ML13044A765: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 3
| page count = 3
| project = TAC:MF0536
| project = TAC:MF0536
| stage = Acceptance Review
| stage = Other
}}
}}



Revision as of 00:34, 2 April 2018

2013/02/13 NRR E-mail Capture - Acceptance Review for Davis-Besse LAR to Revise TS 3.4.17, TS 3.7.18, TS 5.5.8, and TS 5.6.6 - TAC No. MF0536
ML13044A765
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/13/2013
From: Purnell B A
Plant Licensing Branch III
To: Lashley P
FirstEnergy Nuclear Generation Corp
References
TAC MF0536
Download: ML13044A765 (3)


Text

1NRR-PMDAPEm ResourceFrom:Purnell, BlakeSent:Wednesday, February 13, 2013 3:04 PMTo:phlashley@firstenergycorp.comCc:Wiebe, Joel; Mahoney, Michael; Grover, Ravinder; Johnson, Andrew; kmnesser@firstenergycorp.comSubject:Acceptance Review for Davis-Besse LAR to Revise TS 3.4.17, TS 3.7.18, TS 5.5.8, and TS 5.6.6 - TAC No. MF0536February 13, 2013 Phil Lashley Licensing Supervisor Davis-Besse Nuclear Power Plant, Unit 1 FirstEnergy Nuclear Operating Company Dear Mr. Lashley, By letter L-13-040 dated January 18, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13018A350), FirstEnergy Nuclear Operating Company (FENOC, the licensee) submitted a license amendment request (LAR) for the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS). The proposed LAR will revise DBNPS Technical Specification (TS) 3.4.17, "Steam Generator (SG) Tube Integrity"; TS 3.7.18, "Steam Generator Level"; TS 5.5.8, "Steam Generator (SG) Program"; and TS 5.6.6, "Steam Generator Tube Inspection Report." The proposed revision to these TSs is to support plant operations following the replacement of the original SGs which is scheduled to be completed in April 2014. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this application. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant. Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations. The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence. If you have any questions, please contact me. A copy of this email will be made publicly available in ADAMS. Docket No. 50-346 Thanks Blake Purnell, Project Manager Plant Licensing Branch III-2 2Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Email: Blake.Purnell@nrc.gov Phone: 301-415-1380 Hearing Identifier: NRR_PMDA Email Number: 609 Mail Envelope Properties (Blake.Purnell@nrc.gov20130213150300)

Subject:

Acceptance Review for Davis-Besse LAR to Revise TS 3.4.17, TS 3.7.18, TS 5.5.8, and TS 5.6.6 - TAC No. MF0536 Sent Date: 2/13/2013 3:03:58 PM Received Date: 2/13/2013 3:03:00 PM From: Purnell, Blake Created By: Blake.Purnell@nrc.gov Recipients: "Wiebe, Joel" <Joel.Wiebe@nrc.gov> Tracking Status: None "Mahoney, Michael" <Michael.Mahoney@nrc.gov> Tracking Status: None "Grover, Ravinder" <Ravinder.Grover@nrc.gov>

Tracking Status: None "Johnson, Andrew" <Andrew.Johnson@nrc.gov> Tracking Status: None "kmnesser@firstenergycorp.com" <kmnesser@firstenergycorp.com> Tracking Status: None "phlashley@firstenergycorp.com" <phlashley@firstenergycorp.com> Tracking Status: None Post Office: Files Size Date & Time MESSAGE 2878 2/13/2013 3:03:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received: