IR 05000416/2015501: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 28: | Line 28: | ||
==Dear Mr. Mulligan:== | ==Dear Mr. Mulligan:== | ||
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Grand Gulf Nuclear Station. This | On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Grand Gulf Nuclear Station. This | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000416/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of | |||
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Sincerely,/RA/ | Sincerely,/RA/ | ||
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-416 License No. NPF-29 | Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety | ||
Docket No. 50-416 License No. NPF-29 | |||
cc: Electronic Distribution | cc: Electronic Distribution UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511 | ||
SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2015501 DISTRIBUTION: Regional Administrator (Marc.Dapas@nrc.gov) | ML16007A746 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Kevin Mulligan from Mark S. Haire, dated January 6, 2016 | ||
SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2015501 | |||
DISTRIBUTION | |||
: Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Senior Resident Inspector (Matt.Young@nrc.gov) | Senior Resident Inspector (Matt.Young@nrc.gov) | ||
Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov) Branch Chief, DRP/C (Greg.Warnick@nrc.gov) | Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov) | ||
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) | Branch Chief, DRP/C (Greg.Warnick@nrc.gov) | ||
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov) | |||
Project Engineer (Michael.Stafford@nrc.gov) | Project Engineer (Michael.Stafford@nrc.gov) | ||
Project Engineer (Lindsay.Brandt@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (Alan.Wang@nrc.gov) | Project Engineer (Lindsay.Brandt@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Project Manager (Alan.Wang@nrc.gov) | |||
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) | Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
Revision as of 14:30, 30 June 2018
ML16007A746 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 01/06/2016 |
From: | Haire M S Plant Support Branch-1 |
To: | Kevin Mulligan Entergy Operations |
References | |
IR 2015501 | |
Download: ML16007A746 (3) | |
Text
January 6, 2016
Mr. Kevin Mulligan Site Vice President Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150
SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2015501
Dear Mr. Mulligan:
On December 31, 2015, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Grand Gulf Nuclear Station. This
inspection began on January 1, 2015. Issuance of this letter closes NRC Inspection Report 05000416/2015501. The inspection results associated with the 2015-501 reports are documented in integrated Resident Inspector Reports 2015-001, 2015-002, 2015-003, and 2015-004.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of
this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Docket No. 50-416 License No. NPF-29
cc: Electronic Distribution UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. ARLINGTON, TX 76011-4511
ML16007A746 SUNSI Review By: PElkmann ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE PSB1:SEPI PSB1:BC NAME PElkmann/dch MHaire SIGNATURE /RA/ /RA/ DATE 12/14/15 1/6/16 Letter to Kevin Mulligan from Mark S. Haire, dated January 6, 2016
SUBJECT: GRAND GULF NUCLEAR STATION - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000416/2015501
DISTRIBUTION
- Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Neil.Day@nrc.gov) Administrative Assistant (Alley.Farrell@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer, DRP/C (Cale.Young@nrc.gov)
Project Engineer (Michael.Stafford@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Alan.Wang@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov)