ML15084A346: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OFFICIAL USE ONLY | {{#Wiki_filter:OFFICIAL USE ONLY - SECURIW-REI.ATED INFORMATION WTHHOLD IN ACCORDANCE WITH 10 CFR 2.390 FENOC^FirstEnergy Nuclaar Opentiry Company Be ave r V alley Power SfafionP.O. Box 4 Shippingport, PA 1ffi77 Eric A. Latson Sde Vice President March 19, 2015 L-l5-093 ATTN: Document Control DeskU. S. Nuclear Regufatory Commission Washington, DC 20555-0001 | ||
- SECURIW-REI.ATED INFORMATION WTHHOLD IN ACCORDANCE WITH 10 CFR 2. | |||
==SUBJECT:== | ==SUBJECT:== | ||
Beaver Valfey Power Station, Unit Nos. 1 | Beaver Valfey Power Station, Unit Nos. 1 andz Docket No. 50-334, License No. DPR-66 Docket No. 50412, License No. NPF-73 724-682-5234 Fax: 724-643-8069 10 cFR 50.90 Reouest to Ghange Cyber Securitv lmolementation Plan Milestone I Completion Date Pursuant to 10 CFR 50.90, FirctEnergy Nuclear Operating Company (FENOC) is requesting an amendment for the BeaverValley Power Station, Unit Nos. I and2, Operating Licenses.An evaluation of the proposed amendment is enclosed. | ||
An evaluation of the proposed amendment is enclosed. | FENOC is requesting Nuclear Regulatory Commission (NRC) staff approval by January 2.2016 with an implementation period of 30 days following issuance of the amendment.FENOC requests that the enclosure, which contains security-related information, bewithheld from public disclosure in accordance with 10 CFR 2.390.There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. LenE, Manager - Fleet Licensing, at (330) 315*810.The enclosure to this letter contains security-related information. | ||
FENOC is requesting Nuclear Regulatory Commission (NRC) staff approval by January 2.2016 with an implementation period of 30 days following issuance of the amendment.FENOC requests that the enclosure, which contains security-related information, bewithheld from public disclosure in accordance with 10 CFR 2.390.There are no regulatory commitments contained in this submittal. lf there are | |||
Withhold from public disclosure under 10 CFR 2.390.Upon removal of the enclosure, this letter is uncontrolled. | Withhold from public disclosure under 10 CFR 2.390.Upon removal of the enclosure, this letter is uncontrolled. | ||
OFFICIAL USE ONLY | OFFICIAL USE ONLY - SECURITY.REISTED INFORMATION Beaver Valley Power Station, Unit Nos. 1 and2 L-l5-093 Page 2 I declare under penalty of perjury that the foregoing is true and corect. Executed on March lcl ,2015.Sincerely,{c Eric A. Larson | ||
- SECURITY.REISTED INFORMATION Beaver Valley Power Station, Unit Nos. 1 | |||
{ | |||
==Enclosure:== | ==Enclosure:== | ||
Evaluation of Proposed Request for Licensing Action cc: NRC Region lAdministrator Nuclear Reactor Regufation Project | Evaluation of Proposed Request for Licensing Action cc: NRC Region lAdministrator Nuclear Reactor Regufation Project Manager NRC Resident Inspector Director BRP/DEP (w/o encfosure) | ||
Site BRP/DEP Representative (w/o enclosure) | Site BRP/DEP Representative (w/o enclosure) | ||
Enclosure L-15-093Evaluation of Proposed Request for Licensing Action(26 Pages Follow) | Enclosure L-15-093Evaluation of Proposed Request for Licensing Action (26 Pages Follow) | ||
ATTACHMENT | ATTACHMENT 2 Proposed Unit 1 Facility Operating License Change (Mark-up)(1 Page Follows) | ||
(1 Page Follows) | D.-7-PhvsicalPlobdion FENOC shallfufiy lmplement fid malntain In efled afl ptovi$ons of $e Commlssion-approved physicil *hurlty, fairiq and qualification, and safeguards oontingency plans Including amendmerG made pursuant to provlslons ol the Mlscellaneous Amendments and Search Requtranents EMslons to 10 CFR 73.55 (51 FR27817 and 27822) and bthe authority 10 CFR 50.90 and 10 CFR f0.54(p). | ||
D.-7-PhvsicalPlobdion FENOC shallfufiy lmplement fid malntain In efled afl ptovi$ons of $e Commlssion-approved physicil | The combinad set of phns. wttlctt contains Srifeguards Inbrmatinn prdod*d under 10 CFR 73.21 is editled: Blaver Valley Porver St*ion (BVPS) Physical Secudty Plan" submitled by letter September 9, 2004, and supplemenied September 30,2fl04", October 14,2UJ/., and May 12, 2006. | ||
*hurlty, fairiq and qualification, and safeguards oontingency | FENOC shdlfully implement and maintain ln ofrd all provisbns of the Commission-apppved cyUer seqrity plan (CSP), includlng changes made punuant to the authority o10 CFR 50.90 and 10 CFR 50.54(p). The Beaver Valley Po*tr Stdon CSP was approved by Llcense Amendment No.Allwotk and adlvlfles In connection wtth this ffiec{ shall be perfomed pursuant b the prcvlslons d the Commonwealth ol Penns$vanla Clean Streams Acts d June 24, 1913,io amended and of June A2, $37 , as amonded, and In accordance u,lth all permltslssued bythe Departnent of Erwfronmental Resources of the Commonwealth of Pennsylvanla.License Rena ral Commitnenb - The UFSAR supplement, as revlsed, submlttod pursuant to 10 CFR il.21(dl, descrlbes ceilaln futule adlvltes to be comple*d ptlol tobnd/or during the period dextended opefiaton- FENOC drall conptete these ac{vi0esln accordarrce urur nppenOlx A of NUREG-1929, Safety Evalua[on Repofl Related tothe Beawr Valley Folier Sbtifi, Unlts 1 and 2, dated October 2fl19, and SupSement 1d NUREG-1929. dated Oclober 2009, and shall notfi the NRG In wriilng when activltiesto be compl*bd prior b 0te pdiod of elttended operatlon are oomplete and can be verilied by NRC inspsdion.UFSAR Supplement Changes - Thc lnfonnatlon In tlre UFSAR supdement, as rcvised, submitted pursuant b 10 CFR54.21(d), shall be Incoporabd lnto the UFSAR asrequlrcd by 10 CFR $.71(e) trlowittg the hsuance of this renewed opraling llcense.UnU nat ripO*e ls complete, FENOC may not make changes to ll1e inturmation In the supplemeil. | ||
The combinad set of phns. | |||
October 14,2UJ/., and May 12, 2006. | |||
FENOC shdlfully implement and maintain ln ofrd all provisbns of the Commission-apppved cyUer seqrity plan (CSP), includlng changes made punuant to the authority o10 CFR 50.90 and 10 CFR 50.54(p). The Beaver Valley Po*tr Stdon CSP | |||
$37 , as amonded, and In accordance u,lth all permltslssued bythe Departnent of Erwfronmental Resources of the Commonwealth | |||
- The UFSAR supplement, as revlsed, submlttod pursuant to 10 CFR il.21(dl, descrlbes ceilaln futule adlvltes to be comple*d ptlol tobnd/or during the period dextended opefiaton- FENOC drall conptete these ac{vi0esln accordarrce urur nppenOlx A of NUREG-1929, Safety Evalua[on Repofl Related tothe Beawr Valley Folier Sbtifi, Unlts 1 and 2, dated October 2fl19, and SupSement 1d NUREG-1929. dated Oclober 2009, and shall notfi the NRG In wriilng when activltiesto be compl*bd prior b 0te pdiod of elttended operatlon are oomplete and can | |||
Follovtftg hcoporation lnto the UFSAR. | Follovtftg hcoporation lnto the UFSAR. | ||
he need fur pior Commission approvalof any changes will be governEd by 10 CFR 50.59.Capaule Wltrdnwd Sdpdult | he need fur pior Commission approvalof any changes will be governEd by 10 CFR 50.59.Capaule Wltrdnwd Sdpdult - Fq the mrpwed operating license tenn, all capsules in he nactorvcssel tral an rumovsd and testsd must meetthe bstprocedures and reporting requlrements of Amerlcan Society for Testng and Materlals (ASTlr) E- 185*2 to'the extenf praclicatrle br the conliguration of lhe specimens In the capule. Any dtanges to the capsule withdrarval schedule, including spare capzules, must be approvad bythe NRC pnorto implqnentdion. | ||
- Fq the mrpwed operating license tenn, all capsules | |||
Containmerl Llner Vdurn*ic Inspec{hn | Containmerl Llner Vdurn*ic Inspec{hn | ||
-a) lf degnadation (grealer tran 10 percent of the nominal thldmess nol attibuhble | -a) lf degnadation (grealer tran 10 percent of the nominal thldmess nol attibuhble lo fabdcation/ersc{ion practftns) b Henffi*d in the non-random areas examined usingulfasonlc bsffig (UT) as described ln Supplement I of NUREG-1929' UTexaminathns shall be perfomed at addltonaltun-random areas, b be seleded based on tlrls operatng erycrlence. | ||
Should addltlonaldegnadaton be ldeniifred, addltlonal nontandom arsas shall be UT oomined until no further degradalion (greatertran 10 porcont of ulo nomlnalhickneee) is ltlenfilled. | Should addltlonaldegnadaton be ldeniifred, addltlonal nontandom arsas shall be UT oomined until no further degradalion (greatertran 10 porcont of ulo nomlnalhickneee) is ltlenfilled. | ||
Allareas withdegradation shali ba reexamined owr at least the next three Euc*ssive lnspectlon periods lo ensure trat progrcsein of the degradalion b not oocuning. | Allareas withdegradation shali ba reexamined owr at least the next three Euc*ssive lnspectlon periods lo ensure trat progrcsein of the degradalion b not oocuning.Amendment No. 287 Renewed Operating License DPR-66 F.G.H.Beaver Valley Unit 1 ATTACHMENT 3 Proposed Unit 2 Facility Operating License Ghange (Mark-up)(1 Page Folfows) (2) Thofacitity requfres an wrryfibn froilm the requilernmts of f0 CFR 5{I, App*rd[xJ, Sedirn l1LD.2{bXii0-The judinceton of thb orcnplkn is wltairpd ln Sectin 52.6 d gppbne*ffi 5l,o fire $afety Bnaf ualion Reporttrd tttodfied Ia lstbrdalsd.tdy26. | ||
Amendment No. | lS5- Ths stds envirsrrnedal assmsnnnt was Wbffi on illay 12" 1987 (52 FR 17651) ard sn June 9, 1!lS (tr FR 30611} Ttprefore, pursuentlo {0 CFR 5t}.12(afi1} and 10 CfR 5ll-l2{ail2[il and fi}, Baaver Vatery Psenr Stak}n, lJnil 2 b exenqfi forn tn quded roqllelrnntsild irililed. | ||
(1 Page Folfows) (2) Thofacitity requfres an wrryfibn froilm the requilernmts of f0 CFR 5{I, App*rd[xJ, Sedirn l1LD.2{bXii0-The judinceton of thb orcnplkn | is rquired to perfumthe ovsail aL lod( bd( hC et prccam Pa bcbre est*Fshirry containment inte$ity if ail lod( mrinlersrce has been perhrmed ftat ou,rH ffiect Ote a[rb* sedng cryabiff. Locd ld( rab tesning at a pre$sure d]d lesshilt P3 ray be subotlhiled hr m ouwall air locfr hst nrhere fie desftp perntb Ftrysical Securiry FEltlm shafl tfy implerililt d ma-nah in efied all provisbrc sf tp Oommissl@ | ||
lS5- Ths stds envirsrrnedal assmsnnnt was Wbffi on illay 12" 1987 (52 FR 17651) ard sn June 9,1!lS (tr FR 30611} Ttprefore, pursuentlo {0 CFR 5t}.12(afi1} and | ptrynicd secrtily, hft*rg and Walificatim, andssfquds wttirqencydils ittdudtrg ffi rnade prrsuantto prwisist$ | ||
is rquired to perfumthe ovsail aL lod( bd( hC et prccam Pa bcbre est*Fshirry containment inte$ity if ail lod( mrinlersrce has been perhrmed ftat ou,rH ffiect | oftlp M[smhpots A]rHdrEntB end Scarch Requirernents rwisims b 10 CFR 71.55 t51 fR 27817 and Ti8flZland b fte afrnrly I0 CFR 5tl.Sl ard 10CFR 50-54b1- Tho mnttned sdd phr, uilich $*elns S@uads Infonnalion gilecbd-urder l0 CFR 7321b srtidcd: "Be*erVdley Pmur Stalion (BVPSI Pttyulcd Seflrily Plm'srbritled by fdbr Septenrber , erd srrylernmted Septernhr S,4n04, October IA,TJ0!., and lilny lld flffi-FENOC she[ frfyitnpfement md ruilah in efuctall pruuishm of tre Commission.appouuA cper senrly Can tSP), incLding *arqie$ mde rurwant b fttB authorityof 10 CFR 50gt ard 10 CFR 50-5{p)- Ihe Besver Valley Pmrer$alim CSPrffi apprord by Uense Arrwrffir{ hb- 17{,,* | ||
ptrynicd | F- Fire ftoleFligr Proornn (Sedrtn 9-5"'l of SER Supgennnt 3)FENOC sha[ inphnwrt and mdntain ln ffi all pouisftnsof the appwed fte prcileclhn prqgrnn n ffid in the Firnl Safdy Armlysb RWrt duoqgh Amendnrent No, 17, and subrni[ds trd iiry 18, lulsyZ{l, May2t, Jme24 and JgU!, 1987, and as descrbed h fire S#y Euafuation Report dated Otuhr 1S5, ard W 1 ttrougtr6, $fiedlothe illoruiry prmision: FENOC mabt nnke drarryss to the +proved fire prolection prugnam rnithnil pir aptrovuf of tre Connision uty iltrm dangm urudd nat *ersly ffieot Sp abiny to acfiioye and mfibin safu shrrlddnn i-n ttre erront o,f a fre- 'Beever Va$ey Unit 2Arnendnrent Na 174 Rernmpd Openatirg Llcense tfPFfg E. | ||
"Be*erVdley Pmur Stalion ( | |||
, erd srrylernmted Septernhr S,4n04, October IA,TJ0!., and lilny lld flffi-FENOC she[ frfyitnpfement md ruilah in efuctall pruuishm of | |||
*arqie$ | |||
F- Fire ftoleFligr Proornn (Sedrtn 9-5"'l of SER Supgennnt 3)FENOC sha[ inphnwrt and mdntain ln ffi all pouisftnsof the appwed | |||
$fiedlothe illoruiry prmision: | |||
FENOC mabt nnke drarryss to the +proved fire prolection prugnam rnithnil | |||
ATTACHMENT4 Proposed Unit 1 Facility Operating License Change (Re-typed) | ATTACHMENT4 Proposed Unit 1 Facility Operating License Change (Re-typed) | ||
(1 Page Follows) | (1 Page Follows) | ||
D.-7-Physical Probction FENOC shall fully implement and maintaln in effect all provisions of the Commission-appoved physlcal | D.-7-Physical Probction FENOC shall fully implement and maintaln in effect all provisions of the Commission-appoved physlcal securlty, talnlng and guallflcaton, and safeguards conlingency plans including amendmenb made pusuant to prwisions of the Miscelhneous Arnendments and Search Requlrements revlsions to 10 GFR 73.55 (51 FR27817 and27822l and b theauthodty 10 CFR 50.90 antl 10 CFR 50.54(p). The comblned set of plans, wlrlcfr contalnsSaEguards Informatlon protecbd under 10 CFR 73.21 is enlitled: "BeaverValley Porver Shtion (BVPS) Physical Secudg Plan" submitted by lefrer September 9, 20(X, and supplemented September30,2qt4, October 14,2trl/., and May 12,2006.FENOC shallfirlly implement and malntaln In eflect all provlslons of the Gommission-aprwed cyber secudty plan (CSP), induding changes made pursuant to the authodty of10 CFR 50.9t1 and 10 CFR 50.54(p). The Bsaver Valley Power Station GSP wasapprwed by Licensa Amendmenihio- 287, and amend6d by License Amendment No. | ||
IAll uork and ac{ivities in connedion with thls prciect shall be perbrmed pursuant b the provisions of the Gommonvealth of Pennsylvanla Clean Streams Acts of June 24. | |||
"BeaverValley | 1913, as amendod and otJunc 22,1987, as amended, and In accordance wlth allpermlts lssued by the Departnent of Environmental Resources of the Commonweallh of Pennsylvrania-Llcense Renewal Comml0nents - The UFSAR supplemant, as revlsed. | ||
and May 12,2006.FENOC shallfirlly implement and malntaln In eflect all provlslons of the Gommission-aprwed cyber secudty plan (CSP), induding changes made pursuant to the authodty of10 CFR 50.9t1 and 10 CFR 50.54(p). The Bsaver Valley Power Station GSP wasapprwed by Licensa Amendmenihio- 287, and amend6d by License Amendment No. | submltted pursuantto 10 CFR 54.21(d). desqibes ceilain future activilies b be completed prior to and/or during fre pefiod of extended opentlon. FENOC shall complete these activities in acordance wlth Appendlx A of NUREG-1929, Safety Evaluation Repoil Related to lheBeaver Valley Porer Shtion, UniF I and 2, dated Octo0er 2009, and Supplement 1 of NUREG-1929, dabd Odober 2009, and shall notify he NRC in writing when actlvities to be completed prlorto the perlod of extended operation are complete and can be verified byNRC inspection-UFSAR Supplement Changos - The Information In the UFSAR supplement, as revised, submitEd pusuantto 10 CFR54.21(d), shal be inoorporated Into the UFSAR as requited by 10 CFR 50.71(e) blloring the bsuance of thls renalad oparatlng license. Unlil thatupdate is compbte, FENOC may not make dranges to the Inbrmatlon In the supplement. | ||
IAll uork and ac{ivities in connedion with thls prciect shall be perbrmed pursuant b | Folloring Incorporation into the UFSAR, the need for prior Commlssion apprwal of anychanges wlll be govemed by 10 CFR 50.59.Capsule Wlthdrawal Schedule - Forthe renewed operating license term, all capsules In thereactor vessel that are removed and tested must meet the test procedures and repoiling requlrements of Amerlcan Soclety for Testlrg and Materials (ASTM) E 18542 to the extent practicable for the configuraton of the spocimens in the capsule. Any changes to thecapsule withdrawal schedule, includlng spare capsules. musl be approved by the NRC fiorto lmplemenhtlon.Containment Liner Volumetlc Inspection | ||
1913, | -a) lf degradation (greater than 10 perccnt of the nominal hickness not attibutable to fabricaton/erection pracdces) is ldentlfed In he non-nndom areas examined uslngultrasonic testing (UT) as descdbed In Supplement 1 of NUREG-1929, UT examlnatlons shall be perbrmed at additional non-random areas, to be selected based on this operatlng experlence. ShouH additionaldegradation be identilied, addltional non+andom areas shall be UT examined until no fuiher degradation (greater than 10 percent of the nominal thidrness) ls identified. All areas withdegradation shall be reexamlned over at least the noxt ftree successlve Inryectlon periods to ensure that progression of the degradatlon ls not occunlng. | ||
- The UFSAR supplemant, as revlsed. | Amendment No.Renewed Operating License DPR-66 E.F.G.H.Beaver Valfey Unit 1 ATTACHMENT 5 Proposed Unit 2 Facility Operating License Change (Re-typed) | ||
submltted pursuantto 10 CFR 54.21(d). desqibes ceilain future activilies b be completed prior to and/or during fre pefiod of extended opentlon. FENOC shall complete these activities | |||
- The Information In the UFSAR supplement, as revised, submitEd pusuantto 10 CFR54.21(d), shal be inoorporated Into the UFSAR as requited by 10 CFR 50.71(e) blloring the bsuance of thls renalad oparatlng license. Unlil thatupdate is compbte, FENOC may not make dranges to the Inbrmatlon In the supplement. | |||
Folloring Incorporation into the UFSAR, the need for prior Commlssion apprwal of anychanges wlll be govemed by 10 CFR 50.59.Capsule Wlthdrawal Schedule | |||
- Forthe renewed operating license term, all capsules In thereactor vessel that are removed and tested must meet the test procedures and repoiling requlrements of Amerlcan Soclety for Testlrg and Materials (ASTM) E 18542 to the extent practicable for the configuraton of the spocimens in the capsule. Any changes to thecapsule withdrawal schedule, includlng spare capsules. musl be approved by the NRC fiorto lmplemenhtlon.Containment Liner Volumetlc Inspection | |||
-a) lf degradation (greater than 10 perccnt of the nominal hickness not attibutable | |||
Amendment No.Renewed Operating License DPR- | |||
(1 Page Follows) | (1 Page Follows) | ||
E.-8-(21 The facility requires an excmplion ffom the requirements of 10 CFR 50,Appendix J, Section lll.D.2(bxii). | E.-8-(21 The facility requires an excmplion ffom the requirements of 10 CFR 50,Appendix J, Section lll.D.2(bxii). | ||
The juslillcation of this exemplion | The juslillcation of this exemplion is contalned In Sectlcn 6.2.6 of Supplement 5 to the Safety Evalualion Reportand modilied by a letbr dalecl July 26, 1995. | ||
The staffs envirortmental assessnentwas publlshed on May 12,1987 (52 FR 176511 and on Jun* 9,1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(aX1) and | The staffs envirortmental assessnentwas publlshed on May 12,1987 (52 FR 176511 and on Jun* 9, 1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(aX1) and 10 CFR 50.12(ax2xll) and (lil), Bearor Valley Power Statbn, Unit 2 is exemptfom the quoted requirements and instead, is required to perbrm theoverall alr lock leak test at pressure Ps before establlshing contrainment inlegfity if air lod< maintenancc has been performed that could afiect thealr lock sealing cryablllty. Local leak rate tes0ng at a pressure of not less. than Ps may be substifuted br an overall air lodt test where the design permib.Phlaical SecurltyFENOC shallfully implement and malnbin in effect all provisions of tp Commission-approved phynielseorri$, haining and qualification, and safeguards contingency plans Includlng amcndments made purcuant to provlslonq of the Mlscellaneous Amendmentrs and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 arfr27822land to the authority 10 CFR 50.90 and 10 CFR50.54(p). The combined set of plans, whictr contains | ||
haining and qualification, and safeguards contingency plans Includlng amcndments made purcuant to provlslonq of | $afeguards Information protected under 10 CFR 73.21 ls entiUed: "BeaverValley Powcr Stttktn (BVPS)Physlcal Secunty Plan" submltbd by letter September 9, 2(X14. and suppbmentedSeptember30,2004, October 14,20fl/', and May 12,20ffi. | ||
$afeguards Information protected under 10 CFR 73.21 ls entiUed: | FENOC shalf tully implement and mahtaln In effect allprovisions of 0re Commission-approved cyber searity plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). | ||
"BeaverValley Powcr Stttktn (BVPS)Physlcal Secunty Plan" submltbd by letter September 9, 2(X14. and suppbmentedSeptember30,2004, October 14,20fl/', | TtE BeaverValley Power Sbtion CSP was approved by License Amendment No. 174, and amended by Llcense Amendment No.Fire Proteclion Proonam (Secton 9.5.1 of $ER Supplement 3)FENOC shall implement aM maintain in efiect aT povisions of the approved fireprotec'tion program as descrlbed In the Final Safety Analysis ReporthrwghAmendment No. 17, and submlttals dated May 18, May 20, May 21, June 24 ard July 6, 1987, and as described In the Sabty Evaluation Repod dated Oc{oher1985, and Supplements 1 through 6, sublect to the follotving provlslon: | ||
and May 12,20ffi. | FENOC may make changes to the approved fire protection program without prlorapprcval of the Commission onty if those changes wouH not advsrcely affect theabllity to adtieve and malntaln safe shutdown in the event of a fire-Amendment No.Renewed Operating License NPF-73 F.Beaver Valley Unit 2}} | ||
FENOC shalf tully implement and mahtaln In effect allprovisions of | |||
TtE BeaverValley Power Sbtion CSP was approved by License Amendment No. 174,and amended by Llcense Amendment No.Fire Proteclion Proonam (Secton 9.5.1 of $ER Supplement 3)FENOC shall implement aM maintain in efiect aT povisions of the approved fireprotec'tion program as descrlbed In the Final Safety Analysis ReporthrwghAmendment No. 17, and submlttals dated May 18, May 20, May 21, June 24 ard July 6, 1987, and as described In the Sabty Evaluation Repod dated Oc{oher1985, and Supplements 1 through 6, sublect to the follotving provlslon: | |||
FENOC may make changes to the approved fire protection program without prlorapprcval of the Commission onty if those changes wouH not advsrcely affect theabllity to adtieve and malntaln safe shutdown in the event of a fire-Amendment No.Renewed Operating License NPF- |
Revision as of 05:39, 9 July 2018
ML15084A346 | |
Person / Time | |
---|---|
Site: | Beaver Valley |
Issue date: | 03/19/2015 |
From: | Larson E A FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML15084A344 | List: |
References | |
L-15-083 | |
Download: ML15084A346 (11) | |
Text
OFFICIAL USE ONLY - SECURIW-REI.ATED INFORMATION WTHHOLD IN ACCORDANCE WITH 10 CFR 2.390 FENOC^FirstEnergy Nuclaar Opentiry Company Be ave r V alley Power SfafionP.O. Box 4 Shippingport, PA 1ffi77 Eric A. Latson Sde Vice President March 19, 2015 L-l5-093 ATTN: Document Control DeskU. S. Nuclear Regufatory Commission Washington, DC 20555-0001
SUBJECT:
Beaver Valfey Power Station, Unit Nos. 1 andz Docket No. 50-334, License No. DPR-66 Docket No. 50412, License No. NPF-73 724-682-5234 Fax: 724-643-8069 10 cFR 50.90 Reouest to Ghange Cyber Securitv lmolementation Plan Milestone I Completion Date Pursuant to 10 CFR 50.90, FirctEnergy Nuclear Operating Company (FENOC) is requesting an amendment for the BeaverValley Power Station, Unit Nos. I and2, Operating Licenses.An evaluation of the proposed amendment is enclosed.
FENOC is requesting Nuclear Regulatory Commission (NRC) staff approval by January 2.2016 with an implementation period of 30 days following issuance of the amendment.FENOC requests that the enclosure, which contains security-related information, bewithheld from public disclosure in accordance with 10 CFR 2.390.There are no regulatory commitments contained in this submittal. lf there are any questions or if additional information is required, please contact Mr. Thomas A. LenE, Manager - Fleet Licensing, at (330) 315*810.The enclosure to this letter contains security-related information.
Withhold from public disclosure under 10 CFR 2.390.Upon removal of the enclosure, this letter is uncontrolled.
OFFICIAL USE ONLY - SECURITY.REISTED INFORMATION Beaver Valley Power Station, Unit Nos. 1 and2 L-l5-093 Page 2 I declare under penalty of perjury that the foregoing is true and corect. Executed on March lcl ,2015.Sincerely,{c Eric A. Larson
Enclosure:
Evaluation of Proposed Request for Licensing Action cc: NRC Region lAdministrator Nuclear Reactor Regufation Project Manager NRC Resident Inspector Director BRP/DEP (w/o encfosure)
Site BRP/DEP Representative (w/o enclosure)
Enclosure L-15-093Evaluation of Proposed Request for Licensing Action (26 Pages Follow)
ATTACHMENT 2 Proposed Unit 1 Facility Operating License Change (Mark-up)(1 Page Follows)
D.-7-PhvsicalPlobdion FENOC shallfufiy lmplement fid malntain In efled afl ptovi$ons of $e Commlssion-approved physicil *hurlty, fairiq and qualification, and safeguards oontingency plans Including amendmerG made pursuant to provlslons ol the Mlscellaneous Amendments and Search Requtranents EMslons to 10 CFR 73.55 (51 FR27817 and 27822) and bthe authority 10 CFR 50.90 and 10 CFR f0.54(p).
The combinad set of phns. wttlctt contains Srifeguards Inbrmatinn prdod*d under 10 CFR 73.21 is editled: Blaver Valley Porver St*ion (BVPS) Physical Secudty Plan" submitled by letter September 9, 2004, and supplemenied September 30,2fl04", October 14,2UJ/., and May 12, 2006.
FENOC shdlfully implement and maintain ln ofrd all provisbns of the Commission-apppved cyUer seqrity plan (CSP), includlng changes made punuant to the authority o10 CFR 50.90 and 10 CFR 50.54(p). The Beaver Valley Po*tr Stdon CSP was approved by Llcense Amendment No.Allwotk and adlvlfles In connection wtth this ffiec{ shall be perfomed pursuant b the prcvlslons d the Commonwealth ol Penns$vanla Clean Streams Acts d June 24, 1913,io amended and of June A2, $37 , as amonded, and In accordance u,lth all permltslssued bythe Departnent of Erwfronmental Resources of the Commonwealth of Pennsylvanla.License Rena ral Commitnenb - The UFSAR supplement, as revlsed, submlttod pursuant to 10 CFR il.21(dl, descrlbes ceilaln futule adlvltes to be comple*d ptlol tobnd/or during the period dextended opefiaton- FENOC drall conptete these ac{vi0esln accordarrce urur nppenOlx A of NUREG-1929, Safety Evalua[on Repofl Related tothe Beawr Valley Folier Sbtifi, Unlts 1 and 2, dated October 2fl19, and SupSement 1d NUREG-1929. dated Oclober 2009, and shall notfi the NRG In wriilng when activltiesto be compl*bd prior b 0te pdiod of elttended operatlon are oomplete and can be verilied by NRC inspsdion.UFSAR Supplement Changes - Thc lnfonnatlon In tlre UFSAR supdement, as rcvised, submitted pursuant b 10 CFR54.21(d), shall be Incoporabd lnto the UFSAR asrequlrcd by 10 CFR $.71(e) trlowittg the hsuance of this renewed opraling llcense.UnU nat ripO*e ls complete, FENOC may not make changes to ll1e inturmation In the supplemeil.
Follovtftg hcoporation lnto the UFSAR.
he need fur pior Commission approvalof any changes will be governEd by 10 CFR 50.59.Capaule Wltrdnwd Sdpdult - Fq the mrpwed operating license tenn, all capsules in he nactorvcssel tral an rumovsd and testsd must meetthe bstprocedures and reporting requlrements of Amerlcan Society for Testng and Materlals (ASTlr) E- 185*2 to'the extenf praclicatrle br the conliguration of lhe specimens In the capule. Any dtanges to the capsule withdrarval schedule, including spare capzules, must be approvad bythe NRC pnorto implqnentdion.
Containmerl Llner Vdurn*ic Inspec{hn
-a) lf degnadation (grealer tran 10 percent of the nominal thldmess nol attibuhble lo fabdcation/ersc{ion practftns) b Henffi*d in the non-random areas examined usingulfasonlc bsffig (UT) as described ln Supplement I of NUREG-1929' UTexaminathns shall be perfomed at addltonaltun-random areas, b be seleded based on tlrls operatng erycrlence.
Should addltlonaldegnadaton be ldeniifred, addltlonal nontandom arsas shall be UT oomined until no further degradalion (greatertran 10 porcont of ulo nomlnalhickneee) is ltlenfilled.
Allareas withdegradation shali ba reexamined owr at least the next three Euc*ssive lnspectlon periods lo ensure trat progrcsein of the degradalion b not oocuning.Amendment No. 287 Renewed Operating License DPR-66 F.G.H.Beaver Valley Unit 1 ATTACHMENT 3 Proposed Unit 2 Facility Operating License Ghange (Mark-up)(1 Page Folfows) (2) Thofacitity requfres an wrryfibn froilm the requilernmts of f0 CFR 5{I, App*rd[xJ, Sedirn l1LD.2{bXii0-The judinceton of thb orcnplkn is wltairpd ln Sectin 52.6 d gppbne*ffi 5l,o fire $afety Bnaf ualion Reporttrd tttodfied Ia lstbrdalsd.tdy26.
lS5- Ths stds envirsrrnedal assmsnnnt was Wbffi on illay 12" 1987 (52 FR 17651) ard sn June 9, 1!lS (tr FR 30611} Ttprefore, pursuentlo {0 CFR 5t}.12(afi1} and 10 CfR 5ll-l2{ail2[il and fi}, Baaver Vatery Psenr Stak}n, lJnil 2 b exenqfi forn tn quded roqllelrnntsild irililed.
is rquired to perfumthe ovsail aL lod( bd( hC et prccam Pa bcbre est*Fshirry containment inte$ity if ail lod( mrinlersrce has been perhrmed ftat ou,rH ffiect Ote a[rb* sedng cryabiff. Locd ld( rab tesning at a pre$sure d]d lesshilt P3 ray be subotlhiled hr m ouwall air locfr hst nrhere fie desftp perntb Ftrysical Securiry FEltlm shafl tfy implerililt d ma-nah in efied all provisbrc sf tp Oommissl@
ptrynicd secrtily, hft*rg and Walificatim, andssfquds wttirqencydils ittdudtrg ffi rnade prrsuantto prwisist$
oftlp M[smhpots A]rHdrEntB end Scarch Requirernents rwisims b 10 CFR 71.55 t51 fR 27817 and Ti8flZland b fte afrnrly I0 CFR 5tl.Sl ard 10CFR 50-54b1- Tho mnttned sdd phr, uilich $*elns S@uads Infonnalion gilecbd-urder l0 CFR 7321b srtidcd: "Be*erVdley Pmur Stalion (BVPSI Pttyulcd Seflrily Plm'srbritled by fdbr Septenrber , erd srrylernmted Septernhr S,4n04, October IA,TJ0!., and lilny lld flffi-FENOC she[ frfyitnpfement md ruilah in efuctall pruuishm of tre Commission.appouuA cper senrly Can tSP), incLding *arqie$ mde rurwant b fttB authorityof 10 CFR 50gt ard 10 CFR 50-5{p)- Ihe Besver Valley Pmrer$alim CSPrffi apprord by Uense Arrwrffir{ hb- 17{,,*
F- Fire ftoleFligr Proornn (Sedrtn 9-5"'l of SER Supgennnt 3)FENOC sha[ inphnwrt and mdntain ln ffi all pouisftnsof the appwed fte prcileclhn prqgrnn n ffid in the Firnl Safdy Armlysb RWrt duoqgh Amendnrent No, 17, and subrni[ds trd iiry 18, lulsyZ{l, May2t, Jme24 and JgU!, 1987, and as descrbed h fire S#y Euafuation Report dated Otuhr 1S5, ard W 1 ttrougtr6, $fiedlothe illoruiry prmision: FENOC mabt nnke drarryss to the +proved fire prolection prugnam rnithnil pir aptrovuf of tre Connision uty iltrm dangm urudd nat *ersly ffieot Sp abiny to acfiioye and mfibin safu shrrlddnn i-n ttre erront o,f a fre- 'Beever Va$ey Unit 2Arnendnrent Na 174 Rernmpd Openatirg Llcense tfPFfg E.
ATTACHMENT4 Proposed Unit 1 Facility Operating License Change (Re-typed)
(1 Page Follows)
D.-7-Physical Probction FENOC shall fully implement and maintaln in effect all provisions of the Commission-appoved physlcal securlty, talnlng and guallflcaton, and safeguards conlingency plans including amendmenb made pusuant to prwisions of the Miscelhneous Arnendments and Search Requlrements revlsions to 10 GFR 73.55 (51 FR27817 and27822l and b theauthodty 10 CFR 50.90 antl 10 CFR 50.54(p). The comblned set of plans, wlrlcfr contalnsSaEguards Informatlon protecbd under 10 CFR 73.21 is enlitled: "BeaverValley Porver Shtion (BVPS) Physical Secudg Plan" submitted by lefrer September 9, 20(X, and supplemented September30,2qt4, October 14,2trl/., and May 12,2006.FENOC shallfirlly implement and malntaln In eflect all provlslons of the Gommission-aprwed cyber secudty plan (CSP), induding changes made pursuant to the authodty of10 CFR 50.9t1 and 10 CFR 50.54(p). The Bsaver Valley Power Station GSP wasapprwed by Licensa Amendmenihio- 287, and amend6d by License Amendment No.
IAll uork and ac{ivities in connedion with thls prciect shall be perbrmed pursuant b the provisions of the Gommonvealth of Pennsylvanla Clean Streams Acts of June 24.
1913, as amendod and otJunc 22,1987, as amended, and In accordance wlth allpermlts lssued by the Departnent of Environmental Resources of the Commonweallh of Pennsylvrania-Llcense Renewal Comml0nents - The UFSAR supplemant, as revlsed.
submltted pursuantto 10 CFR 54.21(d). desqibes ceilain future activilies b be completed prior to and/or during fre pefiod of extended opentlon. FENOC shall complete these activities in acordance wlth Appendlx A of NUREG-1929, Safety Evaluation Repoil Related to lheBeaver Valley Porer Shtion, UniF I and 2, dated Octo0er 2009, and Supplement 1 of NUREG-1929, dabd Odober 2009, and shall notify he NRC in writing when actlvities to be completed prlorto the perlod of extended operation are complete and can be verified byNRC inspection-UFSAR Supplement Changos - The Information In the UFSAR supplement, as revised, submitEd pusuantto 10 CFR54.21(d), shal be inoorporated Into the UFSAR as requited by 10 CFR 50.71(e) blloring the bsuance of thls renalad oparatlng license. Unlil thatupdate is compbte, FENOC may not make dranges to the Inbrmatlon In the supplement.
Folloring Incorporation into the UFSAR, the need for prior Commlssion apprwal of anychanges wlll be govemed by 10 CFR 50.59.Capsule Wlthdrawal Schedule - Forthe renewed operating license term, all capsules In thereactor vessel that are removed and tested must meet the test procedures and repoiling requlrements of Amerlcan Soclety for Testlrg and Materials (ASTM) E 18542 to the extent practicable for the configuraton of the spocimens in the capsule. Any changes to thecapsule withdrawal schedule, includlng spare capsules. musl be approved by the NRC fiorto lmplemenhtlon.Containment Liner Volumetlc Inspection
-a) lf degradation (greater than 10 perccnt of the nominal hickness not attibutable to fabricaton/erection pracdces) is ldentlfed In he non-nndom areas examined uslngultrasonic testing (UT) as descdbed In Supplement 1 of NUREG-1929, UT examlnatlons shall be perbrmed at additional non-random areas, to be selected based on this operatlng experlence. ShouH additionaldegradation be identilied, addltional non+andom areas shall be UT examined until no fuiher degradation (greater than 10 percent of the nominal thidrness) ls identified. All areas withdegradation shall be reexamlned over at least the noxt ftree successlve Inryectlon periods to ensure that progression of the degradatlon ls not occunlng.
Amendment No.Renewed Operating License DPR-66 E.F.G.H.Beaver Valfey Unit 1 ATTACHMENT 5 Proposed Unit 2 Facility Operating License Change (Re-typed)
(1 Page Follows)
E.-8-(21 The facility requires an excmplion ffom the requirements of 10 CFR 50,Appendix J, Section lll.D.2(bxii).
The juslillcation of this exemplion is contalned In Sectlcn 6.2.6 of Supplement 5 to the Safety Evalualion Reportand modilied by a letbr dalecl July 26, 1995.
The staffs envirortmental assessnentwas publlshed on May 12,1987 (52 FR 176511 and on Jun* 9, 1995 (60 FR 30611). Therefore, pursuant to 10 CFR 50.12(aX1) and 10 CFR 50.12(ax2xll) and (lil), Bearor Valley Power Statbn, Unit 2 is exemptfom the quoted requirements and instead, is required to perbrm theoverall alr lock leak test at pressure Ps before establlshing contrainment inlegfity if air lod< maintenancc has been performed that could afiect thealr lock sealing cryablllty. Local leak rate tes0ng at a pressure of not less. than Ps may be substifuted br an overall air lodt test where the design permib.Phlaical SecurltyFENOC shallfully implement and malnbin in effect all provisions of tp Commission-approved phynielseorri$, haining and qualification, and safeguards contingency plans Includlng amcndments made purcuant to provlslonq of the Mlscellaneous Amendmentrs and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 arfr27822land to the authority 10 CFR 50.90 and 10 CFR50.54(p). The combined set of plans, whictr contains
$afeguards Information protected under 10 CFR 73.21 ls entiUed: "BeaverValley Powcr Stttktn (BVPS)Physlcal Secunty Plan" submltbd by letter September 9, 2(X14. and suppbmentedSeptember30,2004, October 14,20fl/', and May 12,20ffi.
FENOC shalf tully implement and mahtaln In effect allprovisions of 0re Commission-approved cyber searity plan (CSP), including changes made pursuant to the authority of 10 CFR 50.90 and 10 CFR 50.54(p).
TtE BeaverValley Power Sbtion CSP was approved by License Amendment No. 174, and amended by Llcense Amendment No.Fire Proteclion Proonam (Secton 9.5.1 of $ER Supplement 3)FENOC shall implement aM maintain in efiect aT povisions of the approved fireprotec'tion program as descrlbed In the Final Safety Analysis ReporthrwghAmendment No. 17, and submlttals dated May 18, May 20, May 21, June 24 ard July 6, 1987, and as described In the Sabty Evaluation Repod dated Oc{oher1985, and Supplements 1 through 6, sublect to the follotving provlslon:
FENOC may make changes to the approved fire protection program without prlorapprcval of the Commission onty if those changes wouH not advsrcely affect theabllity to adtieve and malntaln safe shutdown in the event of a fire-Amendment No.Renewed Operating License NPF-73 F.Beaver Valley Unit 2