ML15231A839: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:NUREG-1021, R9 Supplement 1       FENOC Facsimile Rev. 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:          Davis Besse                           Date of Examination:__6/15/15 thru 6/26/15 __ Exam Level:  RO  SRO(I)      SRO(U)          Operating Test No.: __DB NRC 2015__ Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U)  System / JPM Title Type Code* Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply   (Alt Path - Undesired rod motion)                     (JPM New)         N, A, S  1 S2 - (004) / Recover from Letdown Isolation on High Temp                      (JPM 017) D, S  2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR         (Alt Path - Cooler Outlet Valve Fails open)        (JPM New)       N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path - Trip Reactor)                     (JPM 020) D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak)          (JPM New)       N, A, S, EN 5  S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate                     (JPM 017) D, S  6    S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start)          (JPM 162)       D, A, S, L 8 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)  P1 - (004) / Perform Att. 5 of Control Room Evacuation                   DB-OP-02508, CTRM Evacuation         (JPM 048) D, E, R  2  P2 - (064) / Restore EDG to supply 4160 Essential Bus                       DB-OP-02538, Loss of D2P and DBP                   (JPM 079) D, E  6  P3 - (078) / Bypass and isolate the in service air dryers           DB-OP-02528, IA Malfunctions           (JPM 078) D, E  8 @ All RO and SRO control room (and in-plant) systems must be different and serve different safety functions; all  5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room. *Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A) (P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)     (randomly selected)}}
{{#Wiki_filter:NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility:          Davis Besse Date of Examination:
__6/15/15 thru 6/26/15
__ Exam Level:  RO  SRO(I)      SRO(U)          Operating Test No.:
__DB NRC 2015__ Control Room Systems
@ (8 for RO); (7 for SRO
-I); (2 or 3 for SRO
-U)  System / JPM Title Type Code*
Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)
                      (JPM New)
N, A, S  1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp                      (JPM 017)
D, S  2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open
)        (JPM New)
N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path  
- Trip Reactor)
                      (JPM 020)
D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak
)          (JPM New)
N, A, S, EN 5  S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)
D, S  6    S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start
)          (JPM 162)
D, A, S, L 8 In-Plant Systems
@ (3 for RO); (3 for SRO
-I); (3 or 2 for SRO
-U)  P1 - (004) / Perform Att
. 5 of Control Room Evacuation
 
DB-OP-02508, CTRM Evacuation (JPM 048)
D, E, R  2  P2 - (064) / Restore EDG to supply 4160 Essential Bus
 
DB-OP-02538, Loss of D2P and DBP (JPM 079)
D, E  6  P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)
D, E  8 @ All RO and SRO control room (and in
-plant) systems must be different and serve different safety functions; all  5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
*Type Codes Criteria for RO
/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3      /  / > 1 (control room system)
    (randomly selected)}}

Revision as of 20:59, 30 June 2018

2015 Davis-Besse Nuclear Power Station Initial License Examination ES-301-2 Sroi Systems Outline
ML15231A839
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/06/2015
From:
NRC/RGN-III
To:
FirstEnergy Nuclear Operating Co
Reeser D W
Shared Package
ML15217A099 List:
References
Download: ML15231A839 (1)


Text

NUREG-1021, R9 Supplement 1 FENOC Facsimile Rev. 1 ES-301 Control Room/In

-Plant Systems Outline Form ES-301-2 Facility: Davis Besse Date of Examination:

__6/15/15 thru 6/26/15

__ Exam Level: RO SRO(I) SRO(U) Operating Test No.:

__DB NRC 2015__ Control Room Systems

@ (8 for RO); (7 for SRO

-I); (2 or 3 for SRO

-U) System / JPM Title Type Code*

Safety Function S1 - (001) / Transfer Rods from the Auxiliary Power Supply (Alt Path - Undesired rod motion)

(JPM New)

N, A, S 1 S2 - (004) / Recover from Letdown Isolation on Hi gh Temp (JPM 017)

D, S 2 S3 - (005) / Start Decay Heat Pump 1 following a loss of DHR (Alt Path - Cooler Outlet Valve Fails open

) (JPM New)

N, A, S, L 4P S4 - (055) / Actions for Steam Leak on Gland Steam Header (Alt Path

- Trip Reactor)

(JPM 020)

D, A, S, L 4S S5 - (026) / Initiate Containment Spray (Alt Path - Spray header develops leak

) (JPM New)

N, A, S, EN 5 S6 - (062) / Transfer Essential 4160Kv Bus C1 to Alternate (JPM 017)

D, S 6 S8 - (029) / Purge Containment in Mode 5 (Alt Path - Supply fan fails to start

) (JPM 162)

D, A, S, L 8 In-Plant Systems

@ (3 for RO); (3 for SRO

-I); (3 or 2 for SRO

-U) P1 - (004) / Perform Att

. 5 of Control Room Evacuation

DB-OP-02508, CTRM Evacuation (JPM 048)

D, E, R 2 P2 - (064) / Restore EDG to supply 4160 Essential Bus

DB-OP-02538, Loss of D2P and DBP (JPM 079)

D, E 6 P3 - (078) / Bypass and isolate the in service air dryers DB-OP-02528, IA Malfunctions (JPM 078)

D, E 8 @ All RO and SRO control room (and in

-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO

/ SRO-I / SRO-U (A)lternate Path (C)ontrol room (D)irect from bank (E)mergency or abnormal in

-plant (EN)gineered safety feature (L)ow-power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 /4-6 /2-3 / / > 1 (control room system)

(randomly selected)