|
---|
Category:Inspection Report Correspondence
MONTHYEARIR 05000275/20192012019-06-0303 June 2019 @, NRC Inspection Report 05000275/2019201 and 05000323/2019201 ML17103A6392017-04-13013 April 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000275/2017002 and 05000323/2017002) and Request for Information IR 05000275/20160102017-02-28028 February 2017 NRC Denial of Pacific Gas and Electric Company Appeal of Diablo Canyon Power Plant - Final Significance Determination of a White Finding; NRC Inspection Report 05000275/2016010 and 05000323/2016010 IR 05000275/20162012016-10-26026 October 2016 NRC Security Inspection Report 05000275/2016201 and 05000323/2016201 (Cover Letter Only) IR 05000275/20164052016-07-15015 July 2016 Cover Letter for NRC Security Inspection Report 05000275/2016405 and 05000323/2016405 ML16196A3942016-07-14014 July 2016 Notification of NRC Triennial Fire Protection Baseline Inspection 05000275/2016008 and 05000323/2016008 and Request for Information IR 05000275/20154022016-03-0202 March 2016 Non-Public Security Inspection Plan for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (NRC Physical Security Inspection Report Numbers 05000275/2015402 and 05000323/2015402) ML15268A1482015-09-30030 September 2015 Review of Steam Generator Tube Inspection Report for Cycle 18 (2R18) Refueling Outage in Fall 2014 IR 05000275/20105012011-01-10010 January 2011 IR 05000275-10-501, 05000323-10-501, on 12/31/2010, Diablo Canyon Power, Unit 1 & 2 - NRC Annual Emergency Preparedness IR 05000275/20085012009-03-13013 March 2009 IR 05000275-08-501, and IR 05000323-08-501, on 11/31/2008, for Diablo Canyon Power Plant Units 1 and 2 - Emergency Preparedness Annual Inspection Report ML0822005022008-08-0707 August 2008 NRC Inspection Report 05000275/2008002 and 05000323/2008002, Response to Disputed Non-cited Violation ML0820505092008-07-23023 July 2008 Notification of Inspection (NRC Inspection Report 05000275-08-004 05000323-08-004) and Request for Information IR 05000275/20075012008-02-21021 February 2008 IR 05000275-07-501, and IR 05000323-07-501, on 12/31/2007, for Diablo Canyon, Units 1 and 2, Emergency Preparedness Annual ML0712801192007-05-14014 May 2007 Ltr. to John S. Keenan Diablo Canyon Power Plant - NRC Material Control and Accounting Program Inspection ML0623303072006-08-21021 August 2006 Errata for Diablo Canyon Power Plant - NRC Problem Identification and Resolution Inspection Report 05000275/2006012 and 05000323/2006012 IR 05000275/20010112002-05-0101 May 2002 IR 05000275/2001-011, IR 05000323/2001-011, 12/30/01 to 04/06/02, Pacific Gas and Electric. Co., Diablo Canyon Nuclear Power Plant Units 1 and 2. Equipment Alignments: Personnel Perf. Rel to Nonroutine Plant Evals. and Events IR 05000275/20020072002-04-0808 April 2002 IR 05000275/2002-007, IR 05000323/2002-007, on 2/22/02 - 3/1/02; Pacific Gas and Electric Co.; Diablo Canyon Nuclear Power Plant Units 1 and 2. Special Team Insp Rpt. Problem Identification & Resolution, Event Response, Operability Eval, Mo 2019-06-03
[Table view] Category:Letter
MONTHYEARML24302A2622024-11-0101 November 2024 Letter to CA SHPO Regarding DCPP Dseis ML24302A2612024-11-0101 November 2024 Letter to Achp Re DCPP Dseis ML24275A0622024-10-30030 October 2024 NRC to NMFS Request Initiate Formal Endangered Species Act Consultation and Abbreviated Essential Fish Habitat for Proposed License Renewal of DCP Plant Units 1, 2 ML24269A0122024-10-29029 October 2024 OEDO-24-00083 2.206 Petition Diablo Canyon Seismic CDF - Response to Petitioner Letter ML24261B9492024-10-24024 October 2024 Issuance of Amendment Nos. 246 and 248 Revision to Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) DCL-24-103, Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 22024-10-24024 October 2024 Pg&Es Voluntary Submittal of Information Related to 10 CFR 2.206 Petition Regarding Seismic Core Damage Frequency for DCPP, Units 1 and 2 IR 05000275/20244042024-10-23023 October 2024 Security Baseline Inspection Report 05000275/2024404 and 05000323/2024404 ML24277A0292024-10-18018 October 2024 NRC to Fws Req. for Concurrence W. Endangered Species Act Determinations for Diablo Canyon Power Plant Units 1,2, ISFSI Proposed License Renewals in San Luis Obispo Co., CA DCL-24-092, Supplement and Annual Update License Renewal Application, Amendment 12024-10-14014 October 2024 Supplement and Annual Update License Renewal Application, Amendment 1 DCL-24-098, Material Status Report for the Period Ending August 31, 20242024-10-0909 October 2024 Material Status Report for the Period Ending August 31, 2024 DCL-24-091, Response to Request for Additional Information by the Office of Nuclear Reactor Regulation2024-10-0303 October 2024 Response to Request for Additional Information by the Office of Nuclear Reactor Regulation IR 05000275/20253012024-10-0303 October 2024 Notification of NRC Initial Operator Licensing Examination 05000275/2025301; 05000323/2025301 ML24240A0222024-09-20020 September 2024 Letter to A. Peck Environmental Impact Statement Scoping Summary Report for Diablo Canyon Nuclear Power Plant Units 1 and 2 ML24260A1222024-09-14014 September 2024 14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-079, DC-2024-07 Post Exam Comments Analysis2024-08-0202 August 2024 DC-2024-07 Post Exam Comments Analysis DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 ML24190A0812024-07-10010 July 2024 NRC Initial Operator Licensing Examination Approval 05000275/2024301; 05000323/2024301 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report 2024-09-09
[Table view] |
See also: IR 05000275/2017002
Text
April 13, 2017 Mr. Edward D. Halpin, Senior Vice President,
Generation and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF EVALUATIONS OF CHANGES, TESTS, AND EXPERIMENTS INSPECTION
(05000275/2017002 AND 05000323/2017002) AND REQUEST FOR INFORMATION
Dear Mr. Halpin:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff will conduct the baseline inspection of evaluations of changes, tests, and experiments at your Diablo Canyon Power Plant, Units 1 and 2, from June 19-23, 2017. The inspection will consist of three reactor inspectors from the NRC's Region IV office for one week. The inspection will be conducted in accordance with NRC Inspection Procedure 71111.17T, "Evaluations of Changes,
Tests, and Experiments."
Experience has shown that this inspection is resource intensive for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources and to ensure a productive inspection, we have enclosed a request for documents needed for this inspection.
Please note that the documents are requested to be provided by June 12, 2017. Upon review of these documents, the inspectors will select additional documentation for review upon arrival. It is important that all of these documents are up-to-date and complete in order to minimize the number of additional documents requested during the preparation and the on-site portions of the
inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be David Madsen of your licensing organization. If there are any questions about this inspection or the material requested, please contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at Gerond.George@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control
number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
E. Halpin 2 requesting document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Thomas R. Farnholtz, Chief Engineering Branch 1
Division of Reactor Safety
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Evaluations of Changes, Tests,
and Experiments Inspection
Request for Information Electronic Distribution for Diablo Canyon
Power Plant
ML17103A639 SUNSI Review ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: TFarnholtz Yes No Publicly Available Sensitive NRC-002 OFFICE SRI:EB1 C:EB1 NAME GGeorge TFarnholtz SIGNATURE /RA/ /RA/ DATE 4/13/17 4/13/17
Enclosure Request for Information Evaluations of Changes, Tests, and Experiments Inspection Diablo Canyon Power Plant, Units 1 and 2
Inspection Report: 05000275/2017002 and 05000323/2017002
Inspection Dates: June 19-23, 2017
Inspection Procedure: IP 71111.17T, "Evaluations of Changes, Tests, and Experiments"
Lead Inspector: Gerond A. George, Senior Reactor Inspector
Information Requested for the In-Office Preparation Week The following information should be sent to the Region IV office in hard copy or electronic
format (preferred) by June 12, 2017, to the attention of Gerond A. George. We request that you
categorize the documents in your response with the numbered list below. If only hard copies of the requested documents are available or if the electronic format is too large, please inform the lead inspector and provide the documents on the first day of the on-site inspection. Also, the
inspectors will select specific items from the information requested below and request from your staff additional documents needed during the on-site inspection weeks. We ask that the specific
items requested be available and ready for review on the first day of inspection. If you have any questions regarding this information request, please contact the lead inspector as soon as possible. 1. Procedure(s) for conducting 10 CFR 50.59 screenings and evaluations. 2. A list with descriptions of all 10 CFR 50.59 screenings (or equivalent) of fully implemented changes, tests, and experiments performed since the last triennial modification inspection that did not result in an evaluation. 3. A list with descriptions of all 10 CFR 50.59 evaluations of fully implemented changes, tests, and experiments performed since the last triennial 10 CFR 50.59 inspection that
did not result in an application for a license amendment. 4. A list with descriptions of all temporary plant modifications implemented since the last triennial 10 CFR 50.59 inspection.
5. A list with descriptions of all compensatory actions for degraded or non-conforming conditions implemented since the last triennial 10 CFR 50.59 inspection. 6. A list with descriptions of all corrective action documents related to 10 CFR 50.59 screenings and evaluations since the last triennial 10 CFR 50.59 inspection. 7. A list of personnel qualified to prepare 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 8. A list of personnel qualified to review and approve 10 CFR 50.59 screenings and/or evaluations, including qualification dates. 9. Current revisions of the Technical Specifications and Bases and the Updated Final Safety Analysis Report.
2 10. A copy of the most recent audits/self-assessments performed of the 10 CFR 50.59 programs. 11. A copy of the most recent submittal of the report containing a brief description of any changes, tests, and experiments, including a summary of the evaluation of each,
required by 10 CFR 50.59(d)(2). 12. A list of systems and system designators and a set of one-line (i.e., simplified) system diagrams.
Note: Descriptions should be brief but of sufficient detail to ensure that inspectors can
determine the safety and/or risk significance of the screenings, evaluations, and modifications.
Inspector Contact Information:
Gerond A. George
Senior Reactor Inspector
817-200-1562 Gerond.George@nrc.gov Shiattin Makor Reactor Inspector
817-200-1507 Shiattin.Makor@nrc.gov Chad Stott Reactor Inspector
817-200-1526 Chad.Stott@nrc.gov
Mailing Address: U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4125