Docket No. 50-346 TOLEDO License No. NPF-3                                                   EDISON Serial No. 983                                                       Roano P. CROUSE fl17"""*
Docket No. 50-346 TOLEDO EDISON License No. NPF-3 Serial No. 983 Roano P. CROUSE fl17"""*
August 31, 1983                                                     i4,9 asa sea, F
August 31, 1983 i4,9 asa sea, F
Hr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission
Hr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission
                    -Wa'shington, D. C. 20555
-Wa'shington, D. C.
20555


==Dear Mr. Eisenhut:==
==Dear Mr. Eisenhut:==
On August 26, 1983,.the Toledo Edison Company (TED) transmitted to you the
On August 26, 1983,.the Toledo Edison Company (TED) transmitted to you the
                      " Evaluation of July 25-29, 1983, NRC Appendix R Audit Findings and Corrective Action Plan" (Serial No. 981). This submittal addressed the TED actions to be taken at the Davis-Besse Cuclear Power Station, Unit No. 1 (D8-1),
" Evaluation of July 25-29, 1983, NRC Appendix R Audit Findings and Corrective Action Plan" (Serial No. 981). This submittal addressed the TED actions to be taken at the Davis-Besse Cuclear Power Station, Unit No. 1 (D8-1),
to ensure that adequate fire protection features wera in place prior to returning to power for Fuel Cycle 4 operation.
to ensure that adequate fire protection features wera in place prior to returning to power for Fuel Cycle 4 operation.
This letter transmits a revised Action Summary Table, which was Attachment N               2,of the subject evaluation. This revision does not reflect any changes to the body of the document.     It was TED's intent to provide the Attachment 42 summary as an aid to the commitment tracking effort on your part, as well as ours. ~Therefore, the enclosed revision pages are necessary to agree with the content of the August 26, 1983 submittal.
This letter transmits a revised Action Summary Table, which was Attachment N
l                   -- Very 1.ruly yours, RPC:JSH:nif encl.
2,of the subject evaluation. This revision does not reflect any changes to the body of the document.
It was TED's intent to provide the Attachment 42 summary as an aid to the commitment tracking effort on your part, as well as ours. ~Therefore, the enclosed revision pages are necessary to agree with the content of the August 26, 1983 submittal.
l
-- Very 1.ruly yours, RPC:JSH:nif encl.
cc: _DB-1 NRC Resident Inspector
cc: _DB-1 NRC Resident Inspector
                                                                                            $0N ry
$0N ry
            ; urnemna F         _
' ; urnemna F
R' THE TOLEDO EDISON COMPANY . EO! SON PLAZA 300 MADISON AVENUE   TOLEDO, OHIO 43652 L.                           _                            _
R' THE TOLEDO EDISON COMPANY.
* Dock 1t Ns. 50-346             -
EO! SON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 L.
Licensa No. NPF-3 S2 rial 981 Attachment 2
* Dock 1t Ns. 50-346 Licensa No. NPF-3 S2 rial 981  
  ' Pego 1 To Be.         Considered s'                                 ,
' Pego 1 To Be.
Completed         Interim Finding                     .
Considered s'
Prior To         Compensatory No.-             Finding Action                           Restart           Action                     Comments
Completed Interim Finding Prior To Compensatory No.-
: 1. Alt Shutdown Capability / Hot Standby 1.1       Interim procedure developed                   X 1.2       Operators trained                             X.
Finding Action Restart Action Comments 1.
1.3       Procedures implemented                       X                                                                 +
Alt Shutdown Capability / Hot Standby 1.1 Interim procedure developed X
:            1.'4       Revalidation of procedure                                               Tasks 1 and 2 after long-term Tasks 1                                                 Systems-Oct. 17, 1983 and 2                                                                   Evaluation-Jan. 31, 1984 1
1.2 Operators trained X.
l'5' Associate circuits                                                         Task 5 analysis                                                                 Jan. 31, 1984                         1 1.6 . Preplan validation                                                           Task 8 April 30, 1984
1.3 Procedures implemented X
    .2. Alt Shutdown Capability / Cold Shutdown
+
            -2.1       Interim procedure. developed                 X 2.2       Operators trained                             X 2.3       Procedures implemented                       X 2 . <4     72 hour time requirement                                                 File for exemption exemption request                                                       Oct. 1, 1983 i                   -submitted 2.5       Revalidation of procedure                                               Tasks 1 and 2 after long-term. Tasks 1                                                 Systems-Oct. 17, 1983 and 2                                                                   Evaluation-Jan. 31, 1984 12 . 6     Associate circuits                                                       Task 5 analysis                                                                 Jan. 31, 1984 2.7       Preplan validation                                                       Task 8 April 30, 1984
1.'4 Revalidation of procedure Tasks 1 and 2 after long-term Tasks 1 Systems-Oct. 17, 1983 and 2 Evaluation-Jan. 31, 1984 1
: 3. _ Auxiliary Shutdown Panel s
l'5 ' Associate circuits Task 5 analysis Jan. 31, 1984 1
3.1       T and T interim                               X               X rEadoutbapability
1.6. Preplan validation Task 8 April 30, 1984
                                          \
.2.
                      -      ywre g             -
Alt Shutdown Capability / Cold Shutdown
r-,--m-r+w ,-y     ----        -w-,   w *m e---my---           -
-2.1 Interim procedure. developed X
2.2 Operators trained X
2.3 Procedures implemented X
2. <4 72 hour time requirement File for exemption exemption request Oct. 1, 1983 i
-submitted 2.5 Revalidation of procedure Tasks 1 and 2 after long-term. Tasks 1 Systems-Oct. 17, 1983 and 2 Evaluation-Jan. 31, 1984 12. 6 Associate circuits Task 5 analysis Jan. 31, 1984 2.7 Preplan validation Task 8 April 30, 1984 3.
_ Auxiliary Shutdown Panel s
3.1 T and T interim X
X rEadoutbapability
\\
9 ywre g
-yiwe-=w-w-
r--+-
r-,--m-r+w
,-y wg--
-w-,
w
*m e---my---
c w-w=-T-me**T
'-v-
"'t---T


        ,.              . _ . - ..    .___=         .  -  -    - - -    _ . . -        . . - . - _ -.
.___=
    ' Docket No. 50-346 I,icensa No. NPF-3 Serial 981 Attachment 2 Page 2'                                                                                                 i l
' Docket No. 50-346 I,icensa No. NPF-3 Serial 981 Page 2' i
To Be     Considered Completed     Interim j   Finding               .                        Prior To   Compensatory No.             Finding Action                 Restart     Action             Comments
To Be Considered Completed Interim j
: 3.       Auxiliary Shutdown Panel (Cont.)
Finding Prior To Compensatory No.
3.2   Source range f)ux, T and                               Task 1 ThPermanentresolutfon                                  Resolution identifica-tion and schedule provided Jan. 31, 1984 3.3   Permanent sampling and           X             X valve lineup procedures for reactivity monitoring
Finding Action Restart Action Comments 3.
: 4.       Emergency Lighting Design 4.1   Normal lighting                   X             X
Auxiliary Shutdown Panel (Cont.)
.                    re-energizing from essential bus integrated into procedure 4.2   Lighting walkdown maxi-           X             X mizing illumination 4.3   Emergency lighting review                             Task 4 to App. R, Section III.J                               Nov. 30, 1983 S.- -Fire ~ Doors 5.1'   Resolution on NRC-               X j                     identified doors
3.2 Source range f)ux, T and Task 1 T Permanentresolutfon Resolution identifica-h tion and schedule provided Jan. 31, 1984 3.3 Permanent sampling and X
: 6.       Reactor Coolant Pump Oil Collection System 6
X valve lineup procedures for reactivity monitoring 4.
: 6. I' File for exemption request,.                           File for exemption-
Emergency Lighting Design 4.1 Normal lighting X
!                    RCP oil. collection system                             Oct. 1, 1983
X re-energizing from essential bus integrated into procedure 4.2 Lighting walkdown maxi-X X
!    7.       Housekeeping
mizing illumination 4.3 Emergency lighting review Task 4 to App. R, Section III.J Nov. 30, 1983 S.-
              -7.1~   Transient combustible                                 Procedure implemented by
-Fire ~ Doors 5.1' Resolution on NRC-X j
_ procedure implementation                             Nov. 1, 1983
identified doors 6.
: 8.       Fire Damper Inoperability 8.1   LER processed                   .X
Reactor Coolant Pump Oil Collection System
            '8.2     Surveillance Tests-(ST)           X reviewed i
: 6. I' File for exemption request,.
* Dock 2t No. 50-346 License No. NPF-3 S2 rial 981 Att<tchment 2 Page 3 To Be   Considered Completed   Interim Finding                                   Prior To Compensatory No.         Finding Action               Restart   Action             Comments
File for exemption-6 RCP oil. collection system Oct. 1, 1983 7.
: 8. Fire Damper Inoperability (Cont.)
Housekeeping
8.3   Surveillance Test               X Revision 8.4   Surveillance Test portions     X re performed 8.5   Applicable records             X available for audit
-7.1~
: 9. Service Water Discharge Valve Room 9.1   Resolution of discharge         X valve deficiency by revised procedure 9.2   One-hour wrap deficiency                           See Finding Action 11 resolution 9.3   Partial vs. full sup-                               Task 2 pression resolution                                 Jan. 31, 1981 (possible exemption                                 (when information request)                                           is available)
Transient combustible Procedure implemented by
: 10. .One Hour Fire Barriers - Test Report 10.1 Kaowool wrap accept-                                 Task 6 ability review                                     Dec. 16, 1983 10.2 Presently installed             X           X required wrap walkdown, reinstallation, repair 10.3 Fire watches ir place           X           X in high combustible loading areas
_ procedure implementation Nov. 1, 1983 8.
: 11. One Hour Wraps - Installation 11.1 Presently installed             X           X       Task 6 required wrap walkdown,                             Dec. 16, 1983 reinsta11ation, repair 11.2 Administrative controls                             Final resolution will on wraps in place                                   be provided in response   1 to the Inspection Report.
Fire Damper Inoperability 8.1 LER processed
.X
'8.2 Surveillance Tests-(ST)
X reviewed i
* Dock 2t No. 50-346 License No. NPF-3 S2 rial 981 Att<tchment 2 Page 3 To Be Considered Completed Interim Finding Prior To Compensatory No.
Finding Action Restart Action Comments 8.
Fire Damper Inoperability (Cont.)
8.3 Surveillance Test X
Revision 8.4 Surveillance Test portions X
re performed 8.5 Applicable records X
available for audit 9.
Service Water Discharge Valve Room 9.1 Resolution of discharge X
valve deficiency by revised procedure 9.2 One-hour wrap deficiency See Finding Action 11 resolution 9.3 Partial vs. full sup-Task 2 pression resolution Jan. 31, 1981 (possible exemption (when information request) is available)
: 10..One Hour Fire Barriers - Test Report 10.1 Kaowool wrap accept-Task 6 ability review Dec. 16, 1983 10.2 Presently installed X
X required wrap walkdown, reinstallation, repair 10.3 Fire watches ir place X
X in high combustible loading areas 11.
One Hour Wraps - Installation 11.1 Presently installed X
X Task 6 required wrap walkdown, Dec. 16, 1983 reinsta11ation, repair 11.2 Administrative controls Final resolution will on wraps in place be provided in response 1
to the Inspection Report.


    'D:ckst No. 50-346 License No. NPF-3 Smrial 981 Attechnent 2 Pcge 4                                                                                                                                             -
'D:ckst No. 50-346 License No. NPF-3 Smrial 981 Attechnent 2 Pcge 4 To Be Considered j
j                                                      To Be               Considered Completed                 Interim Finding                                         Prior To             Compensatory No.             Finding Action                 Restart                 Action                           Comments
Completed Interim Finding Prior To Compensatory No.
: 12. Fire in the-Auxiliary Shutdown Panel 12.1: Auxiliary feed pump                   X                             X turbine circuitry resolution 12.2 Associated Circuits Analysis                                                     Task 5 Jan. 31, 1984
Finding Action Restart Action Comments
: 13. Diesel Fire Pump Test Procedure 13.1 ~NFPA-USAR compatibility                                                         Task 3 Nov. 30, 1983 13.2 _ Full procedure deficiency             X identification 13.3 Procedure rectification                 X 13.4 ' Manufacturer's represen-                                                       Scheduled tative inspection and adjustment i
: 12. Fire in the-Auxiliary Shutdown Panel 12.1: Auxiliary feed pump X
    .14. Fire Hose Stations 14.1 NFPA-USAR compatibility                                                         Task 3 i                                                                                                 Nov. 30, 1983 i
X turbine circuitry resolution 12.2 Associated Circuits Analysis Task 5 Jan. 31, 1984
14.2 Finding review and                       X resolution-L     15. Fire Door Modifications I
: 13. Diesel Fire Pump Test Procedure 13.1 ~NFPA-USAR compatibility Task 3 Nov. 30, 1983 13.2 _ Full procedure deficiency X
!            15.1 Resolution of door                                                               Task 2
identification 13.3 Procedure rectification X
                    ' deficiency                                                                   Jan. 31, 1984 l
13.4 ' Manufacturer's represen-Scheduled tative inspection and adjustment i
l    - 16. . Sprinkler System
.14.
            ~16.1     Sprinkler deficiency                 X resolution 16.2 NFPA-USAR compatibility                                                         Task 3 Nov. 30, 1983 l
Fire Hose Stations 14.1 NFPA-USAR compatibility Task 3 i
l i
Nov. 30, 1983 i
I
14.2 Finding review and X
* Docket No. 50-346 Licensa No. NPF-3 Serial'981       ,
resolution-L
Attachment 2 Page 5 To Be   Cansidered Completed   Interim Finding-                                 Prior To Compensatory No..         Finding Action           Restart   Action           Comments
: 15. Fire Door Modifications I
: 17. Yard Hydrants and Valves 17.1 Yard-hydrant, and valves       X resolution 17.2 NFPA-USAR compatibility                           Task 3 Nov. 30, 1983
15.1 Resolution of door Task 2 l
: 18. Fire Pump Test 18.1 See. deficiency 13 18.2 Vibration reading             X incorporation 18.3 NFPA-USAR compatibility                           Task 3 Nov. 30, 1983
' deficiency Jan. 31, 1984 l
: 19. Control of Combustibles 19.1 See deficiency 7
- 16.. Sprinkler System
: 20. Fire Protection System Flush 20.1 System flush deficiency       X resolution 20.2 NFPA-USAR compatibility                           Task 3 Nov. 30, 1983
~16.1 Sprinkler deficiency X
'21. Fire Detector' Maintenance 21.1~ Detector maintenance         X deficiency resolution
resolution 16.2 NFPA-USAR compatibility Task 3 l
' 22. Fire Door and Damper Maintenance 22.1 Issuance of new procedure     'X 22.2 NFPA-USAR compatibility                           Task 3 Nov. 30, 1983
Nov. 30, 1983 l
                    ~
i I
: 23. -Emergency Lighting - Surveillance 23.1 .NFPA-USAR compatibility                           Task 3 Nov. 30, 1983
* Docket No. 50-346 Licensa No. NPF-3 Serial'981 Page 5 To Be Cansidered Completed Interim Finding-Prior To Compensatory No..
Finding Action Restart Action Comments
: 17. Yard Hydrants and Valves 17.1 Yard-hydrant, and valves X
resolution 17.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983
: 18. Fire Pump Test 18.1 See. deficiency 13 18.2 Vibration reading X
incorporation 18.3 NFPA-USAR compatibility Task 3 Nov. 30, 1983 19.
Control of Combustibles 19.1 See deficiency 7 20.
Fire Protection System Flush 20.1 System flush deficiency X
resolution 20.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983
'21.
Fire Detector' Maintenance 21.1~ Detector maintenance X
deficiency resolution
' 22.
Fire Door and Damper Maintenance 22.1 Issuance of new procedure
'X 22.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983
~
: 23. -Emergency Lighting - Surveillance 23.1.NFPA-USAR compatibility Task 3 Nov. 30, 1983


  'D:ck;t No. 50-346 License No. NPF-3 S: rial 981 Attschment 2 Page 6 To Be   Considered Completed   Interim Finding                                   Prior To Compensatory No.         Finding Action             Restart   Action           Comments
'D:ck;t No. 50-346 License No. NPF-3 S: rial 981 Attschment 2 Page 6 To Be Considered Completed Interim Finding Prior To Compensatory No.
Finding Action Restart Action Comments
: 23. Emergency Lighting - Surveillance (Cont.)
: 23. Emergency Lighting - Surveillance (Cont.)
23.2 Manufacturer's recom-           X mendations review 23.3 Batteries replaced                                 Jan. 31, 1984 23.4 Random sampling                                     Jan. 31, 1984 completed 23.5 Replacement schedule                               Jan. 31, 1984 established, Sur-veille.nce Test revised
23.2 Manufacturer's recom-X mendations review 23.3 Batteries replaced Jan. 31, 1984 23.4 Random sampling Jan. 31, 1984 completed 23.5 Replacement schedule Jan. 31, 1984 established, Sur-veille.nce Test revised
: 24. Off-Site Fire Department Training 24.1 Off-site personnel             X training resolution 24.2 Off-site responsibility         X delineation
: 24. Off-Site Fire Department Training 24.1 Off-site personnel X
: 25. Welding Permits 25.1 NFPA-USAR compatibility                             Task 3 s                                                                  Nov. 30, 1983 25.2 Welding permit defi-           X ciency resolved
training resolution 24.2 Off-site responsibility X
: 26. Sprinkler Tests 26.1 Test resolution                 X 26.2 NFPA-USAR compatibility                             Task 3 Nov. 30, 1983
delineation
: 27. Off-Site Contractors Fire Watch Training 27.1 Fire watch training                                 See response to Finding i resolution                                         Action 28.
: 25. Welding Permits 25.1 NFPA-USAR compatibility Task 3 Nov. 30, 1983 s
27.2 NFPA-USAR Compatibility                             Task 3 Nov. 30, 1983
25.2 Welding permit defi-X ciency resolved 26.
Sprinkler Tests 26.1 Test resolution X
26.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983
: 27. Off-Site Contractors Fire Watch Training 27.1 Fire watch training See response to Finding i
resolution Action 28.
27.2 NFPA-USAR Compatibility Task 3 Nov. 30, 1983
* Dookst-No. 50-346 Licensa No. NPF-3 Serial 981
* Dookst-No. 50-346 Licensa No. NPF-3 Serial 981
    ' Attachment'2
' Attachment'2
      'Pegn 7 4-To Be-         Considered Completed         Interim Finding                                                       Prior To         Compensatory No.             Finding Action                           Restart           Action                     Comments
'Pegn 7 4-To Be-Considered Completed Interim Finding Prior To Compensatory No.
: 28. Fire Protection Coordinator Staff 28.1 Fire protection staff                                                             Jan. 31, 1984 resolution
Finding Action Restart Action Comments
: 29. High/ Low Pressure Interfaces 29.1 Specific deficiency                                   X resolutien 29.2 Associated. circuits                                                             Task 5 analysis                                                                   Jan. 31, 1984
: 28. Fire Protection Coordinator Staff 28.1 Fire protection staff Jan. 31, 1984 resolution
              ~ N/A       Additionally requested                                                     Task 7
: 29. High/ Low Pressure Interfaces 29.1 Specific deficiency X
                          - BTP APCSB 9.5-1 review                                                     Nov. 30, 1983 l               N/A       Preplan review                                                             Task.8 Apr. 30, 1984
resolutien 29.2 Associated. circuits Task 5 analysis Jan. 31, 1984
\
~ N/A Additionally requested Task 7
- BTP APCSB 9.5-1 review Nov. 30, 1983 l
N/A Preplan review Task.8 Apr. 30, 1984
\\
i b
i b
l i
l i
t b
t b
DBP 4328EE c--4   T         ?----tp**     -
DBP 4328EE c--4 T
w----*   *-
?----tp**
                                                                              + - *           --
w----*
sew *--mw-         --g vew-+-y----' * -Nw+w+--w------w-+-}}
+ -
* v-7v--
sew
*--mw-3 i-c--
--g vew-+-y----' * -Nw+w+--w------w-+-}}

Latest revision as of 23:14, 20 December 2024

Forwards Revised Action Summary Table to Util 830826 Evaluation of NRC 830725-29 App R Audit Findings & Corrective Action Plan
ML20024E960
Person / Time
Site: Davis Besse 
Issue date: 08/31/1983
From: Crouse R
TOLEDO EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
983, TAC-52156, NUDOCS 8309080037
Download: ML20024E960 (8)


Text

.

Docket No. 50-346 TOLEDO EDISON License No. NPF-3 Serial No. 983 Roano P. CROUSE fl17"""*

August 31, 1983 i4,9 asa sea, F

Hr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission

-Wa'shington, D. C.

20555

Dear Mr. Eisenhut:

On August 26, 1983,.the Toledo Edison Company (TED) transmitted to you the

" Evaluation of July 25-29, 1983, NRC Appendix R Audit Findings and Corrective Action Plan" (Serial No. 981). This submittal addressed the TED actions to be taken at the Davis-Besse Cuclear Power Station, Unit No. 1 (D8-1),

to ensure that adequate fire protection features wera in place prior to returning to power for Fuel Cycle 4 operation.

This letter transmits a revised Action Summary Table, which was Attachment N

2,of the subject evaluation. This revision does not reflect any changes to the body of the document.

It was TED's intent to provide the Attachment 42 summary as an aid to the commitment tracking effort on your part, as well as ours. ~Therefore, the enclosed revision pages are necessary to agree with the content of the August 26, 1983 submittal.

l

-- Very 1.ruly yours, RPC:JSH:nif encl.

cc: _DB-1 NRC Resident Inspector

$0N ry

' ; urnemna F

R' THE TOLEDO EDISON COMPANY.

EO! SON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 L.

  • Dock 1t Ns. 50-346 Licensa No. NPF-3 S2 rial 981

' Pego 1 To Be.

Considered s'

Completed Interim Finding Prior To Compensatory No.-

Finding Action Restart Action Comments 1.

Alt Shutdown Capability / Hot Standby 1.1 Interim procedure developed X

1.2 Operators trained X.

1.3 Procedures implemented X

+

1.'4 Revalidation of procedure Tasks 1 and 2 after long-term Tasks 1 Systems-Oct. 17, 1983 and 2 Evaluation-Jan. 31, 1984 1

l'5 ' Associate circuits Task 5 analysis Jan. 31, 1984 1

1.6. Preplan validation Task 8 April 30, 1984

.2.

Alt Shutdown Capability / Cold Shutdown

-2.1 Interim procedure. developed X

2.2 Operators trained X

2.3 Procedures implemented X

2. <4 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time requirement File for exemption exemption request Oct. 1, 1983 i

-submitted 2.5 Revalidation of procedure Tasks 1 and 2 after long-term. Tasks 1 Systems-Oct. 17, 1983 and 2 Evaluation-Jan. 31, 1984 12. 6 Associate circuits Task 5 analysis Jan. 31, 1984 2.7 Preplan validation Task 8 April 30, 1984 3.

_ Auxiliary Shutdown Panel s

3.1 T and T interim X

X rEadoutbapability

\\

9 ywre g

-yiwe-=w-w-

r--+-

r-,--m-r+w

,-y wg--

-w-,

w

  • m e---my---

c w-w=-T-me**T

'-v-

"'t---T

.___=

' Docket No. 50-346 I,icensa No. NPF-3 Serial 981 Page 2' i

To Be Considered Completed Interim j

Finding Prior To Compensatory No.

Finding Action Restart Action Comments 3.

Auxiliary Shutdown Panel (Cont.)

3.2 Source range f)ux, T and Task 1 T Permanentresolutfon Resolution identifica-h tion and schedule provided Jan. 31, 1984 3.3 Permanent sampling and X

X valve lineup procedures for reactivity monitoring 4.

Emergency Lighting Design 4.1 Normal lighting X

X re-energizing from essential bus integrated into procedure 4.2 Lighting walkdown maxi-X X

mizing illumination 4.3 Emergency lighting review Task 4 to App. R,Section III.J Nov. 30, 1983 S.-

-Fire ~ Doors 5.1' Resolution on NRC-X j

identified doors 6.

Reactor Coolant Pump Oil Collection System

6. I' File for exemption request,.

File for exemption-6 RCP oil. collection system Oct. 1, 1983 7.

Housekeeping

-7.1~

Transient combustible Procedure implemented by

_ procedure implementation Nov. 1, 1983 8.

Fire Damper Inoperability 8.1 LER processed

.X

'8.2 Surveillance Tests-(ST)

X reviewed i

  • Dock 2t No. 50-346 License No. NPF-3 S2 rial 981 Att<tchment 2 Page 3 To Be Considered Completed Interim Finding Prior To Compensatory No.

Finding Action Restart Action Comments 8.

Fire Damper Inoperability (Cont.)

8.3 Surveillance Test X

Revision 8.4 Surveillance Test portions X

re performed 8.5 Applicable records X

available for audit 9.

Service Water Discharge Valve Room 9.1 Resolution of discharge X

valve deficiency by revised procedure 9.2 One-hour wrap deficiency See Finding Action 11 resolution 9.3 Partial vs. full sup-Task 2 pression resolution Jan. 31, 1981 (possible exemption (when information request) is available)

10..One Hour Fire Barriers - Test Report 10.1 Kaowool wrap accept-Task 6 ability review Dec. 16, 1983 10.2 Presently installed X

X required wrap walkdown, reinstallation, repair 10.3 Fire watches ir place X

X in high combustible loading areas 11.

One Hour Wraps - Installation 11.1 Presently installed X

X Task 6 required wrap walkdown, Dec. 16, 1983 reinsta11ation, repair 11.2 Administrative controls Final resolution will on wraps in place be provided in response 1

to the Inspection Report.

'D:ckst No. 50-346 License No. NPF-3 Smrial 981 Attechnent 2 Pcge 4 To Be Considered j

Completed Interim Finding Prior To Compensatory No.

Finding Action Restart Action Comments

12. Fire in the-Auxiliary Shutdown Panel 12.1: Auxiliary feed pump X

X turbine circuitry resolution 12.2 Associated Circuits Analysis Task 5 Jan. 31, 1984

13. Diesel Fire Pump Test Procedure 13.1 ~NFPA-USAR compatibility Task 3 Nov. 30, 1983 13.2 _ Full procedure deficiency X

identification 13.3 Procedure rectification X

13.4 ' Manufacturer's represen-Scheduled tative inspection and adjustment i

.14.

Fire Hose Stations 14.1 NFPA-USAR compatibility Task 3 i

Nov. 30, 1983 i

14.2 Finding review and X

resolution-L

15. Fire Door Modifications I

15.1 Resolution of door Task 2 l

' deficiency Jan. 31, 1984 l

- 16.. Sprinkler System

~16.1 Sprinkler deficiency X

resolution 16.2 NFPA-USAR compatibility Task 3 l

Nov. 30, 1983 l

i I

  • Docket No. 50-346 Licensa No. NPF-3 Serial'981 Page 5 To Be Cansidered Completed Interim Finding-Prior To Compensatory No..

Finding Action Restart Action Comments

17. Yard Hydrants and Valves 17.1 Yard-hydrant, and valves X

resolution 17.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983

18. Fire Pump Test 18.1 See. deficiency 13 18.2 Vibration reading X

incorporation 18.3 NFPA-USAR compatibility Task 3 Nov. 30, 1983 19.

Control of Combustibles 19.1 See deficiency 7 20.

Fire Protection System Flush 20.1 System flush deficiency X

resolution 20.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983

'21.

Fire Detector' Maintenance 21.1~ Detector maintenance X

deficiency resolution

' 22.

Fire Door and Damper Maintenance 22.1 Issuance of new procedure

'X 22.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983

~

23. -Emergency Lighting - Surveillance 23.1.NFPA-USAR compatibility Task 3 Nov. 30, 1983

'D:ck;t No. 50-346 License No. NPF-3 S: rial 981 Attschment 2 Page 6 To Be Considered Completed Interim Finding Prior To Compensatory No.

Finding Action Restart Action Comments

23. Emergency Lighting - Surveillance (Cont.)

23.2 Manufacturer's recom-X mendations review 23.3 Batteries replaced Jan. 31, 1984 23.4 Random sampling Jan. 31, 1984 completed 23.5 Replacement schedule Jan. 31, 1984 established, Sur-veille.nce Test revised

24. Off-Site Fire Department Training 24.1 Off-site personnel X

training resolution 24.2 Off-site responsibility X

delineation

25. Welding Permits 25.1 NFPA-USAR compatibility Task 3 Nov. 30, 1983 s

25.2 Welding permit defi-X ciency resolved 26.

Sprinkler Tests 26.1 Test resolution X

26.2 NFPA-USAR compatibility Task 3 Nov. 30, 1983

27. Off-Site Contractors Fire Watch Training 27.1 Fire watch training See response to Finding i

resolution Action 28.

27.2 NFPA-USAR Compatibility Task 3 Nov. 30, 1983

  • Dookst-No. 50-346 Licensa No. NPF-3 Serial 981

' Attachment'2

'Pegn 7 4-To Be-Considered Completed Interim Finding Prior To Compensatory No.

Finding Action Restart Action Comments

28. Fire Protection Coordinator Staff 28.1 Fire protection staff Jan. 31, 1984 resolution
29. High/ Low Pressure Interfaces 29.1 Specific deficiency X

resolutien 29.2 Associated. circuits Task 5 analysis Jan. 31, 1984

~ N/A Additionally requested Task 7

- BTP APCSB 9.5-1 review Nov. 30, 1983 l