiple steps.
These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.
The timeclock starts when the candidate acknowledges the initiating cue.
S-N-k Page 4 of 8
JPM Start Time: _________
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT NOTE:
Provide the Examinee with the supplied copy of DOP 4650-01.
- 1. Proceeds to Emergency Proceeds to Emergency Breathing Air manifold in Unit Breathing Air manifold in 2 Battery Room. Unit 2 Battery Room. _____ _____ _____
- 2. Verify the following: Verifies valve handle perpendicular to valve body for:
- LP-1 CLOSED
- LP-2 CLOSED
- LP-2 _____ _____ _____
- LP-3 CLOSED
- LP-4 CLOSED
- 3. OPEN all Main Bank Cylinder Turns hand wheels on shutoff valves (Cylinders 7 cylinders 7-13 full counter through 13). clockwise. _____ _____ _____
CUE:
The component is in the condition you have described.
NOTE:
Count cylinders from left to right to find cylinders 7-13.
- 4. Check Main Bank pressure. Reads pressure on PRV 3, CR EMER AIR BREATHING CYL OUTLET PRV. (right side _____ _____ _____
gauge).
NOTE:
Have examinee read actual pressure.
CUE:
If pressure is < 2000 psig, point to 2000 psig, on the gauge, and inform that pressure is here.
S-N-k Page 5 of 8
UNSAT Comment PERFORMANCE CHECKLIST STANDARDS SAT
- 5. Pressurize the supply OPENS valve LP-3 by manifold from the Main Bank turning valve handle by opening LP-3, CR EMERG counter clockwise 1/4 turn _____ _____ _____
AIR BREATHING CYL SV. so handle is in-line with valve body CUE:
The component is in the condition you have described.
- 6. Verify pressure regulator VERIFIES manifold PRV-3 is maintaining pressure between 65 and manifold pressure >65 psig 80 psig as read on CR _____ _____ _____
and <80 psig. EMER AIR BREATHING CYL OUTLET PRV. (left side gauge).
CUE:
If pressure is out of spec, point to 70 psig, on the gauge, and inform that pressure is here.
NOTE:
Have examinee read actual pressure.
- 7. Informs Unit Supervisor task Examinee notifies the Unit is complete. Supervisor.
CUE:
Acknowledge report of task completion.
END JPM Stop Time:_________
S-N-k Page 6 of 8
Operators Name:
Job
Title:
Title:
VALVE IN CONTROL ROOM EMERGENCY BREATHING AIR Revision Number: 11 JPM Number: S-N-k Task Number and
Title:
279M001, Valve in Control Room Breathing Air Supply.
K/A Number and Importance: 600000.A2.10 2.9 / 3.1 Suggested Testing Environment: Simulator Actual Testing Environment: Simulator Control Room In-Plant Testing Method: Simulate Alternate Path: Yes No Perform SRO Only: Yes No Time Critical: Yes No Estimated Time to Complete: 15 minutes Actual Time Used: minutes
References:
DOP 4650-01, rev 09 EVALUATION
SUMMARY
Were all the Critical Elements performed satisfactorily? Yes No The operators performance was evaluated against the standards contained in this JPM, and has been determined to be: Satisfactory Unsatisfactory Comments:
Evaluators Name (Print):
Evaluators Signature: Date:
S-N-k Page 7 of 8
INITIAL CONDITIONS
- 1. You are an extra NSO.
- 2. Control Room personnel have noticed a pungent odor in the Control Room.
- 3. The Control Room Ventilation is NOT operating properly and the smell is getting worse.
- 4. The Unit 3 Supervisor has evacuated ALL non-essential personnel from the Control Room and has directed all NSOs to don SCBAs.
INITIATING CUE
- 1. The Unit 3 Unit Supervisor has directed you to place the Control Room Emergency Breathing Air System Main Bank in operation in accordance with DOP 4650-01, step G.3.
- 2. Inform the Unit 3 Supervisor when the task is complete.