Sent:Tuesday, November 10, 2015 12:29 PM To:Lamb, John; Katzman, Eric Cc:Saba, Farideh; Buckberg, Perry | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: For Your | [External_Sender] RE: For Your Revi ew - DRAFT RAI - St. Lucie AFW LARWe don't need a call. 45 days would be appreciated. | ||
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748 | |||
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748 | |||
From: Lamb, John [mailto:John.Lamb@nrc.gov] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken | From: Lamb, John [mailto:John.Lamb@nrc.gov] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken | ||
==Subject:== | ==Subject:== | ||
FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR | FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. | ||
Eric, | |||
Do you need a conference call and how much time does FP&L need to respond? | Do you need a conference call and how much time does FP&L need to respond? | ||
Thanks. John From: Lamb, John Sent: Wednesday, November 04, 2015 2:31 PM To: Katzman, Eric ( | |||
Eric.Katzman@fpl.com | |||
) <Eric.Katzman@fpl.com | |||
> Cc: Saba, Farideh <Farideh.Saba@nrc.gov | |||
>; Buckberg, Perry <Perry.Buckberg@nrc.gov | |||
> | |||
==Subject:== | ==Subject:== | ||
For Your Review - DRAFT RAI - St. Lucie AFW LAR | For Your Review - DRAFT RAI - St. Lucie AFW LAR Eric, | ||
Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI. | Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI. | ||
Line 36: | Line 45: | ||
John | John | ||
2 DRAFT RAI 1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps. | 2 DRAFT RAI | ||
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. 2.0 REQUEST FOR ADDITIONAL INFORMATION | |||
1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps. | |||
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. | |||
2.0 REQUEST FOR ADDITIONAL INFORMATION On June 22, 2015 (ADAMS Accession No. ML15127A066), th e NRC issued Amendment No. 223 to Renewed Facility Operating License No. DPR-67 and Amendment No. 173 to Renewed Facility Oper ating License No. NPF-16 for the St. Lucie Unit Nos. 1 and 2, respectively. The amendments revised the St. Lucie 1 and 2 TSs by relocating specific surveillance frequencies to a licensee-controlled program. Amendment No. 223 for St. Lucie Unit 1 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". Amendment No. 173 for St. Lucie Unit 2 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". | |||
By letter dated July 15, 2015, FP&L submitted the AFW pumps license amendment request. In Attachment 1, "Unit 1 Technical Specification Markups," Attachment 2, "Unit 2 Technical Specification Markups," Attachment 3, "Revised Unit 1 Technical Specifications Page," and Attachment 4, "Revised Unit 2 Technical Specifications Page," FP&L has the incorrect SR 4.7.1.2.a that does not reflect the Amendment No. 223 for Unit 1 and Amendment No. 173 for Unit 2. | |||
Please correct these errors. | |||
Please correct these errors. | |||
Hearing Identifier: NRR_PMDA | Hearing Identifier: NRR_PMDA Email Number: 2500 Mail Envelope Properties (C9ED835677B34D419A002BA9983983AC62B63785) | ||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM | [External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM From: Frehafer, Ken Created By: Ken.Frehafer@fpl.com Recipients: "Saba, Farideh" <Farideh.Saba@nrc.gov> | ||
Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None Post Office: GOXSA1809.fplu.fpl.com | Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None | ||
1NRR-PMDAPEm | |||
Post Office: GOXSA1809.fplu.fpl.com Files Size Date & Time MESSAGE 3377 11/10/2015 12:29:20 PM | |||
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: | |||
1NRR-PMDAPEm Resource From:Frehafer, Ken <Ken.Frehafer@fpl.com> | |||
Sent:Tuesday, November 10, 2015 12:29 PM To:Lamb, John; Katzman, Eric Cc:Saba, Farideh; Buckberg, Perry | |||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: For Your | [External_Sender] RE: For Your Revi ew - DRAFT RAI - St. Lucie AFW LARWe don't need a call. 45 days would be appreciated. | ||
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748 | |||
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748 | |||
From: Lamb, John [mailto:John.Lamb@nrc.gov] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken | From: Lamb, John [mailto:John.Lamb@nrc.gov] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken | ||
==Subject:== | ==Subject:== | ||
FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR | FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email. | ||
Eric, | |||
Do you need a conference call and how much time does FP&L need to respond? | Do you need a conference call and how much time does FP&L need to respond? | ||
Thanks. John From: Lamb, John Sent: Wednesday, November 04, 2015 2:31 PM To: Katzman, Eric ( | |||
Eric.Katzman@fpl.com | |||
) <Eric.Katzman@fpl.com | |||
> Cc: Saba, Farideh <Farideh.Saba@nrc.gov | |||
>; Buckberg, Perry <Perry.Buckberg@nrc.gov | |||
> | |||
==Subject:== | ==Subject:== | ||
For Your Review - DRAFT RAI - St. Lucie AFW LAR | For Your Review - DRAFT RAI - St. Lucie AFW LAR Eric, | ||
Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI. | Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI. | ||
Line 68: | Line 95: | ||
John | John | ||
2 DRAFT RAI 1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps. | 2 DRAFT RAI | ||
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. 2.0 REQUEST FOR ADDITIONAL INFORMATION | |||
1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps. | |||
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. | |||
2.0 REQUEST FOR ADDITIONAL INFORMATION On June 22, 2015 (ADAMS Accession No. ML15127A066), th e NRC issued Amendment No. 223 to Renewed Facility Operating License No. DPR-67 and Amendment No. 173 to Renewed Facility Oper ating License No. NPF-16 for the St. Lucie Unit Nos. 1 and 2, respectively. The amendments revised the St. Lucie 1 and 2 TSs by relocating specific surveillance frequencies to a licensee-controlled program. Amendment No. 223 for St. Lucie Unit 1 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". Amendment No. 173 for St. Lucie Unit 2 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". | |||
By letter dated July 15, 2015, FP&L submitted the AFW pumps license amendment request. In Attachment 1, "Unit 1 Technical Specification Markups," Attachment 2, "Unit 2 Technical Specification Markups," Attachment 3, "Revised Unit 1 Technical Specifications Page," and Attachment 4, "Revised Unit 2 Technical Specifications Page," FP&L has the incorrect SR 4.7.1.2.a that does not reflect the Amendment No. 223 for Unit 1 and Amendment No. 173 for Unit 2. | |||
Please correct these errors. | |||
Please correct these errors. | |||
Hearing Identifier: NRR_PMDA | Hearing Identifier: NRR_PMDA Email Number: 2500 Mail Envelope Properties (C9ED835677B34D419A002BA9983983AC62B63785) | ||
==Subject:== | ==Subject:== | ||
[External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM | [External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM From: Frehafer, Ken Created By: Ken.Frehafer@fpl.com Recipients: "Saba, Farideh" <Farideh.Saba@nrc.gov> | ||
Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None Post Office: GOXSA1809.fplu.fpl.com | Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None | ||
Post Office: GOXSA1809.fplu.fpl.com Files Size Date & Time MESSAGE 3377 11/10/2015 12:29:20 PM | |||
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} |
Revision as of 18:24, 30 June 2018
ML15322A314 | |
Person / Time | |
---|---|
Site: | Saint Lucie ![]() |
Issue date: | 11/10/2015 |
From: | Frehafer K W Florida Power & Light Co |
To: | Lamb J G Plant Licensing Branch 1 |
References | |
Download: ML15322A314 (3) | |
Text
1NRR-PMDAPEm Resource From:Frehafer, Ken <Ken.Frehafer@fpl.com>
Sent:Tuesday, November 10, 2015 12:29 PM To:Lamb, John; Katzman, Eric Cc:Saba, Farideh; Buckberg, Perry
Subject:
[External_Sender] RE: For Your Revi ew - DRAFT RAI - St. Lucie AFW LARWe don't need a call. 45 days would be appreciated.
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748
From: Lamb, John [1] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken
Subject:
FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email.
Eric,
Do you need a conference call and how much time does FP&L need to respond?
Thanks. John From: Lamb, John Sent: Wednesday, November 04, 2015 2:31 PM To: Katzman, Eric (
Eric.Katzman@fpl.com
) <Eric.Katzman@fpl.com
> Cc: Saba, Farideh <Farideh.Saba@nrc.gov
>; Buckberg, Perry <Perry.Buckberg@nrc.gov
>
Subject:
For Your Review - DRAFT RAI - St. Lucie AFW LAR Eric,
Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI.
Thanks.
John
2 DRAFT RAI
1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review.
2.0 REQUEST FOR ADDITIONAL INFORMATION On June 22, 2015 (ADAMS Accession No. ML15127A066), th e NRC issued Amendment No. 223 to Renewed Facility Operating License No. DPR-67 and Amendment No. 173 to Renewed Facility Oper ating License No. NPF-16 for the St. Lucie Unit Nos. 1 and 2, respectively. The amendments revised the St. Lucie 1 and 2 TSs by relocating specific surveillance frequencies to a licensee-controlled program. Amendment No. 223 for St. Lucie Unit 1 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". Amendment No. 173 for St. Lucie Unit 2 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:".
By letter dated July 15, 2015, FP&L submitted the AFW pumps license amendment request. In Attachment 1, "Unit 1 Technical Specification Markups," Attachment 2, "Unit 2 Technical Specification Markups," Attachment 3, "Revised Unit 1 Technical Specifications Page," and Attachment 4, "Revised Unit 2 Technical Specifications Page," FP&L has the incorrect SR 4.7.1.2.a that does not reflect the Amendment No. 223 for Unit 1 and Amendment No. 173 for Unit 2.
Please correct these errors.
Hearing Identifier: NRR_PMDA Email Number: 2500 Mail Envelope Properties (C9ED835677B34D419A002BA9983983AC62B63785)
Subject:
[External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM From: Frehafer, Ken Created By: Ken.Frehafer@fpl.com Recipients: "Saba, Farideh" <Farideh.Saba@nrc.gov>
Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None
Post Office: GOXSA1809.fplu.fpl.com Files Size Date & Time MESSAGE 3377 11/10/2015 12:29:20 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
1NRR-PMDAPEm Resource From:Frehafer, Ken <Ken.Frehafer@fpl.com>
Sent:Tuesday, November 10, 2015 12:29 PM To:Lamb, John; Katzman, Eric Cc:Saba, Farideh; Buckberg, Perry
Subject:
[External_Sender] RE: For Your Revi ew - DRAFT RAI - St. Lucie AFW LARWe don't need a call. 45 days would be appreciated.
Ken Frehafer St. Lucie Licensing Engineer (772) 467-7748
From: Lamb, John [2] Sent: Monday, November 09, 2015 10:42 AM To: Katzman, Eric Cc: Saba, Farideh; Buckberg, Perry; Frehafer, Ken
Subject:
FW: For Your Review - DRAFT RAI - St. Lucie AFW LAR This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from unknown senders or unexpected email.
Eric,
Do you need a conference call and how much time does FP&L need to respond?
Thanks. John From: Lamb, John Sent: Wednesday, November 04, 2015 2:31 PM To: Katzman, Eric (
Eric.Katzman@fpl.com
) <Eric.Katzman@fpl.com
> Cc: Saba, Farideh <Farideh.Saba@nrc.gov
>; Buckberg, Perry <Perry.Buckberg@nrc.gov
>
Subject:
For Your Review - DRAFT RAI - St. Lucie AFW LAR Eric,
Below, for your review, is a DRAFT RAI regarding the St. Lucie Auxiliary Feedwater (AFW) License Amendment Request (LAR). Please review to ensure that the questions are understandable, the regulatory basis is clear, there is no proprietary information contained in the RAI, and to determine if the information was previously docketed. Please also let me know how much time FP&L needs to respond to the RAI.
Thanks.
John
2 DRAFT RAI
1.0 SCOPE By letter dated July 15, 2015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML15198A028), Florida Power and Light Company (FP&L or the licensee) requested changes to the technical specifications (TSs) for the St. Lucie Plant, Unit No. 1 and Unit No. 2 (St. Lucie). The proposed amendment would revise the required actions for inoperability of auxiliary feedwater (AFW) pumps.
The U.S. Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review.
2.0 REQUEST FOR ADDITIONAL INFORMATION On June 22, 2015 (ADAMS Accession No. ML15127A066), th e NRC issued Amendment No. 223 to Renewed Facility Operating License No. DPR-67 and Amendment No. 173 to Renewed Facility Oper ating License No. NPF-16 for the St. Lucie Unit Nos. 1 and 2, respectively. The amendments revised the St. Lucie 1 and 2 TSs by relocating specific surveillance frequencies to a licensee-controlled program. Amendment No. 223 for St. Lucie Unit 1 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:". Amendment No. 173 for St. Lucie Unit 2 replaced the surveillance requirements (SRs) of SR 4.7.1.2.a that stated "At least once per 31 days by:" with "In accordance with the Surveillance Frequency control Program by:".
By letter dated July 15, 2015, FP&L submitted the AFW pumps license amendment request. In Attachment 1, "Unit 1 Technical Specification Markups," Attachment 2, "Unit 2 Technical Specification Markups," Attachment 3, "Revised Unit 1 Technical Specifications Page," and Attachment 4, "Revised Unit 2 Technical Specifications Page," FP&L has the incorrect SR 4.7.1.2.a that does not reflect the Amendment No. 223 for Unit 1 and Amendment No. 173 for Unit 2.
Please correct these errors.
Hearing Identifier: NRR_PMDA Email Number: 2500 Mail Envelope Properties (C9ED835677B34D419A002BA9983983AC62B63785)
Subject:
[External_Sender] RE: For Your Review - DRAFT RAI - St. Lucie AFW LAR Sent Date: 11/10/2015 12:29:15 PM Received Date: 11/10/2015 12:29:20 PM From: Frehafer, Ken Created By: Ken.Frehafer@fpl.com Recipients: "Saba, Farideh" <Farideh.Saba@nrc.gov>
Tracking Status: None "Buckberg, Perry" <Perry.Buckberg@nrc.gov> Tracking Status: None "Lamb, John" <John.Lamb@nrc.gov> Tracking Status: None "Katzman, Eric" <Eric.Katzman@fpl.com> Tracking Status: None
Post Office: GOXSA1809.fplu.fpl.com Files Size Date & Time MESSAGE 3377 11/10/2015 12:29:20 PM
Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: