ML24179A110: Difference between revisions
From kanterella
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 1: | Line 1: | ||
{{Adams | |||
| number = ML24179A110 | |||
| issue date = 06/27/2024 | |||
| title = Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification | |||
| author name = Snider S | |||
| author affiliation = Duke Energy Carolinas, LLC | |||
| addressee name = | |||
| addressee affiliation = NRC/NRR, NRC/Document Control Desk | |||
| docket = 05000269, 05000270, 05000287 | |||
| license number = DPR-038, DPR-047, DPR-055 | |||
| contact person = | |||
| case reference number = RA-24-0141 | |||
| package number = ML24179A109 | |||
| document type = Letter, Updated Final Safety Analysis Report (UFSAR) | |||
| page count = 385 | |||
}} | |||
=Text= | |||
{{#Wiki_filter:}} |
Latest revision as of 11:53, 4 October 2024
ML24179A110 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 06/27/2024 |
From: | Snider S Duke Energy Carolinas |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24179A109 | List: |
References | |
RA-24-0141 | |
Download: ML24179A110 (385) | |
Similar Documents at Oconee | |
---|---|
Category:Letter
MONTHYEARIR 05000269/20240032024-10-31031 October 2024
[Table view]Integrated Inspection Report 05000269/2024003 and 05000270/2024003 and 05000287/2024003 (2) ML24255A3322024-10-16016 October 2024 SLRA - Revised SE Letter ML24297A6172024-10-11011 October 2024 PCA Letter to NRC Oconee Hurricane Helene ML24269A0912024-10-0909 October 2024 Request for Withholding Information from Public Disclosure ML24145A1782024-08-26026 August 2024 Issuance of Amendment Nos. 430, 432, and 431, to TS 5.5.2, Containment Leakage Rate Testing Program for a one-time Extension of the Type a Leak Rate Test Frequency IR 05000269/20240052024-08-26026 August 2024 Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 (Report 05000269/2024005, 05000270/2024005, and 05000287-2024005) 05000287/LER-2024-001, Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation2024-08-0202 August 2024 Procedure Deficiency Results in Inadvertent Automatic Feedwater Isolation and Automatic Emergency Feedwater Actuation IR 05000269/20240022024-07-25025 July 2024 Integrated Inspection Report 05000269/2024002 and 05000270/2024002 and 05000287/2024002 ML24192A1312024-07-15015 July 2024 Licensed Operator Positive Fitness-For-Duty Test ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 ML24183A2352024-06-29029 June 2024 Update 3 to Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 ML24179A1102024-06-27027 June 2024 Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc IR 05000269/20240012024-05-0303 May 2024 Integrated Inspection Report 05000269/2024001, 05000270/2024001 and 05000287/2024001 IR 05000269/20244022024-04-24024 April 2024 Security Baseline Inspection Report 05000269/2024402 and 05000270/2024402 and 05000287/2024402 ML24108A0792024-04-16016 April 2024 EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000 IR 05000269/20244012024-03-28028 March 2024 – Security Baseline Inspection Report 05000269-2024401 and 05000270-2024401 and 05000287-2024401 ML24088A3052024-03-25025 March 2024 Fws to NRC, Agreement with Nlaa Determination for Tricolored Bat for Oconee Lr 05000270/LER-2023-001, Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee2024-02-29029 February 2024 Inappropriate Procedural Guidance for Planned Online Maintenance Results in Event or Condition That Could Have Prevented Fulfillment of a Safety Function Licensee 05000287/LER-2023-002, Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications2024-02-29029 February 2024 Passive Containment Isolation Device Inoperability Results in Operation or Condition Prohibited by Technical Specifications IR 05000269/20230062024-02-28028 February 2024 Annual Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 - (NRC Inspection Report 05000269/2023006, 05000270/2023006, and 05000287/2023006) ML24045A3042024-02-16016 February 2024 Ltr. to Lisa M. Collins Chief the Wassamasaw Tribe of Varnertown Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24030A0052024-02-16016 February 2024 Ltr. to Brian Harris, Chief, Catawba Indian Nation; Re., Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2942024-02-16016 February 2024 Ltr. to Carolyn Chavis Bolton Chief Pee Dee Indian Nation of Upper Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2962024-02-16016 February 2024 Ltr. to David Hill Principal Chief Muscogee Creek Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2992024-02-16016 February 2024 Ltr. to Eric Pratt Chief the Santee Indian Organization Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3082024-02-16016 February 2024 Ltr. to Ralph Oxendine Chief Sumter Tribe of Cheraw Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3022024-02-16016 February 2024 Ltr. to Joe Bunch United Keetoowah Band of Cherokee Indians in Ok Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3072024-02-16016 February 2024 Ltr. to Pete Parr Chief Pee Dee Indian Tribe Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3032024-02-16016 February 2024 Ltr. to John Creel Chief Edisto Natchez-Kusso Tribe of Sc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3012024-02-16016 February 2024 Ltr. to Harold Hatcher Chief the Waccamaw Indian People Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2952024-02-16016 February 2024 Ltr. to Chuck Hoskin, Jr, Principal Chief Cherokee Nation Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A2972024-02-16016 February 2024 Ltr. to Dexter Sharp Chief Piedmont American Indian Assoc Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3052024-02-16016 February 2024 Ltr. to Louis Chavis Chief Beaver Creek Indians Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24045A3062024-02-16016 February 2024 Ltr. to Michell Hicks, Principal Chief Eastern Band of Cherokee Re Oconee Nuclear Station Units 1,2, and 3 Section 106 ML24019A1442024-02-13013 February 2024 Letter to Reid Nelson, Executive Director, Achp; Re Oconee Nuclear Station Units 1, 2, and 3 Section 106 ML24011A1532024-02-13013 February 2024 Letter to Tracy Watson EPA-Oconee Nuclear Sta, Unites 1, 2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants ML24030A5212024-02-13013 February 2024 Letter to Elizabeth Johnson, Director, SHPO; Re Oconee Nuclear Stations Units 1, 2, and 3 Section 106 ML24011A1482024-02-13013 February 2024 Letter to Steven M. Snider-Oconee Nuclear Sta, Unites 1,2 & 3 Notice of Avail of the Draft Site-Specific Supp. 2, 2nd Renewal to the Generic EIS for Lic. Renew of Nuclear Plants IR 05000269/20230042024-02-13013 February 2024 Integrated Inspection Report 05000269/2023004, 05000270/2023004, and 05000287/2023004; and Inspection Report 07200040/2023001 ML23304A1422024-02-0101 February 2024 Issuance of Environmental Scoping Summary Report Associated with the U.S. Nuclear Regulatory Commission Staff’S Review of the Oconee Nuclear Station, Units 1, 2, & 3, Subsequent License Renewal Application ML24005A2492024-01-24024 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000269/20243012024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000269/2024301, 05000270/2024301, and 05000287/2024301 ML23331A7982023-12-14014 December 2023 Review of the Fall 2022 Steam Generator Tube Inspection Report (01R32) ML23262A9672023-12-13013 December 2023 Alternative to Use RR-22-0174, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section XI, Division 1 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000269/20230032023-11-14014 November 2023 Integrated Inspection Report 05000269/2023003, 05000270/2023003, and 05000287/2023003; and IR 07200040/2023001; and Exercise of Enforcement Discretion ML23219A1402023-10-10010 October 2023 Audit Report Proposed Alternative to Use ASME Code Case N-752, Risk Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems XI, Division 1 ML23269A1102023-10-0606 October 2023 Letter to Steven Snider-Revised Schedule for the Environmental Review of the Oconee Nuclear Station, Unit 1, 2, and 3, Subsequent License Renewal Application ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds 2024-08-26 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24179A1102024-06-27027 June 2024
[Table view]Submittal of Updated Final Safety Analysis Report Revision 30, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification RA-24-0141, Updated Final Safety Analysis Report Revision 302023-12-31031 December 2023 Updated Final Safety Analysis Report Revision 30 RA-22-0121, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of2022-06-29029 June 2022 Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 29, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions, 10 CFR 50.59 Evaluation Summary Report, and 10 CFR 54.37 Update, and Notification of Co ML20189A0942020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B. Figures, (Redacted Version) ML20189A0802020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML20189A0922020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML20189A1112020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 16, Selected Licensee Commitments ML20189A1132020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs and Activities ML20189A1102020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Figures ML20189A0812020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5A, Tables ML20189A1042020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13A. Tables ML20189A1022020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 12, Appendix 12A. Tables ML20189A1052020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Appendix 13B, Figures ML20189A1032020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML20189A0992020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11A. Tables ML20189A0982020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20189A1002020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 11, Appendix 11B. Figures ML20189A0692020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1A, Tables ML20189A0882020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures ML20189A1062020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation ML20189A0872020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7A, Tables ML20189A0832020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards ML20189A0822020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5B, Figures ML20189A0852020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Figures, (Redacted Version) ML20189A0842020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Tables ML20189A0762020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3B, Figures ML20189A0722020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Tables ML20189A0912020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8B, Figures ML20189A0682020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant RA-20-0136, 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables2020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 18, Appendix 18A. Tables ML20189A0892020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML20181A1182020-06-29029 June 2020 Submittal of Revision 28 to Updated Final Safety Analysis Report, Technical Specifications Bases Revisions, Selected Licensee Commitment Revisions and 10CFR50.59 Evaluation Summary Report ML20189A0702020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 1, Appendix 1B, Figures, (Redacted Version) ML20189A1012020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML20189A0772020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML20189A0742020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML20189A0752020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3A, Tables ML20189A1082020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML20189A0862020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML20189A0732020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Figures ML20189A0932020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A. Tables ML20189A1092020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A. Tables ML20189A0952020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20189A1122020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML20189A0972020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B. Figures ML20189A0962020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10A, Tables ML20189A1072020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 14, Appendix 14A, Tables ML20189A0792020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4B, Figures ML20189A0902020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 8, Appendix 8A, Tables ML20189A0782020-06-29029 June 2020 8 to Updated Final Safety Analysis Report, Chapter 4, Appendix 4A, Tables 2024-06-27 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML24179A110&oldid=3673923"