NRC Operator Licensing Initial Exam Results for James A. FitzPatrick Nuclear Power Station (Only This Cover Letter Is Provided to the Public. Enclosures Are Withheld from the Public)
ML081480167
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/14/2008
From: Hansell S
Operations Branch I
To: Dante Johnson
Entergy Nuclear Northeast
Hansell S
Shared Package
ML072850856 List:
References
Download: ML081480167 (3)


Text

May 14, 2008 Mr. Daniel Johnson Training Manager Entergy Nuclear Northeast J. A. Fitzpatrick Nuclear Power Plant 268 Lake Road Lycoming, NY 13093

SUBJECT:

NRC OPERATOR LICENSING INITIAL EXAM RESULTS FOR JAMES A. FITZPATRICK NUCLEAR POWER STATION (Only this cover letter is provided to the public. Enclosures are withheld from the public.)

Dear Mr. Johnson:

The purpose of this letter is to inform you of the examination results for one of your applicants on the initial examination administered March 31 - April 14, 2008 at your facility. This meets the intent of Section E.1 of the Examination Standards (ES 501) in NUREG 1021, Revision 9.

We notified you earlier of the results for thirteen of the fourteen individuals. At that time, we were still evaluating one applicants performance on the operating test; he passed the written exam. Subsequently, we have finished our evaluation, and based on that evaluation the applicant passed the operating test. This information is considered proprietary" in accordance with 10 CFR 2.390 and it supplements the information contained in the related examination report for your facility which will be issued shortly.

is a copy of the Power Plant Examination Results Summary, ES-501-2.

contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for this applicant. In addition, we are including revised 303-2 forms for applicants whose previous 303-2s did not accurately reflect their performance on the walkthrough or scenario portion of the operating test. The revisions do not affect our previous pass/fail decisions.

Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status.

The applicants have authorized the release of this information to your facility by signing Block 19A of NRC Form 398.

is a copy of the license.

Mr. Johnson Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Enclosures:

1. Power Plant Examination Results Summary, ES-501-2
2. ES-303-1 and 303-2, Individual Examination Results
3. License cc with Enclosure 3:

Site Vice President

Thank you for your cooperation in this matter. Please refer any questions you have to me at (610) 337-5046.

Sincerely,

/RA/

Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety Docket No. 50-333 License No. DPR-59

Enclosures:

1. Power Plant Examination Results Summary, ES-501-2
2. ES-303-1 and 303-2, Individual Examination Results
3. License cc with Enclosure 3:

Site Vice President Distribution: w/o enclosures:

Master Exam File SUNSI Review Complete: TF (Reviewer=s Initials)

ADAMS PACKAGE NO.: ML072850856 DOCUMENT NAME: G:G:\\DRS\\Operations Branch\\FISH\\Exam 08-Fitz Mar 08 (U01684)\\ExamNotificationLtrRev1.doc After declaring this document AAn Official Agency Record,@ it will without enclosures be released to the Public.

OFFICE RI/DRS/OB RI/DRS/OB RI/DRS/OB NAME CJBixler/CJB TFish/TF SLHansell/SLH DATE 05/13/08 05/14/08 05/14/08 OFFICIAL RECORD COPY