| | number = ML16162A672 | | | number = ML15309A745 |
| | issue date = 06/10/2016 | | | issue date = 11/05/2015 |
| | title = Examination Report 05000483/2016301; 05/23/2016 - 06/07/2016; Callaway Plant; Initial Operator Licensing Examination Report | | | title = Callaway Plant - Notification of NRC Initial Operator Licensing Examination 05000483/2016301 |
| | author name = Gaddy V G | | | author name = Gaddy V G |
| | author affiliation = NRC/RGN-IV/DRS/OB | | | author affiliation = NRC/RGN-IV/DRS/OB |
Line 8: |
Line 8: |
| | addressee affiliation = Union Electric Co | | | addressee affiliation = Union Electric Co |
| | docket = 05000483 | | | docket = 05000483 |
| | license number = NPF-030 | | | license number = |
| | contact person = | | | contact person = |
| | document report number = 50-483/16-301 | | | document report number = IR 2016301 |
| | document type = Letter, License-Operator Examination Report | | | document type = Letter |
| | page count = 9 | | | page count = 4 |
| }} | | }} |
|
| |
|
Line 19: |
Line 19: |
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter: |
| [[Issue date::June 10, 2016]] | | [[Issue date::November 5, 2015]] |
|
| |
|
| Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 | | Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251 |
|
| |
|
| SUBJECT: CALLAWAY PLANT - NRC EXAMINATION REPORT 05000483/2016301 | | SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2016301 |
|
| |
|
| ==Dear Mr. Diya:== | | ==Dear Mr. Diya:== |
| On June 1, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an initial operator license examination at Callaway Plant. The enclosed report documents the examination results and licensing decisions. A preliminary debrief was held on May 26, 2016, with Mr. J. Patterson, Director, Nuclear Projects, and other members of your staff. A telephonic exit meeting was conducted on June 7, 2016, with Mr. P. Swan, Operations Supervisor, who was provided the NRC licensing decisions.
| | In a telephone conversation on November 4, 2015, between Messrs. M. Covey, Operations Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of licensing examinations at the Callaway Plant during the week of May 23, 2016. |
|
| |
|
| The examination included the evaluation of one applicant for a reactor operator license and seven applicants for instant senior reactor operator licenses. The license examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued. There were no post-examination comments submitted by your staff.
| | As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 22, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by March 24, 2016. |
|
| |
|
| No findings were identified during this examination.
| | Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of April 18, 2016. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | | In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered. |
|
| |
|
| Sincerely,/RA/
| | To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. |
| Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-483 License No. NPF-30
| |
|
| |
|
| ===Enclosure:===
| | This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. |
| Examination Report 05000483/2016301
| |
|
| |
|
| ===w/Attachment:===
| | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. |
| Supplemental Information cc: Electronic Distribution
| |
|
| |
|
| ML16162A672 SUNSI Review By: VGG ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE SOE:OB OE:OB OE:OB OE:OB C:OB C:DRP/B C:OB NAME COsterholtz MBloodgood MHayes CSteely VGaddy NTaylor VGaddy SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ /RA/ DATE 6/9/16 6/9/16 6/10/166/9/166/10/166/9/16 6/10/16 Letter to Fadi Diya from Vincent G. Gaddy, dated June 10, 2016
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. |
|
| |
|
| SUBJECT: CALLAWAY PLANT - NRC EXAMINATION REPORT 05000483/2016301 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)
| | Thank you for your cooperation in this matter. Mr. Covey has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269, or myself at 817-200-1159. |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
| |
| DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
| |
| DRS Deputy Director (Jeff.Clark@nrc.gov)
| |
| Senior Resident Inspector (Thomas.Hartman@nrc.gov)
| |
| Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
| |
| Project Engineer, DRP/B (Shawn.Money@nrc.gov)
| |
| CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
| |
| Public Affairs Officer (Victor.Dricks@nrc.gov) Project Manager (John.Klos@nrc.gov) Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
| |
| RITS Coordinator (Marisa.Herrera@nrc.gov)
| |
| ACES (R4Enforcement.Resource@nrc.gov)
| |
| Regional Counsel (Karla.Fuller@nrc.gov)
| |
| Technical Support Assistant (Loretta.Williams@nrc.gov) Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
| |
| RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
| |
|
| |
|
| Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION IV Docket: 05000483 License: NPF-30 Report: 05000483/2016301 Licensee: Union Electric Company Facility: Callaway Plant Location: P.O. Box 620 Fulton, MO 65251 Dates: May 23 through June 7, 2016 Inspectors: C. Osterholtz, Chief Examiner, Senior Operations Engineer M. Bloodgood, Operations Engineer M. Hayes, Operations Engineer C. Steely, Operations Engineer Approved By: Vincent G. Gaddy Chief, Operations Branch Division of Reactor Safety
| | Sincerely,/RA/ Kelly D. Clayton for Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-483 License No. NPF-30 |
|
| |
|
| =SUMMARY=
| | cc: Electronic Distribution |
| ER 05000483/2016301; 05/23/2016 - 06/07/2016; Callaway Plant; Initial Operator Licensing Examination Report.
| |
|
| |
|
| The NRC examiners evaluated the competency of one applicant for a reactor operator license and seven applicants for instant senior reactor operator licenses at Callaway Plant.
| | ML15309A745 SUNSI Review By: COsterholtz ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE: OB BC:DRP/B C: OB NAME COsterholtz NTaylor VGaddy SIGNATURE /RA/ /RA/ DLP for /RA/ KDC for DATE 11/4/15 11/5/15 11/5/15 Letter to Fadi Diya from Vincent G. Gaddy, dated November 5, 2015 |
|
| |
|
| The licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10. The written examination was administered by the licensee on June 1, 2016. NRC examiners administered the operating tests on May 23-26, 2016.
| | SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2016301 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov) |
| | | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov) |
| The examiners determined that all of the applicants satisfied the requirements of 10 CFR Part 55 and the appropriate licenses have been issued.
| | DRS Director (Anton.Vegel@nrc.gov) |
| | | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| ===A. NRC-Identified and Self-Revealing Findings===
| | Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov) |
| None
| | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) |
| | | Project Engineer, DRP/B (Shawn.Money@nrc.gov) |
| ===B. Licensee-Identified Violations===
| | Project Engineer, DRP/B (Steven.Janicki@nrc.gov) CWY Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) |
| None
| | Project Manager (John.Klos@nrc.gov) |
| | | Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov) |
| =REPORT DETAILS=
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | | ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) |
| ==OTHER ACTIVITIES (OA)==
| | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| {{a|4OA5}}
| | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| ==4OA5 Other Activities (Initial Operator License Examination)==
| | RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROReports Resource |
| | |
| ===.1 License Applications===
| |
| | |
| ====a. Inspection Scope====
| |
| The NRC examiners reviewed all license applications submitted to ensure each applicant satisfied relevant license eligibility requirements. Examiners also audited two of the license applications in detail to confirm that they accurately reflected the subject applicant's qualifications. This audit focused on the applicant's experience and on-the-job training, including control manipulations that provided significant reactivity changes.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.2 Examination Development===
| |
| | |
| ====a. Inspection Scope====
| |
| The NRC examiners reviewed integrated examination outlines and draft examinations submitted by the licensee against the requirements of NUREG-1021. The NRC examination team conducted an on-site validation of the operating tests.
| |
| | |
| ====b. Findings====
| |
| The NRC examiners provided outline, draft examination, and post-validation comments to the licensee. The licensee satisfactorily completed comment resolution prior to examination administration.
| |
| | |
| The NRC examiners determined the written examinations and operating tests initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
| |
| | |
| ===.3 Operator Knowledge and Performance===
| |
| | |
| ====a. Inspection Scope====
| |
| On June 1, 2016, the licensee proctored the administration of the written examinations to all eight applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis and post-examination comments to the NRC on June 3, 2016.
| |
| | |
| The NRC examination team administered the various portions of the operating tests to all applicants on May 23-26, 2016.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| All of the applicants passed the written examination and all applicants passed all parts of the operating test. The final written examinations, post-examination analysis, and comments may be accessed in the ADAMS system under the accession numbers (ML) noted in the attachment.
| |
| | |
| The examination team noted no generic weaknesses associated with applicant performance.
| |
| | |
| ===.4 Simulation Facility Performance===
| |
| | |
| ====a. Inspection Scope====
| |
| The NRC examiners observed simulator performance with regard to plant fidelity during examination validation and administration.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| ===.5 Examination Security===
| |
| | |
| ====a. Inspection Scope====
| |
| The NRC examiners reviewed examination security for examination development during both the on-site preparation week and examination administration week for compliance with 10 CFR 55.49 and NUREG-1021. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
| |
| | |
| ====b. Findings====
| |
| No findings were identified.
| |
| | |
| {{a|4OA6}}
| |
| ==4OA6 Meetings, Including Exit==
| |
| The chief examiner conducted a preliminary debrief with Mr. J. Patterson, Director, Nuclear Projects, and other members of the staff on May 26, 2016. A telephonic exit was conducted on June 7, 2016, between Mr. C. Osterholtz, Chief Examiner, and Mr. P. Swan, Operations Supervisor.
| |
| | |
| The licensee did not identify any information or materials used during the examination as proprietary.
| |
| | |
| =SUPPLEMENTAL INFORMATION=
| |
| | |
| ==KEY POINTS OF CONTACT==
| |
| | |
| ===Licensee Personnel===
| |
| : [[contact::J. Patterson]], Director, Nuclear Projects
| |
| : [[contact::M. Covey]], Manager, Operations Support
| |
| : [[contact::A. Davison]], Coach, Operations
| |
| : [[contact::D. Harris]], Senior Training Supervisor
| |
| : [[contact::S. Lange]], Manager, Operations
| |
| : [[contact::M. Otten]], Supervisor, Operations
| |
| : [[contact::S. Petzel]], Engineer, Regulatory Affairs
| |
| ===NRC Personnel===
| |
| : [[contact::T. Hartman]], Senior Resident Inspector
| |
| | |
| ==ADAMS DOCUMENTS REFERENCED==
| |
| Accession No. ML16158A473 - FINAL WRITTEN EXAMS Accession No. ML16158A475 - FINAL OPERATING TEST
| |
| : Accession No. ML16158A478 - | |
| : POST-EXAM ANALYSIS-COMMENTS
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20230022024-02-21021 February 2024 Amended Integrated Inspection Report 05000483/2023002 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 2024-09-11
[Table view] |
Text
November 5, 2015
Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2016301
Dear Mr. Diya:
In a telephone conversation on November 4, 2015, between Messrs. M. Covey, Operations Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of licensing examinations at the Callaway Plant during the week of May 23, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 10, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by February 22, 2016. The written examinations, operating tests, and supporting reference materials identified in Attachment 3 to ES-201 will be due by March 24, 2016.
Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. In addition, your support for on-site validation of the examinations is required during the week of April 18, 2016.
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Covey has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269, or myself at 817-200-1159.
Sincerely,/RA/ Kelly D. Clayton for Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-483 License No. NPF-30
cc: Electronic Distribution
ML15309A745 SUNSI Review By: COsterholtz ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE: OB BC:DRP/B C: OB NAME COsterholtz NTaylor VGaddy SIGNATURE /RA/ /RA/ DLP for /RA/ KDC for DATE 11/4/15 11/5/15 11/5/15 Letter to Fadi Diya from Vincent G. Gaddy, dated November 5, 2015
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2016301 Electronic distribution by RIV: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Michael.Langelier@nrc.gov) Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Shawn.Money@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) CWY Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (John.Klos@nrc.gov)
Acting Team Leader, DRS/TSS (Eric.Ruesch@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Cindy.Rosales-Cooper@nrc.gov) ROReports Resource