ML15086A181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:
| page count = 2
| page count = 2
}}
}}
=Text=
{{#Wiki_filter:2-1 AMENDMENT NO. 119(EC-22790, Am. 119) 2.2 LIMITING SAFETY SYSTEM SETTINGS    REACTOR TRIP SETPOINTS2.2.1 The reactor protective instrumentation setpoints shall be set consistent with the Trip Setpoint values shown in Table 2.2-1. APPLICABILITY: As shown for each channel in Table 3.3-1. ACTION:With a reactor protective instrumentation setpoint less conservative than the value shown in the Allowable Values column of Table 2.2-1, declare the channel inoperable and apply the applicable ACTION statement requirement of Specification 3.3-1 until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value. (EC-22790, Am. 119) 2-2 AMENDMENT NO. 119 (EC-22790, Am. 119) Table 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS  FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 1. Steam Generator Level - High
TABLE NOTATIONS (1) % of the distance between steam generator upper and low level instrument nozzles. (EC-22790, Am. 119)}}

Revision as of 14:47, 12 June 2018

Technical Requirements Manual/Trm Revision 128/SEC2.0
ML15086A181
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/10/2015
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML15086A176 List:
References
W3F1-2015-0023
Download: ML15086A181 (2)


Text

2-1 AMENDMENT NO. 119(EC-22790, Am. 119) 2.2 LIMITING SAFETY SYSTEM SETTINGS REACTOR TRIP SETPOINTS2.2.1 The reactor protective instrumentation setpoints shall be set consistent with the Trip Setpoint values shown in Table 2.2-1. APPLICABILITY: As shown for each channel in Table 3.3-1. ACTION:With a reactor protective instrumentation setpoint less conservative than the value shown in the Allowable Values column of Table 2.2-1, declare the channel inoperable and apply the applicable ACTION statement requirement of Specification 3.3-1 until the channel is restored to OPERABLE status with its trip setpoint adjusted consistent with the Trip Setpoint value. (EC-22790, Am. 119) 2-2 AMENDMENT NO. 119 (EC-22790, Am. 119) Table 2.2-1 REACTOR PROTECTIVE INSTRUMENTATION TRIP SETPOINT LIMITS FUNCTIONAL UNIT TRIP SETPOINT ALLOWABLE VALUES 1. Steam Generator Level - High

TABLE NOTATIONS (1) % of the distance between steam generator upper and low level instrument nozzles. (EC-22790, Am. 119)