==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4 -REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF.6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)  
JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4 -REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF.6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)  


==Dear Mr. Pierce:==
==Dear Mr. Pierce:==
By letter dated August 31, 2015, the Southern Nuclear Operating  
By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRG approval of a standard emergency plan for all SNC sites and specific annexes. The NRG staff has determined that additional information is needed as in the Enclosure.
: Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRG approval of a standard emergency plan for all SNC sites and specific annexes.
The NRG staff has determined that additional information is needed as in the Enclosure.
We request that SNC respond by February 15, 2016. Please note that the NRG staff's review is continuing and further requests for information may be developed.
We request that SNC respond by February 15, 2016. Please note that the NRG staff's review is continuing and further requests for information may be developed.
Docket Nos. 50-348, 50-364, 50-321, 50-366 50-424, 50-425, 52-025, 52-026  
Docket Nos. 50-348, 50-364, 50-321, 50-366 50-424, 50-425, 52-025, 52-026  
Line 33: Line 30:
==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUESTS FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST FLEET STANDARD EMERGENCY PLAN EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 VOGTLE ELECTRIC GENERATING  
Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUESTS FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST FLEET STANDARD EMERGENCY PLAN EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 VOGTLE ELECTRIC GENERATING STATION, UNITS 1AND2 VOGTLE ELECTRIC GENERATING STATION, UNITS 3 AND 4 DOCKET NUMBERS 50-321, 50-366, 50-348, 50-364, 50-424, 50-425, 52-25 AND 52-26 By letter dated August 31, 2015, Southern Nuclear Operating Company (SNC) requested approval for a fleet standard emergency plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2, Joseph M. Farley Nuclear Plant Units 1 and 2, and Vogtle Electric Generating Stations Units 1, 2, 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. Package Accession No. ML 15246A045).
: STATION, UNITS 1AND2 VOGTLE ELECTRIC GENERATING  
SNC proposes to change the current Joint information Centers (JICs) described in the respective site emergency plans to incorporate a SNC fleet standard approach .for a JIC/Joint Information System (JIS). The request for additional information (RAI) listed below, in regards to Enclosure 3, "Corporate Joint Information Center Description and Technical Evaluation," is needed to support the NRC staff's continued technical review of the proposed change.
: STATION, UNITS 3 AND 4 DOCKET NUMBERS 50-321, 50-366, 50-348, 50-364, 50-424, 50-425, 52-25 AND 52-26 By letter dated August 31, 2015, Southern Nuclear Operating Company (SNC) requested approval for a fleet standard emergency plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2, Joseph M. Farley Nuclear Plant Units 1 and 2, and Vogtle Electric Generating Stations Units 1, 2, 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. Package Accession No. ML 15246A045).
* RAl-1 The letters provided in Enclosure 19, "Off-site Response Organizations Letters of Consultation and Concurrence," provides the following "boilerplate language" describing the level of changes discussed with applicable State and local governmental authorities:
SNC proposes to change the current Joint information Centers (JICs) described in the respective site emergency plans to incorporate a SNC fleet standard approach  
This discussion included but was not limited to layout and format of the Southern Nuclear emergency plan base document and site specific annexes, reduction in level of detail of the overall content of the plan consistent with a planning level document, proposed changes to on-shift and augmented emergency response personnel staffing, proposed changes to emergency response personnel augmentation time, standardization of Southern Nuclear Fleet position titles and duties, proposed changes to dissemination of public information, etc. Enclosure  Per 10 CFR 50/54(s)(3), any change to the licensee's emergency plan that impacts or has the potential to impact State and local REP plans will be provided to FEMA for review to verify that continued reasonable assurance exists that State and local emergency plans can be implemented.
.for a JIC/Joint Information System (JIS). The request for additional information (RAI) listed below, in regards to Enclosure 3, "Corporate Joint Information Center Description and Technical Evaluation,"
is needed to support the NRC staff's continued technical review of the proposed change.
* RAl-1 The letters provided in Enclosure 19, "Off-site Response Organizations Letters of Consultation and Concurrence,"
provides the following "boilerplate language" describing the level of changes discussed with applicable State and local governmental authorities:
This discussion included but was not limited to layout and format of the Southern Nuclear emergency plan base document and site specific  
: annexes, reduction in level of detail of the overall content of the plan consistent with a planning level document, proposed changes to on-shift and augmented emergency response personnel  
: staffing, proposed changes to emergency response personnel augmentation time, standardization of Southern Nuclear Fleet position titles and duties, proposed changes to dissemination of public information, etc. Enclosure  Per 10 CFR 50/54(s)(3),
any change to the licensee's emergency plan that impacts or has the potential to impact State and local REP plans will be provided to FEMA for review to verify that continued reasonable assurance exists that State and local emergency plans can be implemented.
As such, an. adequate evaluation and documentation of coordination with offsite response organization needs to be provided as part of licensee's submittal.
As such, an. adequate evaluation and documentation of coordination with offsite response organization needs to be provided as part of licensee's submittal.
Please provide documentation that the offsite response organizations have reviewed and *concur on the proposed changes with respect to the relocation of the JICs and its potential impact on their respective radiological emergency preparedness (REP) plans. Additionally, please identify whether other proposed changes to the respective site emergency plans were evaluated for their impact the State and local response organizations ability to effectively implement their FEMA-approved REP plans, specifically in regards to licensee interface and coordination with State and local response organizations.
Please provide documentation that the offsite response organizations have reviewed and *concur on the proposed changes with respect to the relocation of the JICs and its potential impact on their respective radiological emergency preparedness (REP) plans. Additionally, please identify whether other proposed changes to the respective site emergency plans were evaluated for their impact the State and local response organizations ability to effectively implement their FEMA-approved REP plans, specifically in regards to licensee interface and coordination with State and local response organizations.
If so, please provide evaluation  
If so, please provide evaluation . performed an.d documentation regarding discussions with affected State and local response organizations used in making this determination.
. performed an.d documentation regarding discussions with affected State and local response organizations used in making this determination.
Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 December 2, 2015  
Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 December 2, 2015  


==SUBJECT:==
==SUBJECT:==
JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4-REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)  
JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4-REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)  


==Dear Mr. Pierce:==
==Dear Mr. Pierce:==
By letter dated August 31, 2015, the Southern Nuclear Operating  
By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRC approval of a standard emergency plan for all SNC sites and site-specific annexes.
: Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRC approval of a standard emergency plan for all SNC sites and site-specific annexes.
* The NRC staff has determined that additional information is needed as discussed in the Enclosure.
* The NRC staff has determined that additional information is needed as discussed in the Enclosure.
We request that SNC respond by February 15, 2016. Please note that the NRC staff's review is continuing and further requests for information be developed.
We request that SNC respond by February 15, 2016. Please note that the NRC staff's review is continuing and further requests for information be developed.
Line 64: Line 50:
==Enclosure:==
==Enclosure:==


Request for Additional Information cc w/encl: Distribution via Listserv Sincerely,  
Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, /RA/ Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation DISTRIBUTION PUBLIC RidsNrrDorlDpr Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDorlLpl2-1 Resource
/RA/ Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation DISTRIBUTION PUBLIC RidsNrrDorlDpr Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDorlLpl2-1 Resource
* RidsNrrDe Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource RMartin, NRR MNorris, NRR . CPatel, NRO ADAMS Accession No.: ML15334A009  
* RidsNrrDe Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource  
: RMartin, NRR MNorris, NRR . CPatel, NRO ADAMS Accession No.: ML15334A009  
*By e-mail OFFICE LPL2-1/PM LPL2-1/LA NSIR/DPR/ORLOB/BC LPL2-1/BC LPL2-1/PM w/comments NAME SWilliams SFigueroa JAnderson*
*By e-mail OFFICE LPL2-1/PM LPL2-1/LA NSIR/DPR/ORLOB/BC LPL2-1/BC LPL2-1/PM w/comments NAME SWilliams SFigueroa JAnderson*
MMarkley SWilliams (GEMiller for) .DATE 12/02/15 12/02/15 11/24/15 12/02/15 12/02/15 OFFICIAL RECORD COPY}}
MMarkley SWilliams (GEMiller for) .DATE 12/02/15 12/02/15 11/24/15 12/02/15 12/02/15 OFFICIAL RECORD COPY}}

Revision as of 20:16, 8 July 2018

Joseph M. Farley, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 - Request for Additional Information (TAC Nos. MF6670, MF6671, MF6672, MF6673, MF6674, MF6675, and RP9516)
ML15334A009
Person / Time
Site: Hatch, Vogtle, Farley  Southern Nuclear icon.png
Issue date: 12/02/2015
From: Shawn Williams
Plant Licensing Branch II
To: Pierce C R
Southern Nuclear Operating Co
Williams S
References
CAC MF6670, CAC MF6671, CAC MF6672, CAC MF6673, CAC MF6674, CAC MF6675, CAC RP9516
Download: ML15334A009 (4)


Text

I. I UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 . .Birmingham, AL 35201-1295 December 2, 2015

SUBJECT:

JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4 -REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF.6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)

Dear Mr. Pierce:

By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRG approval of a standard emergency plan for all SNC sites and specific annexes. The NRG staff has determined that additional information is needed as in the Enclosure.

We request that SNC respond by February 15, 2016. Please note that the NRG staff's review is continuing and further requests for information may be developed.

Docket Nos. 50-348, 50-364, 50-321, 50-366 50-424, 50-425,52-025, 52-026

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation REQUESTS FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST FLEET STANDARD EMERGENCY PLAN EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 JOSEPH M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 VOGTLE ELECTRIC GENERATING STATION, UNITS 1AND2 VOGTLE ELECTRIC GENERATING STATION, UNITS 3 AND 4 DOCKET NUMBERS 50-321, 50-366, 50-348, 50-364, 50-424, 50-425, 52-25 AND 52-26 By letter dated August 31, 2015, Southern Nuclear Operating Company (SNC) requested approval for a fleet standard emergency plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2, Joseph M. Farley Nuclear Plant Units 1 and 2, and Vogtle Electric Generating Stations Units 1, 2, 3 and 4 (Agencywide Documents Access and Management System (ADAMS) Accession No. Package Accession No. ML 15246A045).

SNC proposes to change the current Joint information Centers (JICs) described in the respective site emergency plans to incorporate a SNC fleet standard approach .for a JIC/Joint Information System (JIS). The request for additional information (RAI) listed below, in regards to Enclosure 3, "Corporate Joint Information Center Description and Technical Evaluation," is needed to support the NRC staff's continued technical review of the proposed change.

  • RAl-1 The letters provided in Enclosure 19, "Off-site Response Organizations Letters of Consultation and Concurrence," provides the following "boilerplate language" describing the level of changes discussed with applicable State and local governmental authorities:

This discussion included but was not limited to layout and format of the Southern Nuclear emergency plan base document and site specific annexes, reduction in level of detail of the overall content of the plan consistent with a planning level document, proposed changes to on-shift and augmented emergency response personnel staffing, proposed changes to emergency response personnel augmentation time, standardization of Southern Nuclear Fleet position titles and duties, proposed changes to dissemination of public information, etc. Enclosure Per 10 CFR 50/54(s)(3), any change to the licensee's emergency plan that impacts or has the potential to impact State and local REP plans will be provided to FEMA for review to verify that continued reasonable assurance exists that State and local emergency plans can be implemented.

As such, an. adequate evaluation and documentation of coordination with offsite response organization needs to be provided as part of licensee's submittal.

Please provide documentation that the offsite response organizations have reviewed and *concur on the proposed changes with respect to the relocation of the JICs and its potential impact on their respective radiological emergency preparedness (REP) plans. Additionally, please identify whether other proposed changes to the respective site emergency plans were evaluated for their impact the State and local response organizations ability to effectively implement their FEMA-approved REP plans, specifically in regards to licensee interface and coordination with State and local response organizations.

If so, please provide evaluation . performed an.d documentation regarding discussions with affected State and local response organizations used in making this determination.

Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Co., Inc. P.O. Box 1295, Bin 038 Birmingham, AL 35201-1295 December 2, 2015

SUBJECT:

JOSEPH M. FARLEY, UNITS 1 AND 2, EDWIN I. HATCH, UNITS 1 AND 2, AND VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3, AND 4-REQUEST FOR ADDITIONAL INFORMATION (CAC NOS. MF6670, MF6671, MF6672, MF6673, MF6674, MF6675, AND RP9516)

Dear Mr. Pierce:

By letter dated August 31, 2015, the Southern Nuclear Operating Company, Inc., (SNC) submitted an amendment request for Joseph M. Farley Nuclear Plant, Units 1 and 2, Edwin I. Hatch, Units 1 and 2, and Vogtle Electric Generating Plant, Units 1, 2, 3, and 4. The amendment requests NRC approval of a standard emergency plan for all SNC sites and site-specific annexes.

  • The NRC staff has determined that additional information is needed as discussed in the Enclosure.

We request that SNC respond by February 15, 2016. Please note that the NRC staff's review is continuing and further requests for information be developed.

Docket Nos. 50-348, 50-364, 50-321, 50-366 50-424, 50-425,52-025, 52-026

Enclosure:

Request for Additional Information cc w/encl: Distribution via Listserv Sincerely, /RA/ Shawn Williams, Project Manager Plant Licensing Branch, 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation DISTRIBUTION PUBLIC RidsNrrDorlDpr Resource RidsNrrLASFigueroa Resource LPL2-1 R/F RidsNrrDorlLpl2-1 Resource

  • RidsNrrDe Resource RidsACRS_MailCTR Resource RidsRgn2MailCenter Resource RidsNrrPMFarley Resource RMartin, NRR MNorris, NRR . CPatel, NRO ADAMS Accession No.: ML15334A009
  • By e-mail OFFICE LPL2-1/PM LPL2-1/LA NSIR/DPR/ORLOB/BC LPL2-1/BC LPL2-1/PM w/comments NAME SWilliams SFigueroa JAnderson*

MMarkley SWilliams (GEMiller for) .DATE 12/02/15 12/02/15 11/24/15 12/02/15 12/02/15 OFFICIAL RECORD COPY