ML15222B134: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 53: | Line 53: | ||
L. Coyle 2 | L. Coyle 2 | ||
In accordance with Title 10 of the Code of Federal Regulations | In accordance with Title 10 of the Code of Federal Regulations , Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at | ||
, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
Please contact | Please contact | ||
Line 60: | Line 59: | ||
Sincerely, | Sincerely, | ||
Line 83: | Line 81: | ||
Page 1 of 2 | Page 1 of 2 | ||
03/02/2015 | 03/02/2015 | ||
15:16: | 15:16:39 Report 22 Unit NumberPlanned Dates | ||
Start EndInspection ActivityTitle No. of Staff | |||
Start EndInspection | on Site Indian PointInspection / Activity Plan | ||
on | |||
01/01/2015 | 01/01/2015 | ||
-06/30/20165/11EXAM-U3 INITIAL OL EXAM | -06/30/20165/11EXAM-U3 INITIAL OL EXAM | ||
5 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM | 5 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM | ||
U01908 04/13/2015 | |||
04/17/2015 | 04/17/2015 | ||
3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM | 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM | ||
U0190805/11/2015 | U0190805/11/2015 | ||
05/15/201571124- | 05/15/201571124-RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 02/09/2015 | ||
02/13/2015 | 02/13/2015 | ||
2,3 | 2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/09/2015 | ||
02/13/201571124- | 02/13/201571124-HP 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015 | ||
03/06/2015 | 03/06/2015 | ||
3 | 3 IP Occupational ALARA Planning and Controls71124.02 03/02/2015 | ||
03/06/20157111108P-U3 INSERVICE INSPECTION | 03/06/20157111108P-U3 INSERVICE INSPECTION | ||
1 3 | 1 3 IP Inservice Inspection Activities - PWR7111108P 03/09/2015 | ||
03/20/201571152-GROUNDWATER MONITORING | 03/20/201571152-GROUNDWATER MONITORING | ||
5 2 | 5 2 IP Problem Identification and Resolution71152 05/04/2015 | ||
05/07/201571124- | 05/07/201571124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/07/2015 | ||
05/13/2015 | 05/13/2015 | ||
2,3 | 2, 3 IP Occupational ALARA Planning and Controls71124.02 05/07/2015 | ||
05/13/20157111107T-TRIENNIAL HEAT SINK | 05/13/20157111107T-TRIENNIAL HEAT SINK | ||
1 2,3 | 1 2, 3 IP Heat Sink Performance7111107T 07/06/2015 | ||
07/10/2015 | 07/10/2015 | ||
CDBI-COMPONENT DESIGN BASIS INSPECTION | CDBI-COMPONENT DESIGN BASIS INSPECTION | ||
8 2,3 | 8 2, 3 IP Component Design Bases Inspection7111121 07/20/2015 | ||
07/24/2015 | 07/24/2015 | ||
2,3 | 2, 3 IP Component Design Bases Inspection7111121 08/03/2015 | ||
08/07/2015 | 08/07/2015 | ||
2,3 | 2, 3 IP Component Design Bases Inspection7111121 08/17/2015 | ||
08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS | 08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS | ||
2 3 | 2 3 IP Licensed Operator Requalification Program7111111B 09/21/2015 | ||
09/25/201571124- | 09/25/201571124-HP 1 2, 3 IP Occupational Dose Assessment71124.04 08/10/2015 | ||
08/14/2015 | 08/14/2015 | ||
2,3 | 2, 3 IP Radiation Monitoring Instrumentation71124.05 08/10/2015 | ||
08/14/2015 | 08/14/2015 | ||
2,3 | 2, 3 IP Performance Indicator Verification71151 08/10/2015 | ||
08/14/2015 | 08/14/2015 | ||
EP-EP PROGRAM INSPECTION | EP-EP PROGRAM INSPECTION | ||
1 2,3 | 1 2, 3 IP A lert and Notification System Testing7111402 08/17/2015 | ||
08/21/2015 | 08/21/2015 | ||
2,3 | 2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/17/2015 | ||
08/21/2015 | 08/21/2015 | ||
2,3 | 2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/17/2015 | ||
08/21/2015 | 08/21/2015 | ||
This report does not include INPO and OUTAGE activities. This report shows only on-site | This report does not include INPO and OUTAGE activities. This report shows only on-site | ||
Line 135: | Line 132: | ||
Page 2 of 2 | Page 2 of 2 | ||
03/02/2015 | 03/02/2015 | ||
15:16: | 15:16:39 Report 22 Unit NumberPlanned Dates | ||
Start EndInspection ActivityTitle No. of Staff | |||
Start EndInspection | on Site Indian PointInspection / Activity Plan | ||
on | |||
01/01/2015 | 01/01/2015 | ||
-06/30/2016 | -06/30/2016 | ||
ISFSI-ISFSI LOADING INSPECTION | ISFSI-ISFSI LOADING INSPECTION | ||
2 2,3 | 2 2, 3 IP Operation Of An ISFSI | ||
60855 08/17/2015 | |||
08/21/2015 | 08/21/2015 | ||
2 | 2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants | ||
60855. | 60855.1 08/17/2015 | ||
08/21/2015 | 08/21/2015 | ||
2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION | 2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION | ||
1 3 | 1 3 IP Review of License Renewal Activities | ||
2516/00111/16/201511/20/201571124.08- | 2516/00111/16/201511/20/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL | ||
4 2,3 | 4 2, 3 IP Problem Identification and Resolution71152B11/30/2015 | ||
12/04/2015 | 12/04/2015 | ||
2,3 | 2, 3 IP Problem Identification and Resolution71152B 12/14/2015 | ||
12/18/201571124- | 12/18/201571124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016 | ||
2 | 2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016 | ||
ISI-U2 INSERVICE INSPECTION | ISI-U2 INSERVICE INSPECTION | ||
1 2 | 1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016 | ||
03/25/2016 | 03/25/2016 | ||
EP-EP EXERCISE EVALUATION | EP-EP EXERCISE EVALUATION | ||
4 2,3 | 4 2, 3 IP Exercise Evaluation7111401 06/27/2016 | ||
07/01/2016 | 07/01/2016 | ||
TRI FI-TRIENNIAL FIRE PROTECTION | TRI FI-TRIENNIAL FIRE PROTECTION | ||
4 2,3 | 4 2, 3 IP Fire Protection [Triennial]7111105T 05/23/2016 | ||
05/27/2016 | 05/27/2016 | ||
2,3 | 2, 3 IP Fire Protection [Triennial]7111105T 06/06/2016 | ||
06/10/201671124.07- | 06/10/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/20/2016 | ||
06/24/2016 | 06/24/2016 | ||
This report does not include INPO and OUTAGE activities. This report shows only on-site | This report does not include INPO and OUTAGE activities. This report shows only on-site | ||
and announced inspection procedures. | and announced inspection procedures. | ||
}} | }} |
Revision as of 23:53, 8 July 2018
ML15222B134 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 03/04/2015 |
From: | Entergy Nuclear Operations |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 28138, ASLBP 07-858-03-LR-BD01, 50-247-LR, 50-286-LR | |
Download: ML15222B134 (5) | |
See also: IR 05000247/2014001
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713
March 4, 2015
Mr. Larry Coyle
Site Vice President Entergy Nuclear Operations, Inc. Indian Point Energy Center
450 Broadway, GSB
P.O. Box 249
Buchanan, NY 10511-0249
SUBJECT: ANNUAL ASSESSMENT LETTER FOR INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2014001 AND
Dear Mr. Coyle:
On February 11, 2015, the U. S. Nuclear Regulatory Commission (NRC) completed its end-of-
cycle performance review of Indian Point Nuclear Generating (Indian Point) Units 2 and 3. The
NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection
results and enforcement actions from January 1, 2014 through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Indian Point Units 2 and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined
the performance at Indian Point Units 2 and 3 during the most recent quarter was within the Licensee Response Column of the NRC's Reacto
r Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green).
Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan. The
inspections listed during the last nine months of the inspection plan are tentative and may be
revised at the mid-cycle performance review. In addition to baseline inspections, the NRC will
perform inspection procedure (IP) 60855, "Operation of an Independent Spent Fuel Storage
Installation at Operating Plants," IP 92702, "Follow-up on Corrective Actions for Violations," and Temporary Instruction 2516-001, "Review of License Renewal Activities." The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as
soon as possible to dis
cuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not
include security-related inspections, which will be sent via separate, non-publicly available correspondence.
L. Coyle 2
In accordance with Title 10 of the Code of Federal Regulations , Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact
me at (610)337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/ Arthur L. Burritt, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Docket Nos. 50-247 and 50-286
License Nos. DPR-26 and DPR-64
Enclosure: Indian Point 2 & 3 Inspection/Activity Plan
cc w/encl: Distribution via ListServ
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer/TCS ABurritt/ALB DATE 02/23/15 03/02/15
Page 1 of 2
03/02/2015
15:16:39 Report 22 Unit NumberPlanned Dates
Start EndInspection ActivityTitle No. of Staff
on Site Indian PointInspection / Activity Plan
01/01/2015
-06/30/20165/11EXAM-U3 INITIAL OL EXAM
5 3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U01908 04/13/2015
04/17/2015
3 FY15-IP3 INITIAL OPERATOR LICENSING EXAM
U0190805/11/2015
05/15/201571124-RETS 1 2, 3 IP Radiation Monitoring Instrumentation71124.05 02/09/2015
02/13/2015
2, 3 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 02/09/2015
02/13/201571124-HP 1 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/02/2015
03/06/2015
3 IP Occupational ALARA Planning and Controls71124.02 03/02/2015
03/06/20157111108P-U3 INSERVICE INSPECTION
1 3 IP Inservice Inspection Activities - PWR7111108P 03/09/2015
03/20/201571152-GROUNDWATER MONITORING
5 2 IP Problem Identification and Resolution71152 05/04/2015
05/07/201571124-HP 1 2, 3 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/07/2015
05/13/2015
2, 3 IP Occupational ALARA Planning and Controls71124.02 05/07/2015
05/13/20157111107T-TRIENNIAL HEAT SINK
1 2, 3 IP Heat Sink Performance7111107T 07/06/2015
07/10/2015
CDBI-COMPONENT DESIGN BASIS INSPECTION
8 2, 3 IP Component Design Bases Inspection7111121 07/20/2015
07/24/2015
2, 3 IP Component Design Bases Inspection7111121 08/03/2015
08/07/2015
2, 3 IP Component Design Bases Inspection7111121 08/17/2015
08/21/20157111111B-IP3 REQUAL INSP W/ P/F RESULTS
2 3 IP Licensed Operator Requalification Program7111111B 09/21/2015
09/25/201571124-HP 1 2, 3 IP Occupational Dose Assessment71124.04 08/10/2015
08/14/2015
2, 3 IP Radiation Monitoring Instrumentation71124.05 08/10/2015
08/14/2015
2, 3 IP Performance Indicator Verification71151 08/10/2015
08/14/2015
EP-EP PROGRAM INSPECTION
1 2, 3 IP A lert and Notification System Testing7111402 08/17/2015
08/21/2015
2, 3 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/17/2015
08/21/2015
2, 3 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/17/2015
08/21/2015
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.
Page 2 of 2
03/02/2015
15:16:39 Report 22 Unit NumberPlanned Dates
Start EndInspection ActivityTitle No. of Staff
on Site Indian PointInspection / Activity Plan
01/01/2015
-06/30/2016
ISFSI-ISFSI LOADING INSPECTION
2 2, 3 IP Operation Of An ISFSI
60855 08/17/2015
08/21/2015
2 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants
60855.1 08/17/2015
08/21/2015
2516-001-TI 2516-001 U3 LR COMMITMENTS INSPECTION
1 3 IP Review of License Renewal Activities
2516/00111/16/201511/20/201571124.08-RADWASTE 1 2, 3 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0811/16/201511/20/201571152B-PI&R - BIENNIAL
4 2, 3 IP Problem Identification and Resolution71152B11/30/2015
12/04/2015
2, 3 IP Problem Identification and Resolution71152B 12/14/2015
12/18/201571124-HP 1 2 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/07/201603/11/2016
2 IP Occupational ALARA Planning and Controls71124.02 03/07/201603/11/2016
ISI-U2 INSERVICE INSPECTION
1 2 IP Inservice Inspection Activities - PWR7111108P 03/14/2016
03/25/2016
EP-EP EXERCISE EVALUATION
4 2, 3 IP Exercise Evaluation7111401 06/27/2016
07/01/2016
TRI FI-TRIENNIAL FIRE PROTECTION
4 2, 3 IP Fire Protection [Triennial]7111105T 05/23/2016
05/27/2016
2, 3 IP Fire Protection [Triennial]7111105T 06/06/2016
06/10/201671124.07-REMP 1 2, 3 IP Radiological Environmental Monitoring Program71124.07 06/20/2016
06/24/2016
This report does not include INPO and OUTAGE activities. This report shows only on-site
and announced inspection procedures.