/lnMPCompany May 12, 2022 U. S. Nuclear Regulatory Commission Attn: Mr. Ted Wingfield Region Ill Examiner 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2022 NRC EXAMINATION SUBMITTAL Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106
 
==Reference:==
Letter from Patricia J. Pelke, Nuclear Regulatory Commission, to J. P. Gebbie, Indiana Michigan Power Company, "Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Confirmation of Initial License Examination," dated December 29, 2021.
Indiana Michigan Power Company, the licensee for D.C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing as enclosures to this letter the Initial License Examination based on 1 Senior Reactor Operator (SRO) (U), 3 SRO (I), and 9 Reactor Operator (RO) candidates.
The examination, currently scheduled July 2022, is being prepared in accordance with NUREG 1021, Revision 12.
The following items are enclosed:
: 1)
Form 1.3-1 Examination Security Agreement
: 2)
Form 3.2-1 Administrative Topics (JPM) Outline (SRO)
: 3)
Form 3.2-1 Administrative Topics (JPM) Outline (RO)
: 4)
Form 3.2-3 Admin JPM Exams a)
NRC-RO33-A 1 a-RO b)
NRC-RO33-A 1 a-SRO c)
NRC-RO33-A1b-RO d)
NRC-RO33-A1b-SRO e)
NRC-RO33-A2-RO f)
NRC-RO33-A2-SRO g)
NRC-RO33-A3-RO h)
NRC-RO33-A3-SRO i)
NRC-RO33-A4-SRO
: 5)
Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline (SRO-I)
: 6)
Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline (SRO-U)
: 7)
Form 3.2-2Control Room/In-Plant Systems (JPM) Outline (RO)
: 8)
Form 3.2-3 System JPM Exams a)
NRC-RO33-SIM-a b)
NRC-RO33-SIM-b c)
NRC-RO33-SIM-c d)
NRC-RO33-SIM-d e)
NRC-RO33-SIM-e f)
NRC-RO33-SIM-f g)
NRC-RO33-SIM-g
 
U. S. Nuclear Regulatory Commission May 12, 2022 Page 2 h)
NRC-RO33-SIM-h i)
NRC-RO33-INP-i j)
NRC-RO33-INP-j k)
NRC-RO33-INP-k
: 9)
Form 2.3-2 Operating Test Quality Checklist
: 10)
Scenario Exams Form E3.3-1:
a)
NRC2022-01 b)
NRC2022-02 c)
NRC2022-03 d)
NRC2022-04 e)
NRC2022-Spare
: 11)
Form 3.4-1 Event and Evolution Checklist - Crew 1
: 12)
Form 3.4-1 Event and Evolution Checklist - Crew 2
: 13)
Form 3.4-1 Event and Evolution Checklist - Crew 3
: 14)
Form 3.4-1 Event and Evolution Checklist - Crew 4
: 15)
Form 3.3-2 Required Operator actions - Scenario 1
: 16)
Form 3.3-2 Required Operator actions - Scenario 2
: 17)
Form 3.3-2 Required Operator actions - Scenario 3
: 18)
Form 3.3-2 Required Operator actions - Scenario 4
: 19)
Form 3.3-2 Required Operator actions - Scenario Spare
: 20)
Form 2.3-4 Written Examination Quality Checklist
: 21)
CNP 2022 NRC Written Examination (100 questions with references)
A complete electronic copy of documents with initials or signatures for the Public Document Room (ADAMS) has been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered. No paper copies of any material will be supplied per your request.
None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.
If you have any questions, please contact Todd Valley or Tim Johansen at (269) 465-5901,
extension 3738, or myself at (269) 466-3084.
Sincerely,
[9'K Tod Kaspar Operations Training Manager Enclosures}}

Latest revision as of 15:50, 27 November 2024

Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022
ML22250A692
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/12/2022
From: Kaspar T
American Electric Power, Indiana Michigan Power Co
To: Ted Wingfield
NRC/RGN-III/DRS/OLB
Wingfield T
Shared Package
ML21263A039 List:
References
Download: ML22250A692 (2)


Text

INDIANA MICHIGAN POWER

/lnMPCompany May 12, 2022 U. S. Nuclear Regulatory Commission Attn: Mr. Ted Wingfield Region Ill Examiner 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Donald C. Cook Nuclear Plant Units 1 and 2 2022 NRC EXAMINATION SUBMITTAL Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, Ml 49106

Reference:

Letter from Patricia J. Pelke, Nuclear Regulatory Commission, to J. P. Gebbie, Indiana Michigan Power Company, "Donald C. Cook Nuclear Power Plant, Units 1 and 2 - Confirmation of Initial License Examination," dated December 29, 2021.

Indiana Michigan Power Company, the licensee for D.C. Cook Nuclear Plant (CNP) Units 1 and 2, is providing as enclosures to this letter the Initial License Examination based on 1 Senior Reactor Operator (SRO) (U), 3 SRO (I), and 9 Reactor Operator (RO) candidates.

The examination, currently scheduled July 2022, is being prepared in accordance with NUREG 1021, Revision 12.

The following items are enclosed:

1)

Form 1.3-1 Examination Security Agreement

2)

Form 3.2-1 Administrative Topics (JPM) Outline (SRO)

3)

Form 3.2-1 Administrative Topics (JPM) Outline (RO)

4)

Form 3.2-3 Admin JPM Exams a)

NRC-RO33-A 1 a-RO b)

NRC-RO33-A 1 a-SRO c)

NRC-RO33-A1b-RO d)

NRC-RO33-A1b-SRO e)

NRC-RO33-A2-RO f)

NRC-RO33-A2-SRO g)

NRC-RO33-A3-RO h)

NRC-RO33-A3-SRO i)

NRC-RO33-A4-SRO

5)

Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline (SRO-I)

6)

Form 3.2-2 Control Room/In-Plant Systems (JPM) Outline (SRO-U)

7)

Form 3.2-2Control Room/In-Plant Systems (JPM) Outline (RO)

8)

Form 3.2-3 System JPM Exams a)

NRC-RO33-SIM-a b)

NRC-RO33-SIM-b c)

NRC-RO33-SIM-c d)

NRC-RO33-SIM-d e)

NRC-RO33-SIM-e f)

NRC-RO33-SIM-f g)

NRC-RO33-SIM-g

U. S. Nuclear Regulatory Commission May 12, 2022 Page 2 h)

NRC-RO33-SIM-h i)

NRC-RO33-INP-i j)

NRC-RO33-INP-j k)

NRC-RO33-INP-k

9)

Form 2.3-2 Operating Test Quality Checklist

10)

Scenario Exams Form E3.3-1:

a)

NRC2022-01 b)

NRC2022-02 c)

NRC2022-03 d)

NRC2022-04 e)

NRC2022-Spare

11)

Form 3.4-1 Event and Evolution Checklist - Crew 1

12)

Form 3.4-1 Event and Evolution Checklist - Crew 2

13)

Form 3.4-1 Event and Evolution Checklist - Crew 3

14)

Form 3.4-1 Event and Evolution Checklist - Crew 4

15)

Form 3.3-2 Required Operator actions - Scenario 1

16)

Form 3.3-2 Required Operator actions - Scenario 2

17)

Form 3.3-2 Required Operator actions - Scenario 3

18)

Form 3.3-2 Required Operator actions - Scenario 4

19)

Form 3.3-2 Required Operator actions - Scenario Spare

20)

Form 2.3-4 Written Examination Quality Checklist

21)

CNP 2022 NRC Written Examination (100 questions with references)

A complete electronic copy of documents with initials or signatures for the Public Document Room (ADAMS) has been provided. This contains the full outline (previously submitted) and electronic PDF versions of the RO and SRO examinations that are to be administered. No paper copies of any material will be supplied per your request.

None of these materials are to go to the Public Document Room (ADAMS) until after the examination has been completed.

If you have any questions, please contact Todd Valley or Tim Johansen at (269) 465-5901,

extension 3738, or myself at (269) 466-3084.

Sincerely,

[9'K Tod Kaspar Operations Training Manager Enclosures