July 23, 2008
John T. Conway
Senior Vice President - Station
Generation and Chief Nuclear Officer
Pacific Gas and Electric Company
Diablo Canyon Power Plant
P.O. Box 770000
San Francisco, CA 94177-0001
SUBJECT:
DIABLO CANYON POWER PLANT - NOTIFICATION OF INSPECTION (NRC
INSPECTION REPORT 05000275/05000323/2008004) AND REQUEST FOR
INFORMATION
Dear Mr. Conway:
From September 2-12, 2008, Reactor Inspectors from the U.S. Nuclear Regulatory Commissions
Region IV office will perform the baseline inspection of changes, tests, experiments, and
permanent plant modifications at Diablo Canyon Power Plant, using NRC Inspection
Procedure 71111.17, Evaluations of Changes, Tests, Experiments, and Permanent Plant
Modifications.
Experience has shown that this inspection is resource intensive both for the NRC inspectors
and your staff. In order to minimize the impact to your onsite resources and to ensure a
productive inspection, we have enclosed a request for documents needed for this inspection.
We request these documents be provided to us by August 11, 2008. Upon review of these
documents, the inspectors will select additional documentation for review upon arrival. It is
important that all of these documents are up to date and complete in order to minimize the
number of additional documents requested during the preparation and/or the onsite portions of
the inspection.
We have discussed the schedule for these inspection activities with your staff and understand
that our regulatory contact for this inspection will be Mr. Mike McCoy of your licensing
organization. If there are any questions about this inspection or the material requested, please
contact the lead inspector Lee Ellershaw at (817) 860-8127 (Lee.Ellershaw@nrc.gov).
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R E GI ON I V
612 EAST LAMAR BLVD, SUITE 400
ARLINGTON, TEXAS 76011-4125
Pacific Gas and Electric Company
- 2 -
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room). Send comments regarding this burden
estimate or any other aspect of these information collections, including suggestions for reducing
the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear
Regulatory Commission, Washington, DC 20555-0001.
Sincerely,
/RA/
Russ Bywater, Chief
Engineering Branch 1
Division of Reactor Safety
Dockets: 50-275; 50-323
Enclosure:
Evaluations of Changes, Tests, or
Experiments and Permanent Plant
Modifications Document Request
cc: w/enclosure
Sierra Club San Lucia Chapter
ATTN: Andrew Christie
P.O. Box 15755
San Luis Obispo, CA 93406
Nancy Culver
San Luis Obispo
Mothers for Peace
P.O. Box 164
Pismo Beach, CA 93448
Chairman
San Luis Obispo County
Board of Supervisors
1055 Monterey Street, Suite D430
San Luis Obispo, CA 93408
Truman Burns\\Robert Kinosian
California Public Utilities Commission
505 Van Ness Ave., Rm. 4102
San Francisco, CA 94102
Pacific Gas and Electric Company
- 3 -
Diablo Canyon Independent Safety Committee
Attn: Robert R. Wellington, Esq.
Legal Counsel
857 Cass Street, Suite D
Monterey, CA 93940
Director, Radiological Health Branch
State Department of Health Services
P.O. Box 997414 (MS 7610)
Sacramento, CA 95899-7414
City Editor
The Tribune
3825 South Higuera Street
P.O. Box 112
San Luis Obispo, CA 93406-0112
James D. Boyd, Commissioner
California Energy Commission
1516 Ninth Street (MS 31)
Sacramento, CA 95814
James R. Becker, Site Vice President
Diablo Canyon Power Plant
P.O. Box 56
Avila Beach, CA 93424
Jennifer Tang, Field Representative
United States Senator Barbara Boxer
1700 Montgomery Street, Suite 240
San Francisco, CA 94111
Chief, Radiological Emergency Preparedness Section
National Preparedness Directorate
Technological Hazards Division
Department of Homeland Security
1111 Broadway, Suite 1200
Oakland, CA 94607-4052
Pacific Gas and Electric Company
- 4 -
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov )
DRP Director (Dwight.Chamberlain@nrc.gov )
DRS Director (Roy.Caniano@nrc.gov )
DRS Deputy Director (Troy.Pruett@nrc.gov)
Senior Resident Inspector (Michael.Peck@nrc.gov)
Branch Chief, DRP/B (Vincent.Gaddy@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov )
Team Leader, DRP/TSS (Chuck.Paulk@nrc.gov )
RITS Coordinator (Marisa.Herrera@nrc.gov )
DRS STA (Dale.Powers@nrc.gov )
J. Adams, OEDO RIV Coordinator (John.Adams@nrc.gov)
P. Lougheed, OEDO RIV Coordinator (Patricia.Lougheed@nrc.gov )
ROPreports
DC Site Secretary (Agnes.Chan@nrc.gov )
SUNSI Review Completed: __RLB____
ADAMS: Yes
Initials: _RLB___
Publicly Available
Non-Sensitive
S:\\DRS\\REPORTS\\DC2008004lt-LEE.doc
RI:EB1
RI:EB1
RI:EB1
RI:EB1
C:EB1
SGraves
LEllershaw
JAdams
JDrake
RBywater
/RA/
/RA/
/RA/
/RA/
/RA/
07/23/08
07/23/08
07/23/08
07/23 /08
07/23/08
OFFICIAL RECORD COPY
T=Telephone E=E-mail F=Fax
- 1 -
Enclosure
Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications
Inspection Dates:
September 2, 2008 - September 12, 2008
Inspection Procedures:
IP 71111.17 Evaluation of Changes, Tests, or Experiments and
Permanent Plant Modifications
Inspectors:
L. Ellershaw, PE, Senior Reactor Inspector, Lead
J. Adams, PhD, Reactor Inspector
S. Graves, Reactor Inspector
J. Drake, Senior Reactor Inspector (Trainee)
Information Requested for the In-Office Preparation Week
The following information should be sent to the Region IV office in hard copy or electronic
format, in care of L. Ellershaw, by August 11, 2008, to facilitate the selection of specific items
that will be reviewed during the onsite inspection weeks. The inspectors will select specific
items from the information requested below and then request from your staff additional
documents needed during the onsite inspection weeks. We ask that the specific items
requested be available and ready for review on the first day of inspection. Please provide
requested documentation electronically if possible. If requested documents are large and only
hard copy formats are available, please inform the inspector(s), and provide subject
documentation during the first day of the onsite inspection. If you have any questions regarding
this information request, please call the lead inspector as soon as possible.
A list with descriptions of all 10 CFR 50.59 screenings performed since September 2005
which did not result in an evaluation. Note: Descriptions should be of sufficient detail
such that inspectors can determine the significance of the issue.
A list with descriptions of all 10 CFR 50.59 evaluations performed which did not result in
an application for license amendment to NRC from September 2005 to the present.
Diablo Canyon Power Plant procedure for conducting 10 CFR 50.59 screenings and
evaluations.
A list with descriptions of all Corrective Action documents related to 10 CFR 50.59
activities, including screenings and evaluations from September 2005 to the present.
A list with descriptions of all permanent plant modifications dating from September 2005.
Include sufficient detail to enable the inspectors to determine the significance of each
modification.
Diablo Canyon Power Plant procedure for implementing and controlling permanent plant
modifications.
- 2 -
Enclosure
A list with descriptions of all Corrective Action documents related to your permanent
plant modification program and its implementation since September 2005. Include
sufficient detail to enable the inspectors to determine the significance of each
modification.
Inspector Contact Information:
L. Ellershaw
S. Graves
J. Adams
Senior Reactor Inspector
Reactor Inspector
Reactor Inspector
817-860-8127
817-860-8102
817-860-8294
Lee.Ellershaw@nrc.gov
Samuel.Graves@nrc.gov
James.Adams@nrc.gov
Mailing Address:
US NRC Region IV
Attn: L. Ellershaw
612 E. Lamar Blvd., Suite 400
Arlington, TX 76011-4005