| {{#Wiki_filter:From:Wilkins, LynneaTo:"McCutchen, Edward L." | | {{#Wiki_filter:From:Wilkins, Lynnea To:"McCutchen, Edward L." |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Acceptance of Cooper LAR to Adopt NFPA-805 (ME8551)Date:Wednesday, July 25, 2012 10:59:00 AMEd, By letter dated April 25, 2012 (Agencywide Documents Access and Management System(ADAMS) Accession No. ML121220216), as supplemented by a letter dated July 12, 2012,(ADAMS Accession No. ML12202A042) Nebraska Public Power District (NPPD, thelicensee) submitted a license amendment request for Cooper Nuclear Station (Cooper).The proposed amendment request would adopt National Fire Protection Association(NFPA) Standard NFPA-805, a performance-based standard for fire protection for lightwater reactor electric generating plants, as part of its transition to compliance with Title 10of the Code of Federal Regulations Part 50.48(c). | | Acceptance of Cooper LAR to Adopt NFPA-805 (ME8551) |
| The purpose of this message is to provide the results of the U.S. Nuclear RegulatoryCommission (NRC) staff's acceptance review of this amendment request. The acceptancereview was performed to determine if there is sufficient technical information in scope anddepth to allow the NRC staff to complete its detailed technical review. The acceptancereview is also intended to identify whether the application has any readily apparentinformation insufficiencies in its characterization of the regulatory requirements or thelicensing basis of the plant. | | Date:Wednesday, July 25, 2012 10:59:00 AM Ed, By letter dated April 25, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121220216), as supplemented by a letter dated July 12, 2012, (ADAMS Accession No. ML12202A042) |
| Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), anamendment to the license (including the technical specifications) must fully describe thechanges requested, and following as far as applicable, the form prescribed for originalapplications. Section 50.34 of 10 CFR addresses the content of technical informationrequired. This section stipulates that the submittal address the design and operatingcharacteristics, unusual or novel design features, and principal safety considerations. | | Nebraska Public Power District (NPPD, the licensee) submitted a license amendment request for Cooper Nuclear Station (Cooper).The proposed amendment request would adopt National Fire Protection Association (NFPA) Standard NFPA-805, a performance-based standard for fire protection for light water reactor electric generating plants, as part of its transition to compliance with Title 10 of the Code of Federal Regulations Part 50.48(c). |
| The NRC staff has reviewed your application, as supplemented, and concluded that itdoes provide technical information in sufficient detail to enable the NRC staff to completeits detailed technical review and make an independent assessment regarding theacceptability of the proposed amendment in terms of regulatory requirements and theprotection of public health and safety and the environment. If additional information isneeded for the staff to complete its technical review, you will be advised by separatecorrespondence.
| | The purpose of this message is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. |
| | Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. |
|
| |
|
| If you have any questions, please contact me at (301) 415-1377. Lynnea Wilkins, Project ManagerFort Calhoun Station, Unit 1Cooper Nuclear StationPlant Licensing Branch IV Division of Operating Reactor LicensingOffice of Nuclear Reactor RegulationUS Nuclear Regulatory Commission Phone: 301-415-1377 1 As of the date of issuance of this acceptance review, the supplemental letter datedDecember 22, 2011, had not yet been added to ADAMS. | | The NRC staff has reviewed your application, as supplemented, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. |
| }} | | If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. |
| | |
| | If you have any questions, please contact me at (301) 415-1377. Lynnea Wilkins, Project ManagerFort Calhoun Station, Unit 1Cooper Nuclear StationPlant Licensing Branch IV Division of Operating Reactor LicensingOffice of Nuclear Reactor RegulationUS Nuclear Regulatory Commission Phone: 301-415-1377 1 As of the date of issuance of this acceptance review, the supplemental letter dated December 22, 2011, had not yet been added to ADAMS.}} |
Letter Sequence Acceptance Review |
---|
TAC:ME8551, Control Room Habitability (Approved, Closed) |
|
MONTHYEARNLS2012006, Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c)2012-04-24024 April 2012 Nebraska Public Power District - Cooper Nuclear Station, License Amendment Request to Revise the Fire Protection Licensing Basis to NFPA 805 Per 10 CFR 50.48(c) Project stage: Request ML1211800892012-05-22022 May 2012 National Fire Protection Association (NFPA) Standard NFPA 805, License Amendment Request - Online Reference Portal Project stage: Other ML1217400472012-06-21021 June 2012 Email, Request for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Acceptance Review ML1217400512012-06-21021 June 2012 List of Questions for Supplement to Complete Acceptance Review, License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Acceptance Review NLS2012068, Response to Acceptance Review of Cooper Nuclear Station License Amendment Request to Adopt NFPA-8052012-07-12012 July 2012 Response to Acceptance Review of Cooper Nuclear Station License Amendment Request to Adopt NFPA-805 Project stage: Request ML12207A4842012-07-25025 July 2012 Acceptance Review Email Following Supplement, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Acceptance Review ML12283A4002012-10-0909 October 2012 Email, Draft Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Draft RAI ML12312A2812012-11-14014 November 2012 Request for Additional Information, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: RAI ML13039A0812013-02-0707 February 2013 Email Conference Call Attendees for 2/7/2013 Phone Conference Regarding Rais, Request to Adopt National Fire Protection Agency (NFPA)-805 Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: RAI NLS2013032, 120-Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052013-03-13013 March 2013 120-Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML13319B2202013-11-14014 November 2013 NRR E-mail Capture - Cooper Nuclear Station: Round 2 RAIs NFPA-805 LAR (ME8551) Project stage: RAI NLS2013104, Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Cooper Nuclear Station2013-12-12012 December 2013 Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Cooper Nuclear Station Project stage: Response to RAI NLS2014001, Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052014-01-17017 January 2014 Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Response to RAI ML14034A0502014-02-0606 February 2014 Summary of Audit Conducted 1/28-29/2014, License Amendment Request to Adopt National Fire Protection Agency (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Other NLS2014015, Supplement to 60-Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 8052014-02-18018 February 2014 Supplement to 60-Day Response to Request for Additional Information Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 Project stage: Supplement ML14077A0202014-03-17017 March 2014 Final Cooper Section 3 4 Fpra Record-of-Review 03-17-2014 Project stage: Request ML14104A8722014-03-27027 March 2014 NRR E-mail Capture - Request for NFPA 805 License Amendment Facutrual Accuracy Review Project stage: Acceptance Review ML14077A0192014-03-28028 March 2014 Final Cooper Section 3 4 IE PRA Record-of-Review 03-13-2014 Project stage: Request NLS2014031, Revisions to NFPA 805 License Amendment Request and Response to a Request for Additional Information2014-04-11011 April 2014 Revisions to NFPA 805 License Amendment Request and Response to a Request for Additional Information Project stage: Response to RAI ML14055A0232014-04-29029 April 2014 Issuance of Amendment No. 248, Adopt National Fire Protection Association (NFPA) 805, Performance-Based Standard for Fire Protection for LWR Electric Generating Plants Project stage: Approval 2013-02-07
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24157A0122024-06-0404 June 2024 NRR E-mail Capture - Cooper - Acceptance Review - License Amendment Request (LAR) to Revise TS Table 3.3.2.1-1 Minimum Critical Power Ratio (MCPR) ML24094A2462024-04-0303 April 2024 NRR E-mail Capture - Cooper Nuclear Station - RAI Emergency LAR Turbine Stop Valve Limit Switch TS 3.3.1.1 ML24081A0372024-03-21021 March 2024 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR to Modify Allowable Value for HPCI Low Flow ML24124A0592024-02-22022 February 2024 May 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24032A2382024-02-0101 February 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML24010A1172024-01-10010 January 2024 NRR E-mail Capture - Cooper Nuclear Station - LAR Dfo Tank Inspection RAI Issuance ML23352A2472023-12-18018 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Drywell Head Inspection RAI Issuance ML23339A0892023-12-0505 December 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of CLIIP LAR to Adopt TSTF-374 ML23318A5252023-11-0909 November 2023 NRR E-mail Capture - Cooper Nuclear Station - Relief Request RC3-02 Audit Agenda and Questions ML23257A2192023-09-14014 September 2023 NRR E-mail Capture - Cooper - Final RAI LAR to Adopt TSTF-551, Revision 3 ML23207A1742023-07-26026 July 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RC3-02 Drywell Head Bolting ISI ML23153A1062023-06-0202 June 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-551 ML23150A2492023-05-26026 May 2023 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-580 ML22192A0502022-07-0808 July 2022 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-554 ML22228A2572022-05-12012 May 2022 11 CNS-2022-06 Public Documents ML22055B1512022-02-22022 February 2022 CNS EP Exercise Inspection May 2022 RFI ML22010A2632022-01-10010 January 2022 NRR E-mail Capture - Cooper - Final RAI Relief Request RR5-01 Revision 1 ML21321A3742021-11-10010 November 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RI5-02 Revision 3 ML21258A2632021-09-15015 September 2021 NRR E-mail Capture - Cooper - Final RAI Alternative Request RS-01 ML21253A0312021-09-0909 September 2021 Email 9-9-2021 - Request for Information - In-Office Inspection of Recent Cooper E-Plan Changes ML21232A2102021-08-20020 August 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request Exception to Primary Containment Leakage Rate Program Requirement ML21203A3072021-07-21021 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RI5-02 Revision 3 ML21202A1372021-07-20020 July 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Request RR5-01 Revision 1 ML21165A0062021-06-11011 June 2021 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-582 ML21109A2222021-04-15015 April 2021 Email with RFI Document for CNS PIR 2021012 ML21089A1682021-03-30030 March 2021 Email 3-30-2021-RFI for CNS EP Exercise Inspection (Week of 5-24-2021) ML20315A3922020-11-10010 November 2020 Email 11-10-2020 - Cooper EP Prog Insp RFI ML20260H4812020-09-0909 September 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Request to Use a Provision of a Later Edition of the ASME B&PV Code Section XI, Relief Request RR5-04 (L-2020-LLR-0123) ML20203M3692020-07-21021 July 2020 NRR E-mail Capture - Cooper - Final RAI License Amendment Request for Approval of EAL Scheme Change (EPID L-LLA-2020-0028) ML20175A5692020-06-22022 June 2020 (6-22-20 FEMA Hq Email) Cooper EP Biennial Exercise Exemption Request ML20139A0222020-05-15015 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-529 ML20126G4242020-05-0505 May 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-566, ML20098G0872020-04-0707 April 2020 CNS Req RFI for NRC In-Office Inspection of Eplan EAL Changes ML20071G3522020-03-11011 March 2020 NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action LAR to Adopt EAL Scheme Pursuant to NEI 99-01, Rev. 6 ML19269C1662019-09-26026 September 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of LAR for Exception from Certain Leak Testing Interval Requirements of the Primary Containment Leakage Rate Testing Program (L-2019-LLA-0179) ML19218A3732019-08-0505 August 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of Relief Requests RP5-02 and RI5-02 Rev. 2 (EPID Nos. L-2019-LLR-0063 and -0064) ML19200A0442019-07-19019 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-564, Revision 2 ML19210D4342019-07-11011 July 2019 Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 ML19190A3042019-07-0808 July 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-447, Revision 1 ML19190A0432019-06-28028 June 2019 Discusses Proprietary Information for Curtiss-Wright SAS - 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19256D3372019-06-21021 June 2019 (050-00298) MC&A Wishlist 2019-405 ML19190A0442019-06-0707 June 2019 10 CFR Part 21 Reporting of Defects for Introl Positioner 890265-010 - Cw SAS Initial Report No. 10CFR21-48 ML19092A4812019-04-0202 April 2019 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-514, Revision 3 ML18311A3192018-11-0606 November 2018 NRR E-mail Capture - Cooper Nuclear Station - Verbal Authorization of Relief Request PR5-02 ML18311A1862018-11-0505 November 2018 Email (11-5-18) RR RFI Responses for Review ML18198A5412018-07-17017 July 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-501, Revision 1 ML18166A1882018-06-14014 June 2018 NRR E-mail Capture - Cooper Nuclear Station - Acceptance Review of License Amendment Request to Revise TS Safety Limit Minimum Critical Power Ratio ML18171A1612018-06-12012 June 2018 NRR E-mail Capture - (External_Sender) TSTF-542 Implementation Change Request NRC-2017-0218, NRR E-mail Capture - (External Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response2018-05-0909 May 2018 NRR E-mail Capture - (External_Sender) Opportunity to Review and Comment on NRC Information Collection (10 CFR Part 73) - Response ML18241A3822018-03-23023 March 2018 CNS Email to Beaulieu, George, Kumana: Response to CNS Fan Coil Unit Questions 2024-06-04
[Table view] |
Text
From:Wilkins, Lynnea To:"McCutchen, Edward L."
Subject:
Acceptance of Cooper LAR to Adopt NFPA-805 (ME8551)
Date:Wednesday, July 25, 2012 10:59:00 AM Ed, By letter dated April 25, 2012 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML121220216), as supplemented by a letter dated July 12, 2012, (ADAMS Accession No. ML12202A042)
Nebraska Public Power District (NPPD, the licensee) submitted a license amendment request for Cooper Nuclear Station (Cooper).The proposed amendment request would adopt National Fire Protection Association (NFPA) Standard NFPA-805, a performance-based standard for fire protection for light water reactor electric generating plants, as part of its transition to compliance with Title 10 of the Code of Federal Regulations Part 50.48(c).
The purpose of this message is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications.
Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application, as supplemented, and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment.
If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1377. Lynnea Wilkins, Project ManagerFort Calhoun Station, Unit 1Cooper Nuclear StationPlant Licensing Branch IV Division of Operating Reactor LicensingOffice of Nuclear Reactor RegulationUS Nuclear Regulatory Commission Phone: 301-415-1377 1 As of the date of issuance of this acceptance review, the supplemental letter dated December 22, 2011, had not yet been added to ADAMS.