{{#Wiki_filter:Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 ------ S35 Equipment Class: (2) Low Voltage Switchgear EquiDment DescriDtion: | |||
480V AC/ 480V Switchqear 39 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Reactor, 570.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-453 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 ------ S35 Equipment Class: (2) Low Voltage Switchgear Equipment | |||
== | |||
Description:== | |||
480V AC/ 480V Switchgear 39 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Bottom of eastern-most door at back of switchbear is bent out slightly. | |||
Door is adequately latched and judged to be acceptable. | |||
IR 1396562: UNPINNED SWITCHGEAR HOISTS Dunng Fukushima seismic walkdowns, two movable trolley hoists mounted on top of SWGR 38 and one movable trolley hoist mounted on top of SWGR 39 were found unrestrained against horizontal movement due to the restraining pin for each hoist not being installed while each hoist was in the stored position. | |||
The switchgears are located at U3, N-47, EL. 570.Unit supervisor and shift manager were informed of the condition and station personnel installed the pins for the trolley hoists. Therefore, hoists are judged acceptable. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Overhead light fixtures judged to be acceptable. | |||
Yes Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
C-454 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35 Equipment Class: (2) Low Voltage Switchgear EaUiDment Descriotion: | |||
480V AC/ 480V Switchaear 39 Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: ý' r James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 D~hntn.20'C-455 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [Yii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35.Equipment Class: (2) Low Voltage Switchgear SACl/ 480V Switch C-456 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: EI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339------.S35 Equipment Class: (2) Low Voltage Switchgear C-457 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35 Equipment Class: (2) Low Voltage Switchgear C-458 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 --.... S35 Equipment Class: (2) Low Voltage Switchgear C-459 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment | |||
== | |||
Description:== | |||
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Reactor, 517.50 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., isthe item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable. | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes Yes C-460 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment DescriDtion: | |||
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Emergency light adequately restrained. | |||
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: Panel bolted in each corner to Unistrut. | |||
The unistrut is bolted to the wall with three 3/8" shell expansion anchors on each side.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-461 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1-P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment | |||
== | |||
Description:== | |||
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 C-462 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: 1'7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets NPANELS/ O C-463 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1-P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets L,'4 4 C-464 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: r-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets 20120801-Dresden-3 104 C-465 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: FYI1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-7838-1-1-P06 (20) Instrumentation and Control Panels and Cabinets 1"e l N PANEL,'qRl1 C-466 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: Y--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: in-an floAnri-~n D03-7838-1-1--P06 (20) Instrumentation and Control Panels and Cabinets DISTRIBUTION PANELS/ D ,n Donal 'AA-1-1 zU 1 C-467 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers Eauioment Descriotion: | |||
480V AC/ MCC 38-2 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 538.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchora-ge | |||
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shnnkage cracks in flooriudged acceptable. | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-468 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
480V AC/ MCC 38-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Overhead light fixtures are judged acceptable. | |||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: " James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-469 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2---M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
480V AC/ MCC 38-2 C-470 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers C-471 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers C-472 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-7838-2-M05 (1) Motor Control Centers C-473 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2--M05 Equipment Class: (1) Motor Control Centers C-474 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2---M05 Equipment Class: (1) Motor Control Centers C-475 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers Eauipment | |||
== | |||
Description:== | |||
480V AC/ MCC 39-2 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 534.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shnnkage cracks in floorjudged to be acceptable. | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-476 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers Eauioment Descriotion: | |||
480V AC/ MCC 39-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Adjacent MCC 35-1 is judged to be adequately attached via intermittent welds to base pedestal.Bottom of one door at back of MCC is slightly askew. Door is adequately latched and judged to be acceptable. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-477 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2 | |||
---- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
480V AC/ MCC 39-2 Photos C-478 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2---M05 Equipment Class: (1) Motor Control Centers C-479 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2--M05 Equipment Class: (1) Motor Control Centers 20 C-480 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2-M05 Equipment Class: (1) Motor Control Centers C-481 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: [li N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2--M05 Equipment Class: (1) Motor Control Centers C-482 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3A--B05 Equipment Class: (16) Battery Chargers and Inverters EauiDment DescriDtion: | |||
125V DC/ Batterv Charaer #3A Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 538.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
No 2.. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-483 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3A--B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery Charger #3A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Overhead light fixtures judged acceptable. | |||
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: .9/30/2012 Michael Wodarcyk 9/30/2012 C-484 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: rI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EauiDment Descriotion: | |||
D03-8300-3A-B05 (16) Battery Chargers and Inverters 125V DC/ Battery Charger #3A Photo$C-485 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters r~m~4 f~a,.in~r~n I Or\ ffI CIan~ 1 C-486 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: EY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters M-i~nf Flý&^rimfi~n-419X M") C-487 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y-j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters C-488 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: V N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery Charger #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 538.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable. | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-489 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F--I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery Charger #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Evaluated by: " A James Griffith Date: 9/30/2012 1 W "fIAý " Michael Wodarcyk 9/30/2012 C-490 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery Charger #3 C-491 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3----B05 Equipment Class: (16) Battery Chargers and Inverters C-492 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3--BO5 Equipment Class: (16) Battery Chargers and Inverters C-493 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3---B05 Equipment Class: (16) Battery Chargers and Inverters C-494 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--BC--B04 Equipment Class: (15) Batteries on Racks Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery #3, Feed to TB Battery Bus #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 551.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes Yes Yes Yes Yes C-495 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--BC--B04 Equipment Class: (15) Batteries on Racks Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery #3, Feed to TB Battery Bus #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Overhead light fixtures and trolley hoist and beam judged acceptable. | |||
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Each post leg is through-bolted to an angle iron clip, which is anchored by one 3/8 inch concrete expansion anchor to the concrete floor in accordance with Drawing B-1893, Rev. D.Evaluated by: | |||
* James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-496 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: E-ZI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks Equipment | |||
== | |||
Description:== | |||
125V DC/ Battery #3, Feed to TB Battery Bus #3 Photos C-497 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks C-498 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks 20120731-Dresden-3 046 C-499 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: r TI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC--B04 Equipment Class: (15) Batteries on Racks F C-500 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: inmanf flae,'rinkii~nn D03-8300-BC--B04 (15) Batteries on Racks to TB Battery Bus #3 C-501 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A | |||
----- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Reactor, 570.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-502 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A | |||
----- M05 Equipment Class: (1) Motor Control Centers Eauipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Western-most door on back of MCC has a minor misalignment at the hinge.Door is adequately latched and judged to be acceptable. | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: < James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-503 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A | |||
----- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Photos C-504 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A | |||
----- M05 Equipment Class: (1) Motor Control Centers pment | |||
== Description:== | |||
250V DC/ MCC Bus #3A (C-505 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A | |||
----- M05 Equipment Class: (1) Motor Control Centers 20120802-Dresden-3 016 C-506 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B | |||
----- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Reactor, 570.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
: 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
: 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes Yes Yes Yes 1)Yes Yes C-507 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B | |||
----- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-508 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: LYii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B | |||
----- M05 Equipment Class: (1) Motor Control Centers Equipment | |||
== | |||
Description:== | |||
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Photos C-509 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B---M05 Equipment Class: (1) Motor Control Centers C-510 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B----M05 Equipment Class: (1) Motor Control Centers C-511 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83125----- | |||
P06 Equipment Class: (1) Motor Control Centers Eauioment DescriDtion: | |||
125V DC/ RB 125V DC Distribution Panel #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Reactor, 570.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-512 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83125----- | |||
P06 Equipment Class: (1) Motor Control Centers EauiDment | |||
== | |||
Description:== | |||
125V DC/ RB 125V DC Distribution Panel #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: James Griffith Date: 9/30/2012? 'l t Michael Wodarcyk 9/30/20 12 C-513 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment | |||
== | |||
Description:== | |||
D03-83125---VPu6 (1) Motor Control Centers 125V DC/ RB 125V DC Distribution Panel #3 Photos C-514 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
250V DC/ Battery Charger #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area): | |||
Turbine, 538.00 ft, ALL Manufacturer/Model: | |||
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs. | |||
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)? | |||
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation? | |||
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable. | |||
: 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.) | |||
Not Applicable | |||
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions? | |||
Yes C-515 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters EQuipment | |||
== | |||
Description:== | |||
250V DC/ Battery Charqer #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures? | |||
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment? | |||
Overhead light fixtures judged to be acceptable. | |||
: 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions | |||
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment? | |||
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-516 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: LYI1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment | |||
== | |||
Description:== | |||
250V DC/ Battery Charger #3 C-517 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3--B05 Equipment Class: (16) Battery Chargers and Inverters C-518 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters x/ nrI1 uI r'harndr A'C-519 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: in i-D03-83250-3---B05 (16) Battery Chargers and inverters r #3 20120730-Dresden-3 209 20120730-Dresden-3 210 C-520}} |
Latest revision as of 03:53, 22 July 2018
ML12348A262 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 11/15/2012 |
From: | Delaney M Exelon Generation Co, Stevenson & Associates |
To: | Office of Nuclear Reactor Regulation |
References | |
RS-12-167 12Q0106.30-R-002, Rev 2 | |
Download: ML12348A262 (68) | |
Text
Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: FYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 ------ S35 Equipment Class: (2) Low Voltage Switchgear EquiDment DescriDtion:
480V AC/ 480V Switchqear 39 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 570.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-453 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 ------ S35 Equipment Class: (2) Low Voltage Switchgear Equipment
==
Description:==
480V AC/ 480V Switchgear 39 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Bottom of eastern-most door at back of switchbear is bent out slightly.
Door is adequately latched and judged to be acceptable.
IR 1396562: UNPINNED SWITCHGEAR HOISTS Dunng Fukushima seismic walkdowns, two movable trolley hoists mounted on top of SWGR 38 and one movable trolley hoist mounted on top of SWGR 39 were found unrestrained against horizontal movement due to the restraining pin for each hoist not being installed while each hoist was in the stored position.
The switchgears are located at U3, N-47, EL. 570.Unit supervisor and shift manager were informed of the condition and station personnel installed the pins for the trolley hoists. Therefore, hoists are judged acceptable.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
Yes Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
C-454 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35 Equipment Class: (2) Low Voltage Switchgear EaUiDment Descriotion:
480V AC/ 480V Switchaear 39 Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: ý' r James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 D~hntn.20'C-455 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: [Yii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35.Equipment Class: (2) Low Voltage Switchgear SACl/ 480V Switch C-456 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: EI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339------.S35 Equipment Class: (2) Low Voltage Switchgear C-457 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: [y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339---S35 Equipment Class: (2) Low Voltage Switchgear C-458 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7339 --.... S35 Equipment Class: (2) Low Voltage Switchgear C-459 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
==
Description:==
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 517.50 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., isthe item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes C-460 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: LII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment DescriDtion:
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Emergency light adequately restrained.
- 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: Panel bolted in each corner to Unistrut.
The unistrut is bolted to the wall with three 3/8" shell expansion anchors on each side.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/1/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-461 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1-P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
==
Description:==
DISTRIBUTION PANELS/ Distribution Panel 38-1-1 C-462 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: 1'7 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets NPANELS/ O C-463 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1-P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets L,'4 4 C-464 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: r-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-1-1--P06 Equipment Class: (20) Instrumentation and Control Panels and Cabinets 20120801-Dresden-3 104 C-465 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: FYI1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-7838-1-1-P06 (20) Instrumentation and Control Panels and Cabinets 1"e l N PANEL,'qRl1 C-466 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: Y--] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: in-an floAnri-~n D03-7838-1-1--P06 (20) Instrumentation and Control Panels and Cabinets DISTRIBUTION PANELS/ D ,n Donal 'AA-1-1 zU 1 C-467 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2
M05 Equipment Class: (1) Motor Control Centers Eauioment Descriotion:
480V AC/ MCC 38-2 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchora-ge
- 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shnnkage cracks in flooriudged acceptable.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-468 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 8 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
480V AC/ MCC 38-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures are judged acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: " James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-469 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 8 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2---M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
480V AC/ MCC 38-2 C-470 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 8 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2
M05 Equipment Class: (1) Motor Control Centers C-471 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 8 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2
M05 Equipment Class: (1) Motor Control Centers C-472 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 8 Status: [-ý N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: D03-7838-2-M05 (1) Motor Control Centers C-473 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2--M05 Equipment Class: (1) Motor Control Centers C-474 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 8 of 8 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7838-2---M05 Equipment Class: (1) Motor Control Centers C-475 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2
M05 Equipment Class: (1) Motor Control Centers Eauipment
==
Description:==
480V AC/ MCC 39-2 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 534.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shnnkage cracks in floorjudged to be acceptable.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-476 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2
M05 Equipment Class: (1) Motor Control Centers Eauioment Descriotion:
480V AC/ MCC 39-2 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Adjacent MCC 35-1 is judged to be adequately attached via intermittent welds to base pedestal.Bottom of one door at back of MCC is slightly askew. Door is adequately latched and judged to be acceptable.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-477 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
480V AC/ MCC 39-2 Photos C-478 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2---M05 Equipment Class: (1) Motor Control Centers C-479 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2--M05 Equipment Class: (1) Motor Control Centers 20 C-480 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2-M05 Equipment Class: (1) Motor Control Centers C-481 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: [li N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-7839-2--M05 Equipment Class: (1) Motor Control Centers C-482 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3A--B05 Equipment Class: (16) Battery Chargers and Inverters EauiDment DescriDtion:
125V DC/ Batterv Charaer #3A Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2.. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes Yes Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-483 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3A--B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
125V DC/ Battery Charger #3A Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged acceptable.
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Evaluated by: James Griffith Date: .9/30/2012 Michael Wodarcyk 9/30/2012 C-484 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: rI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: EauiDment Descriotion:
D03-8300-3A-B05 (16) Battery Chargers and Inverters 125V DC/ Battery Charger #3A Photo$C-485 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters r~m~4 f~a,.in~r~n I Or\ ffI CIan~ 1 C-486 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: EY- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters M-i~nf Flý&^rimfi~n-419X M") C-487 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y-j N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3A--B05 Equipment Class: (16) Battery Chargers and Inverters C-488 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: V N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
125V DC/ Battery Charger #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-489 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F--I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
125V DC/ Battery Charger #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Evaluated by: " A James Griffith Date: 9/30/2012 1 W "fIAý " Michael Wodarcyk 9/30/2012 C-490 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
125V DC/ Battery Charger #3 C-491 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: F-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--3----B05 Equipment Class: (16) Battery Chargers and Inverters C-492 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3--BO5 Equipment Class: (16) Battery Chargers and Inverters C-493 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-3---B05 Equipment Class: (16) Battery Chargers and Inverters C-494 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 7 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--BC--B04 Equipment Class: (15) Batteries on Racks Equipment
==
Description:==
125V DC/ Battery #3, Feed to TB Battery Bus #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 551.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchoraae 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes Yes C-495 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 7 Status: F- N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300--BC--B04 Equipment Class: (15) Batteries on Racks Equipment
==
Description:==
125V DC/ Battery #3, Feed to TB Battery Bus #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures and trolley hoist and beam judged acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/31/2012 Each post leg is through-bolted to an angle iron clip, which is anchored by one 3/8 inch concrete expansion anchor to the concrete floor in accordance with Drawing B-1893, Rev. D.Evaluated by:
- James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-496 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 7 Status: E-ZI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks Equipment
==
Description:==
125V DC/ Battery #3, Feed to TB Battery Bus #3 Photos C-497 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 7 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks C-498 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 7 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC-B04 Equipment Class: (15) Batteries on Racks 20120731-Dresden-3 046 C-499 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 7 Status: r TI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8300-BC--B04 Equipment Class: (15) Batteries on Racks F C-500 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 7 of 7 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: inmanf flae,'rinkii~nn D03-8300-BC--B04 (15) Batteries on Racks to TB Battery Bus #3 C-501 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: Fj N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 570.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documentinq other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-502 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A
M05 Equipment Class: (1) Motor Control Centers Eauipment
==
Description:==
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Western-most door on back of MCC has a minor misalignment at the hinge.Door is adequately latched and judged to be acceptable.
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: < James Griffith Date: 10/24/2012 Michael Wodarcyk 10/24/2012 C-503 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
250V DC/ MCC Bus #3A (ROB-RB MCC #3)Photos C-504 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A
M05 Equipment Class: (1) Motor Control Centers pment
Description:
250V DC/ MCC Bus #3A (C-505 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303A
M05 Equipment Class: (1) Motor Control Centers 20120802-Dresden-3 016 C-506 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 5 Status: YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 570.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
- 2. Is the anchorage free of bent, broken, missing or loose hardware?3. Is the anchorage free of corrosion that is more than mild surface oxidation?
- 4. Is the anchorage free of visible cracks in the concrete near the anchors?5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes Yes Yes 1)Yes Yes C-507 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-508 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 5 Status: LYii N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B
M05 Equipment Class: (1) Motor Control Centers Equipment
==
Description:==
250V DC/ MCC Bus #3B (ROB-RB MCC #3)Photos C-509 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 5 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B---M05 Equipment Class: (1) Motor Control Centers C-510 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 5 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-8303B----M05 Equipment Class: (1) Motor Control Centers C-511 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 3 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83125-----
P06 Equipment Class: (1) Motor Control Centers Eauioment DescriDtion:
125V DC/ RB 125V DC Distribution Panel #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Reactor, 570.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Yes 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-512 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 3 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83125-----
P06 Equipment Class: (1) Motor Control Centers EauiDment
==
Description:==
125V DC/ RB 125V DC Distribution Panel #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments SEWS Anchorage Notes: MCC stitch welded to edge angle embedded in concrete.Seismic Walkdown Team: J. Griffith & M. Wodarcyk -8/2/2012 Evaluated by: James Griffith Date: 9/30/2012? 'l t Michael Wodarcyk 9/30/20 12 C-513 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 3 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: Equipment
==
Description:==
D03-83125---VPu6 (1) Motor Control Centers 125V DC/ RB 125V DC Distribution Panel #3 Photos C-514 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 1 of 6 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
250V DC/ Battery Charger #3 Project: Dresden 3 SWEL Location (Bldg, Elev, Room/Area):
Turbine, 538.00 ft, ALL Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findinqs.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes Minor shrinkage cracks in floor judged to be acceptable.
- 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
- 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes C-515 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 2 of 6 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters EQuipment
==
Description:==
250V DC/ Battery Charqer #3 Interaction Effects 7. Are soft targets free from impact by nearby equipment or structures?
- 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Overhead light fixtures judged to be acceptable.
- 9. Do attached lines have adequate flexibility to avoid damage?Yes Yes Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
- 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Seismic Walkdown Team: J. Griffith & M. Wodarcyk -7/30/2012 Evaluated by: James Griffith Date: 9/30/2012 Michael Wodarcyk 9/30/2012 C-516 Dresden Generating Station Unit 3 1200108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 3 of 6 Status: LYI1 N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters Equipment
==
Description:==
250V DC/ Battery Charger #3 C-517 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 4 of 6 Status: FYI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3--B05 Equipment Class: (16) Battery Chargers and Inverters C-518 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 5 of 6 Status: [Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: D03-83250-3---B05 Equipment Class: (16) Battery Chargers and Inverters x/ nrI1 uI r'harndr A'C-519 Dresden Generating Station Unit 3 12Q0108.30-R-002, Rev. 2 Correspondence No.: RS-12-167 Sheet 6 of 6 Status: Y-I N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: in i-D03-83250-3---B05 (16) Battery Chargers and inverters r #3 20120730-Dresden-3 209 20120730-Dresden-3 210 C-520