ML17181A190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 12: Line 12:
| document type = Emergency Preparedness-Emergency Plan
| document type = Emergency Preparedness-Emergency Plan
| page count = 3
| page count = 3
}}
=Text=
{{#Wiki_filter:-::::::--Entergy Indian Point Energy Center Document Control CONTROLLED DOCUMENT TRANSMITTAL §o-z47 zfb 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION DATE: June 26, 2017 FROM: IPEC DOCUMENT CONTROL --3RD FLOOR ADMIN BLDG PHONE#: 914-254-6835 TRANSMITTAL#: EP-17-0011 The Document(s) identified below are forwarded for use. Please review to.verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s). Sign and return the receipt acknowledgement below within ten (10) working days. AFFECTED DOCUMENT: IPEC EMERGENCY PLAN PROCEDURE DOC# REV# TITLE INSTRUCTIONS THE FOLLOWING PROCEDURE HAS BEEN "SUPERCEDED ", PLEASE REMOVE FROM YOUR BOOKS: REASON FOR SUPERCEDED PROCEDURE IS ATTACHED: IP-EP-610 REV.7 ***********PLEASE NOTE EFFECTIVE DATE*********** RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVAE I I (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). NAME (PRINT) SIGNATURE DATE COPY LOCATION Procedure IP-EP-610 (Emerg:ency Termination
* Recov ry) has een , Superseded by Fleet Procedure EN-EP-613 Rev. 0 .
* IPEC EMERGENCY PLAN DISTRIBUTION LIST IP3 CONTROL ROOM IP3 SHIFT MANAGER IP2 CONTROL ROOM IPEC TSC IP2 SIMULATOR IP2 SIMULATOR -CLASSROOM 4 IP2 SIMULATOR -CLASSROOM 5 NRC RESIDENT INSPECTOR DOC CONTROL DESK . NRC NRC NEW YORK STATE OEM WESTCHESTER COUNTY OEM ROCKLAND COUNTY FIRE AND EMERGENCY SERVICES ORANGE COUNTY EMERGENCY SERVICES CENTER PUTNAM COUNTY BUREAU OF EMERGENCY SERVICES I Page 1of2 DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS NRC NRC -ROCKVILLE, MD ADDRESS JAMES DANNA DEPUTY DIRECTOR TED FISCH DENNIS DELBORGO NICHOLAS LONGO SHANNON FISHER ANTHONY SUTION IP3 53FT. CCR IP3 53FT. ELEVATION IP2 53FT. CCR IP2 53FT. ELEVATION IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG.* IP2 88FT. ELEVATION OFFSITE OFF SITE OFFSITE OFFSITE OFFSITE OFFSITE OFFSITE 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 3 COPIES OF ALL EP'S EXCEPT E-PLAN 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF THE FOLLOWING: E-PLAN, IP-EP-115, 120, 210,220,230,250,310, 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340 
}}
}}

Revision as of 21:03, 26 April 2018

Indian Point Energy Center Emergency Plan Procedure
ML17181A190
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/26/2017
From:
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17181A190 (3)


Text

-::::::--Entergy Indian Point Energy Center Document Control CONTROLLED DOCUMENT TRANSMITTAL §o-z47 zfb 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION DATE: June 26, 2017 FROM: IPEC DOCUMENT CONTROL --3RD FLOOR ADMIN BLDG PHONE#: 914-254-6835 TRANSMITTAL#: EP-17-0011 The Document(s) identified below are forwarded for use. Please review to.verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s). Sign and return the receipt acknowledgement below within ten (10) working days. AFFECTED DOCUMENT: IPEC EMERGENCY PLAN PROCEDURE DOC# REV# TITLE INSTRUCTIONS THE FOLLOWING PROCEDURE HAS BEEN "SUPERCEDED ", PLEASE REMOVE FROM YOUR BOOKS: REASON FOR SUPERCEDED PROCEDURE IS ATTACHED: IP-EP-610 REV.7 ***********PLEASE NOTE EFFECTIVE DATE*********** RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVAE I I (IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). NAME (PRINT) SIGNATURE DATE COPY LOCATION Procedure IP-EP-610 (Emerg:ency Termination

  • Recov ry) has een , Superseded by Fleet Procedure EN-EP-613 Rev. 0 .
  • IPEC EMERGENCY PLAN DISTRIBUTION LIST IP3 CONTROL ROOM IP3 SHIFT MANAGER IP2 CONTROL ROOM IPEC TSC IP2 SIMULATOR IP2 SIMULATOR -CLASSROOM 4 IP2 SIMULATOR -CLASSROOM 5 NRC RESIDENT INSPECTOR DOC CONTROL DESK . NRC NRC NEW YORK STATE OEM WESTCHESTER COUNTY OEM ROCKLAND COUNTY FIRE AND EMERGENCY SERVICES ORANGE COUNTY EMERGENCY SERVICES CENTER PUTNAM COUNTY BUREAU OF EMERGENCY SERVICES I Page 1of2 DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS NRC NRC -ROCKVILLE, MD ADDRESS JAMES DANNA DEPUTY DIRECTOR TED FISCH DENNIS DELBORGO NICHOLAS LONGO SHANNON FISHER ANTHONY SUTION IP3 53FT. CCR IP3 53FT. ELEVATION IP2 53FT. CCR IP2 53FT. ELEVATION IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG.* IP2 88FT. ELEVATION OFFSITE OFF SITE OFFSITE OFFSITE OFFSITE OFFSITE OFFSITE 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 3 COPIES OF ALL EP'S EXCEPT E-PLAN 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF THE FOLLOWING: E-PLAN, IP-EP-115, 120, 210,220,230,250,310, 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340 1 COPY OF E-PLAN, IP-EP-310 & 340