| {{#Wiki_filter:NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 1 of 5 Outline Submittal Comments RO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-446; Complete Mode 4 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam? This surveillance is new and was not administered on either of the previous 2 NRC or audit exams. COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO. As validated, the original Admin JPM validated poorly and would take at least an hour to perform. Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check. EC: 802-4101-441; Identify Isolation Boundaries for a Clearance to Replace Pump Impeller Replaced with JP-OP-802-4101-452; Identify Isolation Boundaries for Steam Leak. Based on feedback from validation crew. RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs. Please replace at least one admin JPM such that one is SRO and the other RO. Replaced with 802-4101-416; Determine Dose and Complete a Red Card. Original JPM would be difficult to perform during plant outage. SRO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-440; Complete Mode 5 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam? 1) This surveillance is new and was not administered on either of the previous 2 NRC or audit exams. 2) Modified to JP-OP-802-4101-440; Review Mode 5 Shiftly/Daily Surveillances (PMT). Determination of component operability is more of an SRO function, and also reduces steps from 35 to 6 (decrease JPM time). COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO. As validated, the original Admin JPM validated poorly and would take at least an hour to perform. Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check. | | {{#Wiki_filter:NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 1 of 5 Outline Submittal Comments RO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-446; Complete Mode 4 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam? |
| NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 2 of 5 RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs. Please replace at least one admin JPM such that one is SRO and the other RO. Replaced with 802-4101-435; Notify Hospital of Contaminated Injured Worker. Original JPM would be difficult to perform during plant outage. Scenario ES D-1 Chief Examiner Comment Facility Action/Response Scenario 1 Scenario 1 is similar to 2013-1 exam scenario. (ES-301, Section D.5.b). Or was it a spare on 2013 exam? It was significantly modified. | | This surveillance is new and was not administered on either of the previous 2 NRC or audit exams |
| NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 3 of 5 Operating Test Submittal Comments RO/SRO Admin JPMs Comments Chief Examiner Comment Facility Action/Response RO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical. Revised. RO Admin A2 EC: JPM-802-4101-452; Identify Isolation Boundaries for Steam Leak. Update forms to use current revisions. Recent revision change, updated. RO Admin A3 RC JPM 802-4101-416; Determine Dose and Complete a Red Card Change JPM to increase accumulated dose for the year to 1753 mr to allow use of the original survey map with much lower dose values to make the JPM more believable. JPM was changed from original submittal because the Fermi 2 administrative limit was changed to 2 mr. JPM modified as described. No change to JPM steps, only calculation values. SRO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical. Revised. | | . COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO. |
| NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 4 of 5 RO/SRO CR/IP System JPMs Comments Chief Examiner Comment Facility Action/Response Chief Examiner Comment Facility Action/Response SIM JPM S7(g) JP-OP-802-4101-445; SRM/IRM Overlap Verification and SRM Withdrawal During Startup Incorporate critical JPM Step 3 into Step 2 and make Step 2 critical. Renumber JPM steps accordingly. Lic: Incorporated. SIM JPM S8(h) JP-OP-315-0166-002; Restore RBHVAC to Operation After Auto Isolation JPM Steps 3 and 4 not critical. Lic: Incorporated. IP JPM P3(k) NRC: In-Plant Systems JPM (k) JP-OP-315-0167-005,"Shift RBCCW Supplemental Cooling Chilled Water to Mode 2" was changed to "Adjust Chilled Water Temperature Set-point". Lic: The change was based on the ALARA principle that during licensee validation 3 radiological hot spots were identified in the area of the JPM and during JPM performance significant dose could be obtained. | | As validated, the original Admin JPM validated poorly and would take at least an hour to perform. Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check. |
| NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 5 of 5 Scenario Comments Chief Examiner Comment Facility Action/Response Scenario 1 1. Incorporate Events 3 and 4 into Event 2 and renumber events. 2. Event 5, add TS condition. 3. Event 7, add TS condition, move CT 1, RPV-LEVEL, to Event 10, Drywell Leak. 4. Event 9, rename CT 2, RPV-ED, and move to Event 10, Drywell Leak. 5. Event 10, rename CT 3, RPV-TAF. 6. Event 10, rename CT 4, PC-DWS, and move to Event 12. Delete CT 5. 1. Incorporated Events 3 and 4 into Event 2 and renumbered events. 2. Added TS condition to Event 5 (now Event 3). 3. Added TS condition to Event 7 (now Event 5). Moved CT 1 to new Event 7 (Drywell Leak). 4. Renamed and moved CT 2 to new Event 7 (Drywell Leak). 5. Renamed CT 3, now part of new Event 7. 6. Renamed CT 4, now part of new Event 8. Deleted CT 5. Scenario 2 1. Event 2, add conditions to each of the 4 TSs. Combine Event 3 into Event 2. 2. Event 5, delete CT 1 to reduce power with CRAM Array rods. 3. Relabel CT 2 as CT 1, ATWS-ADS. 4. Relabel CT 3 as CT 2, ATWS-SLC. 5. Relabel CT 4 as CT 3, ATWS-RODS. 6. Relabel CT 5 as CT 4, ATWS-T&P, and add CT 5, ATWS-INJ. 1. Added conditions to TSs, incorporated Event 3 into Event 2, and renumbered events. 2. Deleted CT 1 for Event 5 (new Event 4). 3. Incorporated comment (now CT 1, ATWS-ADS, new Event 5). 4. Incorporated comment (now CT 2, ATWS-SLC, new Event 6). 5. Incorporated comment (now CT 3, ATWS-RODS, new Event 7). 6. Incorporated comment (now CT 4, ATWS-T&P, and CT 5, ATWS-INJ, new Event 8). Scenario 3 1. Event 2, change event to have rod drift out, vices, into the core. More significant reactivity event, but will lose the TS. 2. Incorporate Event 4 into Event 3 and renumber Events. Add condition to TR. 3. Event 5, delete TS. 1. Incorporated comment. 2. Incorporated comment. 3. Incorporated comment.}} | | EC: 802-4101-441; Identify Isolation Boundaries for a Clearance to Replace Pump Impeller Replaced with JP-OP-802-4101-452; Identify Isolation Boundaries for Steam Leak. Based on feedback from validation crew. |
| | RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs. |
| | Please replace at least one admin JPM such that one is SRO and the other RO. |
| | Replaced with 802 |
| | -4101-416; Determine Dose and Complete a Red Card. |
| | Original JPM would be difficult to perform during plant outage. SRO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-440; Complete Mode 5 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam? |
| | : 1) This surveillance is new and was not administered on either of the previous 2 NRC or audit exams |
| | . 2) Modified to JP-OP-802-4101-440; Review Mode 5 Shiftly/Daily Surveillances (PMT) |
| | . Determination of component operability is more of an SRO function |
| | , and also reduces steps from 35 to 6 (decrease JPM time). |
| | COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO. |
| | As validated, the original Admin JPM validated poorly and would take at least an hour to perform. |
| | Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check. |
| | |
| | NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 2 of 5 RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs. Please replace at least one admin JPM such that one is SRO and the other RO. |
| | Replaced with 802 |
| | -4101-435; Notify Hospital of Contaminated Injured Worker. |
| | Original JPM would be difficult to perform during plant outage. Scenario ES D |
| | -1 Chief Examiner Comment Facility Action/Response Scenario 1 Scenario 1 is similar to 2013 |
| | -1 exam scenario. (ES-301, Section D.5.b). Or was it a spare on 2013 exam? |
| | It was significantly modified |
| | . |
| | NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 3 of 5 Operating Test Submittal Comments RO/SRO Admin JPMs Comments Chief Examiner Comment Facility Action/Response RO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical. |
| | Revised. RO Admin A2 EC: JPM-802-4101-452; Identify Isolation Boundaries for Steam Leak. Update forms to use current revisions. |
| | Recent revision change, updated. |
| | RO Admin A3 RC JPM 802-4101-416; Determine Dose and Complete a Red Card Change JPM to increase accumulated dose for the year to 1753 mr to allow use of the original survey map with much lower dose values to make the JPM more believable. JPM was changed from original submittal because the Fermi 2 administrative limit was changed to 2 mr. JPM modified as described. No change to JPM steps, only calculation values. |
| | SRO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical. |
| | Revised. |
| | NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 4 of 5 RO/SRO CR/IP System JPMs Comments Chief Examiner Comment Facility Action/Response Chief Examiner Comment Facility Action/Response SIM JPM S7(g) JP-OP-802-4101-445; SRM/IRM Overlap Verification and SRM Withdrawal During Startup Incorporate critical JPM Step 3 into Step 2 and make Step 2 critical. Renumber JPM steps accordingly. |
| | Lic: Incorporated. |
| | SIM JPM S8(h) JP-OP-315-0166-002; Restore RBHVAC to Operation After Auto Isolation JPM Steps 3 and 4 not critical. |
| | Lic: Incorporated. |
| | IP JPM P3(k) NRC: In-Plant Systems JPM (k) JP |
| | -OP-315-0167-005,"Shift RBCCW Supplemental Cooling Chilled Water to Mode 2" was changed to "Adjust Chilled Water Temperature Set |
| | -point". |
| | Lic: The change was based on the ALARA principle that during licensee validation 3 radiological hot spots were identified in the area of the JPM and during JPM performance significant dose could be obtained. |
| | |
| | NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 5 of 5 Scenario Comments Chief Examiner Comment Facility Action/Response Scenario 1 1. Incorporate Events 3 and 4 into Event 2 and renumber events. |
| | : 2. Event 5 |
| | , add TS condition. |
| | : 3. Event 7, add TS condition, move CT 1, RPV-LEVEL, to Event 10, Drywell Leak |
| | . 4. Event 9, rename CT 2, RPV-ED, and move to Event 10, Drywell Leak. |
| | : 5. Event 10, rename CT 3, RPV |
| | -TAF. 6. Event 10, rename CT 4, PC |
| | -DWS, and move to Event 12. |
| | Delete CT 5. |
| | : 1. Incorporated Events 3 and 4 into Event 2 and renumbered events. |
| | : 2. Added TS condition to Event 5 (now Event 3). |
| | : 3. Added TS condition to Event 7 (now Event 5). Moved CT 1 to new Event 7 (Drywell Leak). 4. Renamed and moved CT 2 to new Event 7 (Drywell Leak). |
| | : 5. Renamed CT 3, now part of new Event 7. |
| | : 6. Renamed CT 4, now part of new Event |
| | : 8. Deleted CT 5. |
| | Scenario 2 1. Event 2, add conditions to each of the 4 TSs. Combine Event 3 into Event |
| | : 2. 2. Event 5, delete CT 1 to reduce power with CRAM Array rods. |
| | : 3. Relabel CT 2 as CT 1, ATWS |
| | -ADS. 4. Relabel CT 3 as CT 2, ATWS |
| | -SLC. 5. Relabel CT 4 as CT 3, ATWS |
| | -RODS. 6. Relabel CT 5 as CT 4, ATWS |
| | -T&P, and add CT 5, ATWS-INJ. 1. Added conditions to TSs, incorporated Event 3 into Event 2, and renumbered events. |
| | : 2. Deleted CT 1 for Event 5 (new Event 4). |
| | : 3. Incorporated comment (now CT 1, ATWS |
| | -ADS, new Event 5). |
| | : 4. Incorporated comment (now CT 2, ATWS |
| | -SLC, new Event 6). |
| | : 5. Incorporated comment (now CT 3, ATWS |
| | -RODS, new Event 7). |
| | : 6. Incorporated comment (now CT 4, ATWS |
| | -T&P, and CT 5, ATWS |
| | -INJ, new Event 8). |
| | Scenario 3 1. Event 2, change event to have rod drift out, vices, into the core. More significant reactivity event, but will lose the TS. 2. Incorporate Event 4 into Event 3 and renumber Events. Add condition to TR. |
| | : 3. Event 5, delete TS. |
| | : 1. Incorporated comment. |
| | : 2. Incorporated comment. |
| | : 3. Incorporated comment.}} |
Similar Documents at Fermi |
---|
Category:License-Operator
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A4252021-06-16016 June 2021 ES-403-1 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A3362021-06-16016 June 2021 Handouts to Applicants (Summary) ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter 2024-07-09
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24197A0622024-07-15015 July 2024 Retake Exam Form 5.1-1 Postexamination Check Sheet IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A0992024-06-14014 June 2024 Retake Exam Form 1.3-1 Examination Security Agreement ML24173A1002024-06-14014 June 2024 Retake Exam Form 2.1-1 Examination Preparation Checklist ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24173A0862024-06-0505 June 2024 Retake Exam Form 2.3-2 Operating Test Quality Checklist NRC-24-0038, Retake Exam Proposed Exam Submittal Letter2024-05-22022 May 2024 Retake Exam Proposed Exam Submittal Letter NRC-24-0031, Retake Exam Outline Submittal Letter2024-04-22022 April 2024 Retake Exam Outline Submittal Letter ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24149A1102024-03-13013 March 2024 Form 1.3-1, Examination Security ML24149A1152024-03-13013 March 2024 Form 5.1-1 Post Examination Check Sheet (Fermi 2024) ML24149A1132024-03-13013 March 2024 Form 2.1-1, Examination Preparation Checklist (Fermi 2024) ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 ML24149A0702024-02-14014 February 2024 Form 3.4-1 Events and Evolutions Checklist (Fermi 2024 Ile - Final) ML24149A0682024-02-14014 February 2024 NRC Form 2.3-1 Examination Outline Quality Checklist ML24149A0862024-01-0505 January 2024 Form 2.3-4, Written Exam Quality Checklist, Fermi 2024 Ile ML24149A0852024-01-0505 January 2024 Form 2.3-2, Operating Test Quality Checklist, Fermi 2024 Ile NRC-23-0078, Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day2023-12-13013 December 2023 Initial Licensed Operator Exam Materials - NRC Cover Letter 75-Day NRC-23-0067, NRC-23-0067 signed-150 Day Outline Submittal2023-09-29029 September 2023 NRC-23-0067 signed-150 Day Outline Submittal IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23213A0302023-08-11011 August 2023 Form 5.1-1 Postexamination Check Sheet ML23212A8732023-07-31031 July 2023 Form 1.3-1 Examination Security Checklist ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis ML23200A2182023-06-28028 June 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Final ML23200A2572023-06-19019 June 2023 Form 2.1-1 Examination Prep Checklist ML23200A2562023-06-19019 June 2023 IP 21 Operator Licensing Exam Schedule ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23200A1852023-06-0202 June 2023 Form 2.3-2 Operating Test Quality Checklist ML23200A1862023-06-0202 June 2023 Form 2.3-4 Written Exam Quality Checklist ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 ML23200A2212023-02-0808 February 2023 Form 2.3-1 Outline Quality Checklist ML23200A2172023-01-20020 January 2023 Form 3.4-1 Scenario Events & Evolutions Checklist RO & SRO Draft ML23200A2162023-01-20020 January 2023 Outline Submittal Letter ML22322A1082022-11-18018 November 2022 Confirmation of Initial License Examination ML21258A0602021-09-15015 September 2021 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21327A4272021-06-16016 June 2021 Post Exam Submittal Letter ML21327A0922021-06-16016 June 2021 ES-301-6 ML21327A0952021-06-16016 June 2021 ES-301-3 ML21326A1242021-06-16016 June 2021 Licensee Outline Submittal Letter ML21326A1212021-06-16016 June 2021 ES-301-5 ML21326A1202021-06-16016 June 2021 ES-201-2 ML21327A1702021-06-16016 June 2021 ES-401-6 ML21327A1042021-06-16016 June 2021 ES-301-4 ML21327A1062021-06-16016 June 2021 Proposed Exam Submittal Letter ML21327A4212021-06-16016 June 2021 ES-201-1 ML21327A4242021-06-16016 June 2021 ES-201-3 ML21327A4252021-06-16016 June 2021 ES-403-1 2024-07-09
[Table view] |
Text
NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 1 of 5 Outline Submittal Comments RO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-446; Complete Mode 4 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam?
This surveillance is new and was not administered on either of the previous 2 NRC or audit exams
. COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO.
As validated, the original Admin JPM validated poorly and would take at least an hour to perform. Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check.
EC: 802-4101-441; Identify Isolation Boundaries for a Clearance to Replace Pump Impeller Replaced with JP-OP-802-4101-452; Identify Isolation Boundaries for Steam Leak. Based on feedback from validation crew.
RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs.
Please replace at least one admin JPM such that one is SRO and the other RO.
Replaced with 802
-4101-416; Determine Dose and Complete a Red Card.
Original JPM would be difficult to perform during plant outage. SRO Administrative JPMs Chief Examiner Comment Facility Action/Response COO1: JP-OP-802-4101-440; Complete Mode 5 Shiftly/Daily Surveillances Was this surveillance administered on either of the previous 2 NRC exams (2013, 2015) or the audit exam?
- 1) This surveillance is new and was not administered on either of the previous 2 NRC or audit exams
. 2) Modified to JP-OP-802-4101-440; Review Mode 5 Shiftly/Daily Surveillances (PMT)
. Determination of component operability is more of an SRO function
, and also reduces steps from 35 to 6 (decrease JPM time).
COO2: JP-OP-802-4101-450; Determine the Availability of RPV Level Instruments Both the RO and SRO perform same COO2 admin JPM. Please replace at least one admin JPM such that one is SRO and the other RO.
As validated, the original Admin JPM validated poorly and would take at least an hour to perform.
Replaced with JP-OP-802-4101-431; Perform Core Performance Parameter Check.
NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 2 of 5 RC: JP-OP-802-4101-416; Enter and Exit a Contaminated Area Both the RO and SRO perform same RC admin JPMs. Please replace at least one admin JPM such that one is SRO and the other RO.
Replaced with 802
-4101-435; Notify Hospital of Contaminated Injured Worker.
Original JPM would be difficult to perform during plant outage. Scenario ES D
-1 Chief Examiner Comment Facility Action/Response Scenario 1 Scenario 1 is similar to 2013
-1 exam scenario. (ES-301, Section D.5.b). Or was it a spare on 2013 exam?
It was significantly modified
.
NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 3 of 5 Operating Test Submittal Comments RO/SRO Admin JPMs Comments Chief Examiner Comment Facility Action/Response RO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical.
Revised. RO Admin A2 EC: JPM-802-4101-452; Identify Isolation Boundaries for Steam Leak. Update forms to use current revisions.
Recent revision change, updated.
RO Admin A3 RC JPM 802-4101-416; Determine Dose and Complete a Red Card Change JPM to increase accumulated dose for the year to 1753 mr to allow use of the original survey map with much lower dose values to make the JPM more believable. JPM was changed from original submittal because the Fermi 2 administrative limit was changed to 2 mr. JPM modified as described. No change to JPM steps, only calculation values.
SRO Admin A1.2 COO2: JP-OP-802-4101-431; Perform Core Performance Parameter Check JPM Step 2 (16.b.2(b)), "Verify-.." is not critical.
Revised.
NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 4 of 5 RO/SRO CR/IP System JPMs Comments Chief Examiner Comment Facility Action/Response Chief Examiner Comment Facility Action/Response SIM JPM S7(g) JP-OP-802-4101-445; SRM/IRM Overlap Verification and SRM Withdrawal During Startup Incorporate critical JPM Step 3 into Step 2 and make Step 2 critical. Renumber JPM steps accordingly.
Lic: Incorporated.
SIM JPM S8(h) JP-OP-315-0166-002; Restore RBHVAC to Operation After Auto Isolation JPM Steps 3 and 4 not critical.
Lic: Incorporated.
IP JPM P3(k) NRC: In-Plant Systems JPM (k) JP
-OP-315-0167-005,"Shift RBCCW Supplemental Cooling Chilled Water to Mode 2" was changed to "Adjust Chilled Water Temperature Set
-point".
Lic: The change was based on the ALARA principle that during licensee validation 3 radiological hot spots were identified in the area of the JPM and during JPM performance significant dose could be obtained.
NRC ILE Outline and Operating Test Submittal Comments 2017 FER Power Plant, Unit 2 5 of 5 Scenario Comments Chief Examiner Comment Facility Action/Response Scenario 1 1. Incorporate Events 3 and 4 into Event 2 and renumber events.
- 2. Event 5
, add TS condition.
- 3. Event 7, add TS condition, move CT 1, RPV-LEVEL, to Event 10, Drywell Leak
. 4. Event 9, rename CT 2, RPV-ED, and move to Event 10, Drywell Leak.
- 5. Event 10, rename CT 3, RPV
-TAF. 6. Event 10, rename CT 4, PC
-DWS, and move to Event 12.
Delete CT 5.
- 1. Incorporated Events 3 and 4 into Event 2 and renumbered events.
- 2. Added TS condition to Event 5 (now Event 3).
- 3. Added TS condition to Event 7 (now Event 5). Moved CT 1 to new Event 7 (Drywell Leak). 4. Renamed and moved CT 2 to new Event 7 (Drywell Leak).
- 5. Renamed CT 3, now part of new Event 7.
- 6. Renamed CT 4, now part of new Event
- 8. Deleted CT 5.
Scenario 2 1. Event 2, add conditions to each of the 4 TSs. Combine Event 3 into Event
- 2. 2. Event 5, delete CT 1 to reduce power with CRAM Array rods.
- 3. Relabel CT 2 as CT 1, ATWS
-ADS. 4. Relabel CT 3 as CT 2, ATWS
-SLC. 5. Relabel CT 4 as CT 3, ATWS
-RODS. 6. Relabel CT 5 as CT 4, ATWS
-T&P, and add CT 5, ATWS-INJ. 1. Added conditions to TSs, incorporated Event 3 into Event 2, and renumbered events.
- 2. Deleted CT 1 for Event 5 (new Event 4).
- 3. Incorporated comment (now CT 1, ATWS
-ADS, new Event 5).
- 4. Incorporated comment (now CT 2, ATWS
-SLC, new Event 6).
- 5. Incorporated comment (now CT 3, ATWS
-RODS, new Event 7).
- 6. Incorporated comment (now CT 4, ATWS
-T&P, and CT 5, ATWS
-INJ, new Event 8).
Scenario 3 1. Event 2, change event to have rod drift out, vices, into the core. More significant reactivity event, but will lose the TS. 2. Incorporate Event 4 into Event 3 and renumber Events. Add condition to TR.
- 3. Event 5, delete TS.
- 1. Incorporated comment.
- 2. Incorporated comment.
- 3. Incorporated comment.