| | {{#Wiki_filter:From:Kalyanam, KalyTo:BICE, DAVID B (ANO); CLARK, ROBERT WCc:Lent, Susan; Burkhardt, JanetSubject:Acceptance Review Result - TAC No. MF0595, Arkansas Nuclear One, Unit 2 (Docket No. 50-368)Date:Tuesday, March 19, 2013 9:20:45 AM TO: DAVE BICE/ROBERT CLARK SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - ACCEPTANCE OFREQUESTED LICENSING ACTION RE: LICENSE AMENDMENTREQUEST TO ADOPTION OF TECHNICAL SPECIFICATION TASKFORCE (TSTF)-500, REVISION 2 "DC ELECTRICAL REWRITE -UPDATE TO TSTF-360" (TAC NO. MF0595) |
| | DOCKET NO: 50-368 By letter dated January 28, 2013, Entergy Operations Inc. submitted a licenseamendment request for Arkansas Nuclear One, Unit 2. The request is for anamendment to the ANO-2 TSs to incorporate the NRC-approved TSTF-500, Revision2, "DC Electrical Rewrite - Update to TSTF-360." |
| | The purpose of this letter is to provide the results of the U.S. Nuclear RegulatoryCommission (NRC) staff=s acceptance review of this amendment request. Theacceptance review was performed to determine if there is sufficient technicalinformation in scope and depth to allow the NRC staff to complete its detailedtechnical review. The acceptance review is also intended to identify whether theapplication has any readily apparent information insufficiencies in its characterizationof the regulatory requirements or the licensing basis of the plant. |
| | Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10CFR), an amendment to the license (including the technical specifications) must fullydescribe the changes requested, and following as far as applicable, the formprescribed for original applications. Section 50.34 of 10 CFR addresses the contentof technical information required. This section stipulates that the submittal addressthe design and operating characteristics, unusual or novel design features, andprincipal safety considerations. |
| | The NRC staff has reviewed your application and concluded that it does providetechnical information in sufficient detail to enable the staff to proceed with its detailedtechnical review and make an independent assessment regarding the acceptability ofthe proposed amendment in terms of regulatory requirements and the protection ofpublic health and safety and the environment. If additional information is needed forthe staff to complete its technical review, you will be advised by separatecorrespondence. |
| | |
| | If you have any questions, please contact the undersigned, at (301) 415-1480. |
| | Kaly N. KalyanamProject Manager, ANO-1 and 2; Waterford 3NRR/DORL/LPL4\Email: kaly.kalyanam@nrc.gov |
| | |
| }} | | }} |
Revision as of 19:04, 22 March 2018
Letter Sequence Acceptance Review |
---|
TAC:MF0595, DC Electrical Rewrite - Update to TSTF-360, Define Operations Involving Positive Reactivity Additions, Eliminate Use of Term Core Alterations in Actions and Notes, DC Electrical Rewrite, Refueling Boron Concentration Clarification, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Approved, Closed) |
|
MONTHYEAR2CAN041201, License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-04-0404 April 2012 License Amendment Request, Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Request 2CAN071201, License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-4712012-07-0909 July 2012 License Amendment Request - Supplemental Technical Specification (TS) Change Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 Project stage: Supplement 2CAN011301, License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-3602013-01-28028 January 2013 License Amendment Request - Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360 Project stage: Request ML13078A3662013-03-19019 March 2013 Acceptance Review Email, License Amendment Request, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: Acceptance Review ML13218A2272013-08-0606 August 2013 Request for Additional Information Email, License Amendment Request, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: RAI ML13261A3532013-09-16016 September 2013 Response to Request for Additional Information Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: Response to RAI 2CAN051402, License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360.2014-05-12012 May 2014 License Amendment Request Supplemental, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360. Project stage: Supplement ML14210A5212014-08-0404 August 2014 Request for Additional Information, Nrr/De/Eeeb, License Amendment Request, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: RAI 2CAN081402, Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-3602014-08-12012 August 2014 Response to Request for Additional Information, Adoption of Technical Specification Task Force (TSTF)-500, Revision 2 DC Electrical Rewrite - Update to TSTF-360 Project stage: Response to RAI ML14302A0152014-12-0404 December 2014 Issuance of Amendment No. 297, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 Project stage: Approval 2013-08-06
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24227A0072024-08-13013 August 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 2 - Proposed Alternative for Implementation of Extended Reactor Vessel In-Service Inspection Interval (ANO2-ISI-24-02) - EPID L-2024-LLR-0048 ML24218A0652024-08-0202 August 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Arkansas Nuclear One, Unit 1 - License Amendment Request - Request for Review and Approval Changes to SAR and to a Confirmatory Order - Pzr Htr Emergency Power Supply - EPID L-2024-LLA-0092 ML24180A0022024-06-26026 June 2024 NRR E-mail Capture - LIC-109 Acceptance - ANO 1 and 2 - Proposed Alternatives for Examinations of SG Pressure Retaining Welds and Full Penetrations Nozzles - EPID L-2024-LLR-0038 ML24149A3672024-05-28028 May 2024 August 2024 Emergency Preparedness Exercise Inspection - Request for Information ML24117A0262024-04-26026 April 2024 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Revise Typographical Errors in Technical Specifications ML24088A0082024-03-27027 March 2024 NRR E-mail Capture - ANO-2 -- TSTF-505 Post-Audit Final RAI (L-2023-LLA-0052) ML23269A0232023-09-22022 September 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - TSTF-505 Audit Questions ML23240A3412023-08-28028 August 2023 NRR E-mail Capture - ANO-2, Grand Gulf, and River Bend - Acceptance Review of LAR Revising TSs to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23194A1752023-07-13013 July 2023 NRR E-mail Capture - ANO-1 - Acceptance Review of Alternative Request ANO1-ISI-037 ML23187A0432023-07-0303 July 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Agenda ML23166A0132023-06-14014 June 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 1 - TSTF-505 Audit Questions ML23130A2752023-05-10010 May 2023 NRR E-mail Capture - ANO Unit 2- Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML23118A0692023-04-28028 April 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Modify ANO-1 TS 3.3.1, Reactor Protection System Instrumentation (L-2023-LLA-0048) ML23104A1052023-03-10010 March 2023 NRR E-mail Capture - ANO-2 Final RAI Alternative Request for Life-of-Repair of RVCH Pen. 46 ML23072A3672023-03-0909 March 2023 NRR E-mail Capture - Entergy Fleet - Acceptance Review of Quality Assurance Program Manual Reduction in Commitment ML23039A0872023-02-0808 February 2023 NRR E-mail Capture - Arkansas Nuclear One, Unit 2 - Acceptance Review of Relief Request ANO2-RR-23-001, Half-Nozzle Repair of RVCH Penetration 46 (L-2023-LLR-0000) ML23026A1322023-01-26026 January 2023 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to Adopt TSTF-505 Revision 2 ML22354A0122022-12-19019 December 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Acceptance Review of Request for Alternative ANO-CISI-002 Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (L-2022-LLR-0080) ML22349A0112022-12-14014 December 2022 NRR E-mail Capture - Final RAI Relief Request ANO1-ISI-035 ML22341A1202022-12-0707 December 2022 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action LAR to to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation (L-2022-LLA-0161) ML22273A0982022-09-30030 September 2022 NRR E-mail Capture - ANO Units 1 and 2 - Acceptance of Requested Licensing Action Emergency Plan Staffing Requirements ML22265A2012022-09-22022 September 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-036 ML22188A1782022-07-0707 July 2022 NRR E-mail Capture - ANO-1 - Acceptance Review of Relief Request ANO1-ISI-035 ML22174A1362022-06-23023 June 2022 NRR E-mail Capture - ANO-2 Final RAI Relief Requests ANO2-ISI-023 Through -028 (EPIDs L-2022-LLR-0022 Through -0027) ML22151A3262022-05-31031 May 2022 August 2022 Emergency Preparedness Exercise Inspection - Request for Information ML22124A2452022-05-0404 May 2022 NRR E-mail Capture - ANO-1 and ANO-2 - Final RAI 2 License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22108A1642022-04-18018 April 2022 NRR E-mail Capture - ANO-1: Final RAI License Amendment Request Concerning TS Changes Due to Revised Dose Calculations (L-2021-LLA-0181) ML22081A3902022-03-22022 March 2022 NRR E-mail Capture - ANO-2 - Acceptance Review of Relief Requests ANO2-ISI-023, -024, -025, -026, -027, and -028 (Epids: L-2022-LLR-022, -023, -024, -025, -026, and -027) ML22034A5482022-02-0303 February 2022 NRR E-mail Capture - Final RAI License Amendment Requests to Implement Provisions of 10 CFR 50.69 (L-2021-LLA-0105/-0106) ML22020A0822022-01-19019 January 2022 NRR E-mail Capture - ANO-1 and 2 - Final RAI 2 License Amendment Requests to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML22020A0742022-01-13013 January 2022 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21314A1212021-11-0909 November 2021 Verbal Authorization of Relief Request ANO2-RR-21-002 ML21312A4792021-11-0505 November 2021 Email: NRC Staff Preliminary Questions Regarding X Energy LLC Xe-100 Topical Report: Risk-Informed Performance-Based Licensing Basis Development ML21312A0382021-11-0505 November 2021 NRR E-mail Capture - ANO-2 RAI Relief Request ANO2-RR-21-002 ML21308A5602021-11-0404 November 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, Grand Gulf, River Bend, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML21292A0112021-10-18018 October 2021 NRR E-mail Capture - ANO, 1 and 2, Grand Gulf, River Bend, Waterford, 3 - Acceptance Review of LAR to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21287A1692021-10-13013 October 2021 Record of 10-13-21 Verbal Authorization of ANO2-R&R-012 (L-2021-LLR-0082) ML21298A1562021-10-11011 October 2021 NRR E-mail Capture - ANO-2 Final RAI Relief Request ANO2-R&R-012 Concerning Rv Closure Head Penetration 46 ML21273A0672021-09-29029 September 2021 NRR E-mail Capture - ANO-2 Final RAI 2 License Amendment Request to Adopt a Safety Function Determination Program ML21238A3742021-08-23023 August 2021 RFI Email - Cyber PI&R Inspection (ANO) ML21252A0052021-08-20020 August 2021 NRR E-mail Capture - ANO-1 and 2 Final RAI License Amendment Request to Allow the ECP to Remain Operable on a One-Time Basis for Up to 65 Days to Perform Piping Upgrade (L-2021-LLA-0015) ML21217A3302021-08-0505 August 2021 (ANO) Problem Identification and Resolution (PIR) Request for Information Combined ML21202A1662021-07-20020 July 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action Alternative ANO2-PT-003 ML21201A0062021-07-19019 July 2021 NRR E-mail Capture - Arkansas Nuclear One, Units 1 and 2, and Waterford, Unit 3 - Acceptance Review of LAR to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML21197A0372021-07-16016 July 2021 NRR E-mail Capture - ANO-1 and 2 - Final RAI Final Response to GL 2004-02 ML21179A0042021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 1 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21179A0052021-06-25025 June 2021 NRR E-mail Capture - ANO Unit 2 - Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21174A0342021-06-22022 June 2021 NRR E-mail Capture - Entergy Fleet (ANO, Ggulf, Rbend, & Waterford) - Acceptance Review for Relief Request to Use a Provision of a Later Edition of the ASME Code, Section XI for Periodic System Pressure Tests Exemptions ML21116A1092021-04-26026 April 2021 NRR E-mail Capture - ANO-1 and ANO-2: Final Supplemental RAI Proposed Alternative to ASME Section XI Requirements for Repair/Replacement of ECP Supply Piping ML21105A0122021-04-0909 April 2021 NRR E-mail Capture - ANO-2 Final RAI License Amendment Request to Adopt a Safety Function Determination Program 2024-08-02
[Table view] |
Text
From:Kalyanam, KalyTo:BICE, DAVID B (ANO); CLARK, ROBERT WCc:Lent, Susan; Burkhardt, JanetSubject:Acceptance Review Result - TAC No. MF0595, Arkansas Nuclear One, Unit 2 (Docket No. 50-368)Date:Tuesday, March 19, 2013 9:20:45 AM TO: DAVE BICE/ROBERT CLARK SUBJECT: ARKANSAS NUCLEAR ONE, UNIT 2 - ACCEPTANCE OFREQUESTED LICENSING ACTION RE: LICENSE AMENDMENTREQUEST TO ADOPTION OF TECHNICAL SPECIFICATION TASKFORCE (TSTF)-500, REVISION 2 "DC ELECTRICAL REWRITE -UPDATE TO TSTF-360" (TAC NO. MF0595)
DOCKET NO: 50-368 By letter dated January 28, 2013, Entergy Operations Inc. submitted a licenseamendment request for Arkansas Nuclear One, Unit 2. The request is for anamendment to the ANO-2 TSs to incorporate the NRC-approved TSTF-500, Revision2, "DC Electrical Rewrite - Update to TSTF-360."
The purpose of this letter is to provide the results of the U.S. Nuclear RegulatoryCommission (NRC) staff=s acceptance review of this amendment request. Theacceptance review was performed to determine if there is sufficient technicalinformation in scope and depth to allow the NRC staff to complete its detailedtechnical review. The acceptance review is also intended to identify whether theapplication has any readily apparent information insufficiencies in its characterizationof the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10CFR), an amendment to the license (including the technical specifications) must fullydescribe the changes requested, and following as far as applicable, the formprescribed for original applications. Section 50.34 of 10 CFR addresses the contentof technical information required. This section stipulates that the submittal addressthe design and operating characteristics, unusual or novel design features, andprincipal safety considerations.
The NRC staff has reviewed your application and concluded that it does providetechnical information in sufficient detail to enable the staff to proceed with its detailedtechnical review and make an independent assessment regarding the acceptability ofthe proposed amendment in terms of regulatory requirements and the protection ofpublic health and safety and the environment. If additional information is needed forthe staff to complete its technical review, you will be advised by separatecorrespondence.
If you have any questions, please contact the undersigned, at (301) 415-1480.
Kaly N. KalyanamProject Manager, ANO-1 and 2; Waterford 3NRR/DORL/LPL4\Email: kaly.kalyanam@nrc.gov