ML18011A402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO.50-400/LICENSE NO.NPF-63 REQUEST FOR LICENSE AMENDMENT MOTOR OPERATED VALVES THERMAL OVERLOAD BYPASS FUNCTION TE HNI AL PE IFI ATI N PA | {{#Wiki_filter:ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT MOTOR OPERATED VALVES THERMAL OVERLOAD BYPASS FUNCTION TE HNI AL PE IFI ATI N PA P'... | ||
Whenever the motor-operated valve is required to be OPERABLE.ACTION: With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours, or declare the affecred valve(s)inoperable and apply the appropriate ACTION Statement(s) of the affected system(s). | 9404050268 940325 | ||
SURVEILLANCE RE UIREMENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry.' | -PDR ADOCK 05000400 | ||
~At least once per 18 months for those rhermal overloads which are normally in force during plant operation and are bypassed only under accident conditions', and b.Following maintenance on the 08.14iiS gag C irc.'v liras, | 'DR Page E5-1 | ||
ELECTRICAL POWER SYSTEMS ELECTRICAL E UIPMENT PROTECTIVE DEVICES MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING CONDITION FOR OPERATION 3.8.4.2 The thermal overload protection of each valve, specified in the Technical Specification Equipment List Program, plant procedure PLP-106, requiring bypass protection, shall be bypassed only under accident conditions by an OPERABLE bypass device.APPLICABILITY: | |||
Whenever the motor-operated valve is required to be OPERABLE.ACTION: With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours, or declare the affected valve(s)inoperable and apply the appropriate ACTION Statement(s) of the affected system(s). | h I 4 | ||
SURVEILLANCE RE(UIREHENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry: | ' p I | ||
'a~ | t | ||
SHEARON HARRIS-UNIT 1 3/4 8-39 Amendment No.}} | |||
1 | |||
~ | |||
~ | |||
ELECTRICAL POWER SYSTEMS ELECTRICAL E UIPMENT PROTECTIVE DEVICES | |||
'MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING CONDITION FOR OPERATION 3.8.4. 2 The thermal overload protection of each valve, specified in the Technical Specification Equipment List Program, plant procedure PLP-106, requiring bypass protection, shall be bypassed only under accident conditions by an OPERABLE bypass device. | |||
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE. | |||
ACTION: | |||
With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours, or declare the affecred valve(s) inoperable and apply the appropriate ACTION Statement(s) of the affected system(s). | |||
SURVEILLANCE RE UIREMENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry.' | |||
~ At least once per 18 months for those rhermal overloads which are normally in force during plant operation and are bypassed only under accident conditions', and | |||
: b. Following maintenance on the Hl srmal 'OVorloV bypass 08.14iiS gag C irc.'v liras, SHEARON HARRIS - UNIT 1 3/4 8"39 Amendment No. | |||
ELECTRICAL POWER SYSTEMS ELECTRICAL E UIPMENT PROTECTIVE DEVICES MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING CONDITION FOR OPERATION 3.8.4.2 The thermal overload protection of each valve, specified in the Technical Specification Equipment List Program, plant procedure PLP-106, requiring bypass protection, shall be bypassed only under accident conditions by an OPERABLE bypass device. | |||
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE. | |||
ACTION: | |||
With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours, or declare the affected valve(s) inoperable and apply the appropriate ACTION Statement(s) of the affected system(s). | |||
SURVEILLANCE RE(UIREHENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry: | |||
'a ~ At least once per 18 months for those thermal overloads which are normally in force during plant operation and are bypassed only under accident conditions; and | |||
: b. Following maintenance on the thermal overload bypass relays and circuitry. | |||
SHEARON HARRIS - UNIT 1 3/4 8-39 Amendment No.}} |
Latest revision as of 20:58, 3 February 2020
ML18011A402 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 03/25/1994 |
From: | CAROLINA POWER & LIGHT CO. |
To: | |
Shared Package | |
ML18011A401 | List: |
References | |
NUDOCS 9404050268 | |
Download: ML18011A402 (4) | |
Text
ENCLOSURE 5 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR LICENSE AMENDMENT MOTOR OPERATED VALVES THERMAL OVERLOAD BYPASS FUNCTION TE HNI AL PE IFI ATI N PA P'...
9404050268 940325
-PDR ADOCK 05000400
'DR Page E5-1
h I 4
' p I
t
1
~
~
ELECTRICAL POWER SYSTEMS ELECTRICAL E UIPMENT PROTECTIVE DEVICES
'MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING CONDITION FOR OPERATION 3.8.4. 2 The thermal overload protection of each valve, specified in the Technical Specification Equipment List Program, plant procedure PLP-106, requiring bypass protection, shall be bypassed only under accident conditions by an OPERABLE bypass device.
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE.
ACTION:
With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or declare the affecred valve(s) inoperable and apply the appropriate ACTION Statement(s) of the affected system(s).
SURVEILLANCE RE UIREMENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry.'
~ At least once per 18 months for those rhermal overloads which are normally in force during plant operation and are bypassed only under accident conditions', and
- b. Following maintenance on the Hl srmal 'OVorloV bypass 08.14iiS gag C irc.'v liras, SHEARON HARRIS - UNIT 1 3/4 8"39 Amendment No.
ELECTRICAL POWER SYSTEMS ELECTRICAL E UIPMENT PROTECTIVE DEVICES MOTOR-OPERATED VALVES THERMAL OVERLOAD PROTECTION LIMITING CONDITION FOR OPERATION 3.8.4.2 The thermal overload protection of each valve, specified in the Technical Specification Equipment List Program, plant procedure PLP-106, requiring bypass protection, shall be bypassed only under accident conditions by an OPERABLE bypass device.
APPLICABILITY: Whenever the motor-operated valve is required to be OPERABLE.
ACTION:
With the thermal overload protection for one or more of the above required valves not capable of being bypassed under conditions for which it is designed to be bypassed, restore the inoperable device or provide a means to bypass the thermal overload within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, or declare the affected valve(s) inoperable and apply the appropriate ACTION Statement(s) of the affected system(s).
SURVEILLANCE RE(UIREHENTS 4.8.4.2 The thermal overload protection for the above required valves shall be verified to be bypassed only under accident conditions by an OPERABLE integral bypass device by the performance of a TRIP ACTUATION DEVICE OPERATIONAL TEST of the bypass circuitry:
'a ~ At least once per 18 months for those thermal overloads which are normally in force during plant operation and are bypassed only under accident conditions; and
- b. Following maintenance on the thermal overload bypass relays and circuitry.
SHEARON HARRIS - UNIT 1 3/4 8-39 Amendment No.