MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination ML21110A5272021-04-19019 April 2021 GFE Results, March 2021 IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A4372020-08-25025 August 2020 2020 DC Cook Ile Exam Preparation Checklist ES-201-1 ML21006A4292020-08-25025 August 2020 2020 DC Cook Ile Exam Security Checklists ES-201-3 ML20356A1572020-08-25025 August 2020 2020 DC Cook Ile Transient and Event Checklists ES-301-5 ML20356A0842020-08-25025 August 2020 2020 DC Cook Ile Simulator Scenario Quality Checklist ES-301-4 2024-09-05
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24256A1732024-09-12012 September 2024 Form 5.1-1 Post Examination Check Sheet (Dcc Ile 2024) IR 05000315/20243012024-09-0505 September 2024 NRC Initial License Examination Report 05000315/2024301 and 05000316/2024301 ML24240A0332024-08-0808 August 2024 Form 2.1-1, Examination Preparation Checklist (Dcc 2024) ML24270A0032024-08-0808 August 2024 Form 1.3-1 DC Cook 2024 ML24256A1512024-08-0202 August 2024 Post Examination Comments ML24256A1482024-08-0202 August 2024 2024 Post Examination Submittal Letter ML24191A0692024-07-0909 July 2024 Operator Licensing Examination Approval - Donald C. Cook Nuclear Power Plant, July 2024 ML24239A3652024-06-13013 June 2024 Form 2.3-1, Outline Quality Checklist (DC Cook 2024) ML24239A3672024-06-13013 June 2024 Form 3.4-1, Events and Evolutions Checklist (DC Cook 2024) ML24239A3812024-06-11011 June 2024 Form 2.3-2, Operating Test Quality Checklist (DC Cook 2024) ML24239A3832024-06-11011 June 2024 Form 2.3-4, Written Quality Checklist (DC Cook 2024) ML24256A1472024-05-0606 May 2024 DC Cook 2024 NRC Examination Submittal Letter: Submittal ML23338A2642023-12-0505 December 2023 Confirmation of Initial License Examination ML22251A0232022-08-10010 August 2022 Form 2.3-5 Written Examination Review Worksheet DC-Cook 2022 ML22251A0162022-08-10010 August 2022 Form 2.1-1 Examination Preparation Checklist DC-Cook 2022 ML22251A0192022-08-10010 August 2022 Form 5.1-1 Postexamination Check Sheet DC-Cook 2022 ML22251A0272022-08-10010 August 2022 Outline Comments & Resolutions DC-Cook 2022 ML22251A0212022-08-10010 August 2022 Form 2.3-3 Operating Test Review Worksheet DC-Cook 2022 ML22250A7202022-08-10010 August 2022 Form 1.3-1 Exam Security Agreement DC-Cook 2022 ML22251A0202022-08-0202 August 2022 Post Examination Submittal Letter DC-Cook 2022 ML22250A7132022-07-27027 July 2022 Administered Walkthrough Admin DC-Cook 2022 ML22250A7192022-07-27027 July 2022 Administered Written Exam References Provided DC-Cook 2022 ML22250A7162022-07-27027 July 2022 Administered Dynamic Simulator Scenarios Forms 3.3-1 & 2 DC-Cook 2022 ML22250A7142022-07-27027 July 2022 Administered Walkthrough Systems Control-Room & In-Plant DC-Cook 2022 ML22250A7182022-07-27027 July 2022 Administered Written Exam and Answer Key RO & SRO DC-Cook 2022 ML22192A1192022-07-11011 July 2022 Operator Licensing Examination Approval ML22250A7072022-06-30030 June 2022 Proposed_Written_Exam_and_Answer_Key_RO&SRO_DC-Cook_2022 ML22250A6772022-06-30030 June 2022 Form 3.2-2 Control Room/In-Plant Systems Outline DC-Cook 2022 ML22250A6902022-06-30030 June 2022 Form_2.3-2_Operating_Test_Quality_Checklist_DC-Cook_2022 ML22250A6742022-06-30030 June 2022 Form 3.2-1 Admin Topics Outline DC-Cook 2022 ML22250A6992022-06-30030 June 2022 Proposed_Walkthrough_Admin_DC-Cook_2022 ML22250A6882022-06-30030 June 2022 Form 4.1-1 Record of Rejected Knowledge and Abilities DC-Cook 2022 ML22250A6912022-06-30030 June 2022 Form_2.3-4_Written_Exam_Quality_Checklist_DC-Cook_2022 ML22250A6852022-06-30030 June 2022 Form 4.1-PWR & Common Exam Outline Administered DC-Cook 2022 ML22250A6812022-06-30030 June 2022 Form 3.3-1 Scenario Outline DC-Cook 2022 ML22250A7042022-06-30030 June 2022 Proposed_Dynamic_Simulator_Scenarios_Forms_3.3-1&2_DC-Cook_2022 ML22250A6692022-06-30030 June 2022 Form 3.4.1 Events and Evolutions Checklist DC-Cook 2022 ML22250A6652022-06-30030 June 2022 Form: 2.3-1 Examination Outline Quality Checklist DC-Cook - 2022 ML22250A7032022-06-30030 June 2022 Proposed_Walkthrough_SYSTEMS_Control-Room&In-Plant_DC-Cook_2022 ML22250A6922022-05-12012 May 2022 Licensee_Iinitial_License_Exam_Submittal_Letter_DC-Cook_2022 AEP-NRC-2022-20, Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations2022-03-14014 March 2022 Response to NRC Regulatory Issue Summary 2022-01 Preparation and Scheduling of Operator Licensing Examinations ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML22032A0392022-02-0101 February 2022 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML21347A5742021-12-29029 December 2021 Confirmation of Initial License Examination IR 05000315/20203012020-10-19019 October 2020 NRC Initial License Examination Report 05000315/2020301; 05000316/2020301 ML21006A2222020-08-25025 August 2020 2020 DC Cook Ile Operating Test Outline Submittal Letter ML20356A2572020-08-25025 August 2020 2020 DC Cook Ile As-Administered RO SRO Written Examination ML20356A0802020-08-25025 August 2020 2020 DC Cook Ile Proposed Exam Submittal Letter ML20356A1522020-08-25025 August 2020 2020 DC Cook Ile Written Exam Outlines ES-401-2 and ES-401-3 ML21006A4182020-08-25025 August 2020 2020 DC Cook Ile Record of Rejected KAs ES-401-4 2024-09-05
[Table view] |
Text
Form 3.3-1 Scenario Outline
Facility: DC COOK 1 & 2 Scenario #: NRC2022-1 Scenario Source: New Op. Test #: Cook 2022
Examiners: Applicants/
Operators:
Initial Conditions: 100% Power
Turnover: The plant is at 100% power and the crew is directed to maintain power at 100% and swap Stator Cooling Water Pumps for maintenance when clearance is ready.
Critical Tasks**: 1. Manually trip the reactor
- 2. Energize at least one AC emergency Bus
Event Malf. No. Event No. Event Type* Description**
1 U2_QLC451 I-RO QLC-451, VCT Level Transmitter, fails Low 2 U2_FFC210 I-BOP FFC-210, Feed Water Flow Instrument, SG #21 MC-BOP Channel 1, fails High TS 3 U2_NFP210 TS RCS Flow Instrument fails low 4 N-BOP Swap Stator Cooling Water Pumps 5 U2_TP03 C-BOP Stator Water Cooling leak R-RO Perform 2%/min Rapid Power Reduction MC-RO Control VCT level in manual 6 U2_NPP151 I-RO Pressurizer pressure controlling channel fails high with U2_RP16A mechanical failure of one spray valve open (EOP entry) 7 U2_RCO1A M-CREW LBLOCA following Rx trip
U2_101TD6 C-CREW RHR Pumps Auto Start failure U2_101TA4 Transfer to Cold Leg Recirculation
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Tech Spec, (MC)Manual Control
- Details on subsequent pages
Op. Test No.: Cook 2022 Scenario No.: NRC2022-2 Form 3.3-1 Page 1 of 1 Form 3.3-1 Scenario Outline
Facility: DC COOK 1 & 2 Scenario #: NRC2022-2 Scenario Source: New Op. Test #: Cook 2022
Examiners: Applicants/
Operators:
Initial Conditions: 100% Power, breaker T21C3 is OOS due to control power failure, T.S.
3.8.1.B in effect.
Turnover: As part of Post Maintenance testing for breaker T21C3, DG2CD output breaker to Bus T21C, start DG2CD per marked up copy of 2-OHP-4021-032-001CD, run loaded on Bus T21C at 900-1100 KW, then shut down the DG per the NOP.
Critical Tasks**: 1. Manually trip the reactor
- 2. Energize at least one AC emergency Bus
Event Malf. No. Event No. Event Type* Description**
1 N-BOP Perform DG2CD start per NOP 2 U2_EG14O C-BOP Failure of DG2CD ESW Supply ZGI101WMO726_ TS U2 ZGI101WMO728_
U2 3 U2_RD07H C-US Uncontrolled automatic Control Rod Insertion R-RO Restore control rod position MC-RO 4 U2_NLP151 I-RO Controlling Pressurizer Level Channel fails High MC-RO TS 5 U2_SW09 C-BOP Loss of Containment Cooling TS 6 RP01A C-RO 21 RCP Trip with Automatic Reactor Trip Failure (EOP RP01B entry)
U2_RCP1 7 U2_ED05E M-CREW Loss of Bus T21A/Loss of Offsite Reserve Power U12_ED25B U12_ED25C
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Tech Spec, (MC)Manual Control
- Details on subsequent pages
Op. Test No.: Cook 2022 Scenario No.: NRC2022-2 Form 3.3-1 Page 1 of 1 Form 3.3-1 Scenario Outline
Facility: DC COOK 1 & 2 Scenario #: NRC2022-3 Scenario Source: New Op. Test #: Cook 2022
Examiners: Applicants/
Operators:
Initial Conditions: 100% Power
Turnover: After crew turnover, swap NESW pumps and place the currently running pump in standby mode. After NESW pumps are swapped, reduce load to 95% in preparation for turbine valve testing.
Critical Tasks**: 1. Isolate ruptured SG
- 2. Control initial RCS cool down
- 3. Depressurize RCS to E-3 SI Termination criteria
- 4. Terminate ECCS flow
Event Malf. No. Event No. Event Type* Description**
1 N-BOP Start South NESW Pump and Stop the North NESW pump.
2 R-RO Commence power reduction to 95%
3 U1_NPP151 I-RO Pressurizer Pressure Channel Fails Low MC-RO TS 4 U2_101GLC2 C-BOP Bus Duct Cooling Fan Failure with failure of the standby M-BOP fan to auto start 5 U2_SW07A C-BOP Main Turbine Oil Temperature Controller Failure MC-BOP 6 U2_RC23B C-RO SG Tube Leak
@1% TS MC-RO 7 U2_RC23B M-CREW Steam Generator Tube Rupture (EOP entry)
ZGI43SDI_U2 C-CREW Steam Dump System failure
U2_RC15A C-CREW Pressurizer spray valve NRV-163 fails open during RCS depressurization
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Tech Spec, (MC)Manual Control
- Details on subsequent pages
Op. Test No.: Cook 2022 Scenario No.: NRC2022-2 Form 3.3-1 Page 1 of 1 Form 3.3-1 Scenario Outline
Facility: DC COOK 1 & 2 Scenario #: NRC2022-4 Scenario Source: New Op. Test #: Cook 2022
Examiners: Applicants/
Operators:
Initial Conditions: 80% power. The South Condensate Booster Pump is running with slightly elevated temperatures.
Turnover: After turnover, shift the Condensate Booster Pumps to the Middle Pump in service and the South Pump in standby. Then, continue power increase to 100% power.
Critical Tasks**: 1. Isolate Main Turbine from SGs during ATWS.
- 2. Start AFW Pumps during ATWS.
Event Malf. No. Event No. Event Type* Description**
1 N-BOP Shift Condensate Booster Pumps 2 R-RO Raise reactor power 3 U2_QFI200 I-RO Charging Flow Instrument QFI-200 fails low MC-RO 4 U2_ECC short C-BOP Running CCW pump failure, CCW pump Auto start fails U2_CC02B M-BOP TS 5 U2_QLC452 I-RO VCT Level channel 2-QLC-452 Fails High 6 U2_BLP141 I-BOP Controlling SG Level Channel fails high MC-BOP TS 7 U2_RP12A M-CREW Inadvertent SI/Loss of Feed ATWS (EOP entry)
U2_RP12B U2_RP03A U2_RP03B U2_TC02 C-CREW Auto & Manual turbine trip failure U2_RP07A Auto Main Steam Isolation failure U2_RP07B U2_FW48A U2_FW48B C-CREW AFWP auto start failures U2_FW48C 8 SI Termination
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor, (TS)Tech Spec, (MC)Manual Control
- Details on subsequent pages
Op. Test No.: Cook 2022 Scenario No.: NRC2022-2 Form 3.3-1 Page 1 of 1