Issue date | Title | Topic | |
---|---|---|---|
IR 05000424/2024403 | 26 January 2024 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000424/2024403; 05000425/2024403 | |
ML23341A204 | 12 January 2024 | Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) | Exemption Request |
ML23354A203 | 18 December 2023 | Document Request for Hatch Nuclear Plant - Radiation Protection Inspection - Inspection Report 2024-01 | Process Control Program |
ML23342A080 | 8 December 2023 | NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) | |
ML23279A208 | 5 October 2023 | Issuance of Formal RAIs - Vogtle, Units 1 and 2 - Proposed LAR and Proposed Alternative Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) | Power-Operated Valves |
ML23250A047 | 20 September 2023 | Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes | |
ML23257A209 | 14 September 2023 | NRR E-mail Capture - Formal Issuance of 2nd Round RAIs for Surry Units 1&2 and North Anna Units 1&2 Emergency Plans LAR | FLEX |
ML23264A014 | 14 September 2023 | NRR E-mail Capture - (External_Sender) Draft Round-2 RAI - Hatch, Units 1 and 2, Revise TS 1.1-1 Modes LAR | |
ML23248A348 | 5 September 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 6 - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) | |
ML23243A995 | 31 August 2023 | Request for Baseline RP Inspection | Process Control Program |
ML23243A986 | 31 August 2023 | NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) | FLEX |
ML23236A002 | 22 August 2023 | NRR E-mail Capture - Request for Additional Information - Farley, Units 1&2, Emergency TS 3.6.5 LAR | Ultimate heat sink |
ML23188A151 | 9 August 2023 | Round 2 RAIs for LAR 22-002 TS 3.8.3 Inverters-Operating, Completion Time Extension | Enforcement Discretion Probabilistic Risk Assessment Large early release frequency |
ML23200A011 | 18 July 2023 | Document Request for Vogtle Unit 3 RP Inspection | Offsite Dose Calculation Manual |
ML23198A155 | 17 July 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Hatch, Farley, and Vogtle, Units 1 and 2 Quality Assurance Topical Report (QATR) Submittal Dated June 15, 2023 | |
ML23193A783 | 12 July 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - TSTF-339 LAR (L-2023-LLA-0053) | |
ML23095A083 | 5 April 2023 | NRR E-mail Capture - for Your Action - RAI - Farley - Containment Isolation Valves, Surveillance Requirement 3.6.3.5 LAR (L-2022-LLA-0189) | Stroke time Surveillance Frequency Control Program |
ML23086A023 | 24 March 2023 | NRR E-mail Capture - for Your Action - Draft RAIs - Farley Surveillance Requirement (SR) 3.6.3.5 License Amendment Request (LAR) (L-2022-LLA-0189) | Stroke time Surveillance Frequency Control Program |
ML23065A061 | 3 March 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) 14 - Vogtle - AST, TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) | |
ML23018A187 | 17 January 2023 | 2023 HNP CGD Inspection Information Request | Commercial Grade Dedication |
ML23006A088 | 6 January 2023 | NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle - Accident Source Term (Ast), TSTF-51, TSTF-471, and TSTF-490 LAR (L-2022-LLA-0096) | Unanalyzed Condition |
ML23003A809 | 3 January 2023 | NRR E-mail Capture - for Your Action - RAI - Farley - ISI Alternative FNP-ISI-ALT-05-05 (L-2022-LLR-0068) | Incorporated by reference |
ML22355A208 | 21 December 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, Reactor Pressure Vessel 'Rpv Head Studs' LAR | Incorporated by reference |
ML22348A033 | 13 December 2022 | NRR E-mail Capture - for Your Action - RAI - Vogtle, Unit 2 - Steam Generator Tube Inspection Report (L-2022-LRO-0120) | |
ML22334A148 | 30 November 2022 | NRR E-mail Capture - for Your Action - RAI - Farley - TS 3.4.10 LAR, Psv Setpoint (L-2022-LLA-0098) | Anticipated operational occurrence |
ML23026A237 | 16 November 2022 | 2023001 Hatch RP RFI Final | High Radiation Area Locked High Radiation Area Surveillance Frequency Control Program |
ML22192A104 | 1 August 2022 | Acceptance of Requested Licensing Action Amendment Request Application to Allow Use of Lead Test Assemblies for Accident Tolerant Fuel with Request for Additional Information | Shutdown Margin Coatings Fuel cladding |
ML22208A133 | 26 July 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-208 LAR | |
ML22157A090 | 6 June 2022 | NRR E-mail Capture - RAIs - Vogtle, Unit 1 - Refueling Outage (RFO) 1R23 Steam Generator (SG) Tube Inspection Report | |
ML22157A354 | 6 June 2022 | NRR E-mail Capture - RAI - Hatch, Units 1 and 2, TSTF-505 LAR | Probabilistic Risk Assessment Large early release frequency |
ML22140A119 | 20 May 2022 | NRR E-mail Capture - RAIs - Hatch, Units 1 and 2, TSTF-505 LAR | Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Large early release frequency |
ML22123A180 | 3 May 2022 | NRR E-mail Capture - Correction - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program | GOTHIC |
ML22123A178 | 3 May 2022 | NRR E-mail Capture - RAIs for Farley LAR Re. TS 5.5.17 Containment Leakage Rate Testing Program | GOTHIC |
ML22112A089 | 22 April 2022 | NRR E-mail Capture - Draft RAIs for Farley LAR Re. TS 5.5.17 | GOTHIC |
ML22104A131 | 14 April 2022 | NRR E-mail Capture - Request for Additional Information - Farley and Vogtle - Relocate Piping Inspection License Amendment Request (L-2021-LLA-0235) | |
ML22073A084 | 21 March 2022 | an NRC Fire Protection Team Inspection (NRC Inspection Report Nos. 05000321/2022011 and 05000366/2022011) and Request for Information | Safe Shutdown Exemption Request Fire Protection Program |
ML22026A394 | 26 January 2022 | NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR | |
ML22025A214 | 21 January 2022 | Plant Hatch 2022001 RP Baseline Inspection Information Request | Process Control Program |
ML21350A103 | 16 December 2021 | NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR | Anticipated operational occurrence Earthquake |
ML21321A377 | 16 November 2021 | NRR E-mail Capture - RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal | |
ML21321A376 | 15 November 2021 | NRR E-mail Capture - Request for Additional Information - Vogtle, Units 1 and 2, TS 3.7.2 LAR | Safe Shutdown |
ML21321A375 | 10 November 2021 | NRR E-mail Capture - Draft RAIs for Farley LAR Sump Recirculation Valve Encapsulation Vessel Removal | |
ML21265A340 | 22 September 2021 | NRR E-mail Capture - Request for Additional Information - Hatch, Unit 1, Emergency TS 3.7.2 LAR | Ultimate heat sink Internal Flooding Probabilistic Risk Assessment FLEX Containment Hardened Vent |
ML21127A113 | 6 May 2021 | Notification of Conduct of a Triennial Fire Protection Baseline Inspection - U.S. Nuclear Regulatory Commission Inspection Report Nos. 05000348/2021012 and 05000364/2021012 | Safe Shutdown Fitness for Duty Exemption Request Fire Protection Program |
ML21111A303 | 21 April 2021 | NRR E-mail Capture - RAI - Hatch Unit 2 - One-Time Emergency RHR LAR (L-2020-LRO-0068) | Containment Hardened Vent |