Similar Documents at Cook |
---|
Category:Legal-Affidavit
MONTHYEARAEP-NRC-2023-34, Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation2023-08-0202 August 2023 Supplement to Request for Approval of Change Regarding Neutron Flux Instrumentation AEP-NRC-2022-12, Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source2022-03-0202 March 2022 Commitment Schedule Change Related to Seismic PRA Distributed Ignition Backup Power Source AEP-NRC-2022-03, Final Supplemental Response to NRC Generic Letter 2004-022022-01-20020 January 2022 Final Supplemental Response to NRC Generic Letter 2004-02 AEP-NRC-2021-68, Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation2021-12-16016 December 2021 Response to Request for Additional Information on Requested Change Regarding Containment Water Level Instrumentation AEP-NRC-2021-28, 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System2021-06-15015 June 2021 10 CFR 50.90 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2021-24, Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation2021-03-23023 March 2021 Unit 2 - Request for Approval of Change Regarding Containment Water Level Instrumentation AEP-NRC-2020-72, License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-12-14014 December 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-50, Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency2020-07-0909 July 2020 Response to Request for Additional Information Regarding License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency ML20164A0452020-06-0808 June 2020 License Amendment Request for One-Time Extension of the Containment Type a Leak Rate Testing Frequency AEP-NRC-2020-33, Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues2020-04-30030 April 2020 Application to Revise Technical Specifications to Adopt TSTF-567, Add Containment Sump TS to Address GSl-191 Issues AEP-NRC-2020-09, Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable2020-04-0707 April 2020 Unit 2, Application to Revise Technical Specifications to Adopt TSTF-412, Revision 3 Provide Actions for One Steam, Supply to Turbine Driven Afw/Efw Pump Inoperable AEP-NRC-2020-14, License Amendment Requests and Exemption Requests Regarding Changes to the Routine Reporting Requirements Subject to Plant Technical Specifications and 10 CFR 50.71(e)2020-04-0707 April 2020 License Amendment Requests and Exemption Requests Regarding Changes to the Routine Reporting Requirements Subject to Plant Technical Specifications and 10 CFR 50.71(e) AEP-NRC-2020-01, License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System2020-04-0707 April 2020 License Amendment Request Regarding a Change to the Reactor Coolant System Pressure and Temperature Limits and Low Temperature Overpressure Protection (LTOP) System AEP-NRC-2017-52, Enclosure 3: Donald C. Cook Nuclear Plant Unit 2, Application for Withholding Proprietary Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program from Public Disclosure2017-12-0808 December 2017 Enclosure 3: Donald C. Cook Nuclear Plant Unit 2, Application for Withholding Proprietary Supplemental Information Regarding the Reactor Vessel Internals Aging Management Program from Public Disclosure AEP-NRC-2016-19, License Amendment Request to Revise the Cyber Security Plan Implementation Schedule2016-03-14014 March 2016 License Amendment Request to Revise the Cyber Security Plan Implementation Schedule AEP-NRC-2014-56, First Response to Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program2014-07-30030 July 2014 First Response to Request for Additional Information Concerning the Reactor Vessel Internals Aging Management Program ML13267A3152013-09-13013 September 2013 Donald C. Cook, Units 1 & 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Dai-ichi Accident AEP-NRC-2012-38, Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation2012-06-11011 June 2012 Response to Request for Information, 10 CFR 50.46 Report for Emergency Core Cooling System Model Change or Error Associated with Thermal Conductivity Degradation ML0519903592005-07-0505 July 2005 Correction of Administrative Error for Improved Technical Specifications ML0317506392003-06-20020 June 2003 Updated Affidavits for Withholding Proprietary Information ML0201704012002-01-14014 January 2002 License Amendment Request for Pressurizer Code Safety Valve Setpoint Tolerance ML18219D7921978-05-23023 May 1978 Letter from Exxon Nuclear Co, Inc. to NRC, Transmitting Copies of Supplement 4 (Report) to Document XN-76-51 for Staff Review 2023-08-02
[Table view] Category:Letter
MONTHYEAR05000316/LER-2024-004, AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications2024-11-11011 November 2024 AB Emergency Diesel Generator Inoperable for Longer than Allowed by Technical Specifications IR 05000315/20240032024-10-31031 October 2024 Integrated Inspection Report 05000315/2024003 05000316/2024003 07200072/2024001 and Exercise of Enforcement Discretion AEP-NRC-2024-77, U2C28 Steam Generator Tube Inspection Report2024-10-21021 October 2024 U2C28 Steam Generator Tube Inspection Report AEP-NRC-2024-80, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2024-10-15015 October 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-79, Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask2024-09-26026 September 2024 Unit 2, Independent Spent Fuel Storage Installation - Registration of Dry Spent Storage Cask AEP-NRC-2024-78, Reply to a Notice of Violation: EA-24-0472024-09-23023 September 2024 Reply to a Notice of Violation: EA-24-047 05000316/LER-2024-002-01, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-09-12012 September 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak IR 05000315/20244022024-09-10010 September 2024 Security Baseline Inspection Report 05000315/2024402 and 05000316/2024402, Independent Spent Fuel Storage Installation Security Inspection Report 07200072/2024401 AEP-NRC-2024-69, Core Operating Limits Report2024-09-0909 September 2024 Core Operating Limits Report IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24225A0022024-09-0303 September 2024 Issuance of Amendment Nos. 363 and 344 Revising Technical Specifications Section 3.8.1, AC Sources-Operating, for a One-Time Extension of a Completion Time IR 05000315/20240112024-08-30030 August 2024 NRC Inspection Report 05000315/2024011 and 05000316/2024011 and Notice of Violation AEP-NRC-2024-76, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-08-28028 August 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-51, Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes2024-08-28028 August 2024 Annual Report of Loss-Of-Coolant Accident Evaluation Model Changes 05000316/LER-2024-003, Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage2024-08-22022 August 2024 Plant Shutdown Required by Technical Specifications Due to Reactor Coolant System Identified Leakage IR 05000315/20240052024-08-21021 August 2024 Updated Inspection Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 (Report 05000315/2024005 and 05000316/2024005) AEP-NRC-2024-61, Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request2024-08-15015 August 2024 Unit 2 - Response to Request for Additional Information for Neutron Flux Instrumentation License Amendment Request ML24221A2702024-08-0808 August 2024 Unit 2 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-62, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-08-0707 August 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter AEP-NRC-2024-47, Form OAR-1, Owners Activity Report2024-07-30030 July 2024 Form OAR-1, Owners Activity Report ML24183A0162024-07-25025 July 2024 Review of Reactor Vessel Material Surveillance Program Capsule W Technical Report ML24169A2142024-07-25025 July 2024 Issuance of Amendment No. 362 Regarding Change to Technical Specification 3.4.12, Low Temperature Overpressure Protection System IR 05000315/20240022024-07-24024 July 2024 Integrated Inspection Report 05000315/2024002 and 05000316/2024002 ML24197A1262024-07-15015 July 2024 Unit 2 - Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak2024-07-15015 July 2024 Manual Reactor Trip Following Rapid Downpower for Steam Leak ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 AEP-NRC-2024-56, Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask2024-07-0808 July 2024 Unit 2, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Cask AEP-NRC-2024-48, Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-07-0202 July 2024 Response to Request for Additional Information (RAI) for License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating ML24176A1012024-06-21021 June 2024 57143-EN 57143 - Paragon Energy Solutions - Update 1 (Final) - 10CFR Part 21 Final Notification: P21-05242024-FN, Rev. 0 AEP-NRC-2024-45, Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring2024-06-13013 June 2024 Report Per Technical Specification 5.6.6 for Inoperability of Post Accident Monitoring Neutron Flux Monitoring ML24163A0132024-06-12012 June 2024 Request for Information for the NRC Age-Related Degradation Inspection: Inspection Report 05000315/2024012 and 05000316/2024012 ML24159A2522024-05-30030 May 2024 10 CFR 50.71(e) Update and Related Site Change Reports AEP-NRC-2024-23, Core Operating Limits Report2024-05-23023 May 2024 Core Operating Limits Report ML24141A2162024-05-20020 May 2024 —Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip2024-05-20020 May 2024 Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip AEP-NRC-2024-40, Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-05-16016 May 2024 Unit 2 - Supplement to License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating AEP-NRC-2024-41, Annual Radiological Environmental Operating Report2024-05-15015 May 2024 Annual Radiological Environmental Operating Report IR 05000315/20240012024-05-14014 May 2024 Integrated Inspection Report 05000315/2024001 and 05000316/2024001 IR 05000315/20244012024-05-14014 May 2024 – Security Baseline Inspection Report 05000315/2024401 and 05000316/2024401 AEP-NRC-2024-26, Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 492024-05-14014 May 2024 Transmittal of Donald C. Cook Nuclear Plant, Emergency Plan Revision 49 AEP-NRC-2024-07, Unit 2 - Transmittal of Report of Changes to the Emergency Plan2024-05-14014 May 2024 Unit 2 - Transmittal of Report of Changes to the Emergency Plan AEP-NRC-2024-24, Form OAR-1, Owners Activity Report2024-05-0707 May 2024 Form OAR-1, Owners Activity Report ML24115A2152024-05-0707 May 2024 LTR: CNP Non-Acceptance with Opportunity TS 3-8-1 ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML24116A0002024-05-0202 May 2024 – Regulatory Audit in Support of Review of the Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors AEP-NRC-2024-35, Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations2024-04-30030 April 2024 Response to NRC Regulatory Issue Summary 2024-01 Preparation and Scheduling of Operator Licensing Examinations AEP-NRC-2024-28, 2023 Annual Radioactive Effluent Release Report2024-04-29029 April 2024 2023 Annual Radioactive Effluent Release Report AEP-NRC-2024-31, Annual Report of Individual Monitoring2024-04-24024 April 2024 Annual Report of Individual Monitoring AEP-NRC-2024-02, Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating2024-04-0303 April 2024 Unit 2 License Amendment Request for One-Time Extension of Completion Time for Inoperable AC Source - Operating 2024-09-09
[Table view] |
Text
'6 Cg E)f(ON, NUCLEAR COIVIPANY,Inc. CO 2101 Horn Rapids Road QJ mC=c-P. O. Box 130, Richland, N'ashington 99352 Phone: (509J 943.8100 7elext 32-6353 >o
~CO~
Pl May 23, ~8 Mr. George Lear, Branch Chief Division of Operating Reactors Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555
SUBJECT:
XN-NF-76-51, Supplement 4(P), "Flow Blockage and Exposure Sensitivity Study for ENC D.,C. Cook Unit 1 Reload Fuel Using ENC WREM-II Model," May 1978
Reference:
XN-NF-76-51, Supplement 3(P), "Flow Blockage and Exposure Sensitivity Study for ENC D. C. Cook Unit 1 Reload Fuel Using ENC WREM-II Model," March 1978
Dear Mr. Lear:
This letter transmits forty (40) copies of the subject Supplement 4 (report) to document XN-76-51 for Staff review. The report supplements the informa-tion contained in Table 1.1 of the reference document regarding the uncer-tainties of the fuel rod internal pressure during the course of a loss-of-coolant accident. This additional information extends the D. C..'Cook pin pressure uncertainty from 38,000 MWD/MTM to 44,000 MWD/MTM.
Exxon Nuclear Company considers the information contained in the report XN-NF-76-51, Supplement 4(P), to be proprietary. In accordance with the Commission's regulation 10CFR2.790(b), the enclosed Affidavit, executed by our Mr. Warren Nechodom, provides the necessary information to support the withholding of the reference document from public disclosure.
Si erely, G.F. Owsley, Mana r Reload Licensing GFO:gf Enclosures As noted CC: Mr. E. Reeves (NRC)
AN AFFILIATE OF EXXON CORPORATION
I gl, l'
)
AFF IDAV IT STATE 'OF Washington st COUNTY OF Benton I, Warren Nechodom, being duly sworn, hereby say and depose:
- l. I am Acting Manager, guality Assurance and Licensing, for Exxon Nuclear Company, Inc. ("ENC"),and as such I am authorized to execute this Affidavit.
h
- 2. I am familiar with ENC's detailed document control system and policies which govern the protection and control of information.
- 3. I am familiar with the document entitled XN-NF-76-51, Supplement 4(P), "Flow Blockage and Exposure Sensitivity Study for ENC D. C. Cook Unit 1 Reload Fuel Using ENC WREN-II Model," referred to as A
"Document." Information contained in this Document has been classified by ENC as proprietary in accordance with the control system and policies established by ENC for the control and protection of information.
- 4. The Document contains information of a proprietary and confidential nature and is of the type customarily held in confidence by ENC and not made available to the public. Based on my experience, I am aware that other companies regard information of the kind contained in the Document as being proprietary and confidential.
- 5. The Document has been made available to the United States Nuclear Regulatory Commission in confidence, with the request that the information contained in the Document not be disclosed or divulged.
' ~
- 6. The Document contains information which is vital to a competitive advantage of ENC and would be helpful to competitors of ENC when competing with ENC.
- 7. The information contained in the Document is considered to be proprietary by ENC because it reveals certain distinguishing aspects of fuel and fuel design analysis methods which secure competitive economic advantage to ENC by design optimization and improved marketability, and includes information utilized by ENC in its business which affords ENC an opportunity to obtain a competitive advantage over its competitors who do not or may not know or use the information contained in the Document.
- 8. The disclosure of the proprietary information contained in the Document to a competitor would permit the competitor to reduce its expenditure of money and manpower and to improve its competitive position by giving it extremely valuable insights into ENC 's analysis, design and testing procedures and would result in substantial harm to the competi tive position of ENC.
- 9. The Document contains proprietary information which is held in confidence by ENC and is not available in public sources.
- 10. In accordance with ENC's policies governing the protection and control of information, proprietary information contained in the Docu-ment has been made available, on a limited basis, to others outside ENC only as required and under suitable agreement providing for non-disclosure and limited use of the information.
ll. ENC policy requires that proprietary information be kept in a secured file or area and distributed on a need-to-know basis. Checks are made routinely to assure the policy procedures are being met.
0
- 12. This Document provides information which reveals fuel characteristics and analysis methods developed by ENC over the past several years. ENC has invested several million dollars and many man-years of effort in the related fuel development efforts. ,Assuming a competitor had available the same background data and incentives as ENC, the com-petitor might, as a minimum cost, develop the information for the same expenditure of manpower and money as ENC.
- 13. Based on my experience in the industry, I do not believe that the background data and incentives of ENC's competitors are sufficiently it 1
similar to the corresponding background data and incentives of ENC that is reasonable to expect such competitors would be in a position to duplicate ENC's proprietary information contained in the documents.
THAT the statements made hereinabove are, to the best of my knowledge, information, and belief, truthful and complete.
FURTHER AFFIANT SAYETH NOT.
SWORN TO AND SUBSCRIBED before me this A9 ~ day of NOTARY PUBLIC l
Kl/
f 1
~ I la'l~
get 5 1g~
p ~
r>
k E~
lt h I 4
XN-NF-76-51 Supplement 4(P)-
ISSUE DATE: 5/24/78 FLOW BLOCKAGE AND EXPOSURE SENSITIVITY STUDY FOR ENC D. C. COOK UNIT 1 RELOAD FUEL USING ENC WREM-I I MODEL Prepared by G ~ C. Cooke
~j ('A.
APPRQYED:
K C.
PrX Gal s-0-1r raith, Manager APPROVED:
G. A. Sofar anaggr Nuc ar Safety Engineering Nuclear ue s Engineering APPROVED: Z ~~~ ' > /~11+~APPROVED:
. S. Nechodo , Mana er G. J. Busselman, nager Contract Performance Licensing. and Compliance NOTICE This document contains information proprietary to Exxon Nuclear Company, Inc.; it is submitted in confidence and is to'be used solely for the'purpose for which it is furnished and returned upon request.
This document and such information is not to be reproduced, trans.
mitted, disclosed or used otherwise, in whole or in part, without the written authorization of Exxon Nuclear Company, Inc.
E)5(ON NUCLEAR COMPANY, Inc.
XN-NF-76-51 Supplement 4(P)
This supplement to Document XH-76-51 provides the results of an analysis extending the pin pressure uncertainty analysis from 38,000 MWD/MTM to 44,000 MWD/MTM. These results are used in the ECCS analysis for the Donald C. Cook Unit 1 plant. The 38,000 fuel exposure limit was the highest exposure for which the pin pressure was reported in XN-NF-76-51, Supplement 3(P). The analysis results are provided to justify the limiting peaking factor for localized fuel exposures in Exxon Nuclear-provided fuel up to 44,000 MWD/MTM. The information contained in this Supplement adds to the information contained in Table 1.1 of XN-NF-76-51, Supplement 3(P).
Page 1 of 2 Use, reproduction, transmittal or disclosure of the above information is subject to the restriction on the first or title page of this document.
0
(
I I
I ~
t~
I
TABLE 1.1 (Continued from Table 1.1 of XN-NF-76-51, Supp. 3(P))
D. C. COOK PIN PRESSURE UNCERTAINTIES BEGINNING OF LIFE TO 44,000 ~~)) PEAK PELLET EXPOSURE ENC/NRC Base Pressure = 605 PSID C
~ PEAK PELLET BURNUP, MWD/MTM 44,000 0
0 0 ~ UNCERTAINTIES, PSI0 0
0 4 0 IO Initial Fill Gas + 0+26 Q
Data Extrapolation +0+5 0 3 Plastic Strain -13+ 4 0 4 +16 0 Fuel Plenum 0 4 0 w
0 Sorbed Gas Release +9+9 0 C Densification -41 4
~0 4 Fuel Swelling +77 +77 0 Fission Gas Release +308 +308 F Rod Growth -25 + 7 4
4 Elastic Compression + 0 + 5
- 0. 0 + 0 + 5 0
0 3 Thermal Creep C
3 0 ~ TOTAL PIN PRESSURE CHANGE FROM +322 31 7 IA BASE CASE -322 4E 0
0
~ RUPTURE PRESSURE, PSID C/)
C OC Nominal 922 I Maximum 1244 III l1 Minimum 600-8 Ch et'
~ FLOW BLOCKAGE Vl Nominal 65K Maximum 761o Ml nl mum 23K
XN-NF-76-51 Supplement 4(P)
DISTRIBUTION GC Cooke RJ Ehlers KP Galbraith WS Nechodom GF Owsley GA Sofer JG Feinstein (AEP)
RH Dischinger (GA)
USNRC (40)
Document Control (]O)
0 e ro
)
C
t, ~% ~EOgp~
P UNITED STATES NUG~R REGULATORY COMiAISSION
%AS)IINGTON, D. C. 20555 l
BWE 3
~ %*4 '+,
I'hose Listed Below 1978'OPICAL'EPORT DISTRIBUTION.
Vendor: EXXON NUCLEAR COM ANY, iNC.
Report Identification Symbol;.
Proprietary X -NF- - (P) Non-Proprietary
. Non-Proprietary Report
'ersion of (P) (HP) tleFlow Blockage and Exposure Sensitivity, Study for ENC D. C. Cook Unit 1 Reload Fuel using.ENC NREM-.II Model Hew Topical Report Supplemental Information to Existing Topical Report Supplement 4 (P Approved Topical Report
'DC fl igltt ~231l 78 Date Recei ved =
This memo is distributed as shown below to in orm recipients of the availability of the report. The number of copies, if appropriate, is indicated. Additional or reference copies may be obtained from the Subject File in the Docket Room (Bethesda Bldg. 016)
Exxon 'cal Report DISTRIBUTION Subject F 'le
'tr (Docket Fj le)
W/ -
R.
T. Speis Regulatory Program Manager Denise V.
D.
Stel lo+>
Eisenhut@p 1
2 D. Ross T. Novak I
~+ 1 .
NSIC
<<~<O Skovhol t tl. Butler R. Check ¹'C+ 1
, VoACRS R.*II. Houston R. Baer ~f 1 Z. Rosztocz>>
,ASLB C. Heltemes L. Shao R. Tedes co ~~
. ASLAP H. Denton B. Grimes V. Benaroya¹ SD W. Gammill K. Goller G. Lainas ISE C. Stepp T. Carter T. Ippol 1 to ~~+
'. S. Hanauer L. Hulman A. Schwencer F. Rosa R. DeYoung R. Yollmer D. Ziemann R. Bosnak F. llilliams D. Bunch Davis L. Kornbl i th~1~
D.
- J. Stol z . J. Collins G. Lear >7~/Ale S. Meiss ~~~1 K. Kniel tl. Kreger R. Reid C; Berl inger Y~
- 0. Parr M. E)'nst J. Knight N ~ Lauben ~/'2 S. Varga J. Youngblood S. Pawlicki F. Coffman'C g+
D. Yassallo R. Ballard I. Sihweil . 4-781530038
~
f
~
-F