ML15231A839: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 | {{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In | ||
-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination: | |||
__6/15/15 thru 6/26/15 | |||
__ Exam Level: RO SRO(I) SRO(U) Operating Test No.: | |||
__DB NRC 2015__ Control Room Systems | |||
@ (8 for RO); (7 for SRO | |||
-I); (2 or 3 for SRO | |||
-U) System / JPM Title Type Code* | |||
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion) | |||
(JPM New) | |||
N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp (JPM 017) | |||
D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open | |||
) (JPM New) | |||
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path | |||
- Trip Reactor) | |||
(JPM 020) | |||
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak | |||
) (JPM New) | |||
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017) | |||
D, S 6 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start | |||
) (JPM 162) | |||
D, A, S, L 8 In-Plant Systems | |||
@ (3 for RO); (3 for SRO | |||
-I); (3 or 2 for SRO | |||
-U) P1 - (004) / Perform Att | |||
. 5 of Control Room Evacuation | |||
DB-OP-02508, CTRM Evacuation (JPM 048) | |||
D, E, R 2 P2 - (064) / Restore EDG to supply 4160 Essential Bus | |||
DB-OP-02538, Loss of D2P and DBP (JPM 079) | |||
D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078) | |||
D, E 8 @ All RO and SRO control room (and in | |||
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
*Type Codes Criteria for RO | |||
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in | |||
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) | |||
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system) | |||
(randomly selected)}} |
Revision as of 20:59, 30 June 2018
ML15231A839 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 03/06/2015 |
From: | NRC/RGN-III |
To: | FirstEnergy Nuclear Operating Co |
Reeser D W | |
Shared Package | |
ML15217A099 | List: |
References | |
Download: ML15231A839 (1) | |
Text
NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:
__6/15/15 thru 6/26/15
__ Exam Level: RO SRO(I) SRO(U) Operating Test No.:
__DB NRC 2015__ Control Room Systems
-I); (2 or 3 for SRO
-U) System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
(JPM New)
N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp (JPM 017)
D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
) (JPM New)
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path
- Trip Reactor)
(JPM 020)
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
) (JPM New)
N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)
D, S 6 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
) (JPM 162)
D, A, S, L 8 In-Plant Systems
-I); (3 or 2 for SRO
-U) P1 - (004) / Perform Att
. 5 of Control Room Evacuation
DB-OP-02508, CTRM Evacuation (JPM 048)
D, E, R 2 P2 - (064) / Restore EDG to supply 4160 Essential Bus
DB-OP-02538, Loss of D2P and DBP (JPM 079)
D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)
D, E 8 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)
(randomly selected)