{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Tuesday, January 18, 2011 4:17 PM To: Garg, Hukam; Darbali, Samir; Carte, Norbert; Singh, Gursharan Cc: WBN2HearingFile Resource
==Subject:==
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Attachments:
20110107 Open Item List Master TVA Update 01-07-11.docx FYI  JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Clark, Mark Steven [mailto:msclark0@tva.gov]
Sent: Tuesday, January 18, 2011 3:19 PM To: Crouch, William D Cc: Hilmes, Steven A; Poole, Justin; Knuettel, Edward Terry
==Subject:==
20110107 Open Item List Master TVA Update 01-07-11.docx Bill:
Please forward the attached update to Justin.
Thanks,  Steve  Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier:  Watts_Bar_2_Operating_LA_Public Email Number:  250  Mail Envelope Properties  (19D990B45D535548840D1118C451C74D7B6471553B) 
==Subject:==
FW: 20110107 Open Item List Master TVA Update 01-07-11.docx  Sent Date:  1/18/2011 4:17:18 PM  Received Date:  1/18/2011 4:17:23 PM From:    Poole, Justin Created By:  Justin.Poole@nrc.gov Recipients:    "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Tracking Status: None  "Garg, Hukam" <Hukam.Garg@nrc.gov>
Tracking Status: None  "Darbali, Samir" <Samir.Darbali@nrc.gov>  Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov>  Tracking Status: None  "Singh, Gursharan" <Gursharan.Singh@nrc.gov>
Tracking Status: None Post Office:  HQCLSTR02.nrc.gov 
Files    Size      Date & Time MESSAGE    693      1/18/2011 4:17:23 PM  20110107 Open Item List Master TVA Update 01-07-11.docx    440542 Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides
: 1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides
: 2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides
: 3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
LIC-110 Rev.
1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2
: 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 7
: 7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 8
: 8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 9
: 9. Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 10
: 10. Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 11
: 11. Y Closed Closed EICB RAI ML101680598
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 12
: 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 13
: 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10
: 14. Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10
: 15. Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
, if an y, for the solid state p rotection Date: 4/27/10
: 17. Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10
: 18. Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10
: 19. Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10
: 20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10
: 21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10
: 22. Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10
: 23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a
: 24. Y Closed Closed  NRC Meetin g N/A - Re q uest for NNC 4/30/10:
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
, verif y that the Date: 4/27/10
: 25. Y Closed Closed NRC Meetin g ML101230248
,  026    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10
: 26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10
: 27. Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
: 28. Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10
: 29. Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark
: 30. Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10
: 31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10
: 32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10
: 33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA
: 34. Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction
: 35. Y Closed Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  36. Y Closed Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  37. Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  38. Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
A ll Other S ystems Re quired for Safet y  39. Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  40. Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10
: 42. Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10
: 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                Date: 5/25/10
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10
: 45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010:  Telecom Date: 5/25/10
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10
: 48. Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10
: 49. Y Closed Closed EICB RAI TVA Letter dated 046    (C aFebruar y 25 , 2010 Date: 5/25/10
: 50. Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 051    (G Ap ril 15 , 2010 Date: 5/25/10
: 54. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 55. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 56. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10
: 57. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                  Date: 5/25/10
: 58. Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10
: 59. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10
: 60. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10
: 61. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  62. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 63. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Webb      Date: 4/8/2010
: 67. Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res ponder: WEC                Date: 5/25/10
: 68. Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                          Date: 5/25/10
: 69. Y Closed Closed N/A - No q uestion TVA Letter dated 072 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                      Date: 5/25/10
: 70. Y Closed Closed  N/A - No q uestion N/A  076 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Clark Date: 5/25/10
: 71. Y Closed Closed  N/A - No q uestion N/A  077 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                          Date: 5/25/10
: 72. Y Closed  Closed N/A - No q uestion TVA Letter dated 078    (G 4/26/2010 Res p onder: Clark                          Date: 5/25/10
: 73. Y Closed  Closed  EICB RAI TVA Letter dated 079    (G 4/26/2010 Res p onder: Clark                              Date: 5/25/10
: 74. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080    (S i 4/26/2010 Res p onder: WEC
: 75. Y Closed Closed RAI No. 2 TVA Letter dated 083 7.5.2 7.5.1  (C a Ma y 6 , 2010 Date:  6/18/10
: 76. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1  (C a May 6, 2010 Date:  6/18/10
: 77. Y Closed Closed EICB RAI TVA Letter dated 087 7.5.2 7.5.1  (S i Ma y 6 , 2010 Date:  5/24/10
: 78. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1  (S i May 6, 2010 Date:  5/24/10
: 79. Y Closed Closed RAI No. 21 TVA Letter dated 089    (C a 5/6/2010 Res p onder: Clark
: 80. Y Closed Closed EICB RAI TVA Letter dated NNC:  Docketed res p onse states that 090    (C a 5/6/2010 Res p onder: Clark                        Date: 5/25/10
: 81. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date:  5/25/10
: 82. Y Closed Closed EICB RAI No.1 TVA Letter dated 093    (G Ma y 20 , 2010 Date:  5/25/10
: 83. Y Closed Closed N/A N/A Will be reviewed under item 154 094    (G 5/20/2010 Res p onder: Clark                          Date: 5/25/10
: 84. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:  85. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 86. Y Closed Closed  EICB RAI No.3 TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:  87. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:  88. Y Closed Closed EICB RAI No.5 TVA Letter dated 099  (B a April 12, 2010 Date:  89. Y Closed Closed  Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC
: 90. Y Closed Closed N/A - No q uestion N/A  102    (C a Ma y 24 , 2010 Date:  5/24/10
: 91. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10
: 92. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten Date: 5/27/10
: 93. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105    (G Ap ril 29 , 2010 Date:  94. Y Closed Closed N/A N/A Will be reviewed under item 154.
106    (S i May 6, 2010 Date:  5/25/10
: 95. Y Closed Closed RAI No. 9 TVA Letter dated 107    (S i May 6, 2010 Date:  5/28/10
: 96. Y Closed Closed RAI No. 22 TVA Letter dated 108    (G Ma y 6 , 2010 Date:  5/25/10
: 97. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A
: 98. Y Closed Closed N/A N/A  109.b    (C a 5/6/2010 Res ponder: N/A
: 99. Y Closed Closed N/A N/A Du plicate of another o p en Item. 110    (G Ma y 6 , 2010 Date:  100. Y Closed Closed N/A N/A Information was found.
111    (C a May 6, 2010 Date:  5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112    (G June 1, 2010 Date:  102. Y Closed Closed N/A N/A Information was received 113    (G 6/1/2010 Res p onder: Clark 103. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2  (G 6/1/2010 Res p onder: WEC 104. Y Close Closed EICB RAI TVA Letter dated 115    (C a 2/25/2010 Res p onder: Clark 105. Y Closed Closed EICB RAI TVA Letter dated 116    (G 6/3/2010 Res p onder: WEC 106. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1  (G 6/3/2010 Res p onder: Hilmes 107. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten 108. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119    (S i June 10 , 2010 Date:  109. Y Closed Closed RAI No. 23 TVA Letter dated 120    (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y 110. Y Closed Closed EICB RAI TVA Letter dated 121    (C a 5/6/2010 Res p onder: Webb/Webber 111. Y Closed Closed EICB RAI TVA Letter dated 122    (C a June 14 , 2010 Date:  112. Y Closed Closed N/A - Re quest for N/A  123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: 113. Y Closed Closed ML101720589
, TVA Letter dated 124 7.7.5 XX (D a r 6/14/2010 Res p onder: 114. Y Closed Closed ML101720589
, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: 115. Y Closed Closed ML101720589
, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date:  116. Y Closed Closed ML101720589
, Item TVA Letter dated 127 7.2 7.2  (G 6/16/2010 Res p onder: WEC/Clar k 117. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2  (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g 118. Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129    (P o 6/12/2010 Res p onder: WEC 119. Y Closed Closed N/A TVA Letter dated 130    (P o 6/28/2010 Res p onder: Clark 120. Y Closed Closed N/A TVA Letter dated 131    (P o 6/28/2010 Res p onder: Clark 121. Y Closed Closed N/A TVA Letter dated 132    (P o 6/28/2010 Res p onder: Clark 122. Y Closed Closed N/A TVA Letter dated 133    (P o 6/28/2010 Res p onder: Clark 123. Y Closed Closed  TVA Letter dated 134    (P o 6/28/2010 Res p onder: Clark 124. Y Closed Closed  TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark 125. Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark 126. Y Closed Closed RAI not necessar y TVA Letter dated 137    (C aSeveral WBN2 PAMS documents contain a table titled
, "Document Res p onder: WEC 127. Y Closed Closed ML101650255
, Item TVA Letter dated 139    (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC 128. Y Closed Closed ML101650255
, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 141    (C a Deleted b y DORL Date:  129. Y Closed Closed ML101650255
, Item  WBN2 PAMS S y stem Re q uirements Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 146    (C a 6/17/2010 Res p onder: 130. Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 147    (C a 6/17/2010 Res p onder: 131. Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 148    (C a 6/17/2010 Res p onder: 132. Y Closed Closed ML101650255
, Item  PAMS S ystem Re q uirements 149 7.2 7.2  (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell 133. Y Close Closed ML101720589
, Item TVA Letter dated 150 7.2 7.2  (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark 134. Y Close Closed ML101720589
, Item TVA Letter dated 151 7.2 7.2  (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark 135. Y Close Closed ML101720589
, Item TVA Letter dated 152 7.2 7.2  (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark 136. Y Close Closed ML101720589
, Item TVA Letter dated 153 7.2 7.2  (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb 137. Y Close Closed ML101720589
, Item TVA Letter dated 154 7.2 7.2  (GFSAR section 7.2.1.1.10
, set p oints: NRC staff has issued RIS Res p onder: Crai g/Webb 138. Y Closed Closed ML101720589
, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2  (G Summar y of FSAR chan ge document section 7.2 states that Date:  139. Y Closed Closed ML101720589
, Item  156 7.2 7.2  (GFSAR section 7.2.2.1.1 states that dashed lines in Fi g ure 15.1-Res p onder: WEC 140. Y Closed Closed ML101720589
, Item TVA Letter dated Res p onse on hold p endin g 157 7.2 7.2  (GFSAR section 7.2.2.1.1
, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell 141. Y Close Closed ML101720589
, Item TVA Letter dated 158 7.2 7.2  (GFSAR section 7.2.2.1.1
, p ara g ra p h six was chan g ed to state that Res ponder: Tindell 142. Y Closed Closed ML101720589
, Item TVA Letter dated 159 7.2 7.2  (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g 143. Y Close Closed ML101720589
, Item TVA Letter dated 160 7.2 7.2  (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell 144. Y Close Closed ML101720589
, Item TVA Letter dated 161 7.2 7.2  (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark 145. Y Closed Closed ML101720589
, Item TVA Letter dated 162 7.2 7.2  (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell 146. Y Closed Closed ML101720589
, Item TVA Letter dated 163 7.2 7.2  (G Deleted b y DORL Date:  147. Y Closed Closed ML101720589
, Item  164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins 148. Y Closed Closed ML101720589
, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2  (GFSAR section 7.2.2.3.2
, last p ara g ra p h of this section has been Res p onder: Clark 149. Y Closed Closed ML101720589
, Item TVA Letter dated 166 7.2 7.2  (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark 150. Y Closed Closed ML101720589
, Item TVA Letter dated 167 7.2 7.2  (GFSAR section 7.2.2.4
, p rovide an anal y sis or reference to cha p ter Res p onder: Clark 151. Y Close Closed ML101720589
, Item TVA Letter dated 168 7.2 7.2  (G FSAR table 7.2-4
, item 9 deleted loss of offsite p ower to station Res p onder: Clark 152. Y Close Closed ML101720589
, Item TVA Letter dated 169    (G 6/18/2010 Res p onder: Clark 153. Y Closed Closed    170    (G 6/17/2010 Res p onder: Clark 154. Y Closed Closed    171 7.2 7.2  (G 6/17/2010 Res p onder: Crai g 155. Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172    (G 6/17/2010 Res p onder: Crai g 156. Y Closed Closed EICB RAI  173 7.1 7.1  (G 6/17/2010 Res p onder: Crai g/Webb/Powers 157. Y Closed Closed  EICB RAI  174    (G 6/28/2010 Res p onder: Hilmes/Crai g 158. Y Closed Closed EICB RAI  175    (G June 28 , 2010 Res p onder:  159. Y Closed Closed EICB RAI  176 7.1 7.1  (G 6/28/2010 Res p onder: Crai g/Webb 160. Y Closed Closed  EICB RAI  177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 161. Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 162. Y Closed Closed N/A TVA Letter dated RAI not re q uired 179    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 163. Y Closed  Closed N/A - Closed to NA  180    (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC 164. Y Closed Closed N/A - Closed to NA  181    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 165. Y Closed Closed N/A - Closed to NA  182    (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC 166. Y Closed Closed N/A - Closed to NA  184    (C a 7/15/2010 Res p onder: WEC 167. Y Closed Closed N/A - Closed to N/A  186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark 168. Y Closed Closed EICB RAI No.6 TVA Letter dated 188    (C a B y letter dated June 30
, 2010 , TVA docketed
, "Tennessee Valle y Res p onder: Clark 169. Y Closed Closed  ML101970033
, Item TVA Letter dated 189  7.6.7  (S i 7/20/2010 Res p onder: Clark 170. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9  (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133
, Ma y 1981 Res p onder: Clark 171. Y Closed Closed  RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9  (C aNUREG-0800 Cha p ter 7 , Section 7.9
, "Data Communication Res p onder: Jimmie Perkins 172. Y Closed  Closed ML10197016
, Item TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800
) Cha p ter 7 Section Res p onder: Clark 173. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR
, Section 7.5.2
, "Plant Com p uter S y stem ," Res p onder: Clark 174. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1
, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman 175. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 176. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 177. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197  X O pen Item 197 was never issued.
178. Y Closed Closed    198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5
, Subsection III
, "Review Procedures" states:
Res p onder: Costle y/Norman 179. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3
, "Technical Su pport Center and Res p onder: Costle y/Norman 180. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2  7/21/2010 Res p onder: Clark 181. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11  (C a 7/21/2010 Res p onder: Webb 182. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark 183. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman 184. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205    (G 7/26/2010 Res p onder: Clark 185. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark 186. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207    (C a Jul y 27 , 2010 Date:  187. Y Closed Closed    208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 188. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 189. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1  (C a 7/27/2010 Res p onder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
214    (C a 7/27/2010 Res p onder: WEC 192. Y Closed Closed EICB RAI TVA Letter dated 215    (P o 7/29/2010 Res p onder: WEC 193. Y Closed Closed    216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217    (G 7/6/2010 Res p onder: Clark 195. Y Close Closed EICB RAI TVA Letter dated 218    (G 7/6/2010 Res p onder: Clark 196. Y Closed Closed EICB RAI TVA Letter dated 219    (G 8/4/2010 Res ponder: TVA Licensin g 197. Y Closed Closed EICB RAI  220    (G 8/4/2010 Res p onder: A y ala 198. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222    (G 8/4/2010 Res p onder: Clark 200. Y Close Closed EICB RAI TVA Letter dated 223    (G 8/4/2010 Res p onder: Clark 201. Y Closed Closed EICB RAI  224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) 202. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225    (G 8/4/2010 Res p onder: Scansen 203. Y Close Closed EICB RAI TVA Letter dated 226    (C a 8/4/2010 Res ponder: TVA Licensin g 204. Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.
227    (G 8/4/2010 Res p onder: Clark 205. Y Close Closed EICB RAI TVA Letter dated 228    (C a 8/4/2010 Res p onder: Clark 206. Y Closed  Closed EICB RAI TVA Letter dated 229    (C a 8/4/2010 Res p onder: Clark 207. Y Closed Closed EICB RAI TVA Letter dated 230    (C a 8/4/2010 Res p onder: Webb 208. Y Closed Closed EICB RAI TVA Letter dated 231    (G 8/4/2010 Res p onder: Clark 209. Y Closed Closed EICB RAI TVA Letter dated 232    (S i 8/4/2010 Res p onder: Clark 210. Y Closed Closed RAI No. 5 TVA Letter dated 233    (C a 8/4/2010 Res p onder: Clark 211. Y Closed Closed EICB RAI TVA Letter dated 234    (C a 8/4/2010 Res p onder: 212. Y Closed Closed N/A - Du p licate N/A  235    (G 8/4/2010 Res ponder: TVA Licensin g 213. Y Closed Closed N/A N/A  236    (G 8/4/2010 Res p onder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 237    (C a 8/4/2010 Res p onder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 238    (C a 8/4/2010 Res p onder: Webb/Hilmes 216. Y Closed Closed N/A - Du p licate N/A  239    (C a 8/4/2010 Res p onder: Hilmes 217. Y Closed Closed N/A - Meetin g N/A  240    (G 8/4/2010 Res p onder: Clark 218. Y Close Closed Ml102910008 TVA Letter dated 241    (S i 8/4/2010 Res p onder: Davies 219. Y Closed Closed RAI No. 10 TVA Letter dated 242    (G 8/4/2010 Res p onder: Hilmes 220. Y Close Closed EICB RAI TVA Letter dated 243    (C a 8/3/2010 Res p onder: WEC 221. Y Closed Closed N/A - Closed to N/A  247    (C a 8/8/2010 Res p onder: WEC 222. Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 248    (C a 8/8/2010 Res p onder: WEC 223. Y Closed Closed  Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 249    (C a 8/8/2010 Res p onder: WEC 224. Y Closed  Closed  LIC-101 Rev. 3 A ppendix B Section 4
, 253    (C a 8/8/2010 Res p onder: Clark 225. Y Closed Closed  TVA Letter dated Related to O pen Item no. 83.
254    (C a 8/10/2010 Res p onder: WEC 226. Y Closed Closed N/A - Re quest to TVA Letter dated 255    (C a 8/10/2010 Res p onder: WEC 227. Y Closed Closed N/A - Re quest to TVA Letter dated 256    (C a 8/10/2010 Res p onder: WEC 228. Y Closed Closed N/A - Re quest to TVA Letter dated 257    (C a 8/10/2010 Res p onder: WEC 229. Y Closed Closed N/A - Re quest to N/A  258    (C a 8/10/2010 Res p onder: WEC 230. Y Closed Closed N/A - Re quest to N/A  259    (C a 8/10/2010 Res p onder: WEC 231. Y Closed Closed N/A - Re quest to TVA Letter dated 260    (C a 8/10/2010 Res p onder: WEC 232. Y Closed Closed N/A - Re quest to N/A  261    (C a 8/10/2010 Res p onder: WEC 233. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262    (C a 8/10/2010 Res p onder: WEC 234. Y Closed Closed N/A - Re quest to N/A  263    (C a 8/11/2010 Res p onder: WEC 235. Y Closed Closed ML101650255
, Item  264    (C a 8/11/2010 Res p onder: WEC 236. Y Closed Closed ML101650255
, Item  265    (C a 8/11/2010 Res p onder: WEC 237. Y Closed Closed ML101650255
, Item  266    (C a 8/11/2010 Res p onder: Webb/Webber 238. Y Closed Closed  TVA Letter dated 267    (C a 8/11/2010 Res p onder: WEC 239. Y Closed Closed    268    (C a 8/19/2010 Res p onder: WEC 240. N O p en Closed    269    (P o 8/20/2010 Res p onder: NRC 241. Y Closed Closed N/A N/A  270    (C a 8/23/2010 Res p onder: Clark 242. Y Closed Closed  See also O p en Item Nod. 41 & 245.
271    (C a 8/23/2010 Res p onder: WEC 243. Y Closed Closed N/A - Closed to NA  272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 244. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 245. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b    (S i 8/26/2010 Res p onder: Stockton 246. Y Closed Closed RAI No. 6 TVA Letter dated 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 247. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 275    (S i 8/27/2010 Res p onder: Clark 248. Y Closed Closed Not Re q uired  N/A  276 7.6 7.6  (G 8/27/2010 Res p onder: Webb 249. Y Closed Closed EICB RAI TVA Letter dated 277 7.6 7.6.3  (G 8/27/2010 Res p onder: Clark 250. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6  (G 8/27/2010 Res ponder: Trelease 251. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6  (G 8/27/2010 Res ponder: Mather 252. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6  (G 8/27/2010 Res ponder: Trelease 253. Y Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9  (G 8/27/2010 Res ponder: Trelease 254. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark 255. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber 256. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil 257. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber 258. Y Closed Closed EICB RAI No.16 TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton 259. Y Closed Closed ML102390538
, Item Res p onse  288 7.3  (G 9/2/2010 Res p onder: McNeil 260. Y Closed Closed EICB RAI  289    (S i 9/2/2010 Res ponder: Faulkner 261. Y Closed Closed  RAI No. 24 TVA Letter dated 290  7.7  (C a 9/7/2010 Res p onder: Clark 262. Y Closed Closed N/A N/A This item is a du plicate of item 291.
291  7.7  (C a 9/7/2010 Res p onder: Clark 263. Y Closed Closed  TVA Letter dated 292 7.2.5 7.2  (G 9/7/2010 Res p onder: Crai g 264. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g 265. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 266. Y Closed Closed ML102390538
, Item Res p onse  295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 267. Y Closed Closed ML102390538
, Item Res p onse  296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 268. Y Closed Closed ML102390538
, Item Res p onse  297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 269. Y Closed Closed ML102390538
, Item Res p onse  298 7.3 XX (D a r 9/9/2010 Res p onder: Clark 270. Y Closed Closed ML102390538
, Item Res p onse  299    (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q 271. Y Closed Closed  TVA Letter dated 300    (S i Need Radiation Monitorin g S ystem Descri p tion/Desi g n Criteria Res p onder: Tem p les/Mather 272. Y Closed Closed RAI No. 25 TVA Letter 301    (S i 1.TVA is re q uested to address the conse q uences of software Res ponder: WEC/Davies/Clark 273. Y Closed Closed RAI No. 11 TVA Letter dated Note 1: 302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 274. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 276. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 277. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1  (GFSAR amendment 100
, p a g e 7.1-12 p rovides the definition of Res p onder: Hilmes 278. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1  (G (1) FSAR amendment 100
, Section 7.1
, p a g e 7.1-12 , definition of Res p onder: Hilmes 279. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1  (G (1) FSAR Amendment 100
, Section 7.1
, p a g e 7.1-13 , definition of Res p onder: Hilmes 280. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1. (G (1) FSAR amendment 100
, Pa g e 7.1-14 , Westin g house set p oint Res p onder: Hilmes 281. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (G (1) FSAR amendment 100
, Pa g e 7.1-14 , TVA set p oint Res p onder: Hilmes 282. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1  (G Both Westin ghouse and TVA set p oint methodolo gy do not have Res p onder: Hilmes 283. Y Closed Closed EICB RAI TVA Letter dated 312  7.0  (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton 284. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2
) states that Desi g n Res p onder: A y ala 285. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton 286. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3  (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) 287. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5  (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather 288. Y Closed Closed RAI No. 26 317 7.5.2.3 7.5  (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples 289. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.3 7.5  (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples 290. Y Closed Closed RAI No. 29 TVA Letter dated 320  E I Per Westin g house letter WBT-D-2340
, TENNESSEE VALLEY Res p onder: Clark 291. Y Closed Closed N/A N/A Du plicate of item 156 321  E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark 292. Y Closed Closed N/A N/A Du plicate of OI# 157 322  7.7.1.11  (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark 293. Y Closed Closed    324  (M aPer the NRC reviewer
, the BISI calculation is not re q uired to be 294. Y Closed Closed    325  B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson 295. Y Closed Closed  Closed to o p en item ? 326  B (G a TVA uses double-sided methodolo gy for as-found and as-left Res p onder: Webb 296. Y Closed Closed  TVA Letter dated 328 7.5.2.3 7.5  (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples 297. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7  (S iSection 7.6.7 of the FSAR (Amendment 100
) states that
, "The Res p onder: Clark 298. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner 299. Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7  (S i A s a follow u p of OI 190
, Staff has reviewed the p ro p rietar y version Res p onder: WEC/Harless/Clark 300. Y Closed Closed RAI No. 8 TVA Letter dated Follow-u p of OI-190.
332 7.5.2.1 7.5.1 (M a 10/26/2010 301. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 333 7.5.2.1 7.5.1 (M a 10/27/2010 302. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 336 7.5.2.3 7.5  (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 303. Y Closed Closed    337 7.5.2.3 7.5  (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 304. Y Closed Closed    342 7.5.2.3 7.5  (S iPlease confirm that RM-1000 monitors and the associated The RM-1000 containment hi g h ran g e radiation monitors are 305. Y Closed Closed    343 7.5.2.3 7.5  (S iSeismic RRS in the 04508905-QR re p ort Fi gures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 306. Y Closed Closed    041 7.5.2 7.5.1 EICB (Carte) 2/19/2010
Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design
Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or
SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test
Procedure" Responder: WEC
Items (1) and (2) were docketed by TVA letter dated April 8, 2010.
Item (3) will be addressed by Revision 2 of the Licensing
Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10
Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10
For Item 3, Attachment 19 contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
: 1. N Open Final Response included in letter dated 12/3/10
Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from
many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there
should be no problem to docket this version.  (4) Per ML091560352, the testing process document does not address the test plan
requirements of the SPM. Please provide a test plan that implements the requirements of
the SPM. Open-NRC Review
Due:  (3) 12/3/10  (4) 12/10/10
TVA to docket information indentified in ISG6. NRC Meeting Summary NRC
Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
043 7.5.2 7.5.1 EICB (Carte) 2/19/2010
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the firs t three lines in the matrix are:
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed
and approved.
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since Responder: WEC                        Date: 5/25/10
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. 
By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.
Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6
: 2. N Open Revised response included in
letter dated 12/22/10.
Response is included in letter
dated 10/5/10.
Revised compliance matrix is unacceptable.
NNC 8/12/10:
It is not quite enough to provide all of the
documents requested. There Open-NRC Review
Due 12/1/10 EICB RAI ML102910002
Item No. 2 TVA Letter dated 2/5/10
TVA Letter dated 5/12/10 TVA Letter dated
6/18/10  TVA Letter dated
10/5/10 NNC 8/25/10:
A CQ PAMS ISG6 compliance matrix was docketed on: (1)
February, 5 12010, (2) March 12, 2010,
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still
waiting for a good compliance evaluation.
NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.
Compliance Matrix."
It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. 
Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be  tracked under NRC RAI Matrix Item 138. This item is considered closed.
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and
software which includes the RSEDs. 
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The
TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were
addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to
review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it
appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are
commercial grade dedication
reports; this apparent deviation should be justified or explained.
050 7.5.2 7.5.1 EICB (Carte) 4/8/2010  How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
Responder: WEC                        Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
TVA Revised Response
Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by
submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
TVA Response to Follow-up NRC Request:
This item is corrected in the revision 3 requirements documents.   
: 3. N Open  Revised response included in letter dated 12/22/10.
TVA response is inconsistent (e.g., WNA-DS-01667-WBT
Rev. 1 page 1-1, Section 1.3.1
implies that "SysRS Section
###" has requirements. See also SDS4.4.2.1-1 on page 4-32).
Is there a requirement on the shall referenced above??
Response is provided in letter
dated 10/29/10.
TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable NNC 11/18/10:
Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are Open-NRC Review Due12/22/10 Discuss at 11/22 phone call.
This will be corrected in the Revision 3
document due to TVA
12/10/10 EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10  TVA Letter dated
10/29/10  Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Attachment 1 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated November 2010. Attachment 2 contains the non-proprietary
version WNA-DS-01617-WBT-NP, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated December 2010. Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification" (Proprietary),
dated December 6, 2010.
Attachment 4 contains  the proprietary version of WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated November 2010. Attachment 5 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification" (Proprietary), dated December 6, 2010.
Attachment 7 contains  the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
dated November 2010. Attachment 8 contains the non-proprietary version WWNA-SD-00239-WBT-NP, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System" (Proprietary), dated December 8, 2010.
not within numbered requirements sections, for example:  (1) Page 2-1, Section 2.3.1 -
See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 067 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September
28, 2010.
Responder: WEC                          Date: 5/25/10
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43: 
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
), these items are available for audit at the Westinghouse Rockville office. 
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office. 
To be addressed during 9/20-9/21 audit
: 4. N Open Response included in letter
dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review
Due 12/3/10
N/A - No question was asked. Item
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 7, "Commercial Grade Dedication Process," has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
068 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
Responder: WEC                          Date: 5/25/10
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43: 
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.   
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit
TVA Response to Follow-up NRC Request:
For the commercial grade dedication process, please see
the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
Instrumentation and Controls Staff Information Requests," (Reference 5):
: a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687
and AI688 Common Q Modules  and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010
: b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS,"
dated September 10, 2010
: 5. N Open Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review
Due 12/3/10 N/A - No question was asked. Item
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010  (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following
documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction" 
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are
available for NRC audit at the Westinghouse Rockville office: a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction" 
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI- 4057, Revision 4, "Commercial Dedication Instruction" 
: b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter" 
: c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"
: d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 070 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.
Responder: WEC                      Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements
: 6. N Open  Final Response included in letter dated 12/3/10
Partial Response is included in letter dated 10/5/10.
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by Open-NRC Review Due 12/17/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10  TVA Letter dated
8/20/10 TVA Letter dated 10/5/10 NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 71.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
TVA Revised Response:
TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in
letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design
Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
Attachment 14contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, "Nuclear Automation Watts Bar
Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
dated November 8, 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
TVA. NNC 8/25/10:
Requirements Phase SVVR provided by TVA
letter dated 8/20/10.
NNC 11/23/10:  The requirements Phase SVVR
provided by TVA on 8/20/10, is
not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.
071 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 2 of the I V&V Report" covering the Design and Implementation phases was July 30, 2010. Responder: WEC              Date: 5/25/10 Attachment 16 contains the Westinghouse document "IV&V Summary Report for the Post Accident Monitoring System,"
WNA-VR-00283-WBT, Revision 2, dated November 2010. 
Attachment 17 contains the Westinghouse Application for withholding for the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment
: 19) for the current contract compliance matrix.
: 7. N Open  Response included in letter dated 12/3/10
Awaiting for document to be docketed by TVA.
Open-NRC Review Due 12/10/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 70.
073 7.5.2 7.5.1 EICB (Carte)
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration
phase was October 29, 2010.
Responder: WEC                    Date: 5/25/10
WNA-VR-00283-WBT, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," covers the Integration phase. Attachment 10 contains the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-P, Revision 3, dated December 2010. Attachment 11 contains the non-proprietary version "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion
: 8. N Open Response included in letter
dated 12/22/10 Awaiting for document to be
docketed by TVA.
Open-NRC Review
Due 12/22/10 N/A - No question was asked. Item
was opened to track commitment made by applicant.
N/A Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System" (Proprietary), dated December 10, 2010.
075 7.5.2 7.5.1 EICB (Carte)
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was
September 30, 2010. Responder: WEC                  Date: 5/25/10
Attachment 12 contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010. 
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,"Nuclear Automation Watts Bar Unit 2 NSSS Completion Pro g ram I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010. 9. N Open Response included in letter
dated 12/3/10 Awaiting for document to be
docketed by TVA.
Open-NRC Review
Due 12/3/10 N/A - No question was asked. Item
was opened to track commitment made by applicant.
N/A  082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:
2.c - CI527 AF100 Peripheral Component Interconnect (PCI)
interface card
: 3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary Product Maintenance/Improvements) 4.a - PM646A Processor Module 4.b - CI631 AF100 Communication Interface Module 4.e - DO620 Digital Output Card Please provide sufficient detail regarding the changes for the NRC to independently evaluate the acceptability of the changes.
Responder: WEC                                Date: 6/18/10
These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP  Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.
Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and
references to the evaluation documentation.
TVA Response to Follow-up NRC Request:
Please see the response to Request for Additional Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix Item 067.
: 10. N Open Revised response included in
letter dated 12/22/10 Regulations require that the NRC review be based on
docketed material. Awaiting for document to be docketed by TVA.
NNC 8/9/10:
per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication
Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public
meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and
associated reports be docketed.
NNC 11/18/10:
During the September 20-21, 2010 audit, TVA agreed to put a description
of the commercial grade
dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
Open-NRC Review
Due 12/3/10
Commercial Grade Dedication to be
addressed in LTR Rev.
2,  EICB RAI ML102910002
Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.
41, Item No. 3.
085 7.5.2 7.5.1 CB (C ar t 5/6/2010  Responder: WEC
: 11. N Open  Open-NRC Review EICB RAI ML102910002
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. Is the WEC ISG4 evaluation inadequate?
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from
propagating to the AC160? 
Node loss on the bus?  Bus loss? 
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device. 
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA letter to NRC dated December 3, 2010 (Reference 1), contains the following changes to address the NRC requests:
Section 2.2, "System Description" page 2-3 provides a description of the MTP Fiber-Optic (FO) data link to the plant computer. Section 2.2.1.4, "Hardware" has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, "Software" has been expanded to include a table detailing all software changes that have occurred since the initial submittal.
Revised response included in letter dated 12/22/10 A response will be provided by
10/31/10 NNC 8/11/10:
Design information should be available
now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux
Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause
5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."
Please describe how the MTP serves as the isolation device.
Due 12/3/10 Hardware is in Rev. 1 of the Licensing
Technical Report due
10/22. NNC 8/25/10:
Disagree with path forward input by TVA above. An explanation is about the design is
needed.
FAT test procedure to include data storm
testing of the MTP
interface NNC 11/18/10:
WEC response states that CQ PAMS LTR Rev. 2 will contain relevant information.
Item No. 13 101  DORL (Poole) 4/12/2010
The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A 
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR Responder: Slifer
The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
: 12. Y Open Documents provided in letter
dated 07/15/10 Open-NRC Review
Due 10/14/10
Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
Responder: WEC
This item is used to track all Commercial Grade Dedication issues.
: a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the
: 13. N Open Revised response included in letter dated 12/22/10
TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing
technical report.  (see ML102920031 Item No 1)
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
Open-NRC Review
Due 12/3/10 To be addressed by
Rev. 2 of the Licensing
Technical Report.
ML101650255, Item No. 2 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." Westinghouse Rockville office: (list included in letter) 
: b. It is TVA's understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.
Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 3)
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial
software components against the generic critical characteristics. (see
ML102920031 Item No 4) 140  EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes."  The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97. 
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?
Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg.
Guide 1.97 variables implemented in the Common Q  based
WBN Unit 2 PAMS TVA Response to Follow-up NRC Request:
WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" was submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1). Revision 2 contains the following change to address this request:  Section 11, "TVA Contract Compliance Matrix" has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).
: 14. N Open  Revised response included in letter dated 12/22/10
NNC 11/3/10:
The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.
Open-NRC Review Due 12/3/10
TVA to docket PAMS Licensing Technical Report Rev. 2.
ML101650255, Item No. 4 TVA Letter dated 10/29/10 Enclosure 1 Item No. 10 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS). 
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
TVA Response:
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by: 
: a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS)
Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1). b. Engineering review/comment/status of each revision of:
: 15. N Open  Response included in letter
dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of
their reusable software element
development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation
of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)
Open-NRC Review Due 12/22/10
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document?  If so, what are these
sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference
12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin? i. WNA-DS-01617-WBT, "Post Accident Monitoring System - System Requirements Specification" ii. WNA-DS-01667-WBT, "Post Accident Monitoring System - System Design Specification" (hardware) iii. WNA-SD-00239-WBT, "Software Requirements Specification for the Post Accident Monitoring System" (software)
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the Software Requirements Specification (SRS), but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the
requirement there?
TVA Response:
As documented in the RTM, some software
requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that
are unchan g ed across pro j ects. Westin ghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, contain requirements or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS. 
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).] 
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and describe how they were verified.
TVA Response:
Unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.
It depends on the document type. The statement would be true for requirements documents (such as the
SysRS or SDS) if they were incorporated by reference.
However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements.
The requirements contained in this document are contained within the text of the various sections.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS
contain, explicitly or by re ference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or
document?  If so, what are these sources or documents?
TVA Response:
The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically, 
00000-ICE-3238, Revision 5, "Software Requirements Specification Post Accident Monitoring System"
00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display Software"
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various t ypes of "-Reusable Software Element-".
These references are used in the body of the SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in
the SRS?  If so what is their origin?
TVA Response:
Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," dated December 2010 (Attachment 10).
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements."  This  document can be made available for audit at the  Westinghouse Rockville office.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification. 
: 6. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
TVA Response:
Please see response to letter Item 13 (NRC Matrix Item 145). 7. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
TVA Response:
Please see response to letter Item 13 (NRC Matrix Item 145). 
: 8. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
TVA Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A comments column has been added to WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring
System."
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 9. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this
information.
TVA Response:
Westin ghouse has confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 10. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to
remove these requirements.
TVA Response:
Westinghouse confirmed that process requirements have been removed from the SRS.
Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 11. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
TVA Response:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):
Section 9, "Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172" has been added.
: 12. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? 
TVA Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V. 
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 13. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). 
These will be removed from the SRS and incorporated into the next revision of the SDS.
TVA Response:
The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)
: 14. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.
TVA Response:
Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM. Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 15. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.
TVA Response:
The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:
6.2 "Manually Initiated Testing," 7.2.23 "Annunciator Test Display," 7.2.25 "Saturation Margin Test Display,"
and 7.2.26 "Analog Output Test Display."
: 16. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.
TVA Response:
Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE."  A review of recent documents for compliance with this comment and Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments commitment was performed with the following results:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch."  Revision 3 of the SDS is consistent in use of the term
"ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:
: i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"
instead of "ENABLE"
: c. Revision 3 of the SRS is not consistent in use of the terms "FE keyswitch" and "ENABLE" as noted below: i. Tables 7.2-1 "Train A PAMS Data Transmitted to the Plant Computer" and 7.2-2 "Train B PAMS Data Transmitted to the Plant Computer" items 101 and 102 in the SRS refer to the FE switch.
All other items in the SRS refer to the FE
keyswitch.
ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of
"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term "FE keyswitch" as noted below:
: i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.
ii. Table 3-1 describes the switch as the "Functional Enable (FE) switch" and the "FE key-switch"
: e. Revision 2 of the Licensing Technical Report is not consistent in use of the term "FE keyswitch" as noted below:
: i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page
5-6 (4 places)
The identified discrepancies in the use of the terms "FE
keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
: 17. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
TVA Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please see response to letter item 13 (NRC Matrix Item 145). 18. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
TVA Response:
The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).
: 19. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
TVA Response:
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."
: 20. Westinghouse to add the Software Design Descriptions to the RTM
TVA Response:
The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 21. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
TVA Response:
When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 22. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response:
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
: 23. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability. 
TVA Response:
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior
requirements documents refer to other generic SDDs also listed in Item b. 
: b. The SDDs developed for this project are:
: i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display" ii. WNA-SD-00250-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C
Projects Software Design Description for the Post Accident Monitoring System AC160 Software" 
iii. WNA-SD-00277-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details" iv. Other generic SDDs referenced by the PAMS project are:
(a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments System Database and Utility Functions"
: c. Refer to WNA-VR-00279-WBT, Revision 3.
Source: E-mail from Westinghouse (Matthew A.
Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 24. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if
the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927  AP-1000 does not discuss RCEDs. WCAP process was
acceptable. RSEDs are listed in the SDD References.
TVA Response:
Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.
Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in
the SPM requirements for software module development.
WCAP-15927 is on the AP1000 docket.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the
WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
(c) What other documents contain the requirements for the other
software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability
& Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.
A detailed explanation will be provided.
TVA Response:
  (a) and (b) The requested information is provided in the following documents:
: i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Table 6-1, "Document Requirements" which lists the software
documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December
2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010
: 16. N Open  Response included in letter
dated 12/22/10 Open-NRC Review Due 12/22/10
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments document is to define the hardware design requirements -"
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are: 
: i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems"). 
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design
and implementation, and hardware design and implementation for Common Q safety system development.
This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application
development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document
: 17. N Open  Revised response included in letter dated 12/22/10
Response provided in letter
dated 10/5/10 NRC Review and WEC to
complete response.
b-d to be addressed at public meeting and audit. Will require information to be docketed.
Open-NRC Review Due 12/3/10
Responses to items a
and e provided.
NNC 11/18/10:
  (1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the
origin of the
requirements in the requirements specifications were
documented. TVA
stated that the origin of the requirements would be demonstrated in
Rev. 2 of the CQ PAMS LTR. ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1,
""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1). 
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0. 
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
TVA Response to Follow-up NRC Request:
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.
  (2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.
145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
This item is used to track all traceability issues with the System Design Specification (SDS).
At the September 15 public meeting in Rockville, the following Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).
  (3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).
(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing
: 18. N Open  Response included in letter
dated 12/22/10
During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
TVA would provide the RSED RTM. (see ML102920031 Item No 6) Open-NRC Review Due 12/22/10
To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 9  WBN2 PAMS System Design Specification
TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December
2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit. 
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next
revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the
revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications. 
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a
good write up of how the process works.
Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).
(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System,"
submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.
(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.
(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference Error! Reference source not found.
).  (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 (Reference 18)
TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see
ML102920031 Item No 7)
TVA would revise and resubmit
the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements
phase review. (see ML102920031 Item No 8) 183  EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS
must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document"  referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?
Responder: WEC The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 12 in letter dated 12/222/10, NRC Matrix Item 144.
: 19. Y Open  Revised response included in
letter dated 12/22/10.
Response provided in letter
dated 10/21/10 Open-NRC Review Due 12/3/10
NNC 11/18/10:  The point behind this open item was that TVA must
demonstrate that the
origin of each requirement in the WEC requirements specification is known
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1 Item
No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If there are additional changes, what is their origin?
185  EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications  in the SRP, in the
unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable
backwards to the system requirements and the design bases or
regulatory requirements that is satisfies"    Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.
References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-". 
These references are used in the body of the SRS, for example:"
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin? Responder: WEC Steve Clark to look at how to combine traceability items.
Was addressed to during the 9/15 meeting and 9/20 - 9/21
audit. TVA Response to Follow-up NRC Request:
(1) Please see the response to Item 12 in this letter (NRC Matrix Item 144).
(2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 "Document Requirements" of WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.
: 20. N Open  Response included in letter dated 12/22/10.
Open-NRC Review Due (1) 12/3/10        (2) 12/22/10
NNC 11/18/10
:  (1)The point behind this open item was that TVA must
demonstrate that the
origin of each requirement in the WEC requirements specification is known
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2. 
(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item No. 17  187  EICB (Carte)
By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division.
If so, NRC staff will need these paths identified on the docket. Responder: Merten
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
: 2) This is a duplicate of closed RAI Matrix Item 45.
TVA Response to Follow-up NRC Request:
A review of the following documents determined that the connection between the OM and the plant computer has been changed to a connection to a printer:
: 1. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated November 2010 (Attachment 1)
: 2. WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification,"
dated November 2010 (Attachment 4)
: 21. N Open Revised response included in letter dated 12/22/10.
Partial Response provided in
letter dated 10/5/10
NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Open-NRC Review
Due 12/22/10 Revise Response
ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 3. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)
Review of the newly released Common Q PAMS documents listed below confirmed the y correctl y show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.
Note: The OM printer connection is only used for maintenance. A printer is not normally connected to the OM. To use the OM printer connection, the FE keyswitch must installed and be in the "ENABLE" position.
(1) WNA-TP-02988-WBT, Revision 0, "Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference
: 1)  (2) WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA to NRC letter November 5, 2010 (Reference 12) 212 7.5.2  EICB (Carte) 7/27/2010
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification
contain information to address the "Design Report on Computer
Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case. 
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Responder: WEC
Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements. 
WEC to provide the information and determine where the information will be located. 
: 1. IEEE-603 1991 5.5 System Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.
TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "Contract Compliance Matrix" items:
87 and 88 Seismic  89, 90, 91, 92 and 185 EMI/RFI
: 22. N Open Response included in letter dated 12/22/10.
Open-NRC Review
Due 12/22/10 To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item
No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closel y as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987 [3]. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case: 
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.
TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:
202 self test    350 Maintenance Bypass  351 Loop Tuning Parameters,  400 and 401 3.7.2 Testing, Calibration, and Verification  402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.
TVA Response: The requirements for repair and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:  179 Mean time to repair  202 self test  398 3.7 Maintenance  399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.
This may be accomplished in various ways; for example:  (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period:  (1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.
(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.
TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:
10, display of sensor diagnostic information  202 self test  205 self diagnostics and watchdog timer  264 through 271, system self checks  311 system status displays,  341 alarms,  344 on-line diagnostics 
: 2. IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:
- Design for computer integrity
- Design for test and calibration
- Fault detection and self-diagnostics 5.5.1 Design for computer integrity
The computer shall be designed to perform its safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes. 
If the system requirements identify a safety system
preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being
inhibited from performing its function.
TVA Response: Common Q PAMS system reliability and failure modes are described in:
WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System" WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix"
item 178.
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.
V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.
V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing
Technical Report" Section 11 "TVA Contract
Compliance Matrix" items:
202 self test    350 Maintenance Bypass  351 Loop Tuning Parameters,  400 and 401 3.7.2 Testing, Calibration, and Verification  402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.
Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:
- Memory functionality and integrity tests (e.g., PROM checksum and RAM tests)
- Computer system instruction set (e.g., calculation tests) - Computer peripheral hardware tests (e.g., watchdog timers and keyboards)
- Computer architecture support hardware (e.g., address lines and shared memory interfaces)
- Communication link diagnostics (e.g., CRC checks)  Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:
107 error free download  202 self test  205 self diagnostics and watchdog timer  263 primary and backup communication  264 through 271, continuous on-line self checks  311 system status displays,  341 alarms,  344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
TVA Response: No response required. 
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (Reference 14) 213 7.5.2  EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation. For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
Attachment 1 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010. 
: 23. N Open  Response is included in letter dated 10/25/10
NNC to review and revise this question after LTR R2 is received.
Open-NRC Review Due 12/31/10.
EICB RAI ML102980066 Item No. 18  244  CB (C ar t 8/3/2010  Responder: WEC
: 24. N Open  Open-NRC Review EICB RAI ML102980066 Item Response is provided in letter LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202
) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.
Please explain how the above meets the intent of the approved
SPM. The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear
Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.
TVA Response to Follow-up NRC Request:
As shown is the listed documents, process related requirements have been deleted from the SRS and S y sRS in Revision 3:
contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System-System Requirements Specification," dated December 2010.   
contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
dated December 2010.   
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
Revised response is included in letter dated 12/22/10 Response is provided in letter
dated 10/25/10.
NNC 11/18/10: SysRS Rev. 2 also contains process
requirements that are more
appropriately incorporated into process documentation. Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
of the proposal in terms of regulatory requirements and the protection of public health and safety." 245  EICB (Carte) 8/3/2010  Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the
NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix
Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.
: 25. N Open  Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10 EICB RAI ML102980066 Item No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010  Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS
platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical
Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 26. N Open  Response is provided in letter
dated 10/25/10
NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain
comparable information.
Open-NRC Review Due 10/22/10
NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.
EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 250  EICB (Carte) 8/8/2010  The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,
SPM Section 6, "Software Configuration Management Plan")
describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc. 
TVA Response to Follow-up NRC Request:
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished. 
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated. 
: b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," (Proprietary),  dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1). 
: 27. N Open  Revised response included in letter dated 12/22/10
Response included in letter dated 10/25/10.
Open-NRC Review Due 12/22/10
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
requirements and the protection of public health and safety." 251  EICB (Carte) 8/8/2010  The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to
be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in Revision 1 of the Licensing Technical Report.
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled: 
"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
TVA Response to Follow-up NRC Request:
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
: 28. N Open  Revised response included in letter dated 12/22/10
Partial response is provided in letter dated 10/25/10 Open-NRC Review Due 12/22/10.
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
requirements and the protection of public health and safety." 252  EICB (Carte) 8/8/2010  The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability Responder: WEC Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.
The following responses are based on WBN Unit 2 Common
: 29. N Open  Response included in letter dated 12/22/10
Read ML091560352 Open-NRC Review Due 12/22/10
Check on this Hilmes  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments analysis has been successfully accomplished. Q PAMS traceability:
Software requirements traceability analysis is described in the following documents:
: 1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA
Contract Compliance Matrix"
: 2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability
Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office)
: 3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)  This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases
("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
(Proprietary), WNA-VR-00283-WBT, Revision 1, dated
November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases
("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
(Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010),  submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-
WBT-P, Revision 3, dated December 2010.
1 contains the non-proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010. analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
of the proposal in terms of regulatory requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
: 30. Y Open  Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10    092  DORL (Poole) 5/20/2010
TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes
This item will close when we are no longer using this document as a communications tool.
: 1. Y Open Open-TVA
Due: SER Issue  Continuous review as items are added 323  EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
: 1. Y Open Response is included in letter
dated 10/29/10
The staff is confused with the response since both units have
reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Unit 1 
Due: 12/22/10
TVA Letter dated 10/29/10  Item
No. 36  281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain
what changes have been made to this FSAR Section.
Responder: Webb Attachment 5 contains the WBN Unit 2 FSAR markup for Section 7.6.8, "Interlocks for RCS Pressure Control During Low Temperature Operation," showing what was changed between Amendments 95 and 96.
TVA Response to Follow-up NRC Request:
The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once si g nals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.
TVA Response to Second Follow-up NRC Request:
The highlighted text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.
7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS wide range temperature channels on RCS loops 1 and 2
: 1. Y Open  Response provided in letter dated 10/29/10
FSAR Amendment 101 did not reflect the changes in 7.6.8 associated with implementation of the DCS. Provide the basis for acceptance to use Foxboro I?A DCS inplace of analog instrumentation and relays.
Open-TVA/Bechtel
Due 11/24/10
Provide the basis for the changes. Look at
Foxboro I/A impact.
EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Enclosure 1 Item No. 16 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the di g ital process control s ystem. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plant's allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for armin g the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated. When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The man ually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.
The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.
318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for  RM-1000 equipment qualification:
(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. Responder: Temples (i) Applicable to WBN Unit 2.
04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000
equipment differences covered in the -1SP report.
The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2
: 2. N Open  Revised response is included in
letter dated 12/22/10.
Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter dated 10/29/10 Open-TVA/Bechtel Due 12/22/10
Response update required. It is clear that 04508903-2SP and -
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF
converter is not clear.
Check page numbers of Appendix F (missing/duplicate pages). Check applicability of RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item  34, and TVA
letter 11/24/10, Att. 2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release
time difference. TVA Response to Follow-up NRC Request:
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19
) is as follows:
: a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
: b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module. 
: c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:
: e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:"  The report is the principle report and the starting point for all
the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists
the major components of the monitor system. 
Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all Appendix C to RM1000 instead of RM2300? See items 336 and 337.
All equipment qualification reports including supplements 2SP and 3SP have
been reviewed as
vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.
Work may proceed." 
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was 
appropriate review guidance used?
Further update required
Provide model number/part number for the RM-1000 and I/F
converter used for
WBN-2. This information is needed to verify that the model or part number used is
the equipment that has been qualified for WBN-
: 2.
Provide qualification reports 04038903-QSR and 04038903-7SP by
the dues date of
1/22/11.
Submit a copy of any other relevant reviewed
versions of the qualification reports. 
Submit copies of the reviewed reports for Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5. 
: f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:"  GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most
cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years. 
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).
Please see Item 1, above, for applicability of the other reports. 
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference  23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.
04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing. 
(6) See item 5.
04508905-QR, 04508905-1SP, 04508905-2SP.
Clarification of applicability of existing reports is acceptable.
338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The  RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).
Responder: Civil EQB Get date from Bob Brown
: 3. N Open Open-TVA/Bechtel Due: 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the  licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. Responder: Bob Brown
: 4. N Open Open-TVA/Bechtel Due: 12/22/10    340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA
The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20), 
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance
with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside
Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010. 
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement 
: c. EN 55022 - Information technology equipment -
Radio disturbance characteristics - Limits and
methods of measurement 
: 5. Y Open Response included in letter
dated 12/22/10.
Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Due:12/22/10    341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.
It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from
: 6. Y Open Open-TVA/Bechtel Will be closed on update of FSAR 3.10 series tables.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.
344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the desi gn is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. The requested information is contained in FSAR Amendment 102 as follows:
7.6.2.1 Description 5 th paragraph: "The motor-operated bypass valves are located in bypass lines paralleling the normal RHR suction isolation valves FCV 74-1 and FCV 74-2 which are in series in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally closed and remain closed with power locked out unless one of the two main isolation valves (FCV 74-1 or FCV 74-2) cannot be opened and the plant must be cooled down."
And:  7.6.6 Spurious Actuation Protection for Motor Operated Valves 7. N Open Open-TVA/Bechtel 345 7.5.2.3 7.5 EICB (Singh) Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86&#xba;F for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but  the rationale for using 86&#xba;F (includes an internal temperature rise of 18&#xba;F) for 40 years has not been justified in the 04508905-QR report or the supplement reports.
TVA to provide the rationale for this acceptance criteria for WBN-2.
: 8. N Open Open-TVA/Bechtel 346 7.5.2.3 7.5 EICB (Singh) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.
: 9. N Open Open-TVA/Bechtel 347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the
EMI/RFI qualification.
: 10. N Open Open-TVA/Bechtel 348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the
EMI/RFI qualification.
: 11. N Open Open-TVA/Bechtel 349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However,  the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE)  (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130&#xba;F due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total In response to aquestion about Common Q PAMS equipment qualification, TVA re-evaluated the Control and Aux Instrument Room TID and concluded it to be less than 1x10 3 RAD. 12. N Open Open-TVA/Bechtel Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the
RRS and the actual test response spectra. The seismic qualification issue is open  till further clarification is received from TVA. 13. N Open Open-TVA/Bechtel 351 7.5.2.3 7.5 EICB (Singh) The replacement schedule for the components that have a qualified life of less than 40 years is noted in Table 6-1 of the supplemental qualification report 04508905-1SP. It is not clear if the components identified for replacement in this report are the only components or if the components which are in addition to the components previously identified in qualification report 04508905-QR. Are there any age sensitive components for the I/F converter used for WBN-2?  (Note:  Report 04508905-2SP does not state an y a g e sensitive components that require replacement during the qualified life). 14. N Open Open-TVA/Bechtel 352 7.5.2.3 7.5 EICB (Singh) Please calrify how many RM-1000 radaition monitors are being procured for WBN-2, is the quantity 2 or four. MR 25402-011-MRA-HARA-00002, R4 under Item 1.6 indicates that the quantit y is 2. If so, is WBN-2 using dual channel indication on each RM-1000 unit. TVA to clarify.
: 15. N Open Open-TVA/Bechtel 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.
Please correct this in a future FSAR amendment.
Update: Please fix symbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton
: 1. Y Open  Figure will be corrected in FSAR Amendment 103. Open-TVA/Licensing RAI not required. N/A RAI not required because the figure is not part of any SE section.
069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010. Responder: WEC                    Date: 5/25/10
: 1. N Open  Awaiting for document to be
docketed by TVA.
Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
N/A  074 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC                  Date: 5/25/10
: 2. N Open  TVA to provide due date.
Open-TVA/WEC Due 2/21/11 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  081 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:  (1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved
: 3. N Open  ML101600092 Item No.1:  There are three sets of regulatory
criteria that relate to a Common Q application (e.g. WBN2 PAMS):
(a) Common Q platform Open-TVA/WEC Due 12/22/10
TVA to provide requested information.
EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11:
See Also Open Item No.
86 and 202.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 
endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
Bechtel to develop a matrix and work with Westinghouse to provide justification.
components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current
regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).
The Common Q SER states:
'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and
conceptual design approach for upgrading an existing PAMS based on Common Q
components (page 58, Section
4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient
information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS
Evaluation")-'
The NRC did not approve the proposed PAMS design. 
Section 6, "References," and
Section 7, "Codes and Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical
Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
603-1991 Clause 5.6.3, "Independence Between Safety
Systems and Other Systems,"
and Clause 6.3, "Interaction Between the Sense and Command Features and Other
Systems," contain application specific requirements that must be addressed by a PAMS system.
Awaiting TVA Response.
086 7.5.2 7.5.1 CB (C ar t 5/6/2010  Responder: WEC                            Date: 5/24/10
: 4. N Open  Open-TVA/WEC EICB RAI ML102910002 TVA Letter dated 6/18/10 NNC 1/6/11:
See Also Open Item No.81
& 202 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example: 
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a
comparison review.
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 TVA to address with item OI
: 81. Due 12/22/10 Item No. 14 202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
TVA Response to Follow-up NRC Request:
WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" (LTR) submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to
address the NRC request:
Section 9, "Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-
1998 and Regulatory Guide 1.172" to show the origin of the requirements has been added.
The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it
appears.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
: 5. N Open Response included in letter dated 12/22/10
Partial Response provided in
letter dated 10/5/10 NNC 1/5/11:
Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.
IEEE 830-1998 has not been formally endorsed by a regulatory guide.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.
In addition, LTR Rev. 2 Section 13 states: "The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1."
Reference 1 is the common Q topical report.
Open-TVA/WEC
to provide information requested.
Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11:
See Also Open Item No.
81 and 86.
335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may Responder: WEC
TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating
: 6. Y Open Partial Response included in letter dated 12/22/10 Open-TVA/WEC
Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable. conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011. Encl 1, Item 28.
Due 12/22/10}}

Revision as of 09:12, 14 August 2018

2011/01/18 Watts Bar 2 OL - FW: 20110107 Open Item List Master TVA Update 01-07-11.docx
ML110400659
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 01/18/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML110400659 (50)


Text

1 WBN2Public Resource From: Poole, Justin Sent: Tuesday, January 18, 2011 4:17 PM To: Garg, Hukam; Darbali, Samir; Carte, Norbert; Singh, Gursharan Cc: WBN2HearingFile Resource

Subject:

FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Attachments:

20110107 Open Item List Master TVA Update 01-07-11.docx FYI JustinC.PooleProjectManagerNRR/DORL/LPWBU.S.NuclearRegulatoryCommission(301)4152048email:Justin.Poole@nrc.gov From: Clark, Mark Steven [1]

Sent: Tuesday, January 18, 2011 3:19 PM To: Crouch, William D Cc: Hilmes, Steven A; Poole, Justin; Knuettel, Edward Terry

Subject:

20110107 Open Item List Master TVA Update 01-07-11.docx Bill:

Please forward the attached update to Justin.

Thanks, Steve Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 250 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7B6471553B)

Subject:

FW: 20110107 Open Item List Master TVA Update 01-07-11.docx Sent Date: 1/18/2011 4:17:18 PM Received Date: 1/18/2011 4:17:23 PM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients: "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Garg, Hukam" <Hukam.Garg@nrc.gov>

Tracking Status: None "Darbali, Samir" <Samir.Darbali@nrc.gov> Tracking Status: None "Carte, Norbert" <Norbert.Carte@nrc.gov> Tracking Status: None "Singh, Gursharan" <Gursharan.Singh@nrc.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov

Files Size Date & Time MESSAGE 693 1/18/2011 4:17:23 PM 20110107 Open Item List Master TVA Update 01-07-11.docx 440542 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides

1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides

2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides

3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb 1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:

LIC-110 Rev.

1 Section 005 7.1.3.1 (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006 (G A mendment 95 of the FSAR

, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2

6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 7

7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3 (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 8

8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 9

9. Y Closed Closed EICB RAI 3/12/10 , 010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847

) documents that the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 10

10. Y Closed Closed EICB RAI 3/12/10 , 011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 11

11. Y Closed Closed EICB RAI ML101680598

, 012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847

) documents that the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 12

12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1 (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 13

13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10

14. Y Closed Closed NRC Meetin g TVA Letter dated 015 (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10
15. Y Closed Closed NRC Meetin g TVA Letter dated 016 (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs

, if an y, for the solid state p rotection Date: 4/27/10

17. Y Closed Closed NRC Meetin g TVA Letter dated 018 (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10
18. Y Closed Closed NRC Meetin g TVA Letter dated 019 (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10
19. Y Closed Closed NRC Meetin g TVA Letter dated 020 (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10
20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

021 7.3 (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10

21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10
22. Y Closed Closed NRC Meetin g TVA Letter dated 023 (GProvide environmental q ualification (10 CFR 50.49

) information for Date: 4/27/10

23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

024 (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a

24. Y Closed Closed NRC Meetin g N/A - Re q uest for NNC 4/30/10:

Carte to address 025 7.5.2 7.5.1 (S i For the containment radiation hi g h radiation monitor

, verif y that the Date: 4/27/10

25. Y Closed Closed NRC Meetin g ML101230248

, 026 (GProvide environmental q ualification (10 CFR 50.49

) information for Date: 4/27/10

26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

027 7.7.1.4 (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10

27. Y Closed Closed NRC Meetin g TVA Letter dated 028 (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
28. Y Closed Closed NRC Meetin g TVA Letter dated 029 (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10
29. Y Closed Closed NRC Meetin g TVA Letter dated 030 (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark
30. Y Closed Closed NRC Meetin g TVA Letter dated 031 (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10
31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032 (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10
32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033 (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10
33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034 (G 2/4/2010 Res ponder: TVA
34. Y Closed Closed N/A TVA Letter dated 034.1 a r g Cha p ter 7.1 - Introduction
35. Y Closed Closed N/A N/A 034.2 (G Cha pter 7.2 - Reactor Tri p S y stem 36. Y Closed Closed N/A N/A 034.3 7.3 7.3 (D a r Cha p ter 7.3 - ESFAS 37. Y Closed Closed N/A N/A 034.4 7.5.1.1 7.5.2 (M a Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y 38. Y Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 r c u Cha p ter 7.6 -

A ll Other S ystems Re quired for Safet y 39. Y Closed Closed N/A N/A Closed 034.6 n g h/ Cha pter 7.7 Control S ystems 40. Y Closed Closed N/A N/A 035 (S i 2/18/2010 Res p onder: Clark

41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1 (C aFebruar y 18 , 2010 Date: 5/25/10
42. Y Closed Closed NRC Meetin g NNC: Unit 2 FSAR Section 7.5.1

, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark Date: 5/25/10

43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark Date: 5/25/10
44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 (G Januar y 13 , 2010 Res p onder: Clark Date: 5/25/10
45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040 (G Januar y 13 , 2010 Res p onder: Clark Date: 5/25/10
46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010: Telecom Date: 5/25/10
47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1 (C aFebruar y 25 , 2010 Date: 5/25/10
48. Y Closed Closed EICB RAI TVA Letter dated 045 (C aFebruar y 25 , 2010 Date: 5/25/10
49. Y Closed Closed EICB RAI TVA Letter dated 046 (C aFebruar y 25 , 2010 Date: 5/25/10
50. Y Closed Closed N/A - Re q uest for N/A 047 7.5.2 7.5.1 (C a 4/8/2010 Res p onder: WEC/Hilmes Date: 5/25/10
51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1 (C a Ap ril 8 , 2010 Date: 5/25/10
52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1 (C a 4/8/2010 Res ponder: WEC Date: 5/25/10
53. Y Closed Closed EICB RAI TVA Letter dated 051 (G Ap ril 15 , 2010 Date: 5/25/10
54. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 5/25/10
55. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 5/25/10
56. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: Slifer/Clark Date: 5/25/10
57. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: Slifer/Clark Date: 5/25/10
58. Y Closed Closed RAI No. 15 TVA Letter dated 056 (S i Ap ril 19 , 2010 Date: 5/25/10
59. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: TVA I&C Staff Date: 5/25/10
60. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5 (S i Ap ril 19 , 2010 Date: 5/25/10
61. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 62. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
63. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: Webb Date: 4/8/2010

67. Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res ponder: WEC Date: 5/25/10

68. Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

69. Y Closed Closed N/A - No q uestion TVA Letter dated 072 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

70. Y Closed Closed N/A - No q uestion N/A 076 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: Clark Date: 5/25/10

71. Y Closed Closed N/A - No q uestion N/A 077 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

72. Y Closed Closed N/A - No q uestion TVA Letter dated 078 (G 4/26/2010 Res p onder: Clark Date: 5/25/10
73. Y Closed Closed EICB RAI TVA Letter dated 079 (G 4/26/2010 Res p onder: Clark Date: 5/25/10
74. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080 (S i 4/26/2010 Res p onder: WEC
75. Y Closed Closed RAI No. 2 TVA Letter dated 083 7.5.2 7.5.1 (C a Ma y 6 , 2010 Date: 6/18/10
76. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1 (C a May 6, 2010 Date: 6/18/10
77. Y Closed Closed EICB RAI TVA Letter dated 087 7.5.2 7.5.1 (S i Ma y 6 , 2010 Date: 5/24/10
78. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1 (S i May 6, 2010 Date: 5/24/10
79. Y Closed Closed RAI No. 21 TVA Letter dated 089 (C a 5/6/2010 Res p onder: Clark
80. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed res p onse states that 090 (C a 5/6/2010 Res p onder: Clark Date: 5/25/10
81. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date: 5/25/10
82. Y Closed Closed EICB RAI No.1 TVA Letter dated 093 (G Ma y 20 , 2010 Date: 5/25/10
83. Y Closed Closed N/A N/A Will be reviewed under item 154 094 (G 5/20/2010 Res p onder: Clark Date: 5/25/10
84. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date: 85. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 86. Y Closed Closed EICB RAI No.3 TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date: 87. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date: 88. Y Closed Closed EICB RAI No.5 TVA Letter dated 099 (B a April 12, 2010 Date: 89. Y Closed Closed Closed to Item 129 100 (C a 5/20/2010 Res p onder: WEC

90. Y Closed Closed N/A - No q uestion N/A 102 (C a Ma y 24 , 2010 Date: 5/24/10
91. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.

103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala Date: 5/27/10

92. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten Date: 5/27/10
93. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105 (G Ap ril 29 , 2010 Date: 94. Y Closed Closed N/A N/A Will be reviewed under item 154.

106 (S i May 6, 2010 Date: 5/25/10

95. Y Closed Closed RAI No. 9 TVA Letter dated 107 (S i May 6, 2010 Date: 5/28/10
96. Y Closed Closed RAI No. 22 TVA Letter dated 108 (G Ma y 6 , 2010 Date: 5/25/10
97. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A
98. Y Closed Closed N/A N/A 109.b (C a 5/6/2010 Res ponder: N/A
99. Y Closed Closed N/A N/A Du plicate of another o p en Item. 110 (G Ma y 6 , 2010 Date: 100. Y Closed Closed N/A N/A Information was found.

111 (C a May 6, 2010 Date: 5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112 (G June 1, 2010 Date: 102. Y Closed Closed N/A N/A Information was received 113 (G 6/1/2010 Res p onder: Clark 103. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2 (G 6/1/2010 Res p onder: WEC 104. Y Close Closed EICB RAI TVA Letter dated 115 (C a 2/25/2010 Res p onder: Clark 105. Y Closed Closed EICB RAI TVA Letter dated 116 (G 6/3/2010 Res p onder: WEC 106. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1 (G 6/3/2010 Res p onder: Hilmes 107. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten 108. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119 (S i June 10 , 2010 Date: 109. Y Closed Closed RAI No. 23 TVA Letter dated 120 (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y 110. Y Closed Closed EICB RAI TVA Letter dated 121 (C a 5/6/2010 Res p onder: Webb/Webber 111. Y Closed Closed EICB RAI TVA Letter dated 122 (C a June 14 , 2010 Date: 112. Y Closed Closed N/A - Re quest for N/A 123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: 113. Y Closed Closed ML101720589

, TVA Letter dated 124 7.7.5 XX (D a r 6/14/2010 Res p onder: 114. Y Closed Closed ML101720589

, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: 115. Y Closed Closed ML101720589

, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date: 116. Y Closed Closed ML101720589

, Item TVA Letter dated 127 7.2 7.2 (G 6/16/2010 Res p onder: WEC/Clar k 117. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2 (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g 118. Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129 (P o 6/12/2010 Res p onder: WEC 119. Y Closed Closed N/A TVA Letter dated 130 (P o 6/28/2010 Res p onder: Clark 120. Y Closed Closed N/A TVA Letter dated 131 (P o 6/28/2010 Res p onder: Clark 121. Y Closed Closed N/A TVA Letter dated 132 (P o 6/28/2010 Res p onder: Clark 122. Y Closed Closed N/A TVA Letter dated 133 (P o 6/28/2010 Res p onder: Clark 123. Y Closed Closed TVA Letter dated 134 (P o 6/28/2010 Res p onder: Clark 124. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark 125. Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark 126. Y Closed Closed RAI not necessar y TVA Letter dated 137 (C aSeveral WBN2 PAMS documents contain a table titled

, "Document Res p onder: WEC 127. Y Closed Closed ML101650255

, Item TVA Letter dated 139 (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC 128. Y Closed Closed ML101650255

, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 141 (C a Deleted b y DORL Date: 129. Y Closed Closed ML101650255

, Item WBN2 PAMS S y stem Re q uirements Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 146 (C a 6/17/2010 Res p onder: 130. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 147 (C a 6/17/2010 Res p onder: 131. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 148 (C a 6/17/2010 Res p onder: 132. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 149 7.2 7.2 (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell 133. Y Close Closed ML101720589

, Item TVA Letter dated 150 7.2 7.2 (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark 134. Y Close Closed ML101720589

, Item TVA Letter dated 151 7.2 7.2 (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark 135. Y Close Closed ML101720589

, Item TVA Letter dated 152 7.2 7.2 (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark 136. Y Close Closed ML101720589

, Item TVA Letter dated 153 7.2 7.2 (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb 137. Y Close Closed ML101720589

, Item TVA Letter dated 154 7.2 7.2 (GFSAR section 7.2.1.1.10

, set p oints: NRC staff has issued RIS Res p onder: Crai g/Webb 138. Y Closed Closed ML101720589

, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2 (G Summar y of FSAR chan ge document section 7.2 states that Date: 139. Y Closed Closed ML101720589

, Item 156 7.2 7.2 (GFSAR section 7.2.2.1.1 states that dashed lines in Fi g ure 15.1-Res p onder: WEC 140. Y Closed Closed ML101720589

, Item TVA Letter dated Res p onse on hold p endin g 157 7.2 7.2 (GFSAR section 7.2.2.1.1

, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell 141. Y Close Closed ML101720589

, Item TVA Letter dated 158 7.2 7.2 (GFSAR section 7.2.2.1.1

, p ara g ra p h six was chan g ed to state that Res ponder: Tindell 142. Y Closed Closed ML101720589

, Item TVA Letter dated 159 7.2 7.2 (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g 143. Y Close Closed ML101720589

, Item TVA Letter dated 160 7.2 7.2 (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell 144. Y Close Closed ML101720589

, Item TVA Letter dated 161 7.2 7.2 (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark 145. Y Closed Closed ML101720589

, Item TVA Letter dated 162 7.2 7.2 (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell 146. Y Closed Closed ML101720589

, Item TVA Letter dated 163 7.2 7.2 (G Deleted b y DORL Date: 147. Y Closed Closed ML101720589

, Item 164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins 148. Y Closed Closed ML101720589

, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2 (GFSAR section 7.2.2.3.2

, last p ara g ra p h of this section has been Res p onder: Clark 149. Y Closed Closed ML101720589

, Item TVA Letter dated 166 7.2 7.2 (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark 150. Y Closed Closed ML101720589

, Item TVA Letter dated 167 7.2 7.2 (GFSAR section 7.2.2.4

, p rovide an anal y sis or reference to cha p ter Res p onder: Clark 151. Y Close Closed ML101720589

, Item TVA Letter dated 168 7.2 7.2 (G FSAR table 7.2-4

, item 9 deleted loss of offsite p ower to station Res p onder: Clark 152. Y Close Closed ML101720589

, Item TVA Letter dated 169 (G 6/18/2010 Res p onder: Clark 153. Y Closed Closed 170 (G 6/17/2010 Res p onder: Clark 154. Y Closed Closed 171 7.2 7.2 (G 6/17/2010 Res p onder: Crai g 155. Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172 (G 6/17/2010 Res p onder: Crai g 156. Y Closed Closed EICB RAI 173 7.1 7.1 (G 6/17/2010 Res p onder: Crai g/Webb/Powers 157. Y Closed Closed EICB RAI 174 (G 6/28/2010 Res p onder: Hilmes/Crai g 158. Y Closed Closed EICB RAI 175 (G June 28 , 2010 Res p onder: 159. Y Closed Closed EICB RAI 176 7.1 7.1 (G 6/28/2010 Res p onder: Crai g/Webb 160. Y Closed Closed EICB RAI 177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 161. Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 162. Y Closed Closed N/A TVA Letter dated RAI not re q uired 179 (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 163. Y Closed Closed N/A - Closed to NA 180 (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC 164. Y Closed Closed N/A - Closed to NA 181 (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 165. Y Closed Closed N/A - Closed to NA 182 (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC 166. Y Closed Closed N/A - Closed to NA 184 (C a 7/15/2010 Res p onder: WEC 167. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark 168. Y Closed Closed EICB RAI No.6 TVA Letter dated 188 (C a B y letter dated June 30

, 2010 , TVA docketed

, "Tennessee Valle y Res p onder: Clark 169. Y Closed Closed ML101970033

, Item TVA Letter dated 189 7.6.7 (S i 7/20/2010 Res p onder: Clark 170. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9 (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133

, Ma y 1981 Res p onder: Clark 171. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

191 7.9 (C aNUREG-0800 Cha p ter 7 , Section 7.9

, "Data Communication Res p onder: Jimmie Perkins 172. Y Closed Closed ML10197016

, Item TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800

) Cha p ter 7 Section Res p onder: Clark 173. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR

, Section 7.5.2

, "Plant Com p uter S y stem ," Res p onder: Clark 174. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1

, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman 175. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 176. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 177. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X O pen Item 197 was never issued.

178. Y Closed Closed 198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5

, Subsection III

, "Review Procedures" states:

Res p onder: Costle y/Norman 179. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3

, "Technical Su pport Center and Res p onder: Costle y/Norman 180. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Res p onder: Clark 181. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11 (C a 7/21/2010 Res p onder: Webb 182. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark 183. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman 184. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205 (G 7/26/2010 Res p onder: Clark 185. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark 186. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207 (C a Jul y 27 , 2010 Date: 187. Y Closed Closed 208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 188. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 189. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 (C a 7/27/2010 Res p onder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214 (C a 7/27/2010 Res p onder: WEC 192. Y Closed Closed EICB RAI TVA Letter dated 215 (P o 7/29/2010 Res p onder: WEC 193. Y Closed Closed 216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217 (G 7/6/2010 Res p onder: Clark 195. Y Close Closed EICB RAI TVA Letter dated 218 (G 7/6/2010 Res p onder: Clark 196. Y Closed Closed EICB RAI TVA Letter dated 219 (G 8/4/2010 Res ponder: TVA Licensin g 197. Y Closed Closed EICB RAI 220 (G 8/4/2010 Res p onder: A y ala 198. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222 (G 8/4/2010 Res p onder: Clark 200. Y Close Closed EICB RAI TVA Letter dated 223 (G 8/4/2010 Res p onder: Clark 201. Y Closed Closed EICB RAI 224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) 202. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225 (G 8/4/2010 Res p onder: Scansen 203. Y Close Closed EICB RAI TVA Letter dated 226 (C a 8/4/2010 Res ponder: TVA Licensin g 204. Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.

227 (G 8/4/2010 Res p onder: Clark 205. Y Close Closed EICB RAI TVA Letter dated 228 (C a 8/4/2010 Res p onder: Clark 206. Y Closed Closed EICB RAI TVA Letter dated 229 (C a 8/4/2010 Res p onder: Clark 207. Y Closed Closed EICB RAI TVA Letter dated 230 (C a 8/4/2010 Res p onder: Webb 208. Y Closed Closed EICB RAI TVA Letter dated 231 (G 8/4/2010 Res p onder: Clark 209. Y Closed Closed EICB RAI TVA Letter dated 232 (S i 8/4/2010 Res p onder: Clark 210. Y Closed Closed RAI No. 5 TVA Letter dated 233 (C a 8/4/2010 Res p onder: Clark 211. Y Closed Closed EICB RAI TVA Letter dated 234 (C a 8/4/2010 Res p onder: 212. Y Closed Closed N/A - Du p licate N/A 235 (G 8/4/2010 Res ponder: TVA Licensin g 213. Y Closed Closed N/A N/A 236 (G 8/4/2010 Res p onder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 237 (C a 8/4/2010 Res p onder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 238 (C a 8/4/2010 Res p onder: Webb/Hilmes 216. Y Closed Closed N/A - Du p licate N/A 239 (C a 8/4/2010 Res p onder: Hilmes 217. Y Closed Closed N/A - Meetin g N/A 240 (G 8/4/2010 Res p onder: Clark 218. Y Close Closed Ml102910008 TVA Letter dated 241 (S i 8/4/2010 Res p onder: Davies 219. Y Closed Closed RAI No. 10 TVA Letter dated 242 (G 8/4/2010 Res p onder: Hilmes 220. Y Close Closed EICB RAI TVA Letter dated 243 (C a 8/3/2010 Res p onder: WEC 221. Y Closed Closed N/A - Closed to N/A 247 (C a 8/8/2010 Res p onder: WEC 222. Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4

, 248 (C a 8/8/2010 Res p onder: WEC 223. Y Closed Closed Res p onse is LIC-101 Rev. 3 A ppendix B Section 4

, 249 (C a 8/8/2010 Res p onder: WEC 224. Y Closed Closed LIC-101 Rev. 3 A ppendix B Section 4

, 253 (C a 8/8/2010 Res p onder: Clark 225. Y Closed Closed TVA Letter dated Related to O pen Item no. 83.

254 (C a 8/10/2010 Res p onder: WEC 226. Y Closed Closed N/A - Re quest to TVA Letter dated 255 (C a 8/10/2010 Res p onder: WEC 227. Y Closed Closed N/A - Re quest to TVA Letter dated 256 (C a 8/10/2010 Res p onder: WEC 228. Y Closed Closed N/A - Re quest to TVA Letter dated 257 (C a 8/10/2010 Res p onder: WEC 229. Y Closed Closed N/A - Re quest to N/A 258 (C a 8/10/2010 Res p onder: WEC 230. Y Closed Closed N/A - Re quest to N/A 259 (C a 8/10/2010 Res p onder: WEC 231. Y Closed Closed N/A - Re quest to TVA Letter dated 260 (C a 8/10/2010 Res p onder: WEC 232. Y Closed Closed N/A - Re quest to N/A 261 (C a 8/10/2010 Res p onder: WEC 233. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262 (C a 8/10/2010 Res p onder: WEC 234. Y Closed Closed N/A - Re quest to N/A 263 (C a 8/11/2010 Res p onder: WEC 235. Y Closed Closed ML101650255

, Item 264 (C a 8/11/2010 Res p onder: WEC 236. Y Closed Closed ML101650255

, Item 265 (C a 8/11/2010 Res p onder: WEC 237. Y Closed Closed ML101650255

, Item 266 (C a 8/11/2010 Res p onder: Webb/Webber 238. Y Closed Closed TVA Letter dated 267 (C a 8/11/2010 Res p onder: WEC 239. Y Closed Closed 268 (C a 8/19/2010 Res p onder: WEC 240. N O p en Closed 269 (P o 8/20/2010 Res p onder: NRC 241. Y Closed Closed N/A N/A 270 (C a 8/23/2010 Res p onder: Clark 242. Y Closed Closed See also O p en Item Nod. 41 & 245.

271 (C a 8/23/2010 Res p onder: WEC 243. Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 244. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 245. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b (S i 8/26/2010 Res p onder: Stockton 246. Y Closed Closed RAI No. 6 TVA Letter dated 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 247. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 275 (S i 8/27/2010 Res p onder: Clark 248. Y Closed Closed Not Re q uired N/A 276 7.6 7.6 (G 8/27/2010 Res p onder: Webb 249. Y Closed Closed EICB RAI TVA Letter dated 277 7.6 7.6.3 (G 8/27/2010 Res p onder: Clark 250. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 251. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 (G 8/27/2010 Res ponder: Mather 252. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 253. Y Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9 (G 8/27/2010 Res ponder: Trelease 254. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark 255. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber 256. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil 257. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber 258. Y Closed Closed EICB RAI No.16 TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton 259. Y Closed Closed ML102390538

, Item Res p onse 288 7.3 (G 9/2/2010 Res p onder: McNeil 260. Y Closed Closed EICB RAI 289 (S i 9/2/2010 Res ponder: Faulkner 261. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 (C a 9/7/2010 Res p onder: Clark 262. Y Closed Closed N/A N/A This item is a du plicate of item 291.

291 7.7 (C a 9/7/2010 Res p onder: Clark 263. Y Closed Closed TVA Letter dated 292 7.2.5 7.2 (G 9/7/2010 Res p onder: Crai g 264. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g 265. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 266. Y Closed Closed ML102390538

, Item Res p onse 295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 267. Y Closed Closed ML102390538

, Item Res p onse 296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 268. Y Closed Closed ML102390538

, Item Res p onse 297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 269. Y Closed Closed ML102390538

, Item Res p onse 298 7.3 XX (D a r 9/9/2010 Res p onder: Clark 270. Y Closed Closed ML102390538

, Item Res p onse 299 (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q 271. Y Closed Closed TVA Letter dated 300 (S i Need Radiation Monitorin g S ystem Descri p tion/Desi g n Criteria Res p onder: Tem p les/Mather 272. Y Closed Closed RAI No. 25 TVA Letter 301 (S i 1.TVA is re q uested to address the conse q uences of software Res ponder: WEC/Davies/Clark 273. Y Closed Closed RAI No. 11 TVA Letter dated Note 1: 302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 274. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 276. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 277. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1 (GFSAR amendment 100

, p a g e 7.1-12 p rovides the definition of Res p onder: Hilmes 278. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1 (G (1) FSAR amendment 100

, Section 7.1

, p a g e 7.1-12 , definition of Res p onder: Hilmes 279. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1 (G (1) FSAR Amendment 100

, Section 7.1

, p a g e 7.1-13 , definition of Res p onder: Hilmes 280. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1. (G (1) FSAR amendment 100

, Pa g e 7.1-14 , Westin g house set p oint Res p onder: Hilmes 281. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (G (1) FSAR amendment 100

, Pa g e 7.1-14 , TVA set p oint Res p onder: Hilmes 282. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1 (G Both Westin ghouse and TVA set p oint methodolo gy do not have Res p onder: Hilmes 283. Y Closed Closed EICB RAI TVA Letter dated 312 7.0 (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton 284. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2

) states that Desi g n Res p onder: A y ala 285. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton 286. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3 (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) 287. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5 (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather 288. Y Closed Closed RAI No. 26 317 7.5.2.3 7.5 (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples 289. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.3 7.5 (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples 290. Y Closed Closed RAI No. 29 TVA Letter dated 320 E I Per Westin g house letter WBT-D-2340

, TENNESSEE VALLEY Res p onder: Clark 291. Y Closed Closed N/A N/A Du plicate of item 156 321 E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark 292. Y Closed Closed N/A N/A Du plicate of OI# 157 322 7.7.1.11 (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark 293. Y Closed Closed 324 (M aPer the NRC reviewer

, the BISI calculation is not re q uired to be 294. Y Closed Closed 325 B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson 295. Y Closed Closed Closed to o p en item ? 326 B (G a TVA uses double-sided methodolo gy for as-found and as-left Res p onder: Webb 296. Y Closed Closed TVA Letter dated 328 7.5.2.3 7.5 (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples 297. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7 (S iSection 7.6.7 of the FSAR (Amendment 100

) states that

, "The Res p onder: Clark 298. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner 299. Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7 (S i A s a follow u p of OI 190

, Staff has reviewed the p ro p rietar y version Res p onder: WEC/Harless/Clark 300. Y Closed Closed RAI No. 8 TVA Letter dated Follow-u p of OI-190.

332 7.5.2.1 7.5.1 (M a 10/26/2010 301. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 333 7.5.2.1 7.5.1 (M a 10/27/2010 302. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 336 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 303. Y Closed Closed 337 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 304. Y Closed Closed 342 7.5.2.3 7.5 (S iPlease confirm that RM-1000 monitors and the associated The RM-1000 containment hi g h ran g e radiation monitors are 305. Y Closed Closed 343 7.5.2.3 7.5 (S iSeismic RRS in the 04508905-QR re p ort Fi gures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 306. Y Closed Closed 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010

Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design

Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or

SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test

Procedure" Responder: WEC

Items (1) and (2) were docketed by TVA letter dated April 8, 2010.

Item (3) will be addressed by Revision 2 of the Licensing

Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10

Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10

For Item 3, Attachment 19 contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

1. N Open Final Response included in letter dated 12/3/10

Partial Response is included in letter dated 10/5/10.

The SysRS and SRS incorporate requirements from

many other documents by reference.

NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there

should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan

requirements of the SPM. Please provide a test plan that implements the requirements of

the SPM. Open-NRC Review

Due: (3) 12/3/10 (4) 12/10/10

TVA to docket information indentified in ISG6. NRC Meeting Summary NRC

Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.

043 7.5.2 7.5.1 EICB (Carte) 2/19/2010

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed. The shortcomings of the firs t three lines in the matrix are:

Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed

and approved.

Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since Responder: WEC Date: 5/25/10

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.

By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.

Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).

By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6

2. N Open Revised response included in

letter dated 12/22/10.

Response is included in letter

dated 10/5/10.

Revised compliance matrix is unacceptable.

NNC 8/12/10:

It is not quite enough to provide all of the

documents requested. There Open-NRC Review

Due 12/1/10 EICB RAI ML102910002

Item No. 2 TVA Letter dated 2/5/10

TVA Letter dated 5/12/10 TVA Letter dated

6/18/10 TVA Letter dated

10/5/10 NNC 8/25/10:

A CQ PAMS ISG6 compliance matrix was docketed on: (1)

February, 5 12010, (2) March 12, 2010,

& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still

waiting for a good compliance evaluation.

NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.

Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.

NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.

Compliance Matrix."

It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.

Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:

(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and

software which includes the RSEDs.

(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The

TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were

addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to

review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it

appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are

commercial grade dedication

reports; this apparent deviation should be justified or explained.

050 7.5.2 7.5.1 EICB (Carte) 4/8/2010 How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?

Responder: WEC Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.

The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.

TVA Revised Response

Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by

submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).

TVA Response to Follow-up NRC Request:

This item is corrected in the revision 3 requirements documents.

3. N Open Revised response included in letter dated 12/22/10.

TVA response is inconsistent (e.g., WNA-DS-01667-WBT

Rev. 1 page 1-1, Section 1.3.1

implies that "SysRS Section

      1. " has requirements. See also SDS4.4.2.1-1 on page 4-32).

Is there a requirement on the shall referenced above??

Response is provided in letter

dated 10/29/10.

TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable NNC 11/18/10:

Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are Open-NRC Review Due12/22/10 Discuss at 11/22 phone call.

This will be corrected in the Revision 3

document due to TVA

12/10/10 EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated

10/29/10 Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Attachment 1 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated November 2010. Attachment 2 contains the non-proprietary

version WNA-DS-01617-WBT-NP, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated December 2010. Attachment 3 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification" (Proprietary),

dated December 6, 2010.

Attachment 4 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated November 2010. Attachment 5 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 6 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification" (Proprietary), dated December 6, 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"

dated November 2010. Attachment 8 contains the non-proprietary version WWNA-SD-00239-WBT-NP, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System" (Proprietary), dated December 8, 2010.

not within numbered requirements sections, for example: (1) Page 2-1, Section 2.3.1 -

See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 067 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September

28, 2010.

Responder: WEC Date: 5/25/10

The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7

), these items are available for audit at the Westinghouse Rockville office.

c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit

4. N Open Response included in letter

dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review

Due 12/3/10

N/A - No question was asked. Item

was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, "Commercial Grade Dedication Process," has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

068 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.

Responder: WEC Date: 5/25/10

The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit

TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see

the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -

Instrumentation and Controls Staff Information Requests," (Reference 5):

a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687

and AI688 Common Q Modules and Supporting Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010

b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 & AI688 Modules for use in Common Q PAMS,"

dated September 10, 2010

5. N Open Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review

Due 12/3/10 N/A - No question was asked. Item

was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following

documents are available for NRC audit at the Westinghouse Rockville office:

a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction"
b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are

available for NRC audit at the Westinghouse Rockville office: a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction"

b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are available for NRC audit at the Westinghouse Rockville office:
a. CDI- 4057, Revision 4, "Commercial Dedication Instruction"
b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter"
c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"
d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 070 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.

Responder: WEC Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.

WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.

The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements

6. N Open Final Response included in letter dated 12/3/10

Partial Response is included in letter dated 10/5/10.

Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by Open-NRC Review Due 12/17/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 TVA Letter dated

8/20/10 TVA Letter dated 10/5/10 NNC 11/23/10: The dues date in this open item does not agree with the due dated in Open Item No. 71.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.

TVA Revised Response:

TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in

letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design

Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.

Attachment 14contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, "Nuclear Automation Watts Bar

Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"

dated November 8, 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.

TVA. NNC 8/25/10:

Requirements Phase SVVR provided by TVA

letter dated 8/20/10.

NNC 11/23/10: The requirements Phase SVVR

provided by TVA on 8/20/10, is

not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.

071 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 2 of the I V&V Report" covering the Design and Implementation phases was July 30, 2010. Responder: WEC Date: 5/25/10 Attachment 16 contains the Westinghouse document "IV&V Summary Report for the Post Accident Monitoring System,"

WNA-VR-00283-WBT, Revision 2, dated November 2010.

Attachment 17 contains the Westinghouse Application for withholding for the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment

19) for the current contract compliance matrix.
7. N Open Response included in letter dated 12/3/10

Awaiting for document to be docketed by TVA.

Open-NRC Review Due 12/10/10 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A NNC 11/23/10: The dues date in this open item does not agree with the due dated in Open Item No. 70.

073 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration

phase was October 29, 2010.

Responder: WEC Date: 5/25/10

WNA-VR-00283-WBT, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," covers the Integration phase. Attachment 10 contains the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-P, Revision 3, dated December 2010. Attachment 11 contains the non-proprietary version "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT, Revision 3, "Nuclear Automation Watts Bar 2 NSSS Completion

8. N Open Response included in letter

dated 12/22/10 Awaiting for document to be

docketed by TVA.

Open-NRC Review

Due 12/22/10 N/A - No question was asked. Item

was opened to track commitment made by applicant.

N/A Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Program I&C Projects, IV &V Summary Report for the Post Accident Monitoring System" (Proprietary), dated December 10, 2010.

075 7.5.2 7.5.1 EICB (Carte)

By letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was

September 30, 2010. Responder: WEC Date: 5/25/10

Attachment 12 contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010.

Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,"Nuclear Automation Watts Bar Unit 2 NSSS Completion Pro g ram I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010. 9. N Open Response included in letter

dated 12/3/10 Awaiting for document to be

docketed by TVA.

Open-NRC Review

Due 12/3/10 N/A - No question was asked. Item

was opened to track commitment made by applicant.

N/A 082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:

2.c - CI527 AF100 Peripheral Component Interconnect (PCI)

interface card

3. - Common Q TC514 AF100 Fiber Optic Modems (Evolutionary Product Maintenance/Improvements) 4.a - PM646A Processor Module 4.b - CI631 AF100 Communication Interface Module 4.e - DO620 Digital Output Card Please provide sufficient detail regarding the changes for the NRC to independently evaluate the acceptability of the changes.

Responder: WEC Date: 6/18/10

These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.

TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.

Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and

references to the evaluation documentation.

TVA Response to Follow-up NRC Request:

Please see the response to Request for Additional Information (RAI) item 3 in letter dated 12/22/10, NRC Matrix Item 067.

10. N Open Revised response included in

letter dated 12/22/10 Regulations require that the NRC review be based on

docketed material. Awaiting for document to be docketed by TVA.

NNC 8/9/10:

per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication

Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public

meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and

associated reports be docketed.

NNC 11/18/10:

During the September 20-21, 2010 audit, TVA agreed to put a description

of the commercial grade

dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

Open-NRC Review

Due 12/3/10

Commercial Grade Dedication to be

addressed in LTR Rev.

2, EICB RAI ML102910002

Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.

41, Item No. 3.

085 7.5.2 7.5.1 CB (C ar t 5/6/2010 Responder: WEC

11. N Open Open-NRC Review EICB RAI ML102910002

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. Is the WEC ISG4 evaluation inadequate?

Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from

propagating to the AC160?

Node loss on the bus? Bus loss?

Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA letter to NRC dated December 3, 2010 (Reference 1), contains the following changes to address the NRC requests:

Section 2.2, "System Description" page 2-3 provides a description of the MTP Fiber-Optic (FO) data link to the plant computer. Section 2.2.1.4, "Hardware" has been expanded to include a table detailing all hardware changes that have occurred since the initial submittal. Section 2.2.2, "Software" has been expanded to include a table detailing all software changes that have occurred since the initial submittal.

Revised response included in letter dated 12/22/10 A response will be provided by

10/31/10 NNC 8/11/10:

Design information should be available

now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux

Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause

5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."

Please describe how the MTP serves as the isolation device.

Due 12/3/10 Hardware is in Rev. 1 of the Licensing

Technical Report due

10/22. NNC 8/25/10:

Disagree with path forward input by TVA above. An explanation is about the design is

needed.

FAT test procedure to include data storm

testing of the MTP

interface NNC 11/18/10:

WEC response states that CQ PAMS LTR Rev. 2 will contain relevant information.

Item No. 13 101 DORL (Poole) 4/12/2010

The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR Responder: Slifer

The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.

12. Y Open Documents provided in letter

dated 07/15/10 Open-NRC Review

Due 10/14/10

Confirm receipt. N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.

138 EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.

(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.

By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."

Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."

Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.

Responder: WEC

This item is used to track all Commercial Grade Dedication issues.

a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:

Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the

13. N Open Revised response included in letter dated 12/22/10

TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing

technical report. (see ML102920031 Item No 1)

TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)

Open-NRC Review

Due 12/3/10 To be addressed by

Rev. 2 of the Licensing

Technical Report.

ML101650255, Item No. 2 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."

(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." Westinghouse Rockville office: (list included in letter)

b. It is TVA's understanding that the submittal of the documents listed in (b.i) and (b.ii) is no longer required.

Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.

TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)

TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial

software components against the generic critical characteristics. (see

ML102920031 Item No 4) 140 EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes." The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97.

What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?

Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg.

Guide 1.97 variables implemented in the Common Q based

WBN Unit 2 PAMS TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" was submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1). Revision 2 contains the following change to address this request: Section 11, "TVA Contract Compliance Matrix" has been added. Specifically the items of concern are addressed by Requirements 7 through 19 (pages 11-1 and 11-2).

14. N Open Revised response included in letter dated 12/22/10

NNC 11/3/10:

The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.

Open-NRC Review Due 12/3/10

TVA to docket PAMS Licensing Technical Report Rev. 2.

ML101650255, Item No. 4 TVA Letter dated 10/29/10 Enclosure 1 Item No. 10 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.

142 EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -

Software Requirements Specifications." IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is traceable of the origin of each of its requirements is clear-"

1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?

Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS).

1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.

TVA Response:

Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:

a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS)

Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1). b. Engineering review/comment/status of each revision of:

15. N Open Response included in letter

dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of

their reusable software element

development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation

of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5)

Open-NRC Review Due 12/22/10

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification

TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Does the same apply to documents referenced by the SRS? Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.

4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these

sources or documents?

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".

These references are used in the body of the SRS, for example:"

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference

12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin? i. WNA-DS-01617-WBT, "Post Accident Monitoring System - System Requirements Specification" ii. WNA-DS-01667-WBT, "Post Accident Monitoring System - System Design Specification" (hardware) iii. WNA-SD-00239-WBT, "Software Requirements Specification for the Post Accident Monitoring System" (software)

2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the Software Requirements Specification (SRS), but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the

requirement there?

TVA Response:

As documented in the RTM, some software

requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that

are unchan g ed across pro j ects. Westin ghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, contain requirements or are all such sections simply considered to be informative?

Does the same apply to documents referenced by the SRS? Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and describe how they were verified.

TVA Response:

Unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly numbered.

It depends on the document type. The statement would be true for requirements documents (such as the

SysRS or SDS) if they were incorporated by reference.

However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements.

The requirements contained in this document are contained within the text of the various sections.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification? Meaning does the SRS

contain, explicitly or by re ference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or

document? If so, what are these sources or documents?

TVA Response:

The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically,

00000-ICE-3238, Revision 5, "Software Requirements Specification Post Accident Monitoring System"

00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display Software"

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various t ypes of "-Reusable Software Element-".

These references are used in the body of the SRS, for example:"

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in

the SRS? If so what is their origin?

TVA Response:

Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System," dated December 2010 (Attachment 10).

RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements." This document can be made available for audit at the Westinghouse Rockville office.

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

6. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

Please see response to letter Item 13 (NRC Matrix Item 145). 7. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

Please see response to letter Item 13 (NRC Matrix Item 145).

8. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A comments column has been added to WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring

System."

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

9. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this

information.

TVA Response:

Westin ghouse has confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

10. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to

remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements have been removed from the SRS.

Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

11. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, "Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172" has been added.

12. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

13. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).

These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

14. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM. Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

15. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 "Manually Initiated Testing," 7.2.23 "Annunciator Test Display," 7.2.25 "Saturation Margin Test Display,"

and 7.2.26 "Analog Output Test Display."

16. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.

TVA Response:

Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE." A review of recent documents for compliance with this comment and Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments commitment was performed with the following results:

a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch." Revision 3 of the SDS is consistent in use of the term

"ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:

i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"

instead of "ENABLE"

c. Revision 3 of the SRS is not consistent in use of the terms "FE keyswitch" and "ENABLE" as noted below: i. Tables 7.2-1 "Train A PAMS Data Transmitted to the Plant Computer" and 7.2-2 "Train B PAMS Data Transmitted to the Plant Computer" items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE

keyswitch.

ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of

"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference

12) is not consistent in use of the term "FE keyswitch" as noted below:
i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.

ii. Table 3-1 describes the switch as the "Functional Enable (FE) switch" and the "FE key-switch"

e. Revision 2 of the Licensing Technical Report is not consistent in use of the term "FE keyswitch" as noted below:
i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page

5-6 (4 places)

The identified discrepancies in the use of the terms "FE

keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

17. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

TVA Response:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please see response to letter item 13 (NRC Matrix Item 145). 18. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10

TVA Response:

The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

19. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."

20. Westinghouse to add the Software Design Descriptions to the RTM

TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

21. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

22. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

23. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior

requirements documents refer to other generic SDDs also listed in Item b.

b. The SDDs developed for this project are:
i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display" ii. WNA-SD-00250-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C

Projects Software Design Description for the Post Accident Monitoring System AC160 Software"

iii. WNA-SD-00277-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details" iv. Other generic SDDs referenced by the PAMS project are:

(a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments System Database and Utility Functions"

c. Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

24. For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if

the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was

acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in

the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 143 EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the

WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"

(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other

software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability

& Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.

A detailed explanation will be provided.

TVA Response:

(a) and (b) The requested information is provided in the following documents:

i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Table 6-1, "Document Requirements" which lists the software

documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December

2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010

16. N Open Response included in letter

dated 12/22/10 Open-NRC Review Due 12/22/10

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification

TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments document is to define the hardware design requirements -"

(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13) 144 EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).

(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems").

(b) Please describe the flow of information between these three documents.

(c) Does the PAMS SRS implement the requirements in these three documents?

(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.

(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.

Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design

and implementation, and hardware design and implementation for Common Q safety system development.

This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application

development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.

(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document

17. N Open Revised response included in letter dated 12/22/10

Response provided in letter

dated 10/5/10 NRC Review and WEC to

complete response.

b-d to be addressed at public meeting and audit. Will require information to be docketed.

Open-NRC Review Due 12/3/10

Responses to items a

and e provided.

NNC 11/18/10:

(1) Items b-d closed to other Open Item nos.

(2) The point of these questions was to understand how the

origin of the

requirements in the requirements specifications were

documented. TVA

stated that the origin of the requirements would be demonstrated in

Rev. 2 of the CQ PAMS LTR. ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1,

""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.

145 EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.

(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?

(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.

This item is used to track all traceability issues with the System Design Specification (SDS).

At the September 15 public meeting in Rockville, the following Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.

(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).

(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).

(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing

18. N Open Response included in letter

dated 12/22/10

During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:

TVA would provide the RSED RTM. (see ML102920031 Item No 6) Open-NRC Review Due 12/22/10

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.

ML101650255, Item No. 9 WBN2 PAMS System Design Specification

TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December

2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next

revision of the SDS.

3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the

revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.

4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a

good write up of how the process works.

Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).

(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System,"

submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.

(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.

The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.

(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.

(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference Error! Reference source not found.

). (9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.

Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 (Reference 18)

TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see

ML102920031 Item No 7)

TVA would revise and resubmit

the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements

phase review. (see ML102920031 Item No 8) 183 EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS

must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document" referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?

Responder: WEC The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.

TVA Response to Follow-up NRC Request:

Please see the response to RAI item 12 in letter dated 12/222/10, NRC Matrix Item 144.

19. Y Open Revised response included in

letter dated 12/22/10.

Response provided in letter

dated 10/21/10 Open-NRC Review Due 12/3/10

NNC 11/18/10: The point behind this open item was that TVA must

demonstrate that the

origin of each requirement in the WEC requirements specification is known

and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1 Item

No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments If there are additional changes, what is their origin?

185 EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the

unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable

backwards to the system requirements and the design bases or

regulatory requirements that is satisfies" Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".

These references are used in the body of the SRS, for example:"

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin? Responder: WEC Steve Clark to look at how to combine traceability items.

Was addressed to during the 9/15 meeting and 9/20 - 9/21

audit. TVA Response to Follow-up NRC Request:

(1) Please see the response to Item 12 in this letter (NRC Matrix Item 144).

(2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 "Document Requirements" of WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office.

20. N Open Response included in letter dated 12/22/10.

Open-NRC Review Due (1) 12/3/10 (2) 12/22/10

NNC 11/18/10

(1)The point behind this open item was that TVA must

demonstrate that the

origin of each requirement in the WEC requirements specification is known

and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item No. 17 187 EICB (Carte)

By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.

1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division.

If so, NRC staff will need these paths identified on the docket. Responder: Merten

1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
2) This is a duplicate of closed RAI Matrix Item 45.

TVA Response to Follow-up NRC Request:

A review of the following documents determined that the connection between the OM and the plant computer has been changed to a connection to a printer:

1. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification," dated November 2010 (Attachment 1)
2. WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification,"

dated November 2010 (Attachment 4)

21. N Open Revised response included in letter dated 12/22/10.

Partial Response provided in

letter dated 10/5/10

NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS? Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?

Open-NRC Review

Due 12/22/10 Revise Response

ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

3. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference 1)

Review of the newly released Common Q PAMS documents listed below confirmed the y correctl y show a connection from the OM to a printer and not the plant computer. None of the other newly released documents contain a figure of the Common Q PAMS system showing the connection from the OM. The exception is WCAP-17351 which was created to allow a non-proprietary version of a generic Common Q document to be submitted on the docket and was not intended to reflect the WBN Unit 2 configuration.

Note: The OM printer connection is only used for maintenance. A printer is not normally connected to the OM. To use the OM printer connection, the FE keyswitch must installed and be in the "ENABLE" position.

(1) WNA-TP-02988-WBT, Revision 0, "Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010, submitted in TVA to NRC letter December 3, 2010 (Reference

1) (2) WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA to NRC letter November 5, 2010 (Reference 12) 212 7.5.2 EICB (Carte) 7/27/2010

By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification

contain information to address the "Design Report on Computer

Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

Responder: WEC

Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.

WEC to provide the information and determine where the information will be located.

1. IEEE-603 1991 5.5 System Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "Contract Compliance Matrix" items:

87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI

22. N Open Response included in letter dated 12/22/10.

Open-NRC Review

Due 12/22/10 To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item

No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closel y as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987 [3]. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items: 179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation.

This may be accomplished in various ways; for example: (1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident period: (1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:

10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics

2. IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

- Design for computer integrity

- Design for test and calibration

- Fault detection and self-diagnostics 5.5.1 Design for computer integrity

The computer shall be designed to perform its safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system

preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being

inhibited from performing its function.

TVA Response: Common Q PAMS system reliability and failure modes are described in:

WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System" WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix"

item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data.

V&V, configuration management, and QA shall be required when the test and calibration function is inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing

Technical Report" Section 11 "TVA Contract

Compliance Matrix" items:

202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system.

Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

- Memory functionality and integrity tests (e.g., PROM checksum and RAM tests)

- Computer system instruction set (e.g., calculation tests) - Computer peripheral hardware tests (e.g., watchdog timers and keyboards)

- Computer architecture support hardware (e.g., address lines and shared memory interfaces)

- Communication link diagnostics (e.g., CRC checks) Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments When self-diagnostics are applied, the following self-diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:

107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 (Reference 14) 213 7.5.2 EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation. For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?

Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.

Attachment 1 contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.

23. N Open Response is included in letter dated 10/25/10

NNC to review and revise this question after LTR R2 is received.

Open-NRC Review Due 12/31/10.

EICB RAI ML102980066 Item No. 18 244 CB (C ar t 8/3/2010 Responder: WEC

24. N Open Open-NRC Review EICB RAI ML102980066 Item Response is provided in letter LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.

Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202

) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved

SPM. The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).

Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear

Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.

TVA Response to Follow-up NRC Request:

As shown is the listed documents, process related requirements have been deleted from the SRS and S y sRS in Revision 3:

contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System-System Requirements Specification," dated December 2010.

contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"

dated December 2010.

Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

Revised response is included in letter dated 12/22/10 Response is provided in letter

dated 10/25/10.

NNC 11/18/10: SysRS Rev. 2 also contains process

requirements that are more

appropriately incorporated into process documentation. Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must be docketed correspondence." LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory requirements and the protection of public health and safety." 245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the

NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).

Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix

Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.

25. N Open Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10 EICB RAI ML102980066 Item No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety." 246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.

Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS

platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.

of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical

Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 26. N Open Response is provided in letter

dated 10/25/10

NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain

comparable information.

Open-NRC Review Due 10/22/10

NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.

EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must

be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory

requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,

SPM Section 6, "Software Configuration Management Plan")

describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.

Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.

Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.

TVA Response to Follow-up NRC Request:

The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.

1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," (Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
27. N Open Revised response included in letter dated 12/22/10

Response included in letter dated 10/25/10.

Open-NRC Review Due 12/22/10

10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory

requirements and the protection of public health and safety." 251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to

be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.

Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.

Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:

"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"

TVA Response to Follow-up NRC Request:

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

28. N Open Revised response included in letter dated 12/22/10

Partial response is provided in letter dated 10/25/10 Open-NRC Review Due 12/22/10.

10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory

requirements and the protection of public health and safety." 252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability Responder: WEC Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.

The following responses are based on WBN Unit 2 Common

29. N Open Response included in letter dated 12/22/10

Read ML091560352 Open-NRC Review Due 12/22/10

Check on this Hilmes LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments analysis has been successfully accomplished. Q PAMS traceability:

Software requirements traceability analysis is described in the following documents:

1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA

Contract Compliance Matrix"

2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability

Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office)

3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases

("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"

(Proprietary), WNA-VR-00283-WBT, Revision 1, dated

November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases

("Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"

(Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-

WBT-P, Revision 3, dated December 2010.

1 contains the non-proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT-P, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010. analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 327 DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.

Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

30. Y Open Response Included in letter dated 11/24/10 Open-NRC Review Due 11/24/10 092 DORL (Poole) 5/20/2010

TVA to review Licensee Open Item list and determine which items are proprietary.

Responder: Hilmes

This item will close when we are no longer using this document as a communications tool.

1. Y Open Open-TVA

Due: SER Issue Continuous review as items are added 323 EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted

to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.

1. Y Open Response is included in letter

dated 10/29/10

The staff is confused with the response since both units have

reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA Unit 1

Due: 12/22/10

TVA Letter dated 10/29/10 Item

No. 36 281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain

what changes have been made to this FSAR Section.

Responder: Webb Attachment 5 contains the WBN Unit 2 FSAR markup for Section 7.6.8, "Interlocks for RCS Pressure Control During Low Temperature Operation," showing what was changed between Amendments 95 and 96.

TVA Response to Follow-up NRC Request:

The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once si g nals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.

TVA Response to Second Follow-up NRC Request:

The highlighted text from FSAR Amendment 101 Section 7.6.8 reflects the installation of the Foxboro DCS.

7.6.8 Text from FSAR Amendment 101 The wide range temperature signals, as inputs to the Protection Sets I and II, continuously monitor RCS temperature conditions. In Protection Set I, the existing RCS wide range temperature channels on RCS loops 1 and 2

1. Y Open Response provided in letter dated 10/29/10

FSAR Amendment 101 did not reflect the changes in 7.6.8 associated with implementation of the DCS. Provide the basis for acceptance to use Foxboro I?A DCS inplace of analog instrumentation and relays.

Open-TVA/Bechtel

Due 11/24/10

Provide the basis for the changes. Look at

Foxboro I/A impact.

EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Enclosure 1 Item No. 16 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments provide inputs to the Eagle 21 digital process protection system. Eagle 21 provides isolated analog signals to the di g ital process control s ystem. An auctioneer function selects the lowest temperature signal which is then used to calculate an acceptable reference pressure limit (PORV setpoint) considering the plant's allowable pressure and temperature Protection Set III. The calculated reference pressure is compared to the actual RCS pressure monitored by the wide range pressure channel. The auctioneered temperature signal will annunciate a main control room (MCR) alarm whenever the measured temperature approaches, within a predetermined amount, the reference temperature for armin g the system. Similarly, whenever the measured pressure approaches within a predetermined amount of the programmed setpoint, another MCR alarm will be generated. When the measured RCS pressure is equal to or above the programmed setpoint (nominal values), a PORV open signal is initiated and a MCR alarm is actuated. A manually armed permissive allows this actuation signal to control the Train A PORV (PCV-68-340A). The man ually armed permissive also serves to block a spurious PORV opening due to potential instrument failure whenever the RCS temperature is above the arming reference temperature.

The monitored generating station variables that generate the actuation signal for the Train B PORV (PCV-68-334) are processed in a similar manner. The RCS loops 3 and 4 wide range temperature signals and the RCS pressure signal are provided from Protection Set II. Therefore, the generating station variables used for the Train B PORV are derived from a protection set that is independent of the sets from which generating station variables used for the Train A PORV are derived. The wide range temperature auctioneer function and the programmed pressure setpoint calculation for the Train B PORV are performed in a different group of the digital process control system than those for the Train A PORV. Each of these control groups has a fault tolerant, redundant processor pair and redundant power supplies with different power sources.

318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for RM-1000 equipment qualification:

(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)

Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.

Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. Responder: Temples (i) Applicable to WBN Unit 2.

04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000

equipment differences covered in the -1SP report.

The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.

(ii) Applicable to WBN Unit 2. (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2

2. N Open Revised response is included in

letter dated 12/22/10.

Note check 04508905-1QR or QR. Staff version is QR only.

Response is included in letter dated 10/29/10 Open-TVA/Bechtel Due 12/22/10

Response update required. It is clear that 04508903-2SP and -

3SP are not applicable.

The response for applicability of 04508905-QR and -

1SP to RM-1000 and IF

converter is not clear.

Check page numbers of Appendix F (missing/duplicate pages). Check applicability of RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10, Encl 1 Item 34, and TVA

letter 11/24/10, Att. 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release

time difference. TVA Response to Follow-up NRC Request:

NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).

(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19

) is as follows:

a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module.
c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.

GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are:

e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:" The report is the principle report and the starting point for all

the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists

the major components of the monitor system.

Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all Appendix C to RM1000 instead of RM2300? See items 336 and 337.

All equipment qualification reports including supplements 2SP and 3SP have

been reviewed as

vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.

Work may proceed."

The applicable reports should have been reviewed prior to dispositioning them.

Please explain the apparent lack of review of WBN-2 applicable documents. Was

appropriate review guidance used?

Further update required

Provide model number/part number for the RM-1000 and I/F

converter used for

WBN-2. This information is needed to verify that the model or part number used is

the equipment that has been qualified for WBN-

2.

Provide qualification reports 04038903-QSR and 04038903-7SP by

the dues date of

1/22/11.

Submit a copy of any other relevant reviewed

versions of the qualification reports.

Submit copies of the reviewed reports for Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.

f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:" GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most

cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than 40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been erroneously marked as having not been reviewed.

04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.

(6) See item 5.

04508905-QR, 04508905-1SP, 04508905-2SP.

Clarification of applicability of existing reports is acceptable.

338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Responder: Civil EQB Get date from Bob Brown

3. N Open Open-TVA/Bechtel Due: 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. Responder: Bob Brown

4. N Open Open-TVA/Bechtel Due: 12/22/10 340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA

The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance

with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside

Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
c. EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and

methods of measurement

5. Y Open Response included in letter

dated 12/22/10.

Open-TVA/Bechtel Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.

Due:12/22/10 341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.

It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from

6. Y Open Open-TVA/Bechtel Will be closed on update of FSAR 3.10 series tables.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in a future FSAR amendment.

344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the desi gn is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. The requested information is contained in FSAR Amendment 102 as follows:

7.6.2.1 Description 5 th paragraph: "The motor-operated bypass valves are located in bypass lines paralleling the normal RHR suction isolation valves FCV 74-1 and FCV 74-2 which are in series in the flowpath. Valves FCV 74-8 and FCV 74-9 are normally closed and remain closed with power locked out unless one of the two main isolation valves (FCV 74-1 or FCV 74-2) cannot be opened and the plant must be cooled down."

And: 7.6.6 Spurious Actuation Protection for Motor Operated Valves 7. N Open Open-TVA/Bechtel 345 7.5.2.3 7.5 EICB (Singh) Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86ºF for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the rationale for using 86ºF (includes an internal temperature rise of 18ºF) for 40 years has not been justified in the 04508905-QR report or the supplement reports.

TVA to provide the rationale for this acceptance criteria for WBN-2.

8. N Open Open-TVA/Bechtel 346 7.5.2.3 7.5 EICB (Singh) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 specific test results report. Please identify and provide the appropriate test results reports to complete the review.
9. N Open Open-TVA/Bechtel 347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the

EMI/RFI qualification.

10. N Open Open-TVA/Bechtel 348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the

EMI/RFI qualification.

11. N Open Open-TVA/Bechtel 349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total In response to aquestion about Common Q PAMS equipment qualification, TVA re-evaluated the Control and Aux Instrument Room TID and concluded it to be less than 1x10 3 RAD. 12. N Open Open-TVA/Bechtel Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for WBN-2. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the

RRS and the actual test response spectra. The seismic qualification issue is open till further clarification is received from TVA. 13. N Open Open-TVA/Bechtel 351 7.5.2.3 7.5 EICB (Singh) The replacement schedule for the components that have a qualified life of less than 40 years is noted in Table 6-1 of the supplemental qualification report 04508905-1SP. It is not clear if the components identified for replacement in this report are the only components or if the components which are in addition to the components previously identified in qualification report 04508905-QR. Are there any age sensitive components for the I/F converter used for WBN-2? (Note: Report 04508905-2SP does not state an y a g e sensitive components that require replacement during the qualified life). 14. N Open Open-TVA/Bechtel 352 7.5.2.3 7.5 EICB (Singh) Please calrify how many RM-1000 radaition monitors are being procured for WBN-2, is the quantity 2 or four. MR 25402-011-MRA-HARA-00002, R4 under Item 1.6 indicates that the quantit y is 2. If so, is WBN-2 using dual channel indication on each RM-1000 unit. TVA to clarify.

15. N Open Open-TVA/Bechtel 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.

Please correct this in a future FSAR amendment.

Update: Please fix symbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton

1. Y Open Figure will be corrected in FSAR Amendment 103. Open-TVA/Licensing RAI not required. N/A RAI not required because the figure is not part of any SE section.

069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010. Responder: WEC Date: 5/25/10

1. N Open Awaiting for document to be

docketed by TVA.

Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

N/A 074 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC Date: 5/25/10

2. N Open TVA to provide due date.

Open-TVA/WEC Due 2/21/11 N/A - No question was asked. Item was opened to track commitment made by applicant.

N/A 081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.

0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example: (1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 Responder: Merten/WEC The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved

3. N Open ML101600092 Item No.1: There are three sets of regulatory

criteria that relate to a Common Q application (e.g. WBN2 PAMS):

(a) Common Q platform Open-TVA/WEC Due 12/22/10

TVA to provide requested information.

EICB RAI ML102910002 Item No. 9 TVA Letter dated 6/18/10 NNC 1/5/11:

See Also Open Item No.

86 and 202.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984

endorses 323-1974)

However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Bechtel to develop a matrix and work with Westinghouse to provide justification.

components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current

regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b).

The Common Q SER states:

'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and

conceptual design approach for upgrading an existing PAMS based on Common Q

components (page 58, Section

4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient

information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS

Evaluation")-'

The NRC did not approve the proposed PAMS design.

Section 6, "References," and

Section 7, "Codes and Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical

Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std. 603-1991 Clause 5.6.3, "Independence Between Safety

Systems and Other Systems,"

and Clause 6.3, "Interaction Between the Sense and Command Features and Other

Systems," contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

086 7.5.2 7.5.1 CB (C ar t 5/6/2010 Responder: WEC Date: 5/24/10

4. N Open Open-TVA/WEC EICB RAI ML102910002 TVA Letter dated 6/18/10 NNC 1/6/11:

See Also Open Item No.81

& 202 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review," states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a

comparison review.

Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 TVA to address with item OI

81. Due 12/22/10 Item No. 14 202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.

Rev. 2 of the Licensing Technical Report will include the applicability of guidance.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" (LTR) submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to

address the NRC request:

Section 9, "Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-

1998 and Regulatory Guide 1.172" to show the origin of the requirements has been added.

The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it

appears.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

5. N Open Response included in letter dated 12/22/10

Partial Response provided in

letter dated 10/5/10 NNC 1/5/11:

Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.

LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.

IEEE 830-1998 has not been formally endorsed by a regulatory guide.

(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.

Yes ISG-4 is one new criteria, and an evaluation against it has been provided.

In addition, LTR Rev. 2 Section 13 states: "The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1."

Reference 1 is the common Q topical report.

Open-TVA/WEC

to provide information requested.

Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11:

See Also Open Item No.

81 and 86.

335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.

Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may Responder: WEC

TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating

6. Y Open Partial Response included in letter dated 12/22/10 Open-TVA/WEC

Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad94FD7.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable. conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled and will be submitted by March 11, 2011. Encl 1, Item 28.

Due 12/22/10