ML11314A195: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| document type = E-Mail
| document type = E-Mail
| page count = 2
| page count = 2
| project = TAC:ME6891, TAC:ME6892
| stage = Other
}}
=Text=
{{#Wiki_filter:1NRR-PMDAPEm ResourceFrom:Paige, JasonSent:Thursday, November 10, 2011 11:33 AMTo:Tomonto, BobCc:Mihalakea, Stavroula; Hanek, OlgaSubject:Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information  (ME6891 and ME6892)Bob,  Below are requests for additional information (RAIs) regarding the Turkey Point Accident Monitoring Instrumentation TS Changes license amendment request. On November 11, 2011, the Nuclear Regulatory Commission (NRC) staff and Florida Power & Light Company (FPL) discussed draft RAIs to gain a common understanding of the questions. The below RAIs reflect the questions discussed during the November 11, 2011, call. FPL agreed upon providing its responses within 30 days of the date of this email. If you have any questions, feel free to contact me.
EICB-1            Verify that the RAD6426 instrument is not solely credited in any emergency / abnormal operational procedures for an event that involves degradation of the primary coolant boundary (e.g., SG tube rupture). Provide the documentation that demonstrates that RAD6426 has been removed from such procedures.
EICB-2            RAD6417 was credited as performing the RG 1.97 Type C instrument function that RAD6426 was previously credited regarding detection of a steam generator tube rupture. Are the 19.c entries in Tables 3.3-5 and 4.3-4 of Technical Specification 3.3.3.3 intended to address operability and surveillance of this instrument?  Alternately, if this instrument is not addressed in the Technical Specification, explain why. Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 Hearing Identifier:  NRR_PMDA  Email Number:  203  Mail Envelope Properties  (Jason.Paige@nrc.gov20111110113200) 
==Subject:==
Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information  (ME6891 and ME6892)  Sent Date:  11/10/2011 11:32:46 AM  Received Date:  11/10/2011 11:32:00 AM  From:    Paige, Jason  Created By:  Jason.Paige@nrc.gov  Recipients:    "Mihalakea, Stavroula" <Stavroula.Mihalakea@fpl.com>  Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com>  Tracking Status: None  "Tomonto, Bob" <Bob.Tomonto@fpl.com>
Tracking Status: None  Post Office:      Files    Size      Date & Time  MESSAGE    1573      11/10/2011 11:32:00 AM Options  Priority:    Standard  Return Notification:    No  Reply Requested:    No  Sensitivity:    Normal  Expiration Date:      Recipients Received:       
}}
}}

Revision as of 09:37, 2 April 2018

2011/11/10 NRR E-mail Capture - Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892)
ML11314A195
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/10/2011
From: Jason Paige
Plant Licensing Branch II
To: Tomonto B
Florida Power & Light Co
References
TAC ME6891, TAC ME6892
Download: ML11314A195 (2)


Text

1NRR-PMDAPEm ResourceFrom:Paige, JasonSent:Thursday, November 10, 2011 11:33 AMTo:Tomonto, BobCc:Mihalakea, Stavroula; Hanek, OlgaSubject:Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892)Bob, Below are requests for additional information (RAIs) regarding the Turkey Point Accident Monitoring Instrumentation TS Changes license amendment request. On November 11, 2011, the Nuclear Regulatory Commission (NRC) staff and Florida Power & Light Company (FPL) discussed draft RAIs to gain a common understanding of the questions. The below RAIs reflect the questions discussed during the November 11, 2011, call. FPL agreed upon providing its responses within 30 days of the date of this email. If you have any questions, feel free to contact me.

EICB-1 Verify that the RAD6426 instrument is not solely credited in any emergency / abnormal operational procedures for an event that involves degradation of the primary coolant boundary (e.g., SG tube rupture). Provide the documentation that demonstrates that RAD6426 has been removed from such procedures.

EICB-2 RAD6417 was credited as performing the RG 1.97 Type C instrument function that RAD6426 was previously credited regarding detection of a steam generator tube rupture. Are the 19.c entries in Tables 3.3-5 and 4.3-4 of Technical Specification 3.3.3.3 intended to address operability and surveillance of this instrument? Alternately, if this instrument is not addressed in the Technical Specification, explain why. Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888 Hearing Identifier: NRR_PMDA Email Number: 203 Mail Envelope Properties (Jason.Paige@nrc.gov20111110113200)

Subject:

Turkey Point Accident Monitoring Instrumentation TS Changes LAR - Request for Additional Information (ME6891 and ME6892) Sent Date: 11/10/2011 11:32:46 AM Received Date: 11/10/2011 11:32:00 AM From: Paige, Jason Created By: Jason.Paige@nrc.gov Recipients: "Mihalakea, Stavroula" <Stavroula.Mihalakea@fpl.com> Tracking Status: None "Hanek, Olga" <Olga.Hanek@fpl.com> Tracking Status: None "Tomonto, Bob" <Bob.Tomonto@fpl.com>

Tracking Status: None Post Office: Files Size Date & Time MESSAGE 1573 11/10/2011 11:32:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: