| | {{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Paige, JasonSent:Thursday, November 10, 2011 11:33 AMTo:Tomonto, BobCc:Mihalakea, Stavroula; Hanek, OlgaSubject:Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892)Bob, Below are requests for additional information (RAIs) regarding the Turkey Point Accident Monitoring Instrumentation TS Changes license amendment request. On November 11, 2011, the Nuclear Regulatory Commission (NRC) staff and Florida Power & Light Company (FPL) discussed draft RAIs to gain a common understanding of the questions. The below RAIs reflect the questions discussed during the November 11, 2011, call. FPL agreed upon providing its responses within 30 days of the date of this email. If you have any questions, feel free to contact me. |
| | EICB-1 Verify that the RAD6426 instrument is not solely credited in any emergency / abnormal operational procedures for an event that involves degradation of the primary coolant boundary (e.g., SG tube rupture). Provide the documentation that demonstrates that RAD6426 has been removed from such procedures. |
| | EICB-2 RAD6417 was credited as performing the RG 1.97 Type C instrument function that RAD6426 was previously credited regarding detection of a steam generator tube rupture. Are the 19.c entries in Tables 3.3-5 and 4.3-4 of Technical Specification 3.3.3.3 intended to address operability and surveillance of this instrument? Alternately, if this instrument is not addressed in the Technical Specification, explain why. Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 Hearing Identifier: NRR_PMDA Email Number: 203 Mail Envelope Properties (Jason.Paige@nrc.gov20111110113200) |
| | |
| | ==Subject:== |
| | Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892) Sent Date: 11/10/2011 11:32:46 AM Received Date: 11/10/2011 11:32:00 AM From: Paige, Jason Created By: Jason.Paige@nrc.gov Recipients: "Mihalakea, Stavroula" <Stavroula.Mihalakea@fpl.com> Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Tomonto, Bob" <Bob.Tomonto@fpl.com> |
| | Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1573 11/10/2011 11:32:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: |
| }} | | }} |
Revision as of 09:37, 2 April 2018
Letter Sequence RAI |
---|
|
|
MONTHYEARML11256A3352011-09-13013 September 2011 NRR E-mail Capture - Acceptance Review: Turkey Point Accident Monitoring Instrumentation TS Changes LAR (ME6891 and ME6892) Project stage: Acceptance Review ML11265A0742011-09-22022 September 2011 NRR E-mail Capture - Acceptance Review: Turkey Point Accident Monitoring Instrumentation TS Changes LAR (ME6891 and ME6892) Project stage: Acceptance Review L-2011-412, Response to Request for Supplemental Documentation2011-10-14014 October 2011 Response to Request for Supplemental Documentation Project stage: Request ML11314A1952011-11-10010 November 2011 NRR E-mail Capture - Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892) Project stage: RAI ML12024A1042012-06-15015 June 2012 Issuance of Amendments Regarding High Range-Noble Gas Effluent Monitors, Main Steam Lines Accident Monitoring Instrumentation (TAC Nos. ME6891 and ME6892) Project stage: Approval ML12174A2692012-06-27027 June 2012 Correction of Amendment Nos. 250 and 246 Regarding Technical Specification Changes Related High Range-Noble Gas Effluent Monitors, Main Steam Lines Accident Monitoring Instrumentation Project stage: Other 2011-09-13
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24282A6722024-10-0808 October 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24261B8062024-09-17017 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0852024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24250A0242024-09-0606 September 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Transition to 24-Month Fuel Cycles (L-2023-LLA-0161) ML24248A0822024-09-0303 September 2024 NRR E-mail Capture - Acceptance Review for Turkey Point Alternative Request VR-02 for Certain Motor-Operated Isolation Valves (L-2024-LLR-0059) ML24234A0842024-08-21021 August 2024 Notification of Inspection and Request for Information ML24234A0142024-08-20020 August 2024 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - Spent Fuel Storage License Amendment Request (LAR) (L-2023-LLA-0142) ML24170A9352024-06-18018 June 2024 NRR E-mail Capture - Supplement to Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle LAR (L-2023-LLA-0161) ML24149A3532024-05-24024 May 2024 Change in Estimated Review Schedule for Nextera Common Emergency Plan Amendment ML24130A0112024-05-0808 May 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 - Sixth 10-Year Inservice Testing Interval Proposed Alternative PR-02 (L-2024-LLR-0029) ML24122C6922024-05-0101 May 2024 NextEra Fleet EP Amendment - Demonstration Drill ML24113A0372024-04-22022 April 2024 NRR E-mail Capture - Acceptance Review - Turkey Point 3 and 4 and St. Lucie 2 - Request to Use Later Code of ASME (L-2024-LLR-0024) ML24107A9062024-04-11011 April 2024 Fws to NRC, Response to Notification of Final EIS for Turkey Point SLR ML24102A2772024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - Spent Fuel Pool Criticality License Amendment Request (LAR) (L-2023-LLA-0142) ML24102A1692024-04-11011 April 2024 NRR E-mail Capture - Audit Plan - Turkey Point - 18 to 24 Month Fuel Cycle License Amendment Request (LAR) (L-2023-LLA-0161) ML24101A0592024-04-11011 April 2024 NRC to Fws, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24101A0602024-04-11011 April 2024 NRC to NMFS, Notification of Nrc’S Issuance of the Final EIS for Turkey Point Subsequent License Renewal ML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 And Turkey Point – Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 2024-09-06
[Table view] |
Text
1NRR-PMDAPEm ResourceFrom:Paige, JasonSent:Thursday, November 10, 2011 11:33 AMTo:Tomonto, BobCc:Mihalakea, Stavroula; Hanek, OlgaSubject:Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892)Bob, Below are requests for additional information (RAIs) regarding the Turkey Point Accident Monitoring Instrumentation TS Changes license amendment request. On November 11, 2011, the Nuclear Regulatory Commission (NRC) staff and Florida Power & Light Company (FPL) discussed draft RAIs to gain a common understanding of the questions. The below RAIs reflect the questions discussed during the November 11, 2011, call. FPL agreed upon providing its responses within 30 days of the date of this email. If you have any questions, feel free to contact me.
EICB-1 Verify that the RAD6426 instrument is not solely credited in any emergency / abnormal operational procedures for an event that involves degradation of the primary coolant boundary (e.g., SG tube rupture). Provide the documentation that demonstrates that RAD6426 has been removed from such procedures.
EICB-2 RAD6417 was credited as performing the RG 1.97 Type C instrument function that RAD6426 was previously credited regarding detection of a steam generator tube rupture. Are the 19.c entries in Tables 3.3-5 and 4.3-4 of Technical Specification 3.3.3.3 intended to address operability and surveillance of this instrument? Alternately, if this instrument is not addressed in the Technical Specification, explain why. Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 Hearing Identifier: NRR_PMDA Email Number: 203 Mail Envelope Properties (Jason.Paige@nrc.gov20111110113200)
Subject:
Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892) Sent Date: 11/10/2011 11:32:46 AM Received Date: 11/10/2011 11:32:00 AM From: Paige, Jason Created By: Jason.Paige@nrc.gov Recipients: "Mihalakea, Stavroula" <Stavroula.Mihalakea@fpl.com> Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Tomonto, Bob" <Bob.Tomonto@fpl.com>