| document type = Report, Miscellaneous
| document type = Report, Miscellaneous
| page count = 76
| page count = 76
| project =
| stage = Other
}}
}}
=Text=
{{#Wiki_filter:Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: FT ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment Descriotion:
SHUTDOWN COOLING/ Shut Down PumDs Suction Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 517.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoragie
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes C-163 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: FT I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Adjacent masonry wall is safety-related.
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Robust valve body and operator near gallery judged to be acceptable.
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/3/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-164 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve C-165 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: FYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-166 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-167 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: Y-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-168 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-169 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: EY[II N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-170 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: jYJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-171 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-172 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: F-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:
SHUTDOWN COOLING/ Iniection Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable' Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-173 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-1 2-167 Sheet 2 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
SHUTDOWN COOLING/ Injection Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Approximately 1/2-inch gap between valve 3-1001-5A yoke and operator and adjacent valve yoke. All are robust and judged to be acceptable.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/3/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9 /30/2012 C-174 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
SHUTDOWN COOLING/ Injection Line Valve C-175 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: E-Z N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-176 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: [TI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves-r C-177 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: [LI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-178 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-179 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves JTDOWN COOLING C-180 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: EZII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-181 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: FIIY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1001-0005AV20 (8) Motor-Operated and Solenoid-Operated Valves C-182 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:
CCSW/ Heat Exchanaer Outlet Service Water Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-183 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Seismic Walkdown Checklist (SWC)Status: ELI N U Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
CCSW/ Heat Exchanqer Outlet Service Water Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Light fixture with I of 2 chains unsupported at hard-wired cord end judged acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
*11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-184 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
CCSW/ Heat Exchanger Outlet Service Water Line Valve C-185 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-186 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-187 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: FY1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0003AV20 (8) Motor-Operated and Solenoid-Operated Valves C-188 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: lJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-189 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 11 Status: FYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
LPCI/ LPCI Injection Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 517.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-190 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 11 Status: Eli] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
LPCI/ LPCI Injection Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures are judged to be acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 For upper area walk-by, see U3 East HCU Bank area walk-by notes from 7/31/12.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-191 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 11 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment
==
Description:==
LPCI/ LPCI Iniection Line Valve C-192 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Line 1 P !20120801-Dresden-3 058 w C-193 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 11 Status: E-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves i Lir C-194 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-195 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 11 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0021AV20 (8) Motor-Operated and Solenoid-Operated Valves I-C-196 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 11 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-197 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-198 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 11 Status: Y-L N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves n Line Valve C-199 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 11 Status: [I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:
LPCI/ LPCI Iniection Line Valve C-200 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment
==
Description:==
LPCI/ LPCI Header Crosstie Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-201 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment
==
Description:==
LPCI/ LPCI Header Crosstie Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-202 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment
==
Description:==
LPCI/ LPCI Header Crosstie Line Valve C-203 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-204 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-1 2-167 Sheet 5 of 7 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-205 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: L-ul N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-206 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0032AV20 (8) Motor-Operated and Solenoid-Operated Valves C-207 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet I of 9 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment
==
Description:==
CCSW/ CCSW Pump "A" Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 495.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-208 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev, 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Eauipment DescriDtion:
CCSW/ CCSW PumD "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Tube touches pump casing; judged acceptable due to flexibility of tube and robustness of pump casing.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
One overhead light fixture above with one open S-hook on one chain at one end of fixture. Other chain at same end has a closed S-hook. Light fixture judged to be acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: Pump bolted with six 7/8" Cast-in-place bolts (3 on each side).Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 S Michael Wodarcyk 9/30/2012 C-209 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: FYý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment
==
Description:==
CCSW/ CCSW Pump "A" Photos C-210 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps VAI tl'tPA C;C-211 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status: -N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps IIA" C-212 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps"A" C-213 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: EYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Lm C-214 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps C-im- r1ýoinC~n PPQAII PI'QIAIDim "l C-215 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps C-216 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: Y1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A
---- P30 Equipment Class: (6) Vertical Pumps Equipment
==
Description:==
LPCI/ LPCI Injection Pump "A" Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?
Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes Minor grout pad cracking near bolts judged to be acceptable because bolts are cast in place into the concrete slab.5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?
C-217 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A
---- P30 Equipment Class: (6) Vertical Pumps Equipment
==
Description:==
LPCI/ LPCI Injection Pump "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: Vertical pump is anchored with four 1" Cast-in-Place bolts.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-218 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps Eauipment
==
Description:==
LPCI/ LPCI Injection Pump "A" Photos C-219 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: Liii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps I DtII I D('I C-220 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: FYii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps C-221 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps Pump "A" 20120801 -Dresden-3 345 C-222 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1 502-A--- P30 (6) Vertical Pumps C-223 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps=^-inm~nf FlI-ir~nfit~n-I DPCIl I n Paimn "A" C-224 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps C-225 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps Eauioment DescriDtion:
LPCI/ LPCI Injection PumD "A" C-226 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A
---- H15 Equipment Class: (21) Tanks and Heat Exchangers Equipment
==
Description:==
LPCI/ LPCI Heat Exchanger Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item.of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted directly to gallery steel.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Yes C-227 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: EYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A
---- H15 Equipment Class: (21) Tanks and Heat Exchangers Equipment
==
Description:==
LPCI/ LPCI Heat Exchanger Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
IR 1396014: LIGHT FIXTURE CONNECTION DEFICIENCY During the Seismic Walkdowns it was identified that a light fixture just west of the 3A Hx in the SE LPCI Comer Room had a detached chain on one side of the fixture. However, the other chain at the same end of the fixture was securely attached and the two chains at the other end of the fixture were also securely attached.
Therefore, the fixture is judged to be acceptable.
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: SRT: R. P. Kennedy & J. D. Stevenson, 3/4-3/8/96.
This vertical heat exchanger is 60" in diameter and supported at approx. 2/3 its height by a floor system composed of wide flange beams.Seismic Walkdown Team: J. Griffith & M. Wodarcyk-8/1/2012 C-228 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers EquiDment DescriDtion:
LPCI/ LPCI Heat Exchanaer Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-229 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 003-1 503-A-Hi 5 (21) Tanks and Heat Exchangers I D0'1l I DfIl L C-230 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers
~nm inmat flep~nj~n I I P(I W)n' F1 '-Innr C-231 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers C-232 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A-H15 Equipment Class: (21) Tanks and Hea I'..:.,,.s a a vIes1 I vIe'*s UA t Exchangers C-233 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167* Sheet 1 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment
==
Description:==
CCSW/ CCSW Pump "A" and "B" Discharge Flow Element Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 476.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable
: 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable Not Applicable Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Flow element is in pipeline (in-line component).
Yes C-234 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment
==
Description:==
CCSW/ CCSW Pump "A" and "B" Discharge Flow Element Interaction Effects 7, Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk-8/3/2012 Reference Drawing: M-392, Rev. T.Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-235 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment
==
Description:==
CCSW/ CCSW Pump "A" and "B" Discharge Flow Element C-236 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks C-237 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Yl] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1541-
-----A-FE (18) Instruments on Racks rr(Z%~AII rr'QIAI P"A" C-238}}

Latest revision as of 05:04, 22 July 2018

12Q0106.30-R-002, Rev. 2, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic for the Dresden Nuclear Power Station, Unit 3, Part 4 of 11
ML12348A258
Person / Time
Site: Dresden Constellation icon.png
Issue date: 11/15/2012
From: Delaney M
Exelon Generation Co, Stevenson & Associates
To:
Office of Nuclear Reactor Regulation
References
RS-12-167 12Q0106.30-R-002, Rev 2
Download: ML12348A258 (76)


Text

Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: FT ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment Descriotion:

SHUTDOWN COOLING/ Shut Down PumDs Suction Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchoragie

1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes C-163 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: FT I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Adjacent masonry wall is safety-related.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Robust valve body and operator near gallery judged to be acceptable.

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/3/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-164 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Shut Down Pumps Suction Line Valve C-165 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: FYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-166 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-167 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: Y-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-168 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-169 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: EY[II N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-170 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: jYJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-171 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0002AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-172 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: F-- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:

SHUTDOWN COOLING/ Iniection Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable' Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-173 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-1 2-167 Sheet 2 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Injection Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Approximately 1/2-inch gap between valve 3-1001-5A yoke and operator and adjacent valve yoke. All are robust and judged to be acceptable.

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/3/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9 /30/2012 C-174 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

SHUTDOWN COOLING/ Injection Line Valve C-175 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: E-Z N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-176 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: [TI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves-r C-177 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: [LI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-178 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-179 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves JTDOWN COOLING C-180 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: EZII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1001-0005AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-181 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: FIIY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1001-0005AV20 (8) Motor-Operated and Solenoid-Operated Valves C-182 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauioment DescriDtion:

CCSW/ Heat Exchanaer Outlet Service Water Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-183 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Seismic Walkdown Checklist (SWC)Status: ELI N U Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CCSW/ Heat Exchanqer Outlet Service Water Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Light fixture with I of 2 chains unsupported at hard-wired cord end judged acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
  • 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-184 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: [Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

CCSW/ Heat Exchanger Outlet Service Water Line Valve C-185 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-186 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-187 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: FY1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0003AV20 (8) Motor-Operated and Solenoid-Operated Valves C-188 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: lJ N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0003AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-189 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 11 Status: FYi N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ LPCI Injection Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 517.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-190 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 11 Status: Eli] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ LPCI Injection Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures are judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 For upper area walk-by, see U3 East HCU Bank area walk-by notes from 7/31/12.Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-191 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 11 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment

==

Description:==

LPCI/ LPCI Iniection Line Valve C-192 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Line 1 P !20120801-Dresden-3 058 w C-193 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 11 Status: E-1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves i Lir C-194 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 11 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-195 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 11 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0021AV20 (8) Motor-Operated and Solenoid-Operated Valves I-C-196 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 11 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-197 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 11 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-198 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 11 Status: Y-L N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves n Line Valve C-199 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 11 of 11 Status: [I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0021AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment DescriDtion:

LPCI/ LPCI Iniection Line Valve C-200 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Equipment

==

Description:==

LPCI/ LPCI Header Crosstie Line Valve Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-201 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves EauiDment

==

Description:==

LPCI/ LPCI Header Crosstie Line Valve Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Overhead light fixtures judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-202 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves Eauipment

==

Description:==

LPCI/ LPCI Header Crosstie Line Valve C-203 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-204 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-1 2-167 Sheet 5 of 7 Status: Yj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-205 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: L-ul N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0032AV20 Equipment Class: (8) Motor-Operated and Solenoid-Operated Valves C-206 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1501-0032AV20 (8) Motor-Operated and Solenoid-Operated Valves C-207 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet I of 9 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

CCSW/ CCSW Pump "A" Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Turbine, 495.00 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.

5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes C-208 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev, 2 Correspondence No.: RS-12-167 Sheet 2 of 9 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Eauipment DescriDtion:

CCSW/ CCSW PumD "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Tube touches pump casing; judged acceptable due to flexibility of tube and robustness of pump casing.8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

One overhead light fixture above with one open S-hook on one chain at one end of fixture. Other chain at same end has a closed S-hook. Light fixture judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Pump bolted with six 7/8" Cast-in-place bolts (3 on each side).Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 S Michael Wodarcyk 9/30/2012 C-209 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 9 Status: FYý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Equipment

==

Description:==

CCSW/ CCSW Pump "A" Photos C-210 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 9 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps VAI tl'tPA C;C-211 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 9 Status: -N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps IIA" C-212 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 9 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps"A" C-213 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 9 Status: EYII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps Lm C-214 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 9 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps C-im- r1ýoinC~n PPQAII PI'QIAIDim "l C-215 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 9 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1501-0044AP30 Equipment Class: (5) Horizontal Pumps C-216 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 10 Status: Y1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A


P30 Equipment Class: (6) Vertical Pumps Equipment

==

Description:==

LPCI/ LPCI Injection Pump "A" Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50% Yes of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?

Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors? Yes Minor grout pad cracking near bolts judged to be acceptable because bolts are cast in place into the concrete slab.5. Is the anchorage configuration consistent with plant documentation? (Note: Yes This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6. Based on the above anchorage evaluations, is the anchorage free of Yes potentially adverse seismic conditions?

C-217 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A


P30 Equipment Class: (6) Vertical Pumps Equipment

==

Description:==

LPCI/ LPCI Injection Pump "A" Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: Vertical pump is anchored with four 1" Cast-in-Place bolts.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-218 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps Eauipment

==

Description:==

LPCI/ LPCI Injection Pump "A" Photos C-219 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 10 Status: Liii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps I DtII I D('I C-220 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 10 Status: FYii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps C-221 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 10 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps Pump "A" 20120801 -Dresden-3 345 C-222 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 10 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1 502-A--- P30 (6) Vertical Pumps C-223 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 10 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A---P30 Equipment Class: (6) Vertical Pumps=^-inm~nf FlI-ir~nfit~n-I DPCIl I n Paimn "A" C-224 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 9 of 10 Status: F-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps C-225 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 10 of 10 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1502-A--P30 Equipment Class: (6) Vertical Pumps Eauioment DescriDtion:

LPCI/ LPCI Injection PumD "A" C-226 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A


H15 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

LPCI/ LPCI Heat Exchanger Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item.of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?Mounted directly to gallery steel.5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Yes C-227 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: EYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A


H15 Equipment Class: (21) Tanks and Heat Exchangers Equipment

==

Description:==

LPCI/ LPCI Heat Exchanger Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

IR 1396014: LIGHT FIXTURE CONNECTION DEFICIENCY During the Seismic Walkdowns it was identified that a light fixture just west of the 3A Hx in the SE LPCI Comer Room had a detached chain on one side of the fixture. However, the other chain at the same end of the fixture was securely attached and the two chains at the other end of the fixture were also securely attached.

Therefore, the fixture is judged to be acceptable.

9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Other Adverse Conditions
11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments SEWS Anchorage Notes: SRT: R. P. Kennedy & J. D. Stevenson, 3/4-3/8/96.

This vertical heat exchanger is 60" in diameter and supported at approx. 2/3 its height by a floor system composed of wide flange beams.Seismic Walkdown Team: J. Griffith & M. Wodarcyk-8/1/2012 C-228 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers EquiDment DescriDtion:

LPCI/ LPCI Heat Exchanaer Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-229 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 003-1 503-A-Hi 5 (21) Tanks and Heat Exchangers I D0'1l I DfIl L C-230 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers

~nm inmat flep~nj~n I I P(I W)n' F1 '-Innr C-231 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A--H15 Equipment Class: (21) Tanks and Heat Exchangers C-232 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1503-A-H15 Equipment Class: (21) Tanks and Hea I'..:.,,.s a a vIes1 I vIe'*s UA t Exchangers C-233 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167* Sheet 1 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CCSW/ CCSW Pump "A" and "B" Discharge Flow Element Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):

Reactor, 476.50 ft, ALL Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.

Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?

No 2. Is the anchorage free of bent, broken, missing or loose hardware?Not Applicable

3. Is the anchorage free of corrosion that is more than mild surface oxidation?
4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable Not Applicable Not Applicable

6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Flow element is in pipeline (in-line component).

Yes C-234 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CCSW/ CCSW Pump "A" and "B" Discharge Flow Element Interaction Effects 7, Are soft targets free from impact by nearby equipment or structures?

Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions

11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk-8/3/2012 Reference Drawing: M-392, Rev. T.Evaluated by: James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-235 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks Equipment

==

Description:==

CCSW/ CCSW Pump "A" and "B" Discharge Flow Element C-236 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-1541 ----- A-FE Equipment Class: (18) Instruments on Racks C-237 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Yl] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-1541-


A-FE (18) Instruments on Racks rr(Z%~AII rr'QIAI P"A" C-238