{{#Wiki_filter:INDIANAMICHIGANPOWEROA unit of American Electric PowerIndiana Michigan PowerCook Nuclear PlantOne Cook PlaceBridgman, MI 49106Indiana Michiga nPower.com September 13, 2013AEP-NRC-2013-74 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission ATTN: Document Control Desk11555 Rockville Pike,Rockville, MD 20852
==Subject:==
Donald C. Cook Nuclear Plant Unit 1 and Unit 2Revised Seismic Walkdown Report Regarding the Seismic Aspects ofRecommendation 2.3 of the Near-Term Task Force Review of Insights fromthe Fukushima Dai-ichi Accident
==References:==
: 1. Letter from the U. S. Nuclear Regulatory Commission, "Donald C. Cook NuclearPlant Unit 1 and Unit 2 Request for Information Pursuant to Title 10 of the Code ofFederal Regulations 50.54(f)
Regarding Recommendations 2.1, 2.3, and 9.3, of theNear-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"
dated March 12, 2012, ADAMS Accession Number ML 12045A046.
: 2. Letter from J. P. Gebbie, Indiana Michigan Power Company to U. S. NuclearRegulatory Commission document Control Desk, "Donald C. Cook Nuclear PlantUnits 1 and 2 180-Day Response to NRC Request for Information Pursuant to10 CFR 50.54(f)
Regarding the Seismic Aspects of Recommendation 2.3 of theNear-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"
dated November 26, 2012, ADAMS Accession Number ML 12340A442.
: 3. Letter from the U. S. Nuclear Regulatory Commission to L. J. Weber, IndianaMichigan Power Company, "Plan for the Regulatory Audit Regarding SeismicWalkdowns at the Donald C. Cook Nuclear Plant, Units 1 and 2, to SupportImplementation of Near-Term Task Force Recommendation 2.3 Related to theFukushima Dai-ichi Nuclear Power Plant Accident (TAC Nos. MF1648 andMF1649),"
dated June 12, 2013, ADAMS Accession Number ML 13143A439.
By Reference 1, the U. S. Nuclear Regulatory Commission (NRC) requested IndianaMichigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP), toprovide further information to support the NRC staff's evaluation of regulatory actions to betaken in response to lessons learned from Japan's Fukushima Dai-ichi Nuclear Power Plantaccident.
The request addressed the methods and procedures for plants to conductseismic and flooding hazards walkdowns to identify and address degraded, nonconforming, A4oo U. S. Nuclear Regulatory Commission AEP-NRC-2013-74 Page 2or unanalyzed conditions through the corrective action program, and to verify the adequacyof the monitoring and maintenance procedures.
By Reference 2, I&M, submitted the Seismic Walkdown Report as requested perEnclosure 3 of Reference 1, "Recommendation 2.3: Seismic" for CNP Units 1 and 2 to theNuclear Regulatory Commission (NRC). Reference 3 notified I&M of the NRC staff plans toconduct a regulatory audit on July 17-19, 2013, to verify information and gain a betterunderstanding of I&M's conduct of the seismic walkdowns at CNP.Based on the results of this regulatory audit, I&M has revised CNP's Seismic WalkdownReport. Enclosure 1 to this letter provides an affirmation.
Enclosure 2 provides CNP'srevised Seismic Walkdown Report.This letter contains no new regulatory commitments.
Should you have any questions concerning the content of this letter, please contact Mr. Michael K. Scarpello, Manager,Nuclear Regulatory
: Affairs, at (269) 466-2649.
Sincerely, Q Shane LiesVice President, Indiana Michigan PowerDB/amp
==Enclosures:==
: 1. Affirmation
: 2. Seismic Walkdown Report, Revision 1c: J. T. King, MPSC, w/o enclosures S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ -RMD/RPS, w/o enclosures NRC Resident Inspector, (Enclosure 2 on CD)C. D. Pederson, NRC Region III, (Enclosure 2 on CD)T. J. Wengert, NRC Washington, DC, (Enclosure 2 on CD)
Enclosure 1 to AEP-NRC-2013-74 AFFIRMATION I, Q. Shane Lies, being duly sworn, state that I am a Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the NuclearRegulatory Commission on behalf of I&M, and that the statements made and the mattersset forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.Indiana Michigan Power CompanyQ. Shane LiesVice President, Indiana Michigan PowerSWORN TO AND SUBSCRIBED BEFORE METHIS \, DAY OF ,2013y CNary tQZbF \My Commission Expires Z,-%- DANIELLE BURGOYNENotary Public. State of MichiganCounty of BerrienMy Commission Expires O0O-4-2O18 Acting In the County of k}}

Revision as of 03:14, 4 July 2018

Donald C. Cook, Units 1 & 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Dai-ichi Accident
ML13267A315
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/13/2013
From: Lies Q S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2013-74, SD-121023-001, Rev 1
Download: ML13267A315 (3)


Text

INDIANAMICHIGANPOWEROA unit of American Electric PowerIndiana Michigan PowerCook Nuclear PlantOne Cook PlaceBridgman, MI 49106Indiana Michiga nPower.com September 13, 2013AEP-NRC-2013-74 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission ATTN: Document Control Desk11555 Rockville Pike,Rockville, MD 20852

Subject:

Donald C. Cook Nuclear Plant Unit 1 and Unit 2Revised Seismic Walkdown Report Regarding the Seismic Aspects ofRecommendation 2.3 of the Near-Term Task Force Review of Insights fromthe Fukushima Dai-ichi Accident

References:

1. Letter from the U. S. Nuclear Regulatory Commission, "Donald C. Cook NuclearPlant Unit 1 and Unit 2 Request for Information Pursuant to Title 10 of the Code ofFederal Regulations 50.54(f)

Regarding Recommendations 2.1, 2.3, and 9.3, of theNear-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"

dated March 12, 2012, ADAMS Accession Number ML 12045A046.

2. Letter from J. P. Gebbie, Indiana Michigan Power Company to U. S. NuclearRegulatory Commission document Control Desk, "Donald C. Cook Nuclear PlantUnits 1 and 2 180-Day Response to NRC Request for Information Pursuant to10 CFR 50.54(f)

Regarding the Seismic Aspects of Recommendation 2.3 of theNear-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident,"

dated November 26, 2012, ADAMS Accession Number ML 12340A442.

3. Letter from the U. S. Nuclear Regulatory Commission to L. J. Weber, IndianaMichigan Power Company, "Plan for the Regulatory Audit Regarding SeismicWalkdowns at the Donald C. Cook Nuclear Plant, Units 1 and 2, to SupportImplementation of Near-Term Task Force Recommendation 2.3 Related to theFukushima Dai-ichi Nuclear Power Plant Accident (TAC Nos. MF1648 andMF1649),"

dated June 12, 2013, ADAMS Accession Number ML 13143A439.

By Reference 1, the U. S. Nuclear Regulatory Commission (NRC) requested IndianaMichigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP), toprovide further information to support the NRC staff's evaluation of regulatory actions to betaken in response to lessons learned from Japan's Fukushima Dai-ichi Nuclear Power Plantaccident.

The request addressed the methods and procedures for plants to conductseismic and flooding hazards walkdowns to identify and address degraded, nonconforming, A4oo U. S. Nuclear Regulatory Commission AEP-NRC-2013-74 Page 2or unanalyzed conditions through the corrective action program, and to verify the adequacyof the monitoring and maintenance procedures.

By Reference 2, I&M, submitted the Seismic Walkdown Report as requested perEnclosure 3 of Reference 1, "Recommendation 2.3: Seismic" for CNP Units 1 and 2 to theNuclear Regulatory Commission (NRC). Reference 3 notified I&M of the NRC staff plans toconduct a regulatory audit on July 17-19, 2013, to verify information and gain a betterunderstanding of I&M's conduct of the seismic walkdowns at CNP.Based on the results of this regulatory audit, I&M has revised CNP's Seismic WalkdownReport. Enclosure 1 to this letter provides an affirmation.

Enclosure 2 provides CNP'srevised Seismic Walkdown Report.This letter contains no new regulatory commitments.

Should you have any questions concerning the content of this letter, please contact Mr. Michael K. Scarpello, Manager,Nuclear Regulatory

Affairs, at (269) 466-2649.

Sincerely, Q Shane LiesVice President, Indiana Michigan PowerDB/amp

Enclosures:

1. Affirmation
2. Seismic Walkdown Report, Revision 1c: J. T. King, MPSC, w/o enclosures S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ -RMD/RPS, w/o enclosures NRC Resident Inspector, (Enclosure 2 on CD)C. D. Pederson, NRC Region III, (Enclosure 2 on CD)T. J. Wengert, NRC Washington, DC, (Enclosure 2 on CD)

Enclosure 1 to AEP-NRC-2013-74 AFFIRMATION I, Q. Shane Lies, being duly sworn, state that I am a Vice President of Indiana MichiganPower Company (I&M), that I am authorized to sign and file this request with the NuclearRegulatory Commission on behalf of I&M, and that the statements made and the mattersset forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.Indiana Michigan Power CompanyQ. Shane LiesVice President, Indiana Michigan PowerSWORN TO AND SUBSCRIBED BEFORE METHIS \, DAY OF ,2013y CNary tQZbF \My Commission Expires Z,-%- DANIELLE BURGOYNENotary Public. State of MichiganCounty of BerrienMy Commission Expires O0O-4-2O18 Acting In the County of k