Line 2: Line 2:
| number = ML081370442
| number = ML081370442
| issue date = 03/25/2008
| issue date = 03/25/2008
| title = FitzPatrick Final - Section B Operating Exam (Folder 3)
| title = Final - Section B Operating Exam (Folder 3)
| author name = Fish T H
| author name = Fish T
| author affiliation = NRC/RGN-I/DRS/OB
| author affiliation = NRC/RGN-I/DRS/OB
| addressee name = Dietrich P T
| addressee name = Dietrich P
| addressee affiliation = Entergy Nuclear Northeast
| addressee affiliation = Entergy Nuclear Northeast
| docket = 05000333
| docket = 05000333
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM A TASK TITLE: Change In-Service RBCLC Pumps APPL. TO JPM NUMBER NRC KIA SYSTEM NUMBER: 400000 A401 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME: ~~~ ~ - JPM Completion Simulated Performed Location:
{{#Wiki_filter:ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0         2008 JPM A         TASK TITLE:       Change In-Service RBCLC Pumps APPL. TO     JPM NUMBER NRC KIA SYSTEM NUMBER:         400000 A401 ESTIMATED COMPLETION TIME:       12 Minutes APPLICANT NAME:
Plant (XI Simulator DATE PERFORMED:
                ~~~                   ~   -
TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION:
JPM Completion       Simulated             Performed Location:             Plant         (XI Simulator DATE PERFORMED:                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION:         0   Satisfactory         0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM A                             ~   Page 1 o f 6
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM A ~ Page 1 of6 SAFETY CONSIDERATIONS None REFERENCES OP-40, Reactor Building Closed Loop Cooling, Rev 40 AOP-39, Loss of Coolant, Rev 17 TOOLS AND EQUIPMENT Copy of AOP-39, Attachments 1 and 2. Copy of AOP-11 Immediate Actions SET UP REQUIREMENTS A. Initialize simulator as follows: 1. Reset into IC-248  
 
: 2. Reset into an at-power IC AND set RBCLC Makeup Tank level low in the operating band with expert command "set swmrbw=21500". -or- B. Ensure RBCLC Pumps A and C are in operation and Pump C is in standby. C. Establish Event Trigger #I: /*15P-2C D. Insert Malfunction SW11, "RBCLC Leakage in Drywell at 30%" on 1 minute ramp and tied to Event Trigger #I. E. Override Drywell Cooler Inlet Valve control switch to the OPEN position:  
SAFETY CONSIDERATIONS None REFERENCES OP-40, Reactor Building Closed Loop Cooling, Rev 40 AOP-39, Loss of Coolant, Rev 17 TOOLS AND EQUIPMENT Copy of AOP-39, Attachments 1 and 2.
*/zloI IRBCC01(2)==1//
Copy of AOP-11 Immediate Actions SET UP REQUIREMENTS A. Initialize simulator as follows:
15P-2C RED LIGHT IS ON OR ZDIllRCCAlO DW CLR A & EQUIP SUMP INL OPEN EVALUATOR NOTES The applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
: 1. Reset into IC-248
2008 JPM A -2 Of 6-TASK CONDITIONS Reactor is operating at power. RBCLC Pump B is in standby *4. INITIATING CUE Change In-Service RBCLC Pumps per OP-40, Section G. 1 Start the standby RBCLC Pump * - CRITICAL STEP 5. STANDARD Verify RBCLC pump motor current is LESS THAN maximum normal amps. Observes normal amps.
                      -or-
Obtain a controlled copy of OP- 40, RBCLC. The applicant obtains a controlled copy of OP-40 *6. 11 2. I Reviews the precautions.
: 2. Reset into an at-power IC AND set RBCLC Makeup Tank level low in the operating band with expert command set swmrbw=21500.
I Reviews the precautions associated with the procedure.
B. Ensure RBCLC Pumps A and C are in operation and Pump C is in standby.
Stop A RBCLC Pump Select the correct section to Derform the task. I Selects Section G.l of OP-40. 7. Verify RBCLC pump motor current is LESS THAN maximum normal amps. Observes normal amps. Starts standby RBCLC Pump Note: Leak malfunction is activated on trigger by pump start. Places and holds control switch for the RBCLC pump to be shutdown in STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch.
C. Establish Event Trigger # I : /*15P-2C */zloI IRBCC01(2)==1// 15P-2C RED LIGHT IS ON D. Insert Malfunction SW11, RBCLC Leakage in Drywell at 30% on 1 minute ramp and tied to Event Trigger # I .
EVALUATION
E. Override Drywell Cooler Inlet Valve control switch to the OPEN position:
/ COMMENT N/A N/A N/A SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM A -3 Of 6-STEP IF sidestream filter is in service, THEN throttle . . . Acknowledges RBC MAKEUP TK LVL HI OR LO alarm (09 2-22). Refers to ARP 09-6-2-22: - Dispatches NPO to visually check tank water level - Monitors RBC discharge header pressure Acknowledges Drywell Floor Sump alarm (09-4-2-12)
OR    ZDIllRCCAlO DW CLR A & EQUIP SUMP INL OPEN EVALUATOR NOTES The applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
Refers to ARP 09-4-2-1 2. Enters AOP-39 SROs: Perform Attachment 1 leak detection Section 7: - Determines sump fill and pumpout rate. - Confirms head tank annunciator lit and makeup valve open.
If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
STANDARD Evaluator Cue: Sidestream filter is not in service. ~~~ ~ ~~ Acknowledges alarm. Refers to ARP. Evaluator Cue: NPO reports tank level dropping rapidly and level control valve is fully open. ~ ~~~~~~~ ~~ Acknowledges alarm.
The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
Reports to CRS. Refers to ARP. Reports that ARP directs AOP-39 entry. Evaluator Cue:
2008 JPM A                                                         -2 Of 6-
Announce:  
 
"Crew Update. Entering AOP- 39". Then
TASK CONDITIONS Reactor is operating at power.
... Evaluator Cue for ROs: "Perform Attachment 2, Step 3 of AOP-39 to isolate suspected RBC leak into the DW". Evaluator Cue for SROs: Perform Attachment 1, Section 7 to confirm RBCLC leak conditions.
RBCLC Pump B is in standby INITIATING CUE Change In-Service RBCLC Pumps per OP-40, Section G. 1
Other operators will Derform other sections of Attachment
* CRITICAL STEP STANDARD                       EVALUATION / COMMENT Obtain a controlled copy of OP-   The applicant obtains a controlled copy of OP-40               N/A 40, RBCLC.
: 1. Reports indications of RBCLC leak. Evaluator Cue:
1      2. I Reviews the precautions.       I Reviews the precautions associated with the procedure.         N/A Select the correct section to Derform the task.
If needed, ask "do you have indications of RBC Drywell leak?"
I Selects Section G . l of OP-40.                                 N/A
Evaluator Cue: Perform Attachment 2, Step 3 to isolate RBC Drywell Leak. EVALUATION
      *4. Start the standby RBCLC           Starts standby RBCLC Pump Pump                              Note: Leak malfunction is activated on trigger by pump start.
/ COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM A -4 Of 6- 
: 5. Verify RBCLC pump motor          Observes normal amps.                                      SAT / UNSAT current is LESS THAN maximum normal amps.
*14. 15. 16. *I 7. *18. STEP ROs & SROs: Refer to Attachment 2, Step 3. Places keylock switch 1-1 RBCAI 0 at Panel 09-75 in CLOSE. Verify closed the following valves: - 130A, OW CLR INLET - 131A, OW CLR OUTLET - 134A, DW EQUIP DRN CLR OUTLET Observes RBC conditions degrade, standby pump starts, header pressure degrades and motor amps fluctuate. Insert a Manual Scram Trips RWR Pumps STANDARD Places switch in CLOSE. Note: Valves associated with keylock switch should not close per JPM setup.
      *6. Stop A RBCLC Pump                Places and holds control switch for the RBCLC pump to      SAT / UNSAT be shutdown in STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch.
Evaluator Cue: If applicant indicates NPO would perform this action, direct the applicant to perform the action at Panel 09-75. Observes and reports that valves did NOT close. Evaluator Cue:
: 7. Verify RBCLC pump motor          Observes normal amps.                                      SAT / UNSAT current is LESS THAN maximum normal amps.
Direct applicant to monitor RBC parameters from the 09-05 panel while an NPO performs remaining steps of Attachment 2, Step 3. 0 0 Reports degrading conditions to CRS. Recommends entry into the AOP for loss of reactor building cooling. Evaluator Cue:
2008 JPM A                                                     -3 Of 6-
If needed, ask applicant what transient is occurring and how should this transient be addressed.
 
Evaluator Cue: WHEN/IF applicant identifies the transient is a loss of RB cooling AND transient is addressed by a Loss of RB Cooling AOP (or AOP-1 I), THEN direct applicant to implement AOP-11 Immediate Actions. Inserts a Manual Scram Trips both RWR pumps EVALUATOR Terminate the task at this point. EVALUATION
STEP                                                 STANDARD                      EVALUATION / COMMENT IF sidestream filter is in service,   Evaluator Cue: Sidestream filter is not in service.
/ COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM A -5 of 6-Applicant Tea r-Off Sheet TASK CONDITIONS A. B. Reactor is operating at power. RBCLC Pump B is in standby. INITIA TING CUE Change In-Service RBCLC Pumps per OP-40, Section G.l 2008 JPM A ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO 2008 JPM B TASK TITLE: Start Reactor Recirc Pump APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 202001 A401 ESTIMATED COMPLETION TIME:
THEN throttle . ..
12 Minutes APPLICANT NAME: ~ JPM Completion c] Simulated Performed Location : 0 Plant Simulator DATE PERFORMED:
                                              ~~~            ~  ~~
TIME TO COMPLETE:
Acknowledges RBC MAKEUP               Acknowledges alarm.                                            SAT / UNSAT TK LVL HI OR LO alarm (09           2-22).
Minutes PERFORMANCE EVALUATION:
Refers to ARP 09-6-2-22:               Refers to ARP.                                                SAT / UNSAT
c] Satisfactory IJ Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM B Page 1 of 6 S/RO 2008 JPM B APPL. TO JPM NUMBER JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION TASK TITLE:
              -   Dispatches NPO to             Evaluator Cue: NPO reports tank level dropping rapidly visually check tank water     and level control valve is fully open.
Start Reactor Recirc Pump  
level
: 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-27, Recirculation System 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. 6. C. Initialize simulator to Mode 3 all rods in (IC-243).
              -   Monitors RBC discharge header pressure
RWR Pump '6' at minimum flow. RWR Pump 'A' ready to start, up through Step G.12.31 V. EVALUATOR NOTES A. B. C. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
                                                  ~    ~~~~~~~                  ~~
If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three- point com m unica tion. VI. TASK CONDITIONS A. 6. C. Plant is in Mode 3, all rods in. RWR Pump '6' is running at minimum speed. RWR Pump 'A' is ready to start. 2008 JPM B -2 Of 6-VII. INITIATING CUE The Applicant obtains a controlled copy of OP-27 Start RWR Pump 'A' per OP-27, b-jin SAT I UNSAT ing at Step G.12.31. Opens discharge valve. Observes normal pump parameters.
Acknowledges Drywell Floor             Acknowledges alarm. Reports to CRS.                            SAT / UNSAT Sump alarm (09-4-2-12)
Booth Operator:
Refers to ARP 09-4-2-12.                Refers to ARP. Reports that ARP directs AOP-39 entry.         SAT / UNSAT Enters AOP-39                           Evaluator Cue: Announce: Crew Update. Entering AOP-
Initiate alarm on Annunciator 09-4-2-1 8, "RWR PMP A MTR VIB HI" approximately one minute after applicant starts the pump.  
: 39. Then ...
* - CRITICAL STEP SAT I UNSAT SAT / UNSAT 1. 2. 3. *4. 5. 6. 7. STEP Obtain a controlled copy of OP- 27, Recirculation System. Reviews the precautions.
Evaluator Cue for ROs: Perform Attachment 2, Step 3 of AOP-39 to isolate suspected RBC leak into the DW.
Select the correct section to Derform the task. Start RWR Pump 'A' Verify the following:  
Evaluator Cue for SROs: Perform Attachment 1, Section 7 to confirm RBCLC leak conditions. Other operators will Derform other sections of Attachment 1.
: a. Speed rises to approximately 80% on RWR MG A SPEED CNTRL. b. RWR MG A GEN FIELD BKR closes. c. Speed returns to approximately 30% on RWR MG A Open RWR PMP A DISCH 02MOV-53A.
SROs: Perform Attachment 1              Reports indications of RBCLC leak.                           SAT / UNSAT leak detection Section 7:
Verify the following:
              -   Determines sump fill and        Evaluator Cue: If needed, ask do you have indications pumpout rate.                    of RBC Drywell leak?
0 All white lights for RPS A and RPS B power source selectors are on at panel 09-16. RWR Loop A flow rate 0 STANDARD I EVALUATION  
              -  Confirms head tank              Evaluator Cue: Perform Attachment 2, Step 3 to isolate annunciator lit and              RBC Drywell Leak.
/ COMMENT Reviews the Drecautions associated with the procedure.
makeup valve open.
I SAT 1 UNSAT Selects Section G of OP-27. I SAT/UNSAT Starts RWR Pump 'A' I SAT / UNSAT Observes normal start parameters.
2008 JPM A                                                          -4 Of 6-
I SAT/UNSAT I 2008 JPM B -3 Of 6-STEP is approximately 10,000 gpm on LOOP FLOW UNIT D. Jet pump flow rate is approximately 1 E6 Ibs/hr on the following:
 
FLOW 02FI-159A - JP-1 FLOW 02- 3FI-87A - JP-6 FLOW 02-3FI- 87C RWR Pump A differential pressure is approximately 10 psid on RWR LOOP A PMP 156A. RWR MG A motor current is approximately 100 amps on RWR MG A DRV MTR AMPS. RWR MG A generator current is approximately 120 amps on RWR MG A GEN AMPS. RWR MG A generator voltage is approximately 1000 volts on RWR MG A GEN VOLTS. DlFF PRESS 02DPI- STANDARD EVALUATION I COMMENT 2008 JPM B -4 of 6-STEP 0 15TIC-100A is controlling oil temperature Observes annunciator for high motor vibs (09-4-2-1 8). EVALUATION I COMMENT STANDARD Applicant acknowledges alarm and reports condition to supervisor (examiner).
STEP                                      STANDARD                        EVALUATION / COMMENT
SAT I UNSAT Attempts to clear alarm by depressing RWR PMP A VI6 Alarm P/B. II 9. I Refers to ARP 9-4-2-18. ~ ~ 1 Refers to ARP. I SAT / UNSAT Depresses alarm P/B. 10. ~~~~~ ~ -~~~ ~ ~~ ~ ~~~ Close RWR PMP A DISCH Closes discharge valve. Verifies pump tripped. Booth Operator:
    *14. ROs & SROs: Refer to          Places switch in CLOSE.                                        SAT / UNSAT Attachment 2, Step 3. Places  Note: Valves associated with keylock switch should not keylock switch 1-1RBCAI0 at  close per JPM setup.
Remove hi vibs alarm when Recirc pump trips. 02MOV-53A.
Panel 09-75 in CLOSE.
Verify RWR PMP 02-2P-lA is tripped. SAT / UNSAT SAT / UNSAT SAT / UNSAT c. 12. 1 11. I Trip pump by: I I ~~ ~~ ~ Place Pump A control switch in PTL. PTL.
Evaluator Cue: If applicant indicates NPO would perform this action, direct the applicant to perform the action at Panel 09-75.
Verify MG A GEN FIELD BKR opens. breaker trips. Stops Recirc pump by placing control switch in STOP or Verifies field breaker opens 17 seconds after drive motor SAT / UNSAT SAT / UNSAT ~~ *a. b. 2008 JPM B -5 of 6-Applicant Tear-Off Sheet TASK CONDITIONS A. B. C. Plant is in Mode 3, all rods in. RWR Pump 'B' is running at minimum speed. RWR Pump 'A' is ready to start. INITIA TING CUE Start RWR Pump 'A' per OP-27, beginning at Step G.12.31.
: 15. Verify closed the following   Observes and reports that valves did NOT close.                SAT / UNSAT valves:                      Evaluator Cue: Direct applicant to monitor RBC
2008 JPM B ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM C TASK TITLE:
                -   130A, OW CLR INLET   parameters from the 09-05 panel while an NPO performs
Shutdown HPCl APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER:
                -  131A, OW CLR OUTLET   remaining steps of Attachment 2, Step 3.
206000 A4.13 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME: ~~ __ ~ JPM Completion 0 Simulated Performed Location:
                -   134A, DW EQUIP DRN CLR OUTLET
0 Plant [XI Simulator DATE PERFORMED:
: 16. Observes RBC conditions           0    Reports degrading conditions to CRS.                  SAT / UNSAT degrade, standby pump starts,     0    Recommends entry into the AOP for loss of reactor header pressure degrades and building cooling.
TIME TO COMPLETE:
motor amps fluctuate.
Minutes PERFORMANCE EVALUATION:  
Evaluator Cue: If needed, ask applicant what transient is occurring and how should this transient be addressed.
[7 Satisfactory Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM C Page 1 of 7 JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SIR0 2008 JPM C APPL. TO JPM NUMBER TASK TITLE: Shutdown HPCl 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-I 5, High Pressure Coolant Injection, Current Revision 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. 6. C. D. E. F. G. H. I. Initialize simulator to any full power IC or IC-247. Manually scram the Reactor and stabilize vessel level and pressure. Secure feedwater and prohibit RClC from starting.
Evaluator Cue: WHEN/IF applicant identifies the transient is a loss of RB cooling AND transient is addressed by a Loss of RB Cooling AOP (or AOP-1 I ) ,
Allow HPCl to start and run until high level trip.
THEN direct applicant to implement AOP-11 Immediate Actions.
Allow vessel level to decrease below 222.5 inches. Re-establish feedwater to maintain vessel level above 126.5 inches and below 222.5 inches. Override the red - open light ON for 23MOV-19.
* I 7. Insert a Manual Scram          Inserts a Manual Scram                                        SAT / UNSAT
Override the green - closed light OFF for 23MOV-I 9. Remove both overrides when candidate takes the control switch for 23MOV-19 to close.
    *18. Trips RWR Pumps              Trips both RWR pumps                                            SAT / UNSAT EVALUATOR Terminate the task at this point.
V. EVALUATOR NOTES A. B. C. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed. The candidate should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
2008 JPM A                                                  -5 of 6-
VI. TASK CONDITIONS A Reactor Scram has occurred resulting in a HPCl initiation and trip on high Reactor vessel water level. RPV level is being maintained by feedwater at 177" to 222". The Control Room Supervisor has given direction to return HPCl to a normal standby line-up in accordance with OP-I 5. A. B. C. 2008 JPM C -2 of 7-VII. INITIATING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15. * - CRITICAL STEP I STEP I STANDARD 1. Obtain a controlled copy of OP- 15, High Pressure Coolant Injection.
 
The candidate determines where to obtain a controlled copy of OP-1 5 (Control Room, Merlin) EVALUATOR:
Applicant Tear-Off Sheet TASK CONDITIONS A. Reactor is operating a t power.
Provide trainee a current copy of OP-I 5 2. Reviews the precautions.  
B. RBCLC Pump B is in standby.
: 3. Select the correct section to perform the task. Reviews the precautions associated with the procedure. Selects Section F of OP-15. EVALUATOR: Provide candidate a copy of section F. Depresses 23A-S-I 9 pushbutton on panel 09-3. *4. Depresses TURB TRIP 23A-S1 9 pushbutton.
INITIA TING CUE Change In-Service RBCLC Pumps per OP-40, Section G.l 2008 JPM A
2.7 psig AND a HPCl low steam supply pressure isolation is present THEN close and protective tag HPCl EX 5. If Drywell pressure is above N/A: Applicant should observe that Drywell Pressure is below 2.7 psig. HVAC BKR 23MOV-59.
 
EVALUATION
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO         2008 JPM B         TASK TITLE:     Start Reactor Recirc Pump APPL. TO     JPM NUMBER NRC K/A SYSTEM NUMBER:         202001 A401 ESTIMATED COMPLETION TIME:       12 Minutes APPLICANT NAME:
/ COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM C -3 of 7-STANDARD EVALUATION I COMMENT Applicant should observe that RPV water level is above 126.5 inches and that drywell pressure is below 2.7 psig. SAT / UNSAT 6. When both the following conditions exist: 0 RPV level is ABOVE 126.5 inches AND 0 Drywell pressure is BELOW Continue with this procedure 2.7 psig SAT I UNSAT *7. Ensure closed TURB STM SUPP VLV 23MOV-14.
                                  ~
Closes 23MOV-14 by taking its control switch to the CLOSE position.
JPM Completion   c] Simulated           Performed Location:         0   Plant               Simulator DATE PERFORMED:                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION:         c]   Satisfactory         IJ Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM B                                 Page 1 of 6
Depresses 23A-SI 7 pushbutton on panel 09-3.
 
SAT I UNSAT *8. Depress INITIATION SlGlMAN pushbutton.
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             2008 JPM B             TASK TITLE:       Start Reactor Recirc Pump APPL. TO          JPM NUMBER
TURB TRIP RESET 23A-SI 7 ~~~~~ ~ ~ Observes that 23A-DS63 iight is off on panel 09-3.
: 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-27, Recirculation System 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Initialize simulator to Mode 3 all rods in (IC-243).
SAT / UNSAT 9. Verifies white INITIATION SIG 23A-DS63 light is off. 10. If amber Rx HIGH LEVL SIG 23A-DS65 light is on at panel 09-3, THEN reset high water level trip as follows: Verify RPV level is LESS THAN value shown on Att. 3 Utilizes multiple indications to observe that RPV level is less than approximately 214 inches (Att. 3). Depresses 23A-S25 pushbutton on panel 09-3.
: 6. RWR Pump 6     at minimum flow.
SAT I UNSAT *11. Depress HI LVL SIG RESET 23A-S25 pushbutton.
C. RWR Pump A ready to start, up through Step G.12.31 V. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
SAT / UNSAT 12. Verify amber Rx HI LVL SIG 23A-DS65 light is off. Observes that amber RX HI LVL SIG 23A-DS65 light is off on Dane1 09-3. Observes that annunciator 09-3-3-28 clears when annunciator reset pushbutton is pushed. SAT I UNSAT 13. Verify annunciator 09-3-3-28 HPCl TURB TRIP SOLENOID ENERGIZED is clear. ~~ ~ -4 of 7- 2008 JPM C II I STEP ~ -1 *14. Ensure closed INJ VLV 23MOV- Observes that 23MOV-19 is NOT closed; closes 23MOV-I 19. 1 19 by taking its control switch to the CLOSE position.
B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
STANDARD SAT / UNSAT 1 EVALUATION I COMMENT 15. Ensure closed TEST VLV TO Observes that the green - closed light for 23MOV-21 is I SCT 23MOV-21.
C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three- point communication.
SAT / UNSAT 17. 1 EVALUATOR:
VI. TASK CONDITIONS A. Plant is in Mode 3, all rods in.
Inform the candidate "Valve 23MOV-24 ensure closed HPCl
: 6. RWR Pump 6     is running at minimum speed.
& RClC TEST vLv To 'ST 23M0V-24. will not be used to support RClC operation.
C. RWR Pump A is ready to start.
When HPCl turbine is stopped, stop AUX OIL PMP 23P-150.
2008 JPM B                                               -2 Of 6-
Observes that HPCl turbine is stopped by speed indicator on panel 09-3 reading 0 rpm. Stops 23P-150 by taking its control switch to the STOP position.
 
SAT I UNSAT SAT / UNSAT 18. Verify closed the following Observes that the GREEN - closed lights for 23HOV-1 valves: and 23HOV-2 are on. TURB STOP VLV 23HOV-1 TURB STOP VLV 23HOV-2 SAT ! UNSAT Verify open the following valves: Observes that the red - open lights for 23AOV-42 and 23AOV-43 are on. 0 STM LINE DRAIN T RADW STM LINE DRAIN T RADW 23AOV-42 0 23AOV-43 SAT I UNSAT 20. Ensure closed MIN FLOW VLV Observes that the green - closed light for 23MOV-25 is SAT / UNSAT 1 23MOV-25.
VII. INITIATING CUE Start RWR Pump A per OP-27, b-jin ing at Step G.12.31.
1 on. 21. Verify open STM LINE WARMING ISOL VLV 23MOV-60.
* CRITICAL STEP STEP                                      STANDARD                        I EVALUATION / COMMENT
Observes that the red - open light for 23MOV-60 is on. SAT / UNSAT *22. Ensure closed OUTBD STM I SUPP VLV 23MOV-16. Closes 23MOV-16 by taking its control switch to the CLOSE position.
: 1. Obtain a controlled copy of OP- The Applicant obtains a controlled copy of OP-27                SAT I UNSAT 27, Recirculation System.
SAT / UNSAT ~~ -~ 2008 JPM C -5 of 7-stopped for at least 15 minutes, STANDARD After a 15 minute wait, stop 24P-140 by taking its control switch to the STOP position. stop GLAND SEAL CNDSR BLOWER 23P-140.
: 2. Reviews the precautions.        Reviews the Drecautions associated with the procedure. I     SAT 1 UNSAT
expired. EVALUATOR: Inform candidate that 15 minutes has  
: 3. Select the correct section to Derform the task.
*24. Ensure closed for the following valves: 0 HPCl GLAND SEAL SUCT 01 -1 25MOV-13A 0 HPCI GLAND SEAL SUCT 0 1 - 1 25 M OV- 1 3 B Closes 01 -1 25MOV-13A and 01 -1 25MOV-138 by placing their control switches on the CLOSE position.  
Selects Section G of OP-27.                             I      SAT/UNSAT
' EVALUATOR: These control switches are located on i panel 09-75. 25. If SGT operation is not required, THEN shutdown SGT per Section F of OP-20. When the candidate states that he/she would shutdown SGT per OP-20, then inform candidate "Another operator has been assigned to shutdown SGT. 26. Ensure TURB VIB MON 23VM- Verifies TURB VIB MON 23MV-100 toggle switch is in off. I 100 tosate switch is in off. 27. Verify HPCl is in a standby lineup per Step E.1.3. EVALUATOR: Inform candidate that another operator will be performing this step. EVALUATOR Terminate the task at this point.
      *4. Start RWR Pump A             Starts RWR Pump A                                      I      SAT / UNSAT
EVALUATION I COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM C -6 Of 7-
: 5. Verify the following:
, Applicant Tear-Off Sheet TASK CONDITIONS A. 6. C. A Reactor Scram has occurred resulting in a HPCI initiation and trip on high Reactor vessel water level. RPV level is being maintained by feedwater at 177" to 222". The Control Room Supervisor has given direction to return HPCI to a normal standby line-up in accordance with OP-15. INITIA TING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15. 2008 JPM C ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SlRO 2008 JPM D TASK TITLE: MSlV Surveillance Test APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 239001 A203 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME: JPM Completion Simulated IXI Performed Location:
: a. Speed rises t o approximately 80% on RWR Observes normal start parameters.
Plant Simulator DATE PERFORMED:
I      SAT/UNSAT MG A SPEED CNTRL.
TIME TO COMPLETE:
: b. RWR MG A GEN FIELD BKR closes.
Minutes PERFORMANCE EVALUATION:
: c. Speed returns to approximately 30% on RWR MG A
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM D Page 1 of 7 JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 2008 JPM D TASK TITLE: MSIV Surveillance Test APPL. TO JPM NUMBER  
: 6. Open RWR PMP A DISCH           Opens discharge valve.                                          SAT I UNSAT 02MOV-53A.
: 1. SAFETY CONSIDERATIONS A. None 11. REFERENCES A. B. AOP-1, Reactor Scram ST-1 I, MSlV Limit Switch Channel Functional Test, Rev.24 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-1 I, with prerequisites signed off. IV. SET UP REQUIREMENTS A. Initialize simulator to IC #249; approx.
: 7. Verify the following:           Observes normal pump parameters.                                SAT / UNSAT 0 All white lights for RPS A and RPS B power       Booth Operator: Initiate alarm on Annunciator 09-4-2-18, source selectors are on  RWR PMP A MTR VIB HI approximately one minute at panel 09-16.         after applicant starts the pump.
80% Rx power. V. EVALUATOR NOTES A. '6. C. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
RWR Loop A flow rate                                                             I 2008 JPM B                                                  -3 Of 6-
The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication. VI. TASK CONDITIONS A. 6. Plant is at about 80% power. No other evolutions are in progress.
 
ST Prerequisites have been performed.
STEP                      STANDARD EVALUATION I COMMENT is approximately 10,000 gpm on LOOP FLOW 02FI-159A FLOW UNIT D.
2008 JPM D -2 of 7- i VII. INITIATING CUE Perform MSlV Limit Switch Channel Functional Test IAW ST-1 I, Section 8. * - CRITICAL STEP Oa. Ob. STEP Obtain a controlled copy of ST- 1 I, MSlV Limit Switch Channel Functional Test.
Jet pump flow rate is approximately 1E6 Ibs/hr on the following:
Reviews the precautions and limitations.  
              -  JP-1 FLOW 02-3FI-87A - JP-6 FLOW 02-3FI-87C RWR Pump A differential pressure is approximately 10 psid on RWR LOOP A PMP DlFF PRESS 02DPI-156A.
: 1. Verifies open: MSlV 29AOV-86A MSlV 29AOV-86B  
RWR MG A motor current is approximately 100 amps on RWR MG A DRV MTR AMPS.
: 2. *3. Verifies the following lights are on: 0 RPS A SCRAM GROUPS 1, 2, 3, and 4 1, 2, 3, and 4 0 RPS B SCRAM GROUPS Remove fuse 5A-F3E inside panel 09-1 5. STANDARD Evaluator Cue:
RWR MG A generator current is approximately 120 amps on RWR MG A GEN AMPS.
Provide applicant with controlled copy of ST-1 I. Reviews the precautions and limitations associated with the procedure.
RWR MG A generator voltage is approximately 1000 volts on RWR MG A GEN VOLTS.
Verifies valves open. Group lights are on. Removes fuse (requests CRS to have fuse removed). Booth Operator:
2008 JPM B                          -4of 6-
Use simulator remote function to remove fuse 5A-F3E inside panel 09-1 5. Evaluator Cue: Fuse has been removed. Dual concurrent verification is complete.
 
EVALUATION I COMMENT NIA SAT / UNSAT SAT / UNSAT SAT I UNSAT SAT I UNSAT 2008 JPM D -3 of 7-5A-K3E relay is de-energized at panel 09-1 5. 5. IF RX MODE switch is in a position other than RUN, ... 6. *7. WHILE performing partial closure of 29AOV-86A, perform the following concurrently:
STEP                                          STANDARD                         EVALUATION I COMMENT 0   15TIC-100A is controlling oil temperature Observes annunciator for high     Applicant acknowledges alarm and reports condition to            SAT I UNSAT motor vibs (09-4-2-18).            supervisor (examiner).
0 Ensure personnel standing by to monitor RPV pressure and power 0 Measure partial closure time with stopwatch 1 0 IF any of the following.. . I Depress and hold MSlV SLOW CLOSE 29AOV-86A pushbutton to start closing 29AOV-86A.
I         9. I Refers to ARP 9-4-2-18.     ~ ~ 1 Refers to ARP.                                           I     SAT / UNSAT
Depresses P/B. Evaluator Cue:
: 10. Attempts to clear alarm by          Depresses alarm P/B.                                             SAT / UNSAT depressing RWR PMP A VI6 Alarm P/B.
Relays are de-energized.
1      ~~
Verify the following relays are de-energ ized : 0 MSlV CLOSURE TRIP 5A-K3A on panel 09-1 5 0 MSlV CLOSURE TRIP 5A-K3B on panel 09-1 7 SAT / UNSAT N/A STANDARD ~~ Evaluator Cue: Relay is de-energized.
: 11. I Trip pump by:
RX MODE switch is NOT in a position other than RUN. CAUTION: If the slow close pushbutton is depressed too long, MSIV could fully close due to steam forces on the valve. Evaluator Cue: Personnel are standing by. Applicant has stopwatch EVALUATION I COMMENT N/A N/A SAT / UNSAT 2008 JPM D -4 of 7- 
                          ~~~~~         ~
: 9. *I 0. 11. 12. ~ 13. STEP Verify the following:
I            -~~~         ~     ~~ ~           ~~~
0 Annunciators 09-5-1-2, 09-5-1-3 are in alarm.
I
0 RPSASCRAM GROUPS 1, 2, 3, and 4 lights are off. SCRAM A indicates TRIP NOT OPEN indicates TRIP 0 EPIC-D-1241 RX 0 EPIC-D-1286 MSlV AI Release MSIV SLOW CLOSE 29AOV-86A pushbutton Verify open MSIV 29AOV-86A.
          *a. Close RWR PMP A DISCH             Closes discharge valve.                                         SAT / UNSAT 02MOV-53A.
Verify the following relays are energized:
: b. Verify RWR PMP 02-2P-lA is         Verifies pump tripped.                                           SAT / UNSAT tripped.                           Booth Operator: Remove hi vibs alarm when Recirc pump trips.
0 MSlV CLOSURE TRIP 5A-K3A on panel 09-1 5 0 MSlV CLOSURE TRIP 5A-K3B on panel 09-1 7 ~~ Verify the following:
                                          ~~                   ~~               ~
Annunciator 09-5-1-2, MSIVS NOT FULL OPEN TRIP is clear NOT OPEN indicates NORMAL EPIC-D-1286 MSlV AI STANDARD Verifies expected response.
: c. Place Pump A control switch in     Stops Recirc pump by placing control switch in STOP or          SAT / UNSAT PTL.                               PTL.
Releases P/B. Verifies MSlV re-opens Relays are energized. Annunciator is clear: EPIC-D-1286 indicates NORMAL EVALUATION I COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM D -5 of 7- 
: 12. Verify MG A GEN FIELD BKR           Verifies field breaker opens 17 seconds after drive motor       SAT / UNSAT opens.                             breaker trips.
*I 4. 15. 16. *I 7. STEP Reset RPS A Verify the following:
2008 JPM B                                                         -5 of 6-
0 Annunciator 09-5-1-3, RPS A AUTO SCRAM is clear. GROUPS 1,2,3, and 4 lights are on. SCRAM A indicates RESET 0 RPSASCRAM EPIC-D-1241 Rx ~~~ ~~ ~ ~~ ~ ~ Record partial closure time on placard above AOV-86A P/B install fuse 5A-F3E inside Panel 09-1 5. STANDARD Resets RPS A ~~~~~ Annunciator is clear; Scram group lights are on; and EPIC-D-1241 is RESET. ~~~~~ Evaluator Cue: Time has been recorded.
 
Evaluator Cue: Fuse has been re-installed. ~~~~ ~ EVALUATOR Terminate the task at this point. EVALUATION I COMMENT SAT / UNSAT SAT / UNSAT NA 2008 JPM D -6 Of 7-Applicant Tear-Off Sheet TASK CONDITIONS A. B. Plant is at about 80% power. No other evolutions are in progress.
Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is in Mode 3, all rods in.
ST Prerequisites have been performed.
B. RWR Pump B is running a t minimum speed.
IN1 TIA TING CUE Perform MSIV Limit Switch Channel Functional Test IAW ST-1 I, Section 8. 2008 JPM D ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO 2008 JPM E TASK 11TLE: Isolate RBCLC Supply to the Drywell APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 223001 A2.01 ESTIMATED COMPLETION TIME:
C. RWR Pump A is ready to start.
10 Minutes APPROVED: JPM Completion 0 Simulated X Performed Location:
INITIA TING CUE Start RWR Pump A per OP-27, beginning at Step G.12.31.
Plant X Simulator DATE PERFORMED:
2008 JPM B
TIME TO COMPLETE:
 
Minutes PERFORMANCE EVALUATION:
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0         2008 JPM C           TASK TITLE:   Shutdown HPCl APPL. TO     JPM NUMBER NRC WA SYSTEM NUMBER:       206000 A4.13 ESTIMATED COMPLETION TIME:           12 Minutes APPLICANT NAME:
0 Satisfactory 0 Unsatisfactory COMMENTS:
__  ~         ~~
JPM Completion   0   Simulated             Performed Location:         0   Plant             [XI Simulator DATE PERFORMED:                       TIME TO COMPLETE:             Minutes PERFORMANCE EVALUATION:           [7 Satisfactory         Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM C                                   Page 1 of 7
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SIR0             2008 JPM C             TASK TITLE:      Shutdown HPCl APPL. TO           JPM NUMBER
: 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-I 5, High Pressure Coolant Injection, Current Revision 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Initialize simulator to any full power IC or IC-247.
: 6. Manually scram the Reactor and stabilize vessel level and pressure.
C. Secure feedwater and prohibit RClC from starting.
D. Allow HPCl to start and run until high level trip.
E. Allow vessel level to decrease below 222.5 inches.
F. Re-establish feedwater to maintain vessel level above 126.5 inches and below 222.5 inches.
G. Override the red - open light ON for 23MOV-19.
H. Override the green - closed light OFF for 23MOV-I 9.
I. Remove both overrides when candidate takes the control switch for 23MOV-19 to close.
V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
VI. TASK CONDITIONS A. A Reactor Scram has occurred resulting in a HPCl initiation and trip on high Reactor vessel water level.
B. RPV level is being maintained by feedwater at 177 to 222.
C. The Control Room Supervisor has given direction to return HPCl to a normal standby line-up in accordance with OP-I 5.
2008 JPM C                                                 -2 of 7-
 
VII. INITIATING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15.
* CRITICAL STEP I               STEP             I                       STANDARD                       EVALUATION / COMMENT
: 1. Obtain a controlled copy of OP-   The candidate determines where to obtain a controlled       SAT / UNSAT 15, High Pressure Coolant        copy of OP-1 5 (Control Room, Merlin)
Injection.                        EVALUATOR: Provide trainee a current copy of OP-I 5
: 2. Reviews the precautions.         Reviews the precautions associated with the procedure.      SAT / UNSAT
: 3. Select the correct section to       Selects Section F of OP-15.                                 SAT / UNSAT perform the task.                EVALUATOR: Provide candidate a copy of section F.
      *4. Depresses TURB TRIP 23A-          Depresses 23A-S-I 9 pushbutton on panel 09-3.               SAT / UNSAT S19 pushbutton.
: 5. If Drywell pressure is above     N/A: Applicant should observe that Drywell Pressure is     SAT / UNSAT 2.7 psig AND a HPCl low          below 2.7 psig.
steam supply pressure isolation is present THEN close and protective tag HPCl EX HVAC BKR 23MOV-59.
2008 JPM C                                             -3 of 7-
 
STANDARD                         EVALUATION I COMMENT
: 6. When both the following      Applicant should observe that RPV water level is above           SAT / UNSAT conditions exist:              126.5 inches and that drywell pressure is below 2.7 psig.
0   RPV level is ABOVE 126.5 inches AND 0   Drywell pressure is BELOW 2.7 psig Continue with this procedure
      *7. Ensure closed TURB STM         Closes 23MOV-14 by taking its control switch to the             SAT I UNSAT SUPP VLV 23MOV-14.              CLOSE position.
      *8. Depress INITIATION SlGlMAN      Depresses 23A-SI 7 pushbutton on panel 09-3.                   SAT I UNSAT TURB TRIP RESET 23A-SI 7 pushbutton.
                                        ~~~~~                 ~ ~
: 9. Verifies white INITIATION SIG  Observes that 23A-DS63 iight is off on panel 09-3.             SAT / UNSAT 23A-DS63 light is off.
: 10. If amber Rx HIGH LEVL SIG       Utilizes multiple indications to observe that RPV level is 23A-DS65 light is on at panel   less than approximately 214 inches (Att. 3).
09-3, THEN reset high water level trip as follows:
Verify RPV level is LESS THAN value shown on Att. 3
      *11. Depress HI LVL SIG RESET        Depresses 23A-S25 pushbutton on panel 09-3.                   SAT I UNSAT 23A-S25 pushbutton.
: 12. Verify amber Rx HI LVL SIG     Observes that amber RX HI LVL SIG 23A-DS65 light is off         SAT / UNSAT 23A-DS65 light is off.          on Dane1 09-3.
: 13. Verify annunciator 09-3-3-28    Observes that annunciator 09-3-3-28 clears when               SAT I UNSAT HPCl TURB TRIP SOLENOID        annunciator reset pushbutton is pushed.
ENERGIZED is clear.
                                                    ~~       ~
2008 JPM C                                            -4 of 7-
 
I          I             STEP           ~ -1                           STANDARD                        1 EVALUATION I COMMENT
      *14.
I Ensure closed INJ VLV 23MOV-
: 19.                              1 Observes that 23MOV-19 is NOT closed; closes 23MOV-19 by taking its control switch to the CLOSE position.
SAT / UNSAT 15.
I Ensure closed TEST VLV TO SCT 23MOV-21.
Observes that the green - closed light for 23MOV-21 is         SAT / UNSAT SAT I UNSAT ensure closed HPCl & RClC TEST vLvTo ST 23M0V-24.
1 EVALUATOR: Inform the candidate Valve 23MOV-24 will not be used to support RClC operation.
: 17. When HPCl turbine is stopped,         Observes that HPCl turbine is stopped by speed indicator       SAT / UNSAT stop AUX OIL PMP 23P-150.          on panel 09-3 reading 0 rpm. Stops 23P-150 by taking its control switch to the STOP position.
: 18. Verify closed the following           Observes that the GREEN - closed lights for 23HOV-1             SAT !UNSAT valves:                             and 23HOV-2 are on.
TURB STOP VLV 23HOV-1 TURB STOP VLV 23HOV-2 Verify open the following valves:   Observes that the red - open lights for 23AOV-42 and           SAT I UNSAT 0  STM LINE DRAIN T RADW          23AOV-43 are on.
23AOV-42 0   STM LINE DRAIN T RADW 23AOV-43 20.
1 Ensure closed MIN FLOW VLV 23MOV-25.                        1 Observes that the green - closed light for 23MOV-25 is on.
SAT / UNSAT
: 21. Verify open STM LINE               Observes that the red - open light for 23MOV-60 is on.         SAT / UNSAT WARMING ISOL VLV 23MOV-60.
  ~~
      *22.
        -~
I Ensure closed OUTBD STM SUPP VLV 23MOV-16.
Closes 23MOV-16 by taking its control switch to the CLOSE position.
SAT / UNSAT 2008 JPM C                                                 -5 of 7-
 
STANDARD                           EVALUATION I COMMENT After a 15 minute wait, stop 24P-140 by taking its control     SAT / UNSAT stopped for at least 15 minutes,  switch to the STOP position.
stop GLAND SEAL CNDSR             EVALUATOR: Inform candidate that 15 minutes has BLOWER 23P-140.                    expired.
    *24. Ensure closed for the following   Closes 01-125MOV-13A and 01-125MOV-138 by placing               SAT / UNSAT valves:                            their control switches on the CLOSE position.
0  HPCl GLAND SEAL SUCT          EVALUATOR: These control switches are located on 01-125MOV-13A                i panel 09-75.
0  HPCI GLAND SEAL SUCT 0 1- 125 MOV- 13 B
: 25. If SGT operation is not           When the candidate states that he/she would shutdown           SAT / UNSAT required, THEN shutdown SGT        SGT per OP-20, then inform candidate Another operator per Section F of OP-20.            has been assigned to shutdown S G T .
26.
27.
I Ensure TURB VIB MON 23VM-100 tosate switch is in off.
Verify HPCl is in a standby Verifies TURB VIB MON 23MV-100 toggle switch is in off.
EVALUATOR: Inform candidate that another operator will SAT / UNSAT SAT / UNSAT lineup per Step E.1.3.             be performing this step.
EVALUATOR Terminate the task at this point.
2008 JPM C                                             -6 Of 7-
 
Applicant Tear-Off Sheet TASK CONDITIONS A. A Reactor Scram has occurred resulting in a HPCI initiation and trip on high Reactor vessel water level.
: 6. RPV level is being maintained by feedwater a t 177" to 222".
C. The Control Room Supervisor has given direction to return HPCI to a normal standby line-up in accordance with OP-15.
INITIA TING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15.
2008 JPM C
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SlRO       2008 JPM D         TASK TITLE:     MSlV Surveillance Test APPL. TO     JPM NUMBER NRC WA SYSTEM NUMBER:         239001 A203 ESTIMATED COMPLETION TIME:       12 Minutes APPLICANT NAME:
JPM Completion       Simulated     IXI   Performed Location:             Plant               Simulator DATE PERFORMED:                   TIME TO COMPLETE:                 Minutes PERFORMANCE EVALUATION:         0   Satisfactory       0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM D                                 Page 1 of 7
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO             2008 JPM D             TASK TITLE:       MSIV Surveillance Test APPL. TO           JPM NUMBER
: 1. SAFETY CONSIDERATIONS A. None
: 11. REFERENCES A. ST-1I, MSlV Limit Switch Channel Functional Test, Rev.24 B. AOP-1, Reactor Scram 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-1 I, with prerequisites signed off.
IV. SET UP REQUIREMENTS A. Initialize simulator to IC #249; approx. 80% Rx power.
V.     EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
: 6. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
VI. TASK CONDITIONS A. Plant is at about 80% power. No other evolutions are in progress.
: 6. ST Prerequisites have been performed.
2008 JPM D                                               -2 of 7-i
 
VII. INITIATING CUE Perform MSlV Limit Switch Channel Functional Test IAW ST-1 I , Section 8.
* CRITICAL STEP STEP                                      STANDARD                      EVALUATION I COMMENT Oa. Obtain a controlled copy of ST- Evaluator Cue: Provide applicant with controlled copy of          NIA 1I, MSlV Limit Switch Channel   ST-1 I.
Functional Test.
Ob. Reviews the precautions and    Reviews the precautions and limitations associated with      SAT / UNSAT limitations.                    the procedure.
: 1. Verifies open:                 Verifies valves open.                                        SAT / UNSAT MSlV 29AOV-86A MSlV 29AOV-86B
: 2. Verifies the following lights   Group lights are on.                                          SAT I UNSAT are on:
0   RPS A SCRAM GROUPS 1, 2, 3, and 4 0  RPS B SCRAM GROUPS 1, 2, 3, and 4
      *3. Remove fuse 5A-F3E inside       Removes fuse (requests CRS to have fuse removed).            SAT I UNSAT panel 09-1 5.
Booth Operator: Use simulator remote function to remove fuse 5A-F3E inside panel 09-15.
Evaluator Cue: Fuse has been removed. Dual concurrent verification is complete.
2008 JPM D                                                   -3 of 7-
 
STANDARD                        EVALUATION I COMMENT
                                                  ~~
Evaluator Cue: Relay is de-energized.                            N/A 5A-K3E relay is de-energized a t panel 09-1 5.
: 5. IF RX MODE switch is in a           RX MODE switch is NOT in a position other than RUN.              N/A position other than RUN, ...
CAUTION: If the slow close pushbutton is depressed too long, MSIV could fully close due to steam forces on the valve.
: 6. WHILE performing partial             Evaluator Cue: Personnel are standing by.                    SAT / UNSAT closure of 29AOV-86A, perform the following concurrently:
Applicant has stopwatch 0   Ensure personnel standing by to monitor RPV pressure and power 0   Measure partial closure I          time with stopwatch 1     0   IF any of the following.. .
      *7. Depress and hold MSlV SLOW             Depresses P/B.                                              SAT / UNSAT CLOSE 29AOV-86A pushbutton to start closing 29AOV-86A.
Verify the following relays are      Evaluator Cue: Relays are de-energized.                         N/A de-energized :
0   MSlV CLOSURE TRIP 5A-K3A on panel 09-15 0   MSlV CLOSURE TRIP 5A-K3B on panel 09-17 2008 JPM D                                                        -4 of 7-
 
STEP                                      STANDARD                  EVALUATION I COMMENT
: 9. Verify the following:          Verifies expected response.                            SAT / UNSAT 0    Annunciators 09-5-1-2, 09-5-1-3 are in alarm.
0    RPSASCRAM GROUPS 1, 2, 3, and 4 lights are off.
0    EPIC-D-1241 RX SCRAM A indicates TRIP 0    EPIC-D-1286 MSlV A I NOT OPEN indicates TRIP
* I 0. Release MSIV SLOW CLOSE        Releases P/B.                                          SAT / UNSAT 29AOV-86A pushbutton
: 11. Verify open MSIV 29AOV-86A. Verifies MSlV re-opens                                  SAT / UNSAT
: 12. Verify the following relays are Relays are energized.                                  SAT / UNSAT energized:
0   MSlV CLOSURE TRIP 5A-K3A on panel 09-15 0    MSlV CLOSURE TRIP 5A-K3B on panel 09-17
          ~            ~~
: 13. Verify the following:            Annunciator is clear: EPIC-D-1286 indicates NORMAL      SAT / UNSAT Annunciator 09-5-1-2, MSIVS NOT FULL OPEN TRIP is clear EPIC-D-1286 MSlV A I NOT OPEN indicates NORMAL 2008 JPM D                                                  -5 of 7-
 
STEP                                          STANDARD              EVALUATION I COMMENT
* I 4. Reset RPS A                      Resets RPS A                                              SAT / UNSAT
                                                                          ~~~~~
: 15. Verify the following:             Annunciator is clear; Scram group lights are on; and      SAT / UNSAT EPIC-D-1241 is RESET.
0    Annunciator 09-5-1-3, RPS A AUTO SCRAM is clear.
0    RPSASCRAM GROUPS 1,2,3, and 4 lights are on.
EPIC-D-1241 Rx SCRAM A indicates RESET
            ~~~            ~~    ~  ~~  ~  ~    ~~~~~
: 16.      Record partial closure time on  Evaluator Cue: Time has been recorded.                        NA placard above AOV-86A P/B
      *I  7. install fuse 5A-F3E inside Panel Evaluator Cue: Fuse has been re-installed.
09-15.
                                                  ~~~~        ~
EVALUATOR Terminate the task at this point.
2008 JPM D                                                         -6O f 7-
 
Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is a t about 80% power. No other evolutions are in progress.
B. ST Prerequisites have been performed.
IN1TIA TING CUE Perform MSIV Limit Switch Channel Functional Test IAW ST-1 I, Section 8.
2008 JPM D
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO      2008 JPM E        TASK 11TLE:    Isolate RBCLC Supply to the Drywell APPL. TO    JPM NUMBER NRC WA SYSTEM NUMBER:          223001 A2.01 ESTIMATED COMPLETION TIME:       10 Minutes APPROVED:
JPM Completion   0   Simulated     X   Performed Location:             Plant         X Simulator DATE PERFORMED:                   TIME TO COMPLETE:               Minutes PERFORMANCE EVALUATION:         0   Satisfactory       0 Unsatisfactory COMMENTS:
EVALUATOR:
EVALUATOR:
SIGNATURE/PRINTED 2008 JPM E Page 1 of 7 JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SlROlNPO 2008 JPM E TASK TITLE:
SIGNATURE/PRINTED 2008 JPM E                         Page 1 of 7
Isolate RBCLC Supply to the Drywell APPL. TO JPM NUMBER  
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SlROlNPO           2008 JPM E             TASK TITLE:     Isolate RBCLC Supply to the Drywell APPL. TO         JPM NUMBER
: 1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.
: 1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.
II. REFERENCES A. EP-12, Isolating RBCLC supply to the Drywell, Rev. 0. 111. TOOLS AND EQUIPMENT A. Necessary material contained in the EP support boxes located adjacent to panels. IV. SET UP REQUIREMENTS A. B. C. Insert the following overrides: Obtain a controlled copy of EP-12 for use by the candidate. Reset simulator to IC-247, with "A RWR pump tripped and "B" pump running. OS SWZDl11 RBCAl3 OPEN OS RWZDJI 1 RBCBIO OPEN V. EVALUATOR NOTES A. B. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
II. REFERENCES A. EP-12, Isolating RBCLC supply to the Drywell, Rev. 0.
VI. TASK CONDITIONS A. A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees. 2008 JPM E -2 of 7-VII. INITIATING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-  
111. TOOLS AND EQUIPMENT A. Necessary material contained in the EP support boxes located adjacent to panels.
: 12. Obtains a controlled copy of EP-12.  
IV. SET UP REQUIREMENTS A. Obtain a controlled copy of EP-12 for use by the candidate.
* - CRITICAL STEP SAT / UNSAT STEP Obtain a controlled copy of EP-12. Ensures RWR pumps are tripped. Trips the "B pump. 1. 2. *3. 4. *5. 2008 JPM E - EVA1 Locates key lock switches Places the following keylock switches in CLOSE: 1-1 RBCAlO 1-1 RBCA13 1-1 RBCBlO 1-1 RBCB12 STANDARD I EVALUATION I COMMENT Observes "A RWR tripped. Informs Control Room that "B RWR pump will be tripped.
B. Reset simulator to IC-247, with A RWR pump tripped and B pump running.
C. Insert the following overrides:
OS     SWZDl11RBCAl3            OPEN OS     RWZDJI 1RBCBIO            OPEN V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
VI. TASK CONDITIONS A. A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees.
2008 JPM E                                                 -2 of 7-
 
VII. INITIATING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-12.
* CRITICAL STEP STEP                                          STANDARD                              I EVALUATION I COMMENT
: 1. Obtain a controlled copy of EP-12. Obtains a controlled copy of EP-12.                                  SAT / UNSAT
: 2. Ensures RWR pumps are tripped.       Observes  A RWR tripped. Informs Control Room that        B       SAT / UNSAT RWR pump will be tripped.
EVALUATOR: If needed, acting as supervisor, order applicant to trip the 6RWR Pump.
    *3. Trips the  B pump.                 Trips 6 RWR pump by taking the 02-2P-1B to STOP                    SAT I UNSAT Notes green trip ON.
EVA1 IATOR: Keylock switches are located at panel 09-75
: 4. Locates key lock switches             Locates keys at SNO desk.                                            SAT I UNSAT
    *5. Places the following keylock         Inserts key into keylock switch(s) and takes to switch(s) to          SAT / UNSAT switches in CLOSE:                   CLOSE.
1-1 RBCAlO 1-1 RBCA13 1-1 RBCBlO 1-1 RBCB12 2008 JPM E                                                -3 of 7-
 
STEP                                    STANDARD                               EVALUATION / COMMENT Verifies closed the following Verifies closed by observing the green light on, the following valves:                      vaIves :
DW CLR A INLET 15AOV-130A    DW CLR A INLET                                                        SAT / UNSAT DW CLR A OUTLET 15AOV-        DW CLR A OUTLET                                                      SAT / UNSAT 131A DW EQUIP DRN CLR OUTLET      DW EQUIP DRN CLR OUTLET                                              SAT / UNSAT 15AOV-134A I
                                                    ~~~      ~  ~  ~
RWR PMP A CLR INLET 15AOV-    Notes RWR PMP A CLR INLET valve is NOT closed Takes                  SAT / UNSAT 132A                          action to close the valve by informing supervisor and recommending NPO locally close valve.
NOTE: Evaluator may have to ask applicant what action he recommends.
EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.
RWR PMP A CLR OUTLET          Notes RWR PMP A CLR OUTLET valve is NOT closed.                I     SAT / UNSAT 15AOV-133A                    Takes action to close the valve by informing supervisor and recommending NPO locally close valve.
NOTE: Evaluator may have to ask applicant what action he recommends.
EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.
2008 JPM E                                        -4of 7-
 
STEP                                    STANDARD                        EVALUATION / COMMENT DW CLR B INLET 15AOV-1305  Notes DW CLR B INLET valve is NOT closed. Takes action        SAT / UNSAT to close the valve by informing supervisor and recommending NPO locally close valve.
NOTE: Evaluator may have to ask applicant what action he recommends.
EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.
DW CLR B OUTLET 15AOV-    Notes DW CLR B OUTLET valve is NOT closed. Takes              SAT / UNSAT 131B                      action to close the valve by informing supervisor and recommending NPO locally close valve.
NOTE: Evaluator may have to ask applicant what action he recommends.
EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.
RWR PMP B CLR INLET 15AOV- RWR PMP B CLR INLET                                          SAT / UNSAT 1328 RWR PMP B CLR OUTLET        RWR PMP B CLR OUTLET                                        SAT / UNSAT 15AOV-1335
  *7. Close                      Calls and directs NPO to CLOSE:                              SAT / UNSAT 02-2RWR-39A (RWR Pump A    02-2RWR-39A Seal Purge)                02-2RWR-395 02-2RWR-395 (RWR Pump B    EVALUATOR: Acting as NPO inform candidate: 02-2RWR Seal Purge)                39A and B are CLOSED.
2008 JPM E                                    -5of 7-
 
STEP                                      STANDARD                    EVALUATION I COMMENT
  *8. Closes the following valves:  Takes switches to CLOSE; observes Red light out, green      SAT / UNSAT light on for the following valves:
02MOV-43A RWR PMP A SUCT                          02MOV-43A RWR PMP A SUCT 02MOV-53A RWR PMP A            02MOV-53A RWR PMP A DISCH DlSCH (not critical, valve    02MOV-436 RWR PMP 6 SUCT already closed) 02MOV-536 RWR PMP 6 DISCH 02MOV-436 RWR PMP 6 SUCT 02MOV-536 RWR PMP B DISCH EVALUATOR: Terminate the task at this point.
2008 JPM E                                        -6Of 7-
 
Applicant Tear-Off Sheet TASK CONDITIONS A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees.
INITIA TING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-12.
2008 JPM E
 
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0        2008 JPM F          TASK TITLE:      Core Spray In-Service Test APPL. TO      JPM NUMBER NRC K/A SYSTEM NUMBER:          209001 K407 ESTIMATED COMPLETION TIME:        12 Minutes APPLICANT NAME:
                ~~~~            ~
JPM Completion      0 Simulated            Performed Location:            0 Plant                Simulator DATE PERFORMED:                    TIME TO COMPLETE:                Minutes PERFORMANCE EVALUATION:          0  Satisfactory        0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM F                                  Page 1 of 5
 
JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO              2008 JPM F            TASK TITLE:      Core Spray In-Service Test APPL. TO          JPM NUMBER
: 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-3PB, Core Spray Loop B Quarterly Operability Test (IST) 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-3PB with steps signed off through Step 8.1 2 2 .
IV. SET UP REQUIREMENTS A. Initialize simulator to a Mode 5 IC.
V. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and      actually performed.
C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.
VI. TASK CONDITIONS A. Plant is in Mode 5.
B. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22.
2008 JPM F                                              -2 of 5-
 
VII. INITIATING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1.23
* CRITICAL STEP STEP              I                            STANDARD                    [ EVALUATION / COMMENT
: 1. Obtain the working copy of ST-    Evaluator: Hand the working copy of the procedure to 3P6                                the amlicant.
              ~~~~~                  ~~        ~    ~    ~
        *2. Close and time SUCT VLV            Closes and times suction valve.                                SAT I UNSAT 14MOV-7B.
        *3. Open and time SUCT VLV.            Opens and times suction valve.                                SAT I UNSAT
: 4. Verify normal CS lube oil level    Evaluator Cue: NPO reports normal level.                      SAT I UNSAT
: 5. Record CS Pump 14P-IB              Evaluator Cue: NPO reports suction pressure reading            SAT / UNSAT suction pressure from 14PI-        5.4 psig.
7582.                              Applicant records pressure.
: 6. Initiate EPIC display TRCS.        Initiates display.                                            SAT / UNSAT
: 7. Verify the following:              Verifies alarm is clear and EPIC indicates normal.            SAT I UNSAT 0 Annunciator 09-3-1-10, CORE SPRAY A OR B DISCH LlLNE NOT FULL is clear.
0 EPIC-D-274 indicates normal.
        *8. Start Core Spray Pump B.          Starts pump.                                                  SAT I UNSAT
        *9. Throttle TEST VLV 14MOV-26B        Throttles valve to flow rate 2 4265 gpm on EPIC display        SAT / UNSAT to establish Loop B flow rate 2    TRCS.
4265 gpm on EPIC display TRCS.
1 2008 JPM F                                                      -3 of 5-
 
I            I              STEP                                        STANDARD                          I EVALUATION /COMMENT Verify MIN FLOW VLV 14MOV-      Verifies valve closed.                                      1      SAT/UNSAT 1
5B closed.
: 11. Record discharge pressure from  Records discharge pressure (approximately 285 psig).              SAT/UNSAT EPIC-A-I 154.
: 12. Record CS Pump 14P-IB            Evaluator Cue: NPO reports suction pressure reading                SAT / UNSAT suction pressure from 14PI-      5.1 psig.
75B2.                            Applicant records pressure.
I
: 13. If suction pressure    .. .      Determines Step 8.1.34 is N/A.                              I      SAT / UNSAT
* I 4.
      *I  5.
If suction pressure is 2 0 psig, THEN calc pump TS d/p.
Throttle TEST VLV 14MOV-26B Calculates d/p (disch minus suction) as psig.
                                                                                                +
Throttles valve to establish average Loop B flow rate trend 1      SAT / UNSAT SAT / UNSAT to establish average Loop B flow of 4700 gpm on EPIC display TRCS.
rate trend of 4700 gpm on EPIC display TRCS.
: 16. I Wait 5 minutes.                  Evaluator Cue: Five minutes have elapsed.                  I          N/A
: 17. Record CS Pump 14P-IB            Evaluator Cue: NPO reports suction pressure reading                SAT / UNSAT suction pressure from 14PI-      4.9 psig.
75B2.                            Applicant records pressure.
18.
I Record discharge pressure from EPIC-A-I 154.
Records discharge pressure (approximately 280 psig).
I      SAT/UNSAT Records average flow rate trend from EPIC display TRCS:            SAT / UNSAT (Acceptable range 4610 to 4790 EVALUATOR Terminate the task at this point.
2008 JPM F                                                      -4of 5-
 
Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is in Mode 5.
B. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22 INITIA TING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1 2 3 2008 JPM F
 
NEW YORK POWER AUTHORITY{PRIVA TE }
JOB PERFORMANCE MEASURE S/RO            2008 JPM G                  TASK TITLE: Perform the Emergency Diesel Generator APPL. TO        JPM NUMBER                                  Load Test ( S / U and Load EDG's)
NRC K/A SYSTEM NUMBER: 2640000 A4.04 ESTIMATED COMPLETION TIME:        18  Minutes APPROVED:
CANDIDATE NAME:
JPM Completion: (  ) Simulated                ( X 1 Performed Location :      (  ) Plant            ( X ) Simulator DATE PERFORMED:                                      TIME TO COMPLETE:            Minutes PERFORMANCE EVALUATION:        (  ) Satisfactory      (  Unsatisfactory COMMENTS :
EVALUATOR:
EVALUATOR:
If needed, acting as supervisor, order applicant to trip the "6" RWR Pump. SAT / UNSAT Trips ''6" RWR pump by taking the 02-2P-1 B to STOP Notes green trip ON. SAT I UNSAT IATOR: Keylock switches are located at panel 09-75 Locates keys at SNO desk. Inserts key into keylock switch(s) and takes to switch(s) to CLOSE. -3 of 7- SAT I UNSAT SAT / UNSAT STEP DW CLR A INLET Verifies closed the following valves: SAT / UNSAT DW CLR A INLET 15AOV-130A DW CLR A OUTLET DW EQUIP DRN CLR OUTLET DW CLR A OUTLET 15AOV- 131A SAT / UNSAT SAT / UNSAT DW EQUIP DRN CLR OUTLET 15AOV-134A ~~~ ~ ~ ~ Notes RWR PMP A CLR INLET valve is NOT closed Takes I action to close the valve by informing supervisor and recommending NPO locally close valve. RWR PMP A CLR INLET 15AOV-132A SAT / UNSAT RWR PMP A CLR OUTLET 15AOV-133A Notes RWR PMP A CLR OUTLET valve is NOT closed. STANDARD I SAT / UNSAT Verifies closed by observing the green light on, the following va I ve s : EVALUATION
SIGNATURE/PRINTED 2008 JPM G                                    -1 of 6-
/ COMMENT NOTE: Evaluator may have to ask applicant what action he recommends.
 
EVALUATOR: Acting as NPO inform candidate:
JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION S/RO                  2008 JPM G                TASK TITLE: Perform the Emergency Diesel Generator APPL. TO            JPM NUMBER                                Load Test (S/U and Load EDGs)
Valve is CLOSED. Takes action to close the valve by informing supervisor and recommending NPO locally close valve. NOTE: Evaluator may have to ask applicant what action he recommends.
I. SAFETY CONSIDERATIONS A. None
: 11. REFERENCES A. ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, Rev. 1 B. OP-22, DIESEL GENERATOR EMERGENCY POWER, Rev. 28 Ill. TOOLS AND EQUIPMENT A. Stopwatch B. Synchronizing Switch IV. SET UP REQUIREMENTS A. Initialize the simulator to any IC B. Obtain a controlled copy of ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST. Initial as complete Section 4.0, 5.0 and Steps 8.1 through and including Steps 8.19.
C. Copies of EDG Demand Log for EDG B & D forms from OP-22, DIESEL GENERATOR EMERGENCY POWER.
V. EVALUA TOR NOTES A. The candidate should, a t a minimum, observe the change in equipment status light indication when equipment is operated.
B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
VI. TASK CONDITIONS A. EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9.
2008 JPM G                                      -3 of 6-
 
Vll. INITIATING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning a t Step 8.20.
* - CRITIC (PRIVA 1L STEP S TEP                                      STANDARD                      1 EVALUATION / COMMENT Obtain a controlled copy of procedure Obtains a controlled copy of ST-SBB                        SAT / UNSAT ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST Reviews the precautions              Reviews the precautions, making note of any that are        SAT / UNSAT applicable Select the correct section to begin  Per cue, begins a t step 8.20.                              SAT / UNSAT the task.
Trip tie Breaker 10604 and allow      Piaces the control switch for Breaker 10604, EDG B          SAT i UNSAT switch to spring return t o AUTO      & D TIE BKR, to TRIP, allow switch to spring return position                              to AUTO Place EDG B and D governor mode      Places the EDG GOV MODE toggle switches for                SAT / UNSAT switches in the droop position        EDGs B&D t o DROOP Place EDG B LOAD BKR SNCH SW in      Places the EDG B LOAD BKR SYNCH SW to ON                    SAT / UNSAT ON Adjust EDG B VOLT REG t o match      Matches INCOMING (EDG) and RUNNING (bus                    SAT / UNSAT INCOMING and RUNNING voltages        10600) voltages with EDG B VOLT REG adjustments
                                                      ~~
Adjust EDG B GOV to rotate            Adjusts EDG B GOV to rotate synchroscope slowly in          SAT / UNSAT synchroscope slowly in the FAST      fast direction direction (clockwise)
When EDG B and the 10600 BUS are      Places the control switch 10602, EDG B LOAD BKR,            SAT / UNSAT in phase (synchroscope a t 1 2      to CLOSE when synchroscope is at 12:OO o'clock) close EDG B LOAD BKR 10602 2008 JPM G
 
I PRlVA                    STEP                                        STANDARD                   EVALUATION / COMMENT I TE3 1  *lo*
Adjust EDG B GOV t o raise EDG B load t o between 100 and 300 k W Places the EDG B GOV switch to RAISE and loads EDG B to between 100 and 300 kW SAT I UNSAT 11  "12.
Place EDG B LOAD BKR SYNCH SW in OFF Adjust EDG B GOV t o raise EDG B load t o 2600 kW over 3 t o 5 minutes Places the EDG B LOAD BKR SYNCH SW t o OFF Adjusted EDG B GOV to raise EDG B load t o 2600 kW over 3 t o 5 minutes in 800 k W increments SAT I UNSAT SAT / UNSAT in approximately 800 k W increments VALUATOR: State," 3 minutes have passed", after each load adjustment.
EVALUATOR: Terminate the task at this point                              I 2008 JPM G                                                    -5 of 6-
 
I .
Applicant Tear-Off Sheet TASK CONDITIONS EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9.
INITIA TING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning a t Step 8.20.
2008 JPM G
 
n Nuclear Northeast James A. FitzPatrick Nuclear Power Plant OPERATIONS TRAINING PROGRAMS JOB PERFORMANCE MEASURE RO                    2008 JPM H                TASK TITLE: Return an LPRM to Service APPL. TO              JPM NUMBER NRC K/A SYSTEM NUMBER: 21 5005 A      m ESTIMATED COMPLETION TIME:          10    Minutes APPROVED:
APPLICANT NAME:
JPM Completion:      (  Simulated              ( X ) Performed Locat ion:            (  Plant          ( X ) Simulator DATE PERFORMED:                                          TIME TO COMPLETE:        Minutes PERFORMANCE EVALUATION:            (  ) Satisfactory    (  ) Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
Acting as NPO inform candidate: Valve is CLOSED. 2008 JPM E -4 of 7- 
SIGNATURE/PRINTED 2008 JPM H                                      Page 1 of 5
*7. STEP DW CLR B INLET 15AOV-1305 DW CLR B OUTLET 15AOV-131B RWR PMP B CLR INLET 15AOV-1328 RWR PMP B CLR OUTLET 15AOV-1335 Close 02-2RWR-39A (RWR Pump A Seal Purge) 02-2RWR-395 (RWR Pump B Seal Purge)
 
STANDARD Notes DW CLR B INLET valve is NOT closed. Takes action to close the valve by informing supervisor and recommending NPO locally close valve. NOTE: Evaluator may have to ask applicant what action he re com mends . EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED. Notes DW CLR B OUTLET valve is NOT closed. Takes action to close the valve by informing supervisor and recommending NPO locally close valve. NOTE: Evaluator may have to ask applicant what action he recommends.
JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION RO                2008 JPM H                TASK TITLE: Return an LPRM to Service APPL. TO            JPM NUMBER I.     SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.
EVALUATOR:
: 11. REFERENCES A. OP-16, "Neutron Monitoring", Rev 27.
Acting as NPO inform candidate:
Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset simulator t o 50% power IC B. LPRM 4C-28-13 bypassed per OP-16.
Valve is CLOSED. RWR PMP B CLR INLET RWR PMP B CLR OUTLET Calls and directs NPO to CLOSE: 02-2RW R-39A 02-2RWR-395 EVALUATOR: Acting as NPO inform candidate: 02-2RWR 39A and B are CLOSED". EVALUATION
C. Obtain a controlled copy of OP-16 for use by the applicant.
/ COMMENT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM E -5 of 7- 
V,     EVAL UA TOR NOTES A. The applicant should, a t a minimum, observe the change in equipment status light indication when equipment is operated.
*8. STEP Closes the following valves:
B. If simulating this task, then inform the applicant t h a t the conditions of each step need only be properly identified and not actually performed.
02MOV-43A RWR PMP A SUCT DlSCH (not critical, valve already closed)
VI. TASK CONDITIONS A. The Reactor is a t 50% power with all systems normal.
SUCT DISCH 02MOV-53A RWR PMP A 02MOV-436 RWR PMP 6 02MOV-536 RWR PMP B STANDARD Takes switches to CLOSE; observes Red light out, green light on for the following valves: 02MOV-43A RWR PMP A SUCT 02MOV-53A RWR PMP A DISCH 02MOV-436 RWR PMP 6 SUCT 02MOV-536 RWR PMP 6 DISCH EVALUATOR:
B. LPRM 4C-28-13 is ready to return to service.
Terminate the task at this point.
2008 JPM H                                      Page 2 O f 5
EVALUATION I COMMENT SAT / UNSAT 2008 JPM E -6 Of 7-Applicant Tear-Off Sheet TASK CONDITIONS A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees. INITIA TING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-12. 2008 JPM E ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM F TASK TITLE: Core Spray In-Service Test APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER:
 
209001 K407 ESTIMATED COMPLETION TIME:
VI. INITIATING CUE Return LPRM 4C-28-13(associated with 'C' APRM) to service per OP-16, Section E. 13, "Returning an LPRM Assigned t o an APRM to Service".
12 Minutes APPLICANT NAME: ~~~~ ~ JPM Completion 0 Simulated Performed Location : 0 Plant Simulator DATE PERFORMED:
      - CRITICAL STEP S TEP                                      STANDARD 1     Obtains OP-16.                         References Section E. 13 "2. Bypass APRM per Subsection E.16 by    Bypasses APRM 'C' Placing APRM BYP switch in
TIME TO COMPLETE:
          'C' APRM 'C' BYPASS indicating    (located on bench board 09-5) light is on APRM 'C' EPIC alarm indicates bypassed "3. Verify BYP light for APRM 'C' is on at Verifies light on top panel 09-14.                       (top row of lights)
Minutes PERFORMANCE EVALUATION:
  "4. Place LPRM amplifier card switch in    Amplifier switch is in OP.
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM F Page 1 of 5 JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 2008 JPM F TASK TITLE: Core Spray In-Service Test APPL. TO JPM NUMBER
OP (for 4C-28-13).
: 1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-3PB, Core Spray Loop B Quarterly Operability Test (IST) 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-3PB with steps signed off through Step 8.1 22. IV. SET UP REQUIREMENTS A. Initialize simulator to a Mode 5 IC. V. EVALUATOR NOTES A. B. C. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
: 5. Verify the LPRM reading is reasonable  Verifies reading when compared with symmetric              -  at LPRM Cabinet LPRM readings.                                   OR
If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and actually performed.
                                                    -  on EPIC by selecting LPRM RD comparing 'C' levels on symmetric LPRMs
The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and th ree-poin t communication.
                                        ~
VI. TASK CONDITIONS A. B. Plant is in Mode 5. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22. 2008 JPM F -2 of 5-VII. INITIATING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1.23 1. *2. *3. 4. 5. 6. 7. *8. *9. 1 * - CRITICAL STEP Obtain the working copy of ST-3P6 Evaluator: Hand the working copy of the procedure to the amlicant.
: 6. Record date and LPRM reading on        Evaluator Cue: Date and reading recorded.
STEP I STANDARD [ EVALUATION
LPRM Bypass Information Sheet at Panel 09-14.
/ COMMENT ~~~~~ ~~ Close and time SUCT VLV Open and time SUCT VLV. Verify normal CS lube oil level Record CS Pump 14P-IB suction pressure from 14PI- 7582. Initiate EPIC display TRCS. Verify the following:
2008 JPM H                                                  Page 3 O f 5
14MOV-7B. ~ ~ ~ Closes and times suction valve. Opens and times suction valve. Evaluator Cue: NPO reports normal level. Evaluator Cue: NPO reports suction pressure reading 5.4 psig. Applicant records pressure. Initiates display.
 
SAT / UNSAT Verifies alarm is clear and EPIC indicates normal. SAT I UNSAT SAT I UNSAT SAT I UNSAT SAT I UNSAT SAT / UNSAT Start Core Spray Pump B. Throttle TEST VLV 14MOV-26B to establish Loop B flow rate 2 4265 gpm on EPIC display TRCS. Starts pump. Throttles valve to flow rate 2 4265 gpm on EPIC display TRCS. 0 Annunciator 09-3-1 -1 0, CORE SPRAY A OR B DISCH LlLNE NOT FULL is clear.
S TEP                                    STANDARD
normal. 0 EPIC-D-274 indicates SAT I UNSAT SAT / UNSAT 2008 JPM F -3 of 5-II I STEP Verify MIN FLOW VLV 14MOV-5B closed. 11. 12. Record discharge pressure from EPIC-A-I 154. Record CS Pump 14P-IB suction pressure from 14PI- 75B2. I I 13. *I 4. If suction pressure If suction pressure is 2 0 psig, THEN calc pump TS d/p. . . . *I 5. Throttle TEST VLV 14MOV-26B to establish average Loop B flow rate trend of 4700 gpm on EPIC display TRCS.  
                                                                              ~_________
: 16. I Wait 5 minutes. 17. Record CS Pump 14P-IB suction pressure from 14PI- 75B2. 18. Record discharge pressure from I EPIC-A-I 154. STANDARD I EVALUATION
Perform ST-5D                        Evaluator Cue: ST-5D completed and sat.
/COMMENT Verifies valve closed.
Depress TRIP RESET P/B t o clear    TRIP RESET P/B is depressed.
1 SAT/UNSAT Records discharge pressure (approximately 285 psig). 1 SAT/UNSAT Evaluator Cue:
applicable upscale or downscale alarm lights for APRM 'C',
NPO reports suction pressure reading 5.1 psig.
Return associated APRM to service    Refers to Section E.17 Der Subsection E. 1 7 bv:
Applicant records pressure.
Verify the following lights for APRM Verifies lights are off.
SAT / UNSAT Determines Step 8.1.34 is N/A. I SAT / UNSAT + SAT / UNSAT -- 1 Calculates d/p (disch minus suction) as psig. Throttles valve to establish average Loop B flow rate trend of 4700 gpm on EPIC display TRCS.
        'C' are off at Panel 09-14:
SAT / UNSAT Evaluator Cue:
0  INOP UPSCL NEUT TRIP 0  UPSCL THERM TRIP Piace APRM BYP switch for APRM      Places APRM BYP switch in center position. SAT i UNSAT
Five minutes have elapsed.
        'C' in center Dosition          ~~ ~
I N/A Evaluator Cue:
Verify APRM 'C' is returned to      Verifies APRM 'C' is returned to service. SAT / UNSAT service using one or both of the following :
NPO reports suction pressure reading 4.9 psig.
0  APRM 'C' BYPASS indicating light is off 0  No EPIC bypassed alarms for the three APRMs Terminate the task at this point.
Applicant records pressure.
2008 JPM H                                                  Page 4 of 5
SAT / UNSAT I SAT/UNSAT Records discharge pressure (approximately 280 psig). Records average flow rate trend from EPIC display TRCS: (Acceptable range 4610 to 4790 EVALUATOR Terminate the task at this point. SAT / UNSAT 2008 JPM F -4 of 5-Applicant Tear-Off Sheet TASK CONDITIONS A. B. Plant is in Mode 5. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22 INITIA TING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1 23 2008 JPM F NEW YORK POWER AUTHORITY{PRIVA TE } JOB PERFORMANCE MEASURE S/RO 2008 JPM G TASK TITLE: Perform the Emergency Diesel Generator APPL. TO JPM NUMBER Load Test (S/U and Load EDG's) NRC K/A SYSTEM NUMBER: 2640000 A4.04 ESTIMATED COMPLETION TIME: 18 Minutes APPROVED: CANDIDATE NAME:
 
JPM Completion: ( ) Simulated ( X 1 Performed Location : ( ) Plant ( X ) Simulator DATE PERFORMED:
Applicant Tear-Off Sheet TASK CONDITIONS A. The Reactor is at 50% power with all systems normal.
TIME TO COMPLETE:
B. LPRM 4C-28-13 is ready t o return t o service.
Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( Unsatisfactory COMMENTS : EVALUATOR:
INITIA TING CUE Return LPRM 4C-28-13 (associated with 'C' APRM) t o service per OP-16, Section E. 13, "Returning an LPRM Assigned t o an APRM t o Service  'I.
SIGNATURE/PRINTED 2008 JPM G -1 of 6-JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION S/RO 2008 JPM G TASK TITLE: Perform the Emergency Diesel Generator APPL. TO JPM NUMBER Load Test (S/U and Load EDG's) I. 11. Ill. IV. V. VI. SAFETY CONSIDERA TIONS A. None REFERENCES A. B. TOOLS AND EQUIPMENT A. Stopwatch B. Synchronizing Switch SET UP REQUIREMENTS A. B. ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, Rev.
2008 JPM H
1 OP-22, DIESEL GENERATOR EMERGENCY POWER, Rev. 28 Initialize the simulator to any IC Obtain a controlled copy of ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST. Initial as complete Section 4.0, 5.0 and Steps 8.1 through and including Steps 8.19. Copies of EDG Demand Log for EDG B & D forms from OP-22, DIESEL GENERATOR EMERGENCY POWER.
 
C. EVALUA TOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.
Nuclear Northeast        James A. FitzPatrick Nuclear Power Plant OPERATIONS TRAlNI NG PROGRAMS JOB PERFORMANCE MEASURE S/RO/NLO                2008 JPM I         TASK TITLE: Close an SRV Remotely by Pulling Fuses.
If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.
APPL. TO              JPM NUMBER NRC K/A SYSTEM NUMBER:      239002 A2.03 ESTIMATED COMPLETION TIME:            10    Minutes APPROVED:
B. TASK CONDITIONS A. EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9. 2008 JPM G -3 of 6-Vll. INITIATING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning at Step 8.20. Obtains a controlled copy of ST-SBB Reviews the precautions, making note of any that are applicable
APPLICANT NAME:
* - CRITIC (PRIVA SAT / UNSAT SAT / UNSAT 1L STEP Places the control switch 10602, EDG B LOAD BKR, to CLOSE when synchroscope is at 12:OO S TEP SAT / UNSAT Obtain a controlled copy of procedure TEST AND ESW PUMP OPERABILITY TEST ST-SBB, EDG B & D FULL LOAD Reviews the precautions Select the correct section to begin the task. Trip tie Breaker 10604 and allow switch to spring return to AUTO position Place EDG B and D governor mode switches in the droop position Place EDG B LOAD BKR SNCH SW in ON Adjust EDG B VOLT REG to match INCOMING and RUNNING voltages Adjust EDG B GOV to rotate synchroscope slowly in the FAST direction (clockwise)
JPM Completion:      ( X ) Simulated      (  1 Performed Location :            ( X ) Plant          (  ) Simulator DATE PERFORMED:                                            TIME TO COMPLETE:      Minutes PERFORMANCE EVALUATION:            (  ) Satisfactory      (  ) Unsatisfactory EVALUATOR:
When EDG B and the 10600 BUS are in phase (synchroscope at 12 o'clock) close EDG B LOAD BKR 10602 2008 JPM G STANDARD 1 EVALUATION
SIGNATURE/PRINTED 2008 JPM I                                      Page 1 of 5
/ COMMENT Per cue, begins at step 8.20. SAT / UNSAT Piaces the control switch for Breaker 10604, EDG B & D TIE BKR, to TRIP, allow switch to spring return to AUTO SAT i UNSAT Places the EDG GOV MODE toggle switches for EDGs B&D to DROOP SAT / UNSAT Places the EDG B LOAD BKR SYNCH SW to ON SAT / UNSAT Matches INCOMING (EDG) and RUNNING (bus 10600) voltages with EDG B VOLT REG adjustments SAT / UNSAT ~~ Adjusts EDG B GOV to rotate synchroscope slowly in fast direction SAT / UNSAT I PRlVA STANDARD Places the EDG B GOV switch to RAISE and loads EDG B to between 100 and 300 kW Places the EDG B LOAD BKR SYNCH SW to OFF Adjusted EDG B GOV to raise EDG B load to 2600 kW over 3 to 5 minutes in 800 kW increments
 
*VALUATOR:
JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMATION S/RO/NLO            20004233A          TASK TITLE: Close an SRV Remotely by Pulling Fuses.
State," 3 minutes have passed", after each load adjustment.
APPL. TO            JPM NUMBER I,    SAFETY CONSIDERATIONS A. Ensure proper safety equipment and safety procedures are observed.
I TE3 EVALUATION
: 11. REFERENCES A. AOP-36, Stuck Open Relief Valve(s), Rev. 13 Ill. TOOLS AND EQUIPMENT A. Fuse Pullers B. Flashlight I v. SET UP REQUIREMENTS A. Make a copy of AOP-36 for use by the Applicant.
/ COMMENT SAT I UNSAT SAT I UNSAT SAT / UNSAT 1 *lo* 11 "12. STEP Adjust EDG B GOV to raise EDG B load to between 100 and 300 kW Place EDG B LOAD BKR SYNCH SW in OFF Adjust EDG B GOV to raise EDG B load to 2600 kW over 3 to 5 minutes in approximately 800 kW increments EVALUATOR:
B. Obtain Shift Manager's permission prior to performing this task.
Terminate the task at this point I 2008 JPM G -5 of 6-I. Applicant Tear-Off Sheet TASK CONDITIONS EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9. INITIA TING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning at Step 8.20. 2008 JPM G n James A. FitzPatrick Nuclear Power Plant Nuclear Northeast OPERATIONS TRAINING PROGRAMS JOB PERFORMANCE MEASURE RO 2008 JPM H TASK TITLE: Return an LPRM to Service APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 21 5005 Am ESTIMATED COMPLETION TIME: 10 Minutes APPROVED:
V. EVAL UA TOR NOTES A. If performing JPM in the plant, inform the Applicant that the conditions of each step need only be properly identified and    actually performed.
APPLICANT NAME: JPM Completion: ( Simulated ( X ) Performed Lo cat ion : ( Plant ( X ) Simulator DATE PERFORMED:
B. The Applicant should, a t a minimum, identify the change in equipment status light indication when equipment operation is simulated.
TIME TO COMPLETE:
C. Place keeping should be demonstrated by the Applicant during the performance of the task.
Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( ) Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
VI. TASK CONDITIONS A. SORV 02-RV-71A has inadvertently opened and remains open.
EVALUATOR:
B. AOP-36, Stuck Open Relief Valves, was entered and attempts to shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.
SIGNATURE/PRINTED 2008 JPM H Page 1 of 5 JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION RO 2008 JPM H TASK TITLE: Return an LPRM to Service APPL. TO JPM NUMBER I. 11. Ill. IV. V, VI. SAFETY CONSIDERA TIONS A. Comply with JAF Safety Standards and Requirements.
C. The next step to close the valve is to remove the control power fuses per step C.2.3.d 2008 JPM I                                    Page 2 of 5
REFERENCES A. OP-16, "Neutron Monitoring", Rev 27. TOOLS AND EQUIPMENT A. None SET UP REQUIREMENTS A. B. C. Reset simulator to 50% power IC LPRM 4C-28-13 bypassed per OP-16. Obtain a controlled copy of OP-16 for use by the applicant.
 
EVAL UA TOR NOTES A. The applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the applicant that the conditions of each step need only be properly identified and not actually performed.
Vll. INITIATING CUE Attempt to close 02-RV-7 1A by removing its control power fuses per AOP-36.
B. TASK CONDITIONS A. B. The Reactor is at 50% power with all systems normal.
* - CRITIC 1L STEP PRlVA                          S TEP                                      STANDARD                          EVALUATION / COMMENT TE 3                                                                                                              ~
LPRM 4C-28-13 is ready to return to service. 2008 JPM H Page 2 Of 5 VI. INITIATING CUE Return LPRM 4C-28-13 (associated with 'C' APRM) to service per OP-16, Section E. 13, "Returning an LPRM Assigned to an APRM to Service". - CRITICAL STEP 1 "2. "3. "4. 5. 6. S TEP Obtains OP-16. Bypass APRM per Subsection E.16 by Placing APRM BYP switch in 'C' APRM 'C' BYPASS indicating light is on APRM 'C' EPIC alarm indicates bypassed Verify BYP light for APRM 'C' is on at top panel 09-14. Place LPRM amplifier card switch in OP (for 4C-28-13).
: 1.     Obtain a controlled copy of procedure  The Applicant obtains a controlled copy of AOP-36.             SAT / UNSAT AOP-36, Stuck Open SRV(s)
Verify the LPRM reading is reasonable when compared with symmetric LPRM readings.
EVALUA TOR Hand copy of AOP-36 to Applicant
~ Record date and LPRM reading on LPRM Bypass Information Sheet at Panel 09-1 4. STANDARD References Section E. 13 Bypasses APRM
                                                                                                                ~~        ~
'C' (located on bench board 09-5) Verifies light on (top row of lights) Amplifier switch is in OP. Verifies reading - at LPRM Cabinet OR - on EPIC by selecting LPRM RD comparing
: 2.       Identify step C.2.3.(d) as appropriate Applicant may use C.2.3.d and Attachment 1 or                  SAT / UNSAT step and obtain fuse puller.           Posted Attachment 1 inside 09-45 as guidance.
'C' levels on symmetric LPRMs Evaluator Cue: Date and reading recorded.
2008 JPM H Page 3 Of 5 S TEP Perform ST-5D Depress TRIP RESET P/B to clear applicable upscale or downscale alarm lights for APRM 'C', Return associated APRM to service Der Subsection E. 17 bv: Verify the following lights for APRM 'C' are off at Panel 09-14: 0 INOP UPSCL NEUT TRIP 0 UPSCL THERM TRIP Piace APRM BYP switch for APRM 'C' in center Dosition ~~ ~ Verify APRM 'C' is returned to service using one or both of the following
: 0 APRM 'C' BYPASS indicating light is off 0 No EPIC bypassed alarms for the three APRMs STANDARD ~_________
Evaluator Cue: ST-5D completed and sat. TRIP RESET P/B is depressed.
Refers to Section E.17 Verifies lights are off. Places APRM BYP switch in center position.
Verifies APRM 'C' is returned to service. Terminate the task at this point. 2008 JPM H Page 4 of 5 SAT i UNSAT SAT / UNSAT Applicant Tear-Off Sheet TASK CONDITIONS A. B. The Reactor is at 50% power with all systems normal. LPRM 4C-28-13 is ready to return to service. INITIA TING CUE Return LPRM 4C-28-13 (associated with 'C' APRM) to service per OP- 16, Section E. 13, "Returning an LPRM Assigned to an APRM to Service 'I. 2008 JPM H James A. FitzPatrick Nuclear Power Plant Nuclear Northeast OPERATIONS TRAl N I NG PROGRAMS JOB PERFORMANCE MEASURE S/RO/NLO 2008 JPM I TASK TITLE: Close an SRV Remotely by Pulling Fuses. APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 239002 A2.03 ESTIMATED COMPLETION TIME: 10 Minutes APPROVED:
APPLICANT NAME: JPM Completion: ( X ) Simulated ( 1 Performed Locat ion : ( X ) Plant ( ) Simulator DATE PERFORMED:
TIME TO COMPLETE:
Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( ) Unsatisfactory EVALUATOR:
SIGNATURE/PRINTED 2008 JPM I Page 1 of 5 JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMATION S/RO/NLO 20004233A TASK TITLE: Close an SRV Remotely by Pulling Fuses. APPL. TO JPM NUMBER I, 11. Ill. I v. V. VI. SAFETY CONSIDERA TIONS A. Ensure proper safety equipment and safety procedures are observed.
REFERENCES A. AOP-36, Stuck Open Relief Valve(s), Rev. 13 TOOLS AND EQUIPMENT A. Fuse Pullers B. Flashlight SET UP REQUIREMENTS A. B. Make a copy of AOP-36 for use by the Applicant.
Obtain Shift Manager's permission prior to performing this task. EVAL UA TOR NOTES A. If performing JPM in the plant, inform the Applicant that the conditions of each step need only be properly identified and actually performed.
B. The Applicant should, at a minimum, identify the change in equipment status light indication when equipment operation is simulated.
C. Place keeping should be demonstrated by the Applicant during the performance of the task. TASK CONDITIONS A. SORV 02-RV-71 A has inadvertently opened and remains open. B. AOP-36, Stuck Open Relief Valves, was entered and attempts to shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.
C. The next step to close the valve is to remove the control power fuses per step C.2.3.d 2008 JPM I Page 2 of 5 Vll. INITIATING CUE Attempt to close 02-RV-7 1 A by removing its control power fuses per AOP-36. * - CRITIC PRlVA TE 3 1. 2. 3. 4. *a. *b. 1L STEP S TEP Obtain a controlled copy of procedure AOP-36, Stuck Open SRV(s) Identify step C.2.3.(d) as appropriate step and obtain fuse puller. Proceed to panel 09-45 in the Relay Room and access the panel. Using either a controlled copy of AOP-36, Stuck Open Relief Valve(s) or the posted attachment inside panel 09-45, determine the correct fuses to be removed. Remove F2(F3A) ~~ Remove F12(F4A) STANDARD The Applicant obtains a controlled copy of AOP-36.
EVALUA TOR Hand copy of AOP-36 to Applicant Applicant may use C.2.3.d and Attachment 1 or Posted Attachment 1 inside 09-45 as guidance.
Applicant points out locker containing fuse puller.
Applicant points out locker containing fuse puller.
Correct panel located and accessed.
: 3.      Proceed to panel 09-45 in the Relay    Correct panel located and accessed.                            SAT / UNSAT Room and access the panel.
Fuses F2(F3A), F12(F4A), F23(F11 A), and F34(F12A) in panel 09-45 identified for removal. EVALUATOR: When the Applicant identifies which fuse is to be removed and describes how to remove it using the fuse pullers, tell the Applicant "The fuse is pulled". "The fuse is pulled" EVALUATION
: 4.      Using either a controlled copy of      Fuses F2(F3A), F12(F4A), F23(F11A), and                       SAT / UNSAT AOP-36, Stuck Open Relief Valve(s)    F34(F12A) in panel 09-45 identified for removal.
/ COMMENT ~ SAT / UNSAT ~~ ~ SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT SAT / UNSAT 2008 JPM I Page 3 of 5 PRlVA S TEP STANDARD EVALUATION  
or the posted attachment inside panel 09-45, determine the correct fuses to be removed.
/ COMMENT TE 1 "C. . Remove F23(F11 A) Contact the Control Room and inform them that the fuses have been removed. "The fuse is pulled" EVALUATOR:
    *a.      Remove F2(F3A)                        EVALUATOR: When the Applicant identifies which                 SAT / UNSAT fuse is to be removed and describes how t o remove it using the fuse pullers, tell the Applicant "The fuse is pulled".
Acknowledge the communication and as the Control Room Operator inform the Applicant that "The SRV now indicates closed".
                  ~~
SAT / UNSAT "d. 6. Remove F34(F12A) "The fuse is pulled" SAT / UNSAT SAT / UNSAT EVALUATOR:
    *b.      Remove F12(F4A)                        "The fuse is pulled"                                           SAT / UNSAT 2008 JPM I                                                       Page 3 of 5
Terminate the task at this point. 2008 JPM I Page 4 of 5 Applicant Tear-Off Sheet TASK CONDITIONS A. B. SORV 02-RV-71A has inadvertently opened and remains open.
 
AOP-36, Stuck Open Relief Valves, was entered and attempts to shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.
PRlVA                   S TEP                                     STANDARD                     EVALUATION / COMMENT .
The next step to close the valve is to remove the control power fuses per step C.2.3.d C. INITIA TING CUE Attempt to close SORV 02-RV-71 A by removing its control power fuses per AOP-36. 2008 JPM I S/RO APPL. TO ENTERGY NUCLEAR NORTHEAST  
TE 1 "C. Remove F23(F11A)                     "The fuse is pulled"                                  SAT / UNSAT "d. Remove F34(F12A)                    "The fuse is pulled"                                   SAT / UNSAT
{PRIVA TE } JOB PERFORMANCE MEASURE 2008 JPM J JPM NUMBER Valves TASK TITLE: Changing In-Service CRD Flow Control NRC K/A SYSTEM NUMBER: 201001 SG 9 ESTIMATED COMPLETION TIME: 15 Minutes APPROVED:
: 6. Contact the Control Room and inform  EVALUATOR: Acknowledge the communication and           SAT / UNSAT them that the fuses have been        as the Control Room Operator inform the Applicant removed.                            that "The SRV now indicates closed".
APPLICANT NAME: JPM Completion: ( X ) Simulated ( Performed Location: ( X 1 Plant ( ) Simulator DATE PERFORMED:
EVALUATOR: Terminate the task a t this point.
TIME TO COMPLETE:
2008 JPM I                                                 Page 4 of 5
Minutes PERFORMANCE EVALUATION: ( ) Satisfactory I ) Unsatisfactory COMMENTS:
 
Applicant Tear-Off Sheet TASK CONDITIONS A. SORV 02-RV-71A has inadvertently opened and remains open.
B. AOP-36, Stuck Open Relief Valves, was entered and attempts t o shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.
C. The next step t o close the valve is to remove the control power fuses per step C.2.3.d INITIA TING CUE Attempt t o close SORV 02-RV-71 A by removing its control power fuses per AOP-36.
2008 JPM I
 
ENTERGY NUCLEAR NORTHEAST {PRIVA TE }
JOB PERFORMANCE MEASURE S/RO          2008 JPM J                   TASK TITLE: Changing In-Service CRD Flow Control APPL. TO        JPM NUMBER                            Valves NRC K/A SYSTEM NUMBER:             201001 SG 9 ESTIMATED COMPLETION TIME:       15   Minutes APPROVED:
APPLICANT NAME:
JPM Completion: ( X ) Simulated           (   Performed Location:       ( X 1 Plant           (   ) Simulator DATE PERFORMED:                                       TIME TO COMPLETE:         Minutes PERFORMANCE EVALUATION:       ( ) Satisfactory     I ) Unsatisfactory COMMENTS:
EVALUATOR:
EVALUATOR:
S IG NATU RE/PRI NTED 2008 JPM J Page 1 of 6 S/RO APPL. TO 2008 JPM J JPM NUMBER EN TERG Y NUCLEAR NOR THEAS T JOB PERFORMANCE MEASURE REQUIRED TASK INFORMA TION TASK TITLE: Changing In-Service CRD Flow Control Valves I. 11. Ill. I v. V. VI. SAFETY CONSIDERA TIONS A. Proper safety attire (hardhat, safety shoes, safety glasses, ear protection, etc.) is to be worn when out in the plant. REFERENCES A. OP-25, CONTROL ROD DRIVE HYDRAULIC SYSTEM, Rev.  
S IG NATURE/PRINTED 2008 JPM J                             Page 1 of 6
: 70. TOOLS AND EQUIPMENT A. None SET UP REQUIREMENTS A. Ensure that flow control valve 03FCV-19A is in-service.
 
EVAL UA TOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
EN TERG Y NUCLEAR NOR THEAST JOB PERFORMANCE MEASURE REQUIRED TASK INFORMA TION S/RO            2008 JPM J                  TASK TITLE: Changing In-Service CRD Flow Control APPL. TO            JPM NUMBER                          Valves I.     SAFETY CONSIDERATIONS A. Proper safety attire (hardhat, safety shoes, safety glasses, ear protection, etc.) is to be worn when out in the plant.
B. TASK CONDITIONS A. B. The Control Rod Drive Hydraulic System is in operation.
: 11. REFERENCES A. OP-25, CONTROL ROD DRIVE HYDRAULIC SYSTEM, Rev. 70.
The plant is operating at rated power. The Maintenance Department has requested that "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.
Ill. TOOLS AND EQUIPMENT A. None I v. SET UP REQUIREMENTS A. Ensure that flow control valve 03FCV-19A is in-service.
2008 JPM J Page 2 of 6 VI/. INITIATING CUE Place "B" CRD Flow Control Valve (03FCV19B) in-service, and place "A" CRD Flow Control Valve (03FCV-19A) in standby. STANDARD Evaluator:
V. EVAL UA TOR NOTES A. The Applicant should, a t a minimum, observe the change in equipment status light indication when equipment is operated.
The Applicant obtains a controlled copy of OP-25. * - CRlTl4 PRlVA TE 1 1. 2. 3. 4. 5. EVALUATION
B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.
/ COMMENT SAT / UNSAT IL STEP STEP Obtain a controlled copy of procedure HYDRAULIC SYSTEM. OP-25, CONTROL ROD DRIVE Review the precautions.
VI.     TASK CONDITIONS A. The Control Rod Drive Hydraulic System is in operation.
G. 1 5 Changing Inservice CRD Flow Control Valves G. 1 5.1 Establish communication between Flow Control Hand Select Station and the Control Room. G.15.2 Line up CRD FLOW CNTRL 03FIC-301 per the following steps: a. Ensure controller is in AUTO. Evaluator:
B. The plant is operating a t rated power. The Maintenance Department has requested t h a t "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.
The Applicant reviews the precautions, Section C2, making note of any that are applicable.
2008 JPM J                                         Page 2 of 6
SAT / UNSAT Evaluator:
 
The Applicant selects Section G. 1 5, Changing In-Service CRD Flow Control Valves. SAT / UNSAT Evaluator:
VI/. INITIATING CUE Place B CRD Flow Control Valve (03FCV19B) in-service, and place A CRD Flow Control Valve (03FCV-19A) in standby.
The Applicant goes to the Rx Building 272' level to the area West of the West HCU's. When the Applicant states that he/she would establish communications between the Control Room and the master control station using either the West HCU area Gaitronics or nearby sound powered phone jack. I SAT / UNSAT Inform the Applicant:
* - CRlTl4 IL STEP PRlVA                       STEP                                      STANDARD                          EVALUATION / COMMENT TE 1
Communications with the Control Room are ESTABLISHED.
: 1.     Obtain a controlled copy of procedure Evaluator: The Applicant obtains a controlled copy of        SAT / UNSAT OP-25, CONTROL ROD DRIVE             OP-25.
EVALUATOR:
HYDRAULIC SYSTEM.
When the Applicant states that he/she would ensure the controller is in AUTO. Inform the Applicant:
: 2.     Review the precautions.               Evaluator: The Applicant reviews the precautions,             SAT / UNSAT Section C2, making note of any that are applicable.
Control Room reports that CRD Flow Controller 03FIC-301 is in AUTO. SAT / UNSAT 2008 JPM J Page 3 of 6
: 3.      G . 1 5 Changing Inservice CRD        Evaluator: The Applicant selects Section G. 15,               SAT / UNSAT Flow Control Valves            Changing In-Service CRD Flow Control Valves.
: 6. 7. "8. "9. "10. G. 15.2 Continued:  
: 4.      G. 15.1 Establish communication      Evaluator: The Applicant goes to the Rx Building 272 level to the area West of the West HCUs.
: b. Adjust controller setpoint to zero gpm. G.15.3 Perform the following for the flow control valve to be placed in service: a. Verify open inlet isolation valve: 03CRD-686 (CRD water 03FCV-196 inlet isol valve)
I      SAT / UNSAT between Flow Control Hand When the Applicant states that he/she would Select Station and the establish communications between the Control Room Control Room.                and the master control station using either the West HCU area Gaitronics or nearby sound powered phone jack.
: b. Slowly open outlet isolation valve: 0 03CRD-696 (CRD water 03FCV-196 outlet isol valve) G.15.4 Close outlet isolation valve for flow control valve to be removed from service. 0 03CRD-69A (CRD water 03CRD- 69A outlet isolation valve), ~~ G. 15.5 Place AUTO-MAN select knob is in AUTO for inservice flow control valve: 0 AUTO-MAN select knob at 03HSS-245B EVALUATOR:
Inform the Applicant: Communications with the Control Room are ESTABLISHED.
When the Applicant states that he/she would request the Control Room place the CRD flow controller setpoint to 0 gpm Inform the Applicant:
: 5.      G.15.2 Line up CRD FLOW CNTRL        EVALUATOR: When the Applicant states that                     SAT / UNSAT 03FIC-301 per the            he/she would ensure the controller is in AUTO.
Control Room reports that CRD Flow Controller 03FIC-301 setpoint is at 0 gpm". SAT / UNSAT EVALUATOR:
following steps:            Inform the Applicant: Control Room reports that CRD
When the Applicant states that he/she would check 03CRD-68B in the closed direction and verify it open. Inform the Applicant: "Valve 03CRD-68B is OPEN". SAT / UNSAT EVALUATOR:
: a. Ensure controller is in AUTO.      Flow Controller 03FIC-301 is in AUTO.
When the Applicant states that he/she would slowly open 03CRD-696, by turning its valve handwheel in the counter-clockwise direction: Inform the Applicant: "Valve 03CRD-69B is OPEN". SAT / UNSAT EVALUATOR:
2008 JPM J                                                     Page 3 of 6
When the Applicant states that he/she would close 03CRD-69A by turning its valve handwheel in the clockwise direction, Inform the Applicant: "Valve 03CRD-69A is CLOSED". SAT / UNSAT EVALUATOR:
: 6. G. 15.2 Continued:                       EVALUATOR: When the Applicant states that          SAT / UNSAT
When the Applicant states that he/she would place AUTO-MAN select knob in AUTO at Inform the Applicant:
: b. Adjust controller setpoint t o        he/she would request the Control Room place the zero gpm.                              CRD flow controller setpoint t o 0 gpm Inform the Applicant: Control Room reports that CRD Flow Controller 03FIC-301 setpoint is at 0 gpm".
03HSS-2456 "Select knob in AUTO at 03HSS-2459".
: 7. G.15.3 Perform the following for          EVALUATOR: When the Applicant states that he/she   SAT / UNSAT the f l o w control valve t o be would check 03CRD-68B in the closed direction and placed in service:              verify it open.
SAT / UNSAT 2008 JPM J Page 4 of 6 "11. 12. G.15.6 Ensure AUTO-MAN select knob is in MAN for standby flow control valve. 0 AUTO-MAN select knob at 03HSS-245A G.15.7 Slowly raise setpoint on 301 to establish 59 to 61 gpm on 03FI-310.
: a. Verify open inlet isolation valve:
CRD FLOW CNTRL 03FIC- G. 15.8 Verify normal operating values on the following indicators at panel 09-5: CHG WTR PRESS 03Pl-302:
03CRD-686 (CRD water                  Inform the Applicant:
BETWEEN 1390 and 1580 psig, not to exceed 1670 psig 303: 260 to 270 psid 304: approximately 10 to 26 psid zero when no CRD is being driven FLOW 03Fl-306:
0 3 F C V - 1 9 6 inlet isol valve)    "Valve 03CRD-68B is OPEN".
59 to 61 gpm DRV WTR DlFF PRESS 03DPI- CLG WTR DlFF PRESS 03DPI- DRV WTR FLOW 03Fl-305:
  "8. b. Slowly open outlet isolation          EVALUATOR: When the Applicant states that he/she   SAT / UNSAT valve:                                    would slowly open 03CRD-696, by turning its valve handwheel in the counter-clockwise direction:
EVALUATOR:
0  03CRD-696 (CRD water 03FCV-196 outlet isol valve)          Inform the Applicant:
Terminate the task at this point EVALUATOR:
                                                    "Valve 03CRD-69B is OPEN".
When the Applicant states that he/she would place AUTO-MAN select knob in MAN at Inform the Applicant:
  "9. G.15.4 Close outlet isolation valve      EVALUATOR: When the Applicant states that he/she   SAT / UNSAT for f l o w control valve t o be would close 03CRD-69A by turning its valve removed from service.            handwheel in the clockwise direction, 0  03CRD-69A (CRD water 03CRD-          Inform the Applicant:
03HSS-245A "Select knob in MAN at 03HSS-245A".
69A outlet isolation valve),          "Valve 03CRD-69A is CLOSED".
EVALUATOR: When the Applicant states that helshe would request the Control Room to raise setpoint of 03FlC-310 to establish 59 to 61 gpm Inform the Applicant:  
                                            ~~
"03FIC-310 setpoint is 60 gpm and flow indication is 60 gpm". EVALUATOR:
  "10. G. 15.5 Place AUTO-MAN select            EVALUATOR: When the Applicant states that he/she   SAT / UNSAT knob is in AUTO for              would place AUTO-MAN select knob in AUTO at inservice f l o w control        03HSS-2456 valve:                          Inform the Applicant:
When the Applicant states that he/she would request the Control Room to verify the values. Inform the Appiicant: "Values are normal". 0 CHG WTR PRESS 03Pl-302:
0  AUTO-MAN select knob a t                "Select knob in AUTO at 03HSS-2459".
1520 psig 0 DRV WTR DlFF PRESS 03DPl-303:
03HSS-245B 2008 JPM J                                                     Page 4 of 6
265 psid 0 0 CLG WTR DlFF PRESS 03DP1-304:
 
20 psid DRV WTR FLOW 03Fl-305:
  "11. G.15.6 Ensure A U T O - M A N select   EVALUATOR: When the Applicant states t h a t he/she knob is in M A N for standby   would place AUTO-MAN select knob in MAN a t flow control valve.            03HSS-245A AUTO-MAN select knob a t            Inform the Applicant:
zero FLOW 03Fl-306:
03HSS-245A                           "Select knob in MAN at 03HSS-245A".
60 gpm SAT / UNSAT SAT / UNSAT 2008 JPM J Page 5 of 6 Applicant Tear-Off Sheet TASK CONDITIONS A. The Control Rod Drive Hydraulic System is in operation.
: 12. G.15.7 Slowly raise setpoint on        EVALUATOR: When the Applicant states t h a t helshe SAT / UNSAT CRD FLOW CNTRL 03FIC-          would request the Control Room to raise setpoint of 3 0 1 to establish 5 9 t o 6 1 03FlC-310 to establish 59 to 61 gpm gpm on 03FI-310.              Inform the Applicant:
                                                  "03FIC-310 setpoint is 6 0 gpm and flow indication is 6 0 gpm".
G. 15.8 Verify normal operating        EVALUATOR: When the Applicant states that           SAT / UNSAT values on the following        he/she would request the Control Room t o verify the indicators a t panel 09-5:    values.
CHG WTR PRESS 03Pl-302:            Inform the Appiicant: "Values are normal".
BETWEEN 1390 and 1 5 8 0            0   CHG WTR PRESS 03Pl-302: 1 5 2 0 psig psig, not t o exceed 1 6 7 0 psig DRV WTR DlFF PRESS 03DPI-          0   DRV WTR DlFF PRESS 03DPl-303: 2 6 5 psid 303: 2 6 0 t o 270 psid 0   CLG WTR DlFF PRESS 03DP1-304: 20 psid CLG WTR DlFF PRESS 03DPI-304: approximately 1 0 t o 2 6    0  DRV WTR FLOW 03Fl-305: zero psid DRV WTR FLOW 03Fl-305:
FLOW 03Fl-306: 60 gpm zero when no CRD is being driven FLOW 03Fl-306: 5 9 t o 6 1 gpm EVALUATOR: Terminate the task at this point 2008 JPM J                                                   Page 5 of 6
 
Applicant Tear-Off Sheet TASK CONDITIONS A. The Control Rod Drive Hydraulic System is in operation.
B. The plant is operating at rated power. The Maintenance Department has requested that "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.
B. The plant is operating at rated power. The Maintenance Department has requested that "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.
INITIA TING CUE Place "B" CRD Flow Control Valve (03FCV-19B) in-service, and place "A" CRD Flow Control Valve (03FCV-19A) in standby. 2008 JPM J ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO 2008 JPM K APPL. TO JPM NUMBER TASK TITLE:
INITIA TING CUE Place "B" CRD Flow Control Valve (03FCV-19B) in-service, and place "A" CRD Flow Control Valve (03FCV-19A) in standby.
SBO Start of EDG NRC WA SYSTEM NUMBER: 264000A209 ESTIMATED COMPLETION TIME: 10 Mi nu tes APPLICANT NAME: JPM Completion X Simulated 0 Performed Plant 0 Simulator Location : X DATE PERFORMED:
2008 JPM J
TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION:
 
0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO       2008 JPM K       TASK TITLE:     SBO Start of EDG APPL. TO      JPM NUMBER NRC WA SYSTEM NUMBER:       264000A209 ESTIMATED COMPLETION TIME:   10     Minutes APPLICANT NAME:
JPM Completion   X   Simulated     0     Performed Location:
X Plant         0     Simulator DATE PERFORMED:                   TIME TO COMPLETE:               Minutes PERFORMANCE EVALUATION:         0   Satisfactory     0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)
EVALUATOR:
EVALUATOR:
SIGNATUREIPRINTED 2008 JPM K Page 1 of 5
SIGNATUREIPRINTED 2008 JPM K                             Page 1 of 5
: 1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.
: 1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.
II. 111. IV. v. REFERENCES A. TSG-8, "Extending Site Black-Out Coping Time, Starting an EDGAnjecting to Vessel with No DC Power Available" TOOLS AND EQUIPMENT A. None SET UP REQUIREMENTS A. Make copy of TSG-8 as handout for applicant.
II. REFERENCES A. TSG-8, Extending Site Black-Out Coping Time, Starting an EDGAnjecting to Vessel with No DC Power Available 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Make copy of TSG-8 as handout for applicant.
EVALUATOR NOTES A. B. C. D. E. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and actually performed. The Applicant should demonstrate proper placekeeping techniques during the performance of the procedure.
: v. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.
The Applicant should demonstrate proper self-checking techniques during the performance of the procedure. The Applicant should demonstrate proper three-point communication techniques during the performance of the procedure.
B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and actually performed.
2008 JPM K Page 2 of 5 VI. TASK CONDITIONS 1 *2 3 4 *5 ~ The site has experienced a station blackout and has entered AOP-49. No emergency diesel has started, due to no DC power at the EDGs. STEP VII. INITIATING CUE Start EDG (B) per TSG-8, "Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available" STANDARD EVALUATION I COMMENT * - CRITICAL STEP pump breaker (71-12610, 46P-28) I CUE: NPO informs operator that ESW Pump Breaker is closed. Report to B EDG enclosure I Report to B EDG enclosure.
C. The Applicant should demonstrate proper placekeeping techniques during the performance of the procedure.
I SAT / UNSAT II Manually close the 2B ESW I Closes 28 ESW Pump Breaker.
D. The Applicant should demonstrate proper self-checking techniques during the performance of the procedure.
I SAT / UNSAT Verify 4KV bkrs assoc with B EDG are open, with exception of L-Gear 71-10660 (needed for ESW pump)
E. The Applicant should demonstrate proper three-point communication techniques during the performance of the procedure.
Verify either Tie Breaker 71 - 10614 or 71-10404 is closed. CUE: 4KV breakers are open; L-Gear Fdr Bkr closed. CUE: The selected tie breaker (71 -1 061 4 or 71 -1 0404) is open. SAT / UNSAT SAT / UNSAT Open air starting solenoid valve 93SOV-1 B or 93SOV- 2B. Opens the air starting solenoid valve by pushing down on T- handle at top of solenoid (located under desk near floor level below air start motors on either side of EDG). CUE: Operator can hear air flow noise, and engine rolls up to approximately 945 rpm. SAT / UNSAT 2008 JPM K Page 3 of 5 STANDARD STEP I Close the air starting solenoid valve after engine is running. ~ Releases T-handle on air starting solenoid valve. Close EDG B output breaker. I CUE: Breaker is closed. Terminate the task at this point.
2008 JPM K                                                             Page 2 of 5
Closes EDG B output breaker 71-10602 by depressing the black CLOSE button at base of breaker front.
 
EVALUATION
VI. TASK CONDITIONS The site has experienced a station blackout and has entered AOP-49. No emergency diesel has started, due to no DC power at the EDGs.
/ COMMENT SAT I UNSAT SAT / UNSAT 2008 JPM K Page 4 of 5
VII. INITIATING CUE Start EDG (B) per TSG-8, Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available
'I Applicant Tear-Off Sheet TASK CONDITIONS The site has experienced a station blackout and has entered AOP-49. No emergency diesel has started, due to no DC power at the EDGs. INITIA TING CUE Start EDG (B) per TSG-8, "Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available" 2008 JPM K}}
* CRITICAL STEP STEP                                        STANDARD                             EVALUATION I COMMENT Report to B EDG enclosure     I Report to B EDG enclosure.                                 I     SAT / UNSAT     II Manually close the 2B ESW     I Closes 28 ESW Pump Breaker.                                 I     SAT / UNSAT
          *2  pump breaker (71-12610, 46P-28)
Verify 4KV bkrs assoc with B CUE: NPO informs operator that ESW Pump Breaker is closed.
CUE: 4KV breakers are open; L-Gear Fdr Bkr closed.
I      SAT / UNSAT EDG are open, with exception 3
of L-Gear 71-10660 (needed for ESW pump)
Verify either Tie Breaker 71-   CUE: The selected tie breaker (71-10614 or 71-10404) is           SAT / UNSAT 4
10614 or 71-10404 is closed. open.
Open air starting solenoid       Opens the air starting solenoid valve by pushing down on T-       SAT / UNSAT valve 93SOV-1B or 93SOV-        handle at top of solenoid (located under desk near floor
        *5 2B.                                level below air start motors on either side of EDG).
CUE: Operator can hear air flow noise, and engine rolls up to approximately 945 rpm.
~
2008 JPM K                                                           Page 3 of 5
 
STEP               I                 ~
STANDARD                        EVALUATION / COMMENT Close the air starting solenoid   Releases T-handle on air starting solenoid valve.           SAT I UNSAT valve after engine is running.
Close EDG B output breaker.       Closes EDG B output breaker 71-10602 by depressing the     SAT / UNSAT black CLOSE button at base of breaker front.
I CUE: Breaker is closed.
Terminate the task at this point.
2008 JPM K                                                       Page 4 of 5
 
I Applicant Tear-Off Sheet TASK CONDITIONS The site has experienced a station blackout and has entered AOP-49.
No emergency diesel has started, due t o no DC power at the EDGs.
INITIA TING CUE Start EDG (B) per TSG-8, Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available 2008 JPM K}}

Latest revision as of 03:03, 13 March 2020

Final - Section B Operating Exam (Folder 3)
ML081370442
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/25/2008
From: Todd Fish
Operations Branch I
To: Peter Dietrich
Entergy Nuclear Northeast
Hansell S
Shared Package
ML072850856 List:
References
Download: ML081370442 (64)


Text

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM A TASK TITLE: Change In-Service RBCLC Pumps APPL. TO JPM NUMBER NRC KIA SYSTEM NUMBER: 400000 A401 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME:

~~~ ~ -

JPM Completion Simulated Performed Location: Plant (XI Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM A ~ Page 1 o f 6

SAFETY CONSIDERATIONS None REFERENCES OP-40, Reactor Building Closed Loop Cooling, Rev 40 AOP-39, Loss of Coolant, Rev 17 TOOLS AND EQUIPMENT Copy of AOP-39, Attachments 1 and 2.

Copy of AOP-11 Immediate Actions SET UP REQUIREMENTS A. Initialize simulator as follows:

1. Reset into IC-248

-or-

2. Reset into an at-power IC AND set RBCLC Makeup Tank level low in the operating band with expert command set swmrbw=21500.

B. Ensure RBCLC Pumps A and C are in operation and Pump C is in standby.

C. Establish Event Trigger # I : /*15P-2C */zloI IRBCC01(2)==1// 15P-2C RED LIGHT IS ON D. Insert Malfunction SW11, RBCLC Leakage in Drywell at 30% on 1 minute ramp and tied to Event Trigger # I .

E. Override Drywell Cooler Inlet Valve control switch to the OPEN position:

OR ZDIllRCCAlO DW CLR A & EQUIP SUMP INL OPEN EVALUATOR NOTES The applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.

If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.

The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.

2008 JPM A -2 Of 6-

TASK CONDITIONS Reactor is operating at power.

RBCLC Pump B is in standby INITIATING CUE Change In-Service RBCLC Pumps per OP-40, Section G. 1

  • CRITICAL STEP STANDARD EVALUATION / COMMENT Obtain a controlled copy of OP- The applicant obtains a controlled copy of OP-40 N/A 40, RBCLC.

1 2. I Reviews the precautions. I Reviews the precautions associated with the procedure. N/A Select the correct section to Derform the task.

I Selects Section G . l of OP-40. N/A

  • 4. Start the standby RBCLC Starts standby RBCLC Pump Pump Note: Leak malfunction is activated on trigger by pump start.
5. Verify RBCLC pump motor Observes normal amps. SAT / UNSAT current is LESS THAN maximum normal amps.
  • 6. Stop A RBCLC Pump Places and holds control switch for the RBCLC pump to SAT / UNSAT be shutdown in STOP until RBCLC System discharge header pressure is stable at GREATER THAN 75 psig, then release control switch.
7. Verify RBCLC pump motor Observes normal amps. SAT / UNSAT current is LESS THAN maximum normal amps.

2008 JPM A -3 Of 6-

STEP STANDARD EVALUATION / COMMENT IF sidestream filter is in service, Evaluator Cue: Sidestream filter is not in service.

THEN throttle . ..

~~~ ~ ~~

Acknowledges RBC MAKEUP Acknowledges alarm. SAT / UNSAT TK LVL HI OR LO alarm (09 2-22).

Refers to ARP 09-6-2-22: Refers to ARP. SAT / UNSAT

- Dispatches NPO to Evaluator Cue: NPO reports tank level dropping rapidly visually check tank water and level control valve is fully open.

level

- Monitors RBC discharge header pressure

~ ~~~~~~~ ~~

Acknowledges Drywell Floor Acknowledges alarm. Reports to CRS. SAT / UNSAT Sump alarm (09-4-2-12)

Refers to ARP 09-4-2-12. Refers to ARP. Reports that ARP directs AOP-39 entry. SAT / UNSAT Enters AOP-39 Evaluator Cue: Announce: Crew Update. Entering AOP-

39. Then ...

Evaluator Cue for ROs: Perform Attachment 2, Step 3 of AOP-39 to isolate suspected RBC leak into the DW.

Evaluator Cue for SROs: Perform Attachment 1, Section 7 to confirm RBCLC leak conditions. Other operators will Derform other sections of Attachment 1.

SROs: Perform Attachment 1 Reports indications of RBCLC leak. SAT / UNSAT leak detection Section 7:

- Determines sump fill and Evaluator Cue: If needed, ask do you have indications pumpout rate. of RBC Drywell leak?

- Confirms head tank Evaluator Cue: Perform Attachment 2, Step 3 to isolate annunciator lit and RBC Drywell Leak.

makeup valve open.

2008 JPM A -4 Of 6-

STEP STANDARD EVALUATION / COMMENT

  • 14. ROs & SROs: Refer to Places switch in CLOSE. SAT / UNSAT Attachment 2, Step 3. Places Note: Valves associated with keylock switch should not keylock switch 1-1RBCAI0 at close per JPM setup.

Panel 09-75 in CLOSE.

Evaluator Cue: If applicant indicates NPO would perform this action, direct the applicant to perform the action at Panel 09-75.

15. Verify closed the following Observes and reports that valves did NOT close. SAT / UNSAT valves: Evaluator Cue: Direct applicant to monitor RBC

- 130A, OW CLR INLET parameters from the 09-05 panel while an NPO performs

- 131A, OW CLR OUTLET remaining steps of Attachment 2, Step 3.

- 134A, DW EQUIP DRN CLR OUTLET

16. Observes RBC conditions 0 Reports degrading conditions to CRS. SAT / UNSAT degrade, standby pump starts, 0 Recommends entry into the AOP for loss of reactor header pressure degrades and building cooling.

motor amps fluctuate.

Evaluator Cue: If needed, ask applicant what transient is occurring and how should this transient be addressed.

Evaluator Cue: WHEN/IF applicant identifies the transient is a loss of RB cooling AND transient is addressed by a Loss of RB Cooling AOP (or AOP-1 I ) ,

THEN direct applicant to implement AOP-11 Immediate Actions.

  • 18. Trips RWR Pumps Trips both RWR pumps SAT / UNSAT EVALUATOR Terminate the task at this point.

2008 JPM A -5 of 6-

Applicant Tear-Off Sheet TASK CONDITIONS A. Reactor is operating a t power.

B. RBCLC Pump B is in standby.

INITIA TING CUE Change In-Service RBCLC Pumps per OP-40, Section G.l 2008 JPM A

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE S/RO 2008 JPM B TASK TITLE: Start Reactor Recirc Pump APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 202001 A401 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME:

~

JPM Completion c] Simulated Performed Location: 0 Plant Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: c] Satisfactory IJ Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM B Page 1 of 6

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 2008 JPM B TASK TITLE: Start Reactor Recirc Pump APPL. TO JPM NUMBER

1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-27, Recirculation System 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Initialize simulator to Mode 3 all rods in (IC-243).
6. RWR Pump 6 at minimum flow.

C. RWR Pump A ready to start, up through Step G.12.31 V. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.

C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three- point communication.

VI. TASK CONDITIONS A. Plant is in Mode 3, all rods in.

6. RWR Pump 6 is running at minimum speed.

C. RWR Pump A is ready to start.

2008 JPM B -2 Of 6-

VII. INITIATING CUE Start RWR Pump A per OP-27, b-jin ing at Step G.12.31.

  • CRITICAL STEP STEP STANDARD I EVALUATION / COMMENT
1. Obtain a controlled copy of OP- The Applicant obtains a controlled copy of OP-27 SAT I UNSAT 27, Recirculation System.
2. Reviews the precautions. Reviews the Drecautions associated with the procedure. I SAT 1 UNSAT
3. Select the correct section to Derform the task.

Selects Section G of OP-27. I SAT/UNSAT

  • 4. Start RWR Pump A Starts RWR Pump A I SAT / UNSAT
5. Verify the following:
a. Speed rises t o approximately 80% on RWR Observes normal start parameters.

I SAT/UNSAT MG A SPEED CNTRL.

b. RWR MG A GEN FIELD BKR closes.
c. Speed returns to approximately 30% on RWR MG A
6. Open RWR PMP A DISCH Opens discharge valve. SAT I UNSAT 02MOV-53A.
7. Verify the following: Observes normal pump parameters. SAT / UNSAT 0 All white lights for RPS A and RPS B power Booth Operator: Initiate alarm on Annunciator 09-4-2-18, source selectors are on RWR PMP A MTR VIB HI approximately one minute at panel 09-16. after applicant starts the pump.

0 RWR Loop A flow rate I 2008 JPM B -3 Of 6-

STEP STANDARD EVALUATION I COMMENT is approximately 10,000 gpm on LOOP FLOW 02FI-159A FLOW UNIT D.

Jet pump flow rate is approximately 1E6 Ibs/hr on the following:

- JP-1 FLOW 02-3FI-87A - JP-6 FLOW 02-3FI-87C RWR Pump A differential pressure is approximately 10 psid on RWR LOOP A PMP DlFF PRESS 02DPI-156A.

RWR MG A motor current is approximately 100 amps on RWR MG A DRV MTR AMPS.

RWR MG A generator current is approximately 120 amps on RWR MG A GEN AMPS.

RWR MG A generator voltage is approximately 1000 volts on RWR MG A GEN VOLTS.

2008 JPM B -4of 6-

STEP STANDARD EVALUATION I COMMENT 0 15TIC-100A is controlling oil temperature Observes annunciator for high Applicant acknowledges alarm and reports condition to SAT I UNSAT motor vibs (09-4-2-18). supervisor (examiner).

I 9. I Refers to ARP 9-4-2-18. ~ ~ 1 Refers to ARP. I SAT / UNSAT

10. Attempts to clear alarm by Depresses alarm P/B. SAT / UNSAT depressing RWR PMP A VI6 Alarm P/B.

1 ~~

11. I Trip pump by:

~~~~~ ~

I -~~~ ~ ~~ ~ ~~~

I

b. Verify RWR PMP 02-2P-lA is Verifies pump tripped. SAT / UNSAT tripped. Booth Operator: Remove hi vibs alarm when Recirc pump trips.

~~ ~~ ~

c. Place Pump A control switch in Stops Recirc pump by placing control switch in STOP or SAT / UNSAT PTL. PTL.
12. Verify MG A GEN FIELD BKR Verifies field breaker opens 17 seconds after drive motor SAT / UNSAT opens. breaker trips.

2008 JPM B -5 of 6-

Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is in Mode 3, all rods in.

B. RWR Pump B is running a t minimum speed.

C. RWR Pump A is ready to start.

INITIA TING CUE Start RWR Pump A per OP-27, beginning at Step G.12.31.

2008 JPM B

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM C TASK TITLE: Shutdown HPCl APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 206000 A4.13 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME:

__ ~ ~~

JPM Completion 0 Simulated Performed Location: 0 Plant [XI Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: [7 Satisfactory Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM C Page 1 of 7

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SIR0 2008 JPM C TASK TITLE: Shutdown HPCl APPL. TO JPM NUMBER

1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. OP-I 5, High Pressure Coolant Injection, Current Revision 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Initialize simulator to any full power IC or IC-247.
6. Manually scram the Reactor and stabilize vessel level and pressure.

C. Secure feedwater and prohibit RClC from starting.

D. Allow HPCl to start and run until high level trip.

E. Allow vessel level to decrease below 222.5 inches.

F. Re-establish feedwater to maintain vessel level above 126.5 inches and below 222.5 inches.

G. Override the red - open light ON for 23MOV-19.

H. Override the green - closed light OFF for 23MOV-I 9.

I. Remove both overrides when candidate takes the control switch for 23MOV-19 to close.

V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

C. The candidate should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.

VI. TASK CONDITIONS A. A Reactor Scram has occurred resulting in a HPCl initiation and trip on high Reactor vessel water level.

B. RPV level is being maintained by feedwater at 177 to 222.

C. The Control Room Supervisor has given direction to return HPCl to a normal standby line-up in accordance with OP-I 5.

2008 JPM C -2 of 7-

VII. INITIATING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15.

  • CRITICAL STEP I STEP I STANDARD EVALUATION / COMMENT
1. Obtain a controlled copy of OP- The candidate determines where to obtain a controlled SAT / UNSAT 15, High Pressure Coolant copy of OP-1 5 (Control Room, Merlin)

Injection. EVALUATOR: Provide trainee a current copy of OP-I 5

2. Reviews the precautions. Reviews the precautions associated with the procedure. SAT / UNSAT
3. Select the correct section to Selects Section F of OP-15. SAT / UNSAT perform the task. EVALUATOR: Provide candidate a copy of section F.
  • 4. Depresses TURB TRIP 23A- Depresses 23A-S-I 9 pushbutton on panel 09-3. SAT / UNSAT S19 pushbutton.
5. If Drywell pressure is above N/A: Applicant should observe that Drywell Pressure is SAT / UNSAT 2.7 psig AND a HPCl low below 2.7 psig.

steam supply pressure isolation is present THEN close and protective tag HPCl EX HVAC BKR 23MOV-59.

2008 JPM C -3 of 7-

STANDARD EVALUATION I COMMENT

6. When both the following Applicant should observe that RPV water level is above SAT / UNSAT conditions exist: 126.5 inches and that drywell pressure is below 2.7 psig.

0 RPV level is ABOVE 126.5 inches AND 0 Drywell pressure is BELOW 2.7 psig Continue with this procedure

~~~~~ ~ ~

9. Verifies white INITIATION SIG Observes that 23A-DS63 iight is off on panel 09-3. SAT / UNSAT 23A-DS63 light is off.
10. If amber Rx HIGH LEVL SIG Utilizes multiple indications to observe that RPV level is 23A-DS65 light is on at panel less than approximately 214 inches (Att. 3).

09-3, THEN reset high water level trip as follows:

Verify RPV level is LESS THAN value shown on Att. 3

12. Verify amber Rx HI LVL SIG Observes that amber RX HI LVL SIG 23A-DS65 light is off SAT / UNSAT 23A-DS65 light is off. on Dane1 09-3.
13. Verify annunciator 09-3-3-28 Observes that annunciator 09-3-3-28 clears when SAT I UNSAT HPCl TURB TRIP SOLENOID annunciator reset pushbutton is pushed.

ENERGIZED is clear.

~~ ~

2008 JPM C -4 of 7-

I I STEP ~ -1 STANDARD 1 EVALUATION I COMMENT

  • 14.

I Ensure closed INJ VLV 23MOV-

19. 1 Observes that 23MOV-19 is NOT closed; closes 23MOV-19 by taking its control switch to the CLOSE position.

SAT / UNSAT 15.

I Ensure closed TEST VLV TO SCT 23MOV-21.

Observes that the green - closed light for 23MOV-21 is SAT / UNSAT SAT I UNSAT ensure closed HPCl & RClC TEST vLvTo ST 23M0V-24.

1 EVALUATOR: Inform the candidate Valve 23MOV-24 will not be used to support RClC operation.

17. When HPCl turbine is stopped, Observes that HPCl turbine is stopped by speed indicator SAT / UNSAT stop AUX OIL PMP 23P-150. on panel 09-3 reading 0 rpm. Stops 23P-150 by taking its control switch to the STOP position.
18. Verify closed the following Observes that the GREEN - closed lights for 23HOV-1 SAT !UNSAT valves: and 23HOV-2 are on.

TURB STOP VLV 23HOV-1 TURB STOP VLV 23HOV-2 Verify open the following valves: Observes that the red - open lights for 23AOV-42 and SAT I UNSAT 0 STM LINE DRAIN T RADW 23AOV-43 are on.

23AOV-42 0 STM LINE DRAIN T RADW 23AOV-43 20.

1 Ensure closed MIN FLOW VLV 23MOV-25. 1 Observes that the green - closed light for 23MOV-25 is on.

SAT / UNSAT

21. Verify open STM LINE Observes that the red - open light for 23MOV-60 is on. SAT / UNSAT WARMING ISOL VLV 23MOV-60.

~~

  • 22.

-~

I Ensure closed OUTBD STM SUPP VLV 23MOV-16.

Closes 23MOV-16 by taking its control switch to the CLOSE position.

SAT / UNSAT 2008 JPM C -5 of 7-

STANDARD EVALUATION I COMMENT After a 15 minute wait, stop 24P-140 by taking its control SAT / UNSAT stopped for at least 15 minutes, switch to the STOP position.

stop GLAND SEAL CNDSR EVALUATOR: Inform candidate that 15 minutes has BLOWER 23P-140. expired.

  • 24. Ensure closed for the following Closes 01-125MOV-13A and 01-125MOV-138 by placing SAT / UNSAT valves: their control switches on the CLOSE position.

0 HPCl GLAND SEAL SUCT EVALUATOR: These control switches are located on 01-125MOV-13A i panel 09-75.

0 HPCI GLAND SEAL SUCT 0 1- 125 MOV- 13 B

25. If SGT operation is not When the candidate states that he/she would shutdown SAT / UNSAT required, THEN shutdown SGT SGT per OP-20, then inform candidate Another operator per Section F of OP-20. has been assigned to shutdown S G T .

26.

27.

I Ensure TURB VIB MON 23VM-100 tosate switch is in off.

Verify HPCl is in a standby Verifies TURB VIB MON 23MV-100 toggle switch is in off.

EVALUATOR: Inform candidate that another operator will SAT / UNSAT SAT / UNSAT lineup per Step E.1.3. be performing this step.

EVALUATOR Terminate the task at this point.

2008 JPM C -6 Of 7-

Applicant Tear-Off Sheet TASK CONDITIONS A. A Reactor Scram has occurred resulting in a HPCI initiation and trip on high Reactor vessel water level.

6. RPV level is being maintained by feedwater a t 177" to 222".

C. The Control Room Supervisor has given direction to return HPCI to a normal standby line-up in accordance with OP-15.

INITIA TING CUE Complete the shutdown and restore HPCl to a standby line-up per OP-15.

2008 JPM C

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SlRO 2008 JPM D TASK TITLE: MSlV Surveillance Test APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 239001 A203 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME:

JPM Completion Simulated IXI Performed Location: Plant Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM D Page 1 of 7

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 2008 JPM D TASK TITLE: MSIV Surveillance Test APPL. TO JPM NUMBER

1. SAFETY CONSIDERATIONS A. None
11. REFERENCES A. ST-1I, MSlV Limit Switch Channel Functional Test, Rev.24 B. AOP-1, Reactor Scram 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-1 I, with prerequisites signed off.

IV. SET UP REQUIREMENTS A. Initialize simulator to IC #249; approx. 80% Rx power.

V. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.

6. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.

C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.

VI. TASK CONDITIONS A. Plant is at about 80% power. No other evolutions are in progress.

6. ST Prerequisites have been performed.

2008 JPM D -2 of 7-i

VII. INITIATING CUE Perform MSlV Limit Switch Channel Functional Test IAW ST-1 I , Section 8.

  • CRITICAL STEP STEP STANDARD EVALUATION I COMMENT Oa. Obtain a controlled copy of ST- Evaluator Cue: Provide applicant with controlled copy of NIA 1I, MSlV Limit Switch Channel ST-1 I.

Functional Test.

Ob. Reviews the precautions and Reviews the precautions and limitations associated with SAT / UNSAT limitations. the procedure.

1. Verifies open: Verifies valves open. SAT / UNSAT MSlV 29AOV-86A MSlV 29AOV-86B
2. Verifies the following lights Group lights are on. SAT I UNSAT are on:

0 RPS A SCRAM GROUPS 1, 2, 3, and 4 0 RPS B SCRAM GROUPS 1, 2, 3, and 4

Booth Operator: Use simulator remote function to remove fuse 5A-F3E inside panel 09-15.

Evaluator Cue: Fuse has been removed. Dual concurrent verification is complete.

2008 JPM D -3 of 7-

STANDARD EVALUATION I COMMENT

~~

Evaluator Cue: Relay is de-energized. N/A 5A-K3E relay is de-energized a t panel 09-1 5.

5. IF RX MODE switch is in a RX MODE switch is NOT in a position other than RUN. N/A position other than RUN, ...

CAUTION: If the slow close pushbutton is depressed too long, MSIV could fully close due to steam forces on the valve.

6. WHILE performing partial Evaluator Cue: Personnel are standing by. SAT / UNSAT closure of 29AOV-86A, perform the following concurrently:

Applicant has stopwatch 0 Ensure personnel standing by to monitor RPV pressure and power 0 Measure partial closure I time with stopwatch 1 0 IF any of the following.. .

  • 7. Depress and hold MSlV SLOW Depresses P/B. SAT / UNSAT CLOSE 29AOV-86A pushbutton to start closing 29AOV-86A.

Verify the following relays are Evaluator Cue: Relays are de-energized. N/A de-energized :

0 MSlV CLOSURE TRIP 5A-K3A on panel 09-15 0 MSlV CLOSURE TRIP 5A-K3B on panel 09-17 2008 JPM D -4 of 7-

STEP STANDARD EVALUATION I COMMENT

9. Verify the following: Verifies expected response. SAT / UNSAT 0 Annunciators 09-5-1-2, 09-5-1-3 are in alarm.

0 RPSASCRAM GROUPS 1, 2, 3, and 4 lights are off.

0 EPIC-D-1241 RX SCRAM A indicates TRIP 0 EPIC-D-1286 MSlV A I NOT OPEN indicates TRIP

11. Verify open MSIV 29AOV-86A. Verifies MSlV re-opens SAT / UNSAT
12. Verify the following relays are Relays are energized. SAT / UNSAT energized:

0 MSlV CLOSURE TRIP 5A-K3A on panel 09-15 0 MSlV CLOSURE TRIP 5A-K3B on panel 09-17

~ ~~

13. Verify the following: Annunciator is clear: EPIC-D-1286 indicates NORMAL SAT / UNSAT Annunciator 09-5-1-2, MSIVS NOT FULL OPEN TRIP is clear EPIC-D-1286 MSlV A I NOT OPEN indicates NORMAL 2008 JPM D -5 of 7-

STEP STANDARD EVALUATION I COMMENT

~~~~~

15. Verify the following: Annunciator is clear; Scram group lights are on; and SAT / UNSAT EPIC-D-1241 is RESET.

0 Annunciator 09-5-1-3, RPS A AUTO SCRAM is clear.

0 RPSASCRAM GROUPS 1,2,3, and 4 lights are on.

EPIC-D-1241 Rx SCRAM A indicates RESET

~~~ ~~ ~ ~~ ~ ~ ~~~~~

16. Record partial closure time on Evaluator Cue: Time has been recorded. NA placard above AOV-86A P/B
  • I 7. install fuse 5A-F3E inside Panel Evaluator Cue: Fuse has been re-installed.

09-15.

~~~~ ~

EVALUATOR Terminate the task at this point.

2008 JPM D -6O f 7-

Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is a t about 80% power. No other evolutions are in progress.

B. ST Prerequisites have been performed.

IN1TIA TING CUE Perform MSIV Limit Switch Channel Functional Test IAW ST-1 I, Section 8.

2008 JPM D

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO 2008 JPM E TASK 11TLE: Isolate RBCLC Supply to the Drywell APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 223001 A2.01 ESTIMATED COMPLETION TIME: 10 Minutes APPROVED:

JPM Completion 0 Simulated X Performed Location: Plant X Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS:

EVALUATOR:

SIGNATURE/PRINTED 2008 JPM E Page 1 of 7

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION SlROlNPO 2008 JPM E TASK TITLE: Isolate RBCLC Supply to the Drywell APPL. TO JPM NUMBER

1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.

II. REFERENCES A. EP-12, Isolating RBCLC supply to the Drywell, Rev. 0.

111. TOOLS AND EQUIPMENT A. Necessary material contained in the EP support boxes located adjacent to panels.

IV. SET UP REQUIREMENTS A. Obtain a controlled copy of EP-12 for use by the candidate.

B. Reset simulator to IC-247, with A RWR pump tripped and B pump running.

C. Insert the following overrides:

OS SWZDl11RBCAl3 OPEN OS RWZDJI 1RBCBIO OPEN V. EVALUATOR NOTES A. The candidate should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

VI. TASK CONDITIONS A. A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees.

2008 JPM E -2 of 7-

VII. INITIATING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-12.

  • CRITICAL STEP STEP STANDARD I EVALUATION I COMMENT
1. Obtain a controlled copy of EP-12. Obtains a controlled copy of EP-12. SAT / UNSAT
2. Ensures RWR pumps are tripped. Observes A RWR tripped. Informs Control Room that B SAT / UNSAT RWR pump will be tripped.

EVALUATOR: If needed, acting as supervisor, order applicant to trip the 6RWR Pump.

  • 3. Trips the B pump. Trips 6 RWR pump by taking the 02-2P-1B to STOP SAT I UNSAT Notes green trip ON.

EVA1 IATOR: Keylock switches are located at panel 09-75

4. Locates key lock switches Locates keys at SNO desk. SAT I UNSAT
  • 5. Places the following keylock Inserts key into keylock switch(s) and takes to switch(s) to SAT / UNSAT switches in CLOSE: CLOSE.

1-1 RBCAlO 1-1 RBCA13 1-1 RBCBlO 1-1 RBCB12 2008 JPM E -3 of 7-

STEP STANDARD EVALUATION / COMMENT Verifies closed the following Verifies closed by observing the green light on, the following valves: vaIves :

DW CLR A INLET 15AOV-130A DW CLR A INLET SAT / UNSAT DW CLR A OUTLET 15AOV- DW CLR A OUTLET SAT / UNSAT 131A DW EQUIP DRN CLR OUTLET DW EQUIP DRN CLR OUTLET SAT / UNSAT 15AOV-134A I

~~~ ~ ~ ~

RWR PMP A CLR INLET 15AOV- Notes RWR PMP A CLR INLET valve is NOT closed Takes SAT / UNSAT 132A action to close the valve by informing supervisor and recommending NPO locally close valve.

NOTE: Evaluator may have to ask applicant what action he recommends.

EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.

RWR PMP A CLR OUTLET Notes RWR PMP A CLR OUTLET valve is NOT closed. I SAT / UNSAT 15AOV-133A Takes action to close the valve by informing supervisor and recommending NPO locally close valve.

NOTE: Evaluator may have to ask applicant what action he recommends.

EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.

2008 JPM E -4of 7-

STEP STANDARD EVALUATION / COMMENT DW CLR B INLET 15AOV-1305 Notes DW CLR B INLET valve is NOT closed. Takes action SAT / UNSAT to close the valve by informing supervisor and recommending NPO locally close valve.

NOTE: Evaluator may have to ask applicant what action he recommends.

EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.

DW CLR B OUTLET 15AOV- Notes DW CLR B OUTLET valve is NOT closed. Takes SAT / UNSAT 131B action to close the valve by informing supervisor and recommending NPO locally close valve.

NOTE: Evaluator may have to ask applicant what action he recommends.

EVALUATOR: Acting as NPO inform candidate: Valve is CLOSED.

RWR PMP B CLR INLET 15AOV- RWR PMP B CLR INLET SAT / UNSAT 1328 RWR PMP B CLR OUTLET RWR PMP B CLR OUTLET SAT / UNSAT 15AOV-1335

2008 JPM E -5of 7-

STEP STANDARD EVALUATION I COMMENT

  • 8. Closes the following valves: Takes switches to CLOSE; observes Red light out, green SAT / UNSAT light on for the following valves:

02MOV-43A RWR PMP A SUCT 02MOV-43A RWR PMP A SUCT 02MOV-53A RWR PMP A 02MOV-53A RWR PMP A DISCH DlSCH (not critical, valve 02MOV-436 RWR PMP 6 SUCT already closed) 02MOV-536 RWR PMP 6 DISCH 02MOV-436 RWR PMP 6 SUCT 02MOV-536 RWR PMP B DISCH EVALUATOR: Terminate the task at this point.

2008 JPM E -6Of 7-

Applicant Tear-Off Sheet TASK CONDITIONS A leak has occurred in the drywell causing drywell temperature to exceed 260 degrees.

INITIA TING CUE Isolate cooling water supply to the drywell coolers, RWR pump and motor coolers and drywell equipment sump cooler per EP-12.

2008 JPM E

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIR0 2008 JPM F TASK TITLE: Core Spray In-Service Test APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 209001 K407 ESTIMATED COMPLETION TIME: 12 Minutes APPLICANT NAME:

~~~~ ~

JPM Completion 0 Simulated Performed Location: 0 Plant Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE) 2008 JPM F Page 1 of 5

JOB PERFORMANCE MEASURE REQUIRED TASK INFORMATION S/RO 2008 JPM F TASK TITLE: Core Spray In-Service Test APPL. TO JPM NUMBER

1. SAFETY CONSIDERATIONS A. None II. REFERENCES A. ST-3PB, Core Spray Loop B Quarterly Operability Test (IST) 111. TOOLS AND EQUIPMENT A. Stopwatch B. Copy of ST-3PB with steps signed off through Step 8.1 2 2 .

IV. SET UP REQUIREMENTS A. Initialize simulator to a Mode 5 IC.

V. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and actually performed.

C. The Applicant should demonstrate proper use of HU tools such as procedure use, self checking and three-point communication.

VI. TASK CONDITIONS A. Plant is in Mode 5.

B. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22.

2008 JPM F -2 of 5-

VII. INITIATING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1.23

  • CRITICAL STEP STEP I STANDARD [ EVALUATION / COMMENT
1. Obtain the working copy of ST- Evaluator: Hand the working copy of the procedure to 3P6 the amlicant.

~~~~~ ~~ ~ ~ ~

  • 2. Close and time SUCT VLV Closes and times suction valve. SAT I UNSAT 14MOV-7B.
  • 3. Open and time SUCT VLV. Opens and times suction valve. SAT I UNSAT
4. Verify normal CS lube oil level Evaluator Cue: NPO reports normal level. SAT I UNSAT
5. Record CS Pump 14P-IB Evaluator Cue: NPO reports suction pressure reading SAT / UNSAT suction pressure from 14PI- 5.4 psig.

7582. Applicant records pressure.

6. Initiate EPIC display TRCS. Initiates display. SAT / UNSAT
7. Verify the following: Verifies alarm is clear and EPIC indicates normal. SAT I UNSAT 0 Annunciator 09-3-1-10, CORE SPRAY A OR B DISCH LlLNE NOT FULL is clear.

0 EPIC-D-274 indicates normal.

  • 9. Throttle TEST VLV 14MOV-26B Throttles valve to flow rate 2 4265 gpm on EPIC display SAT / UNSAT to establish Loop B flow rate 2 TRCS.

4265 gpm on EPIC display TRCS.

1 2008 JPM F -3 of 5-

I I STEP STANDARD I EVALUATION /COMMENT Verify MIN FLOW VLV 14MOV- Verifies valve closed. 1 SAT/UNSAT 1

5B closed.

11. Record discharge pressure from Records discharge pressure (approximately 285 psig). SAT/UNSAT EPIC-A-I 154.
12. Record CS Pump 14P-IB Evaluator Cue: NPO reports suction pressure reading SAT / UNSAT suction pressure from 14PI- 5.1 psig.

75B2. Applicant records pressure.

I

13. If suction pressure .. . Determines Step 8.1.34 is N/A. I SAT / UNSAT
  • I 4.
  • I 5.

If suction pressure is 2 0 psig, THEN calc pump TS d/p.

Throttle TEST VLV 14MOV-26B Calculates d/p (disch minus suction) as psig.

+

Throttles valve to establish average Loop B flow rate trend 1 SAT / UNSAT SAT / UNSAT to establish average Loop B flow of 4700 gpm on EPIC display TRCS.

rate trend of 4700 gpm on EPIC display TRCS.

16. I Wait 5 minutes. Evaluator Cue: Five minutes have elapsed. I N/A
17. Record CS Pump 14P-IB Evaluator Cue: NPO reports suction pressure reading SAT / UNSAT suction pressure from 14PI- 4.9 psig.

75B2. Applicant records pressure.

18.

I Record discharge pressure from EPIC-A-I 154.

Records discharge pressure (approximately 280 psig).

I SAT/UNSAT Records average flow rate trend from EPIC display TRCS: SAT / UNSAT (Acceptable range 4610 to 4790 EVALUATOR Terminate the task at this point.

2008 JPM F -4of 5-

Applicant Tear-Off Sheet TASK CONDITIONS A. Plant is in Mode 5.

B. ST-3PB, Core Spray Loop B Quarterly Operability Test, has been completed through Step 8.1.22 INITIA TING CUE Continue performance of ST-3PB, Core Spray Loop B Quarterly Operability Test, beginning at Step 8.1 2 3 2008 JPM F

NEW YORK POWER AUTHORITY{PRIVA TE }

JOB PERFORMANCE MEASURE S/RO 2008 JPM G TASK TITLE: Perform the Emergency Diesel Generator APPL. TO JPM NUMBER Load Test ( S / U and Load EDG's)

NRC K/A SYSTEM NUMBER: 2640000 A4.04 ESTIMATED COMPLETION TIME: 18 Minutes APPROVED:

CANDIDATE NAME:

JPM Completion: ( ) Simulated ( X 1 Performed Location : ( ) Plant ( X ) Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( Unsatisfactory COMMENTS :

EVALUATOR:

SIGNATURE/PRINTED 2008 JPM G -1 of 6-

JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION S/RO 2008 JPM G TASK TITLE: Perform the Emergency Diesel Generator APPL. TO JPM NUMBER Load Test (S/U and Load EDGs)

I. SAFETY CONSIDERATIONS A. None

11. REFERENCES A. ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, Rev. 1 B. OP-22, DIESEL GENERATOR EMERGENCY POWER, Rev. 28 Ill. TOOLS AND EQUIPMENT A. Stopwatch B. Synchronizing Switch IV. SET UP REQUIREMENTS A. Initialize the simulator to any IC B. Obtain a controlled copy of ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST. Initial as complete Section 4.0, 5.0 and Steps 8.1 through and including Steps 8.19.

C. Copies of EDG Demand Log for EDG B & D forms from OP-22, DIESEL GENERATOR EMERGENCY POWER.

V. EVALUA TOR NOTES A. The candidate should, a t a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the candidate that the conditions of each step need only be properly identified and not actually performed.

VI. TASK CONDITIONS A. EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9.

2008 JPM G -3 of 6-

Vll. INITIATING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning a t Step 8.20.

  • - CRITIC (PRIVA 1L STEP S TEP STANDARD 1 EVALUATION / COMMENT Obtain a controlled copy of procedure Obtains a controlled copy of ST-SBB SAT / UNSAT ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST Reviews the precautions Reviews the precautions, making note of any that are SAT / UNSAT applicable Select the correct section to begin Per cue, begins a t step 8.20. SAT / UNSAT the task.

Trip tie Breaker 10604 and allow Piaces the control switch for Breaker 10604, EDG B SAT i UNSAT switch to spring return t o AUTO & D TIE BKR, to TRIP, allow switch to spring return position to AUTO Place EDG B and D governor mode Places the EDG GOV MODE toggle switches for SAT / UNSAT switches in the droop position EDGs B&D t o DROOP Place EDG B LOAD BKR SNCH SW in Places the EDG B LOAD BKR SYNCH SW to ON SAT / UNSAT ON Adjust EDG B VOLT REG t o match Matches INCOMING (EDG) and RUNNING (bus SAT / UNSAT INCOMING and RUNNING voltages 10600) voltages with EDG B VOLT REG adjustments

~~

Adjust EDG B GOV to rotate Adjusts EDG B GOV to rotate synchroscope slowly in SAT / UNSAT synchroscope slowly in the FAST fast direction direction (clockwise)

When EDG B and the 10600 BUS are Places the control switch 10602, EDG B LOAD BKR, SAT / UNSAT in phase (synchroscope a t 1 2 to CLOSE when synchroscope is at 12:OO o'clock) close EDG B LOAD BKR 10602 2008 JPM G

I PRlVA STEP STANDARD EVALUATION / COMMENT I TE3 1 *lo*

Adjust EDG B GOV t o raise EDG B load t o between 100 and 300 k W Places the EDG B GOV switch to RAISE and loads EDG B to between 100 and 300 kW SAT I UNSAT 11 "12.

Place EDG B LOAD BKR SYNCH SW in OFF Adjust EDG B GOV t o raise EDG B load t o 2600 kW over 3 t o 5 minutes Places the EDG B LOAD BKR SYNCH SW t o OFF Adjusted EDG B GOV to raise EDG B load t o 2600 kW over 3 t o 5 minutes in 800 k W increments SAT I UNSAT SAT / UNSAT in approximately 800 k W increments VALUATOR: State," 3 minutes have passed", after each load adjustment.

EVALUATOR: Terminate the task at this point I 2008 JPM G -5 of 6-

I .

Applicant Tear-Off Sheet TASK CONDITIONS EDG B and D load testing is in progress with ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST complete through Step 8.1 9.

INITIA TING CUE For only EDG B, Perform ST-SBB, EDG B & D FULL LOAD TEST AND ESW PUMP OPERABILITY TEST, beginning a t Step 8.20.

2008 JPM G

n Nuclear Northeast James A. FitzPatrick Nuclear Power Plant OPERATIONS TRAINING PROGRAMS JOB PERFORMANCE MEASURE RO 2008 JPM H TASK TITLE: Return an LPRM to Service APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 21 5005 A m ESTIMATED COMPLETION TIME: 10 Minutes APPROVED:

APPLICANT NAME:

JPM Completion: ( Simulated ( X ) Performed Locat ion: ( Plant ( X ) Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( ) Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATURE/PRINTED 2008 JPM H Page 1 of 5

JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMA TION RO 2008 JPM H TASK TITLE: Return an LPRM to Service APPL. TO JPM NUMBER I. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.

11. REFERENCES A. OP-16, "Neutron Monitoring", Rev 27.

Ill. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Reset simulator t o 50% power IC B. LPRM 4C-28-13 bypassed per OP-16.

C. Obtain a controlled copy of OP-16 for use by the applicant.

V, EVAL UA TOR NOTES A. The applicant should, a t a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the applicant t h a t the conditions of each step need only be properly identified and not actually performed.

VI. TASK CONDITIONS A. The Reactor is a t 50% power with all systems normal.

B. LPRM 4C-28-13 is ready to return to service.

2008 JPM H Page 2 O f 5

VI. INITIATING CUE Return LPRM 4C-28-13(associated with 'C' APRM) to service per OP-16, Section E. 13, "Returning an LPRM Assigned t o an APRM to Service".

- CRITICAL STEP S TEP STANDARD 1 Obtains OP-16. References Section E. 13 "2. Bypass APRM per Subsection E.16 by Bypasses APRM 'C' Placing APRM BYP switch in

'C' APRM 'C' BYPASS indicating (located on bench board 09-5) light is on APRM 'C' EPIC alarm indicates bypassed "3. Verify BYP light for APRM 'C' is on at Verifies light on top panel 09-14. (top row of lights)

"4. Place LPRM amplifier card switch in Amplifier switch is in OP.

OP (for 4C-28-13).

5. Verify the LPRM reading is reasonable Verifies reading when compared with symmetric - at LPRM Cabinet LPRM readings. OR

- on EPIC by selecting LPRM RD comparing 'C' levels on symmetric LPRMs

~

6. Record date and LPRM reading on Evaluator Cue: Date and reading recorded.

LPRM Bypass Information Sheet at Panel 09-14.

2008 JPM H Page 3 O f 5

S TEP STANDARD

~_________

Perform ST-5D Evaluator Cue: ST-5D completed and sat.

Depress TRIP RESET P/B t o clear TRIP RESET P/B is depressed.

applicable upscale or downscale alarm lights for APRM 'C',

Return associated APRM to service Refers to Section E.17 Der Subsection E. 1 7 bv:

Verify the following lights for APRM Verifies lights are off.

'C' are off at Panel 09-14:

0 INOP UPSCL NEUT TRIP 0 UPSCL THERM TRIP Piace APRM BYP switch for APRM Places APRM BYP switch in center position. SAT i UNSAT

'C' in center Dosition ~~ ~

Verify APRM 'C' is returned to Verifies APRM 'C' is returned to service. SAT / UNSAT service using one or both of the following :

0 APRM 'C' BYPASS indicating light is off 0 No EPIC bypassed alarms for the three APRMs Terminate the task at this point.

2008 JPM H Page 4 of 5

Applicant Tear-Off Sheet TASK CONDITIONS A. The Reactor is at 50% power with all systems normal.

B. LPRM 4C-28-13 is ready t o return t o service.

INITIA TING CUE Return LPRM 4C-28-13 (associated with 'C' APRM) t o service per OP-16, Section E. 13, "Returning an LPRM Assigned t o an APRM t o Service 'I.

2008 JPM H

Nuclear Northeast James A. FitzPatrick Nuclear Power Plant OPERATIONS TRAlNI NG PROGRAMS JOB PERFORMANCE MEASURE S/RO/NLO 2008 JPM I TASK TITLE: Close an SRV Remotely by Pulling Fuses.

APPL. TO JPM NUMBER NRC K/A SYSTEM NUMBER: 239002 A2.03 ESTIMATED COMPLETION TIME: 10 Minutes APPROVED:

APPLICANT NAME:

JPM Completion: ( X ) Simulated ( 1 Performed Location : ( X ) Plant ( ) Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: ( ) Satisfactory ( ) Unsatisfactory EVALUATOR:

SIGNATURE/PRINTED 2008 JPM I Page 1 of 5

JOB PERFORMANCE MEA SURE REQUIRED TASK INFORMATION S/RO/NLO 20004233A TASK TITLE: Close an SRV Remotely by Pulling Fuses.

APPL. TO JPM NUMBER I, SAFETY CONSIDERATIONS A. Ensure proper safety equipment and safety procedures are observed.

11. REFERENCES A. AOP-36, Stuck Open Relief Valve(s), Rev. 13 Ill. TOOLS AND EQUIPMENT A. Fuse Pullers B. Flashlight I v. SET UP REQUIREMENTS A. Make a copy of AOP-36 for use by the Applicant.

B. Obtain Shift Manager's permission prior to performing this task.

V. EVAL UA TOR NOTES A. If performing JPM in the plant, inform the Applicant that the conditions of each step need only be properly identified and actually performed.

B. The Applicant should, a t a minimum, identify the change in equipment status light indication when equipment operation is simulated.

C. Place keeping should be demonstrated by the Applicant during the performance of the task.

VI. TASK CONDITIONS A. SORV 02-RV-71A has inadvertently opened and remains open.

B. AOP-36, Stuck Open Relief Valves, was entered and attempts to shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.

C. The next step to close the valve is to remove the control power fuses per step C.2.3.d 2008 JPM I Page 2 of 5

Vll. INITIATING CUE Attempt to close 02-RV-7 1A by removing its control power fuses per AOP-36.

  • - CRITIC 1L STEP PRlVA S TEP STANDARD EVALUATION / COMMENT TE 3 ~
1. Obtain a controlled copy of procedure The Applicant obtains a controlled copy of AOP-36. SAT / UNSAT AOP-36, Stuck Open SRV(s)

EVALUA TOR Hand copy of AOP-36 to Applicant

~~ ~

2. Identify step C.2.3.(d) as appropriate Applicant may use C.2.3.d and Attachment 1 or SAT / UNSAT step and obtain fuse puller. Posted Attachment 1 inside 09-45 as guidance.

Applicant points out locker containing fuse puller.

3. Proceed to panel 09-45 in the Relay Correct panel located and accessed. SAT / UNSAT Room and access the panel.
4. Using either a controlled copy of Fuses F2(F3A), F12(F4A), F23(F11A), and SAT / UNSAT AOP-36, Stuck Open Relief Valve(s) F34(F12A) in panel 09-45 identified for removal.

or the posted attachment inside panel 09-45, determine the correct fuses to be removed.

  • a. Remove F2(F3A) EVALUATOR: When the Applicant identifies which SAT / UNSAT fuse is to be removed and describes how t o remove it using the fuse pullers, tell the Applicant "The fuse is pulled".

~~

  • b. Remove F12(F4A) "The fuse is pulled" SAT / UNSAT 2008 JPM I Page 3 of 5

PRlVA S TEP STANDARD EVALUATION / COMMENT .

TE 1 "C. Remove F23(F11A) "The fuse is pulled" SAT / UNSAT "d. Remove F34(F12A) "The fuse is pulled" SAT / UNSAT

6. Contact the Control Room and inform EVALUATOR: Acknowledge the communication and SAT / UNSAT them that the fuses have been as the Control Room Operator inform the Applicant removed. that "The SRV now indicates closed".

EVALUATOR: Terminate the task a t this point.

2008 JPM I Page 4 of 5

Applicant Tear-Off Sheet TASK CONDITIONS A. SORV 02-RV-71A has inadvertently opened and remains open.

B. AOP-36, Stuck Open Relief Valves, was entered and attempts t o shut the valve from the 09-4 panel have been unsuccessful, steps C.2.1 through C.2.3.c are completed.

C. The next step t o close the valve is to remove the control power fuses per step C.2.3.d INITIA TING CUE Attempt t o close SORV 02-RV-71 A by removing its control power fuses per AOP-36.

2008 JPM I

ENTERGY NUCLEAR NORTHEAST {PRIVA TE }

JOB PERFORMANCE MEASURE S/RO 2008 JPM J TASK TITLE: Changing In-Service CRD Flow Control APPL. TO JPM NUMBER Valves NRC K/A SYSTEM NUMBER: 201001 SG 9 ESTIMATED COMPLETION TIME: 15 Minutes APPROVED:

APPLICANT NAME:

JPM Completion: ( X ) Simulated ( Performed Location: ( X 1 Plant ( ) Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: ( ) Satisfactory I ) Unsatisfactory COMMENTS:

EVALUATOR:

S IG NATURE/PRINTED 2008 JPM J Page 1 of 6

EN TERG Y NUCLEAR NOR THEAST JOB PERFORMANCE MEASURE REQUIRED TASK INFORMA TION S/RO 2008 JPM J TASK TITLE: Changing In-Service CRD Flow Control APPL. TO JPM NUMBER Valves I. SAFETY CONSIDERATIONS A. Proper safety attire (hardhat, safety shoes, safety glasses, ear protection, etc.) is to be worn when out in the plant.

11. REFERENCES A. OP-25, CONTROL ROD DRIVE HYDRAULIC SYSTEM, Rev. 70.

Ill. TOOLS AND EQUIPMENT A. None I v. SET UP REQUIREMENTS A. Ensure that flow control valve 03FCV-19A is in-service.

V. EVAL UA TOR NOTES A. The Applicant should, a t a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and not actually performed.

VI. TASK CONDITIONS A. The Control Rod Drive Hydraulic System is in operation.

B. The plant is operating a t rated power. The Maintenance Department has requested t h a t "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.

2008 JPM J Page 2 of 6

VI/. INITIATING CUE Place B CRD Flow Control Valve (03FCV19B) in-service, and place A CRD Flow Control Valve (03FCV-19A) in standby.

  • - CRlTl4 IL STEP PRlVA STEP STANDARD EVALUATION / COMMENT TE 1
1. Obtain a controlled copy of procedure Evaluator: The Applicant obtains a controlled copy of SAT / UNSAT OP-25, CONTROL ROD DRIVE OP-25.

HYDRAULIC SYSTEM.

2. Review the precautions. Evaluator: The Applicant reviews the precautions, SAT / UNSAT Section C2, making note of any that are applicable.
3. G . 1 5 Changing Inservice CRD Evaluator: The Applicant selects Section G. 15, SAT / UNSAT Flow Control Valves Changing In-Service CRD Flow Control Valves.
4. G. 15.1 Establish communication Evaluator: The Applicant goes to the Rx Building 272 level to the area West of the West HCUs.

I SAT / UNSAT between Flow Control Hand When the Applicant states that he/she would Select Station and the establish communications between the Control Room Control Room. and the master control station using either the West HCU area Gaitronics or nearby sound powered phone jack.

Inform the Applicant: Communications with the Control Room are ESTABLISHED.

5. G.15.2 Line up CRD FLOW CNTRL EVALUATOR: When the Applicant states that SAT / UNSAT 03FIC-301 per the he/she would ensure the controller is in AUTO.

following steps: Inform the Applicant: Control Room reports that CRD

a. Ensure controller is in AUTO. Flow Controller 03FIC-301 is in AUTO.

2008 JPM J Page 3 of 6

6. G. 15.2 Continued: EVALUATOR: When the Applicant states that SAT / UNSAT
b. Adjust controller setpoint t o he/she would request the Control Room place the zero gpm. CRD flow controller setpoint t o 0 gpm Inform the Applicant: Control Room reports that CRD Flow Controller 03FIC-301 setpoint is at 0 gpm".
7. G.15.3 Perform the following for EVALUATOR: When the Applicant states that he/she SAT / UNSAT the f l o w control valve t o be would check 03CRD-68B in the closed direction and placed in service: verify it open.
a. Verify open inlet isolation valve:

03CRD-686 (CRD water Inform the Applicant:

0 3 F C V - 1 9 6 inlet isol valve) "Valve 03CRD-68B is OPEN".

"8. b. Slowly open outlet isolation EVALUATOR: When the Applicant states that he/she SAT / UNSAT valve: would slowly open 03CRD-696, by turning its valve handwheel in the counter-clockwise direction:

0 03CRD-696 (CRD water 03FCV-196 outlet isol valve) Inform the Applicant:

"Valve 03CRD-69B is OPEN".

"9. G.15.4 Close outlet isolation valve EVALUATOR: When the Applicant states that he/she SAT / UNSAT for f l o w control valve t o be would close 03CRD-69A by turning its valve removed from service. handwheel in the clockwise direction, 0 03CRD-69A (CRD water 03CRD- Inform the Applicant:

69A outlet isolation valve), "Valve 03CRD-69A is CLOSED".

~~

"10. G. 15.5 Place AUTO-MAN select EVALUATOR: When the Applicant states that he/she SAT / UNSAT knob is in AUTO for would place AUTO-MAN select knob in AUTO at inservice f l o w control 03HSS-2456 valve: Inform the Applicant:

0 AUTO-MAN select knob a t "Select knob in AUTO at 03HSS-2459".

03HSS-245B 2008 JPM J Page 4 of 6

"11. G.15.6 Ensure A U T O - M A N select EVALUATOR: When the Applicant states t h a t he/she knob is in M A N for standby would place AUTO-MAN select knob in MAN a t flow control valve. 03HSS-245A 0 AUTO-MAN select knob a t Inform the Applicant:

03HSS-245A "Select knob in MAN at 03HSS-245A".

12. G.15.7 Slowly raise setpoint on EVALUATOR: When the Applicant states t h a t helshe SAT / UNSAT CRD FLOW CNTRL 03FIC- would request the Control Room to raise setpoint of 3 0 1 to establish 5 9 t o 6 1 03FlC-310 to establish 59 to 61 gpm gpm on 03FI-310. Inform the Applicant:

"03FIC-310 setpoint is 6 0 gpm and flow indication is 6 0 gpm".

G. 15.8 Verify normal operating EVALUATOR: When the Applicant states that SAT / UNSAT values on the following he/she would request the Control Room t o verify the indicators a t panel 09-5: values.

CHG WTR PRESS 03Pl-302: Inform the Appiicant: "Values are normal".

BETWEEN 1390 and 1 5 8 0 0 CHG WTR PRESS 03Pl-302: 1 5 2 0 psig psig, not t o exceed 1 6 7 0 psig DRV WTR DlFF PRESS 03DPI- 0 DRV WTR DlFF PRESS 03DPl-303: 2 6 5 psid 303: 2 6 0 t o 270 psid 0 CLG WTR DlFF PRESS 03DP1-304: 20 psid CLG WTR DlFF PRESS 03DPI-304: approximately 1 0 t o 2 6 0 DRV WTR FLOW 03Fl-305: zero psid DRV WTR FLOW 03Fl-305:

FLOW 03Fl-306: 60 gpm zero when no CRD is being driven FLOW 03Fl-306: 5 9 t o 6 1 gpm EVALUATOR: Terminate the task at this point 2008 JPM J Page 5 of 6

Applicant Tear-Off Sheet TASK CONDITIONS A. The Control Rod Drive Hydraulic System is in operation.

B. The plant is operating at rated power. The Maintenance Department has requested that "A" CRD Flow Control Valve (03FCV-19A) be removed from service for preventive maintenance.

INITIA TING CUE Place "B" CRD Flow Control Valve (03FCV-19B) in-service, and place "A" CRD Flow Control Valve (03FCV-19A) in standby.

2008 JPM J

ENTERGY NUCLEAR NORTHEAST JOB PERFORMANCE MEASURE SIROINPO 2008 JPM K TASK TITLE: SBO Start of EDG APPL. TO JPM NUMBER NRC WA SYSTEM NUMBER: 264000A209 ESTIMATED COMPLETION TIME: 10 Minutes APPLICANT NAME:

JPM Completion X Simulated 0 Performed Location:

X Plant 0 Simulator DATE PERFORMED: TIME TO COMPLETE: Minutes PERFORMANCE EVALUATION: 0 Satisfactory 0 Unsatisfactory COMMENTS: (MANDATORY FOR UNSATISFACTORY PERFORMANCE)

EVALUATOR:

SIGNATUREIPRINTED 2008 JPM K Page 1 of 5

1. SAFETY CONSIDERATIONS A. Comply with JAF Safety Standards and Requirements.

II. REFERENCES A. TSG-8, Extending Site Black-Out Coping Time, Starting an EDGAnjecting to Vessel with No DC Power Available 111. TOOLS AND EQUIPMENT A. None IV. SET UP REQUIREMENTS A. Make copy of TSG-8 as handout for applicant.

v. EVALUATOR NOTES A. The Applicant should, at a minimum, observe the change in equipment status light indication when equipment is operated.

B. If simulating this task, then inform the Applicant that the conditions of each step need only be properly identified and actually performed.

C. The Applicant should demonstrate proper placekeeping techniques during the performance of the procedure.

D. The Applicant should demonstrate proper self-checking techniques during the performance of the procedure.

E. The Applicant should demonstrate proper three-point communication techniques during the performance of the procedure.

2008 JPM K Page 2 of 5

VI. TASK CONDITIONS The site has experienced a station blackout and has entered AOP-49. No emergency diesel has started, due to no DC power at the EDGs.

VII. INITIATING CUE Start EDG (B) per TSG-8, Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available

  • CRITICAL STEP STEP STANDARD EVALUATION I COMMENT 1 Report to B EDG enclosure I Report to B EDG enclosure. I SAT / UNSAT II Manually close the 2B ESW I Closes 28 ESW Pump Breaker. I SAT / UNSAT
  • 2 pump breaker (71-12610, 46P-28)

Verify 4KV bkrs assoc with B CUE: NPO informs operator that ESW Pump Breaker is closed.

CUE: 4KV breakers are open; L-Gear Fdr Bkr closed.

I SAT / UNSAT EDG are open, with exception 3

of L-Gear 71-10660 (needed for ESW pump)

Verify either Tie Breaker 71- CUE: The selected tie breaker (71-10614 or 71-10404) is SAT / UNSAT 4

10614 or 71-10404 is closed. open.

Open air starting solenoid Opens the air starting solenoid valve by pushing down on T- SAT / UNSAT valve 93SOV-1B or 93SOV- handle at top of solenoid (located under desk near floor

  • 5 2B. level below air start motors on either side of EDG).

CUE: Operator can hear air flow noise, and engine rolls up to approximately 945 rpm.

~

2008 JPM K Page 3 of 5

STEP I ~

STANDARD EVALUATION / COMMENT Close the air starting solenoid Releases T-handle on air starting solenoid valve. SAT I UNSAT valve after engine is running.

Close EDG B output breaker. Closes EDG B output breaker 71-10602 by depressing the SAT / UNSAT black CLOSE button at base of breaker front.

I CUE: Breaker is closed.

Terminate the task at this point.

2008 JPM K Page 4 of 5

I Applicant Tear-Off Sheet TASK CONDITIONS The site has experienced a station blackout and has entered AOP-49.

No emergency diesel has started, due t o no DC power at the EDGs.

INITIA TING CUE Start EDG (B) per TSG-8, Extending SBO Coping Time, Starting and EDGAnjecting to Vessel with No DC Power Available 2008 JPM K