Line 21: |
Line 21: |
|
| |
|
| Mr. David P. Rhoades Senior Vice President President and Chief Nuclear Officer Constellation Energy Generation, LLC 4300 Winfield Rd. | | Mr. David P. Rhoades Senior Vice President President and Chief Nuclear Officer Constellation Energy Generation, LLC 4300 Winfield Rd. |
| Warrenville, IL 60555 | | Warrenville, IL 60555 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| LIMERICK GENERATING STATION, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE 3/4 3-11 IN AMENDMENT NO. 225 (EPID L-2019- PMP-0058) | | LIMERICK GENERATING STATION, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE 3/4 3-11 IN AMENDMENT NO. 225 (EPID L-2019-PMP-0058) |
|
| |
|
| ==Dear David Rhoades:== | | ==Dear David Rhoades:== |
| | The U.S. Nuclear Regulatory Commission (NRC) staff has identified typographical errors in the technical specifications issued in Amendment No. 225 (Agencywide Documents Access and Management System Accession No. ML24204A071) to Renewed Facility Operating License No. NPF-85 for the Limerick Generating Station (Limerick), Unit 2. The NRC staff is issuing this letter to correct the errors per the guidance in the NRC memorandum dated January 16, 1997 (ML103260096), which is derived from the Staff Requirements Memorandum (SRM, ML003754054) for SECY 238 (ML20134M324). |
|
| |
|
| The U.S. Nuclear Regulatory Commission (NRC) staff has identified typographical errors in the technical specifications issued in Amendment No. 225 (Agencywide Documents Access and Management System Accession No. ML24204A071) to Renewed Facility Operating License No. NPF-85 for the Limerick Generating Station (Limerick), Unit 2. The NRC staff is issuing this letter to correct the errors per the guidance in the NRC memorandum dated January 16, 1997 (ML103260096), which is derived from the Staff Requirements Memorandum (SRM, ML003754054) for SECY 238 (ML20134M324).
| | By {{letter dated|date=July 29, 2024|text=letter dated July 29, 2024}}, the NRC staff issued Amendment No. 225 and its related safety evaluation for Limerick, Unit 2 in response to the license amendment request from Constellation Energy Generation, LLC (the licensee) dated June 13, 2024 (ML24165A264), as supplemented by {{letter dated|date=July 19, 2024|text=letter dated July 19, 2024}} (ML24201A166). The Limerick, Unit 2 technical specification page 3/4 3-11 enclosed in Amendment No. 225 contained inadvertent typographical errors (i.e., the incorrect prior amendment numbers appeared in the footer and the page was transposed from landscape to portrait format). To correct these errors, the NRC staff is re-issuing Limerick, Unit 2 technical specification page 3/4 3-11 to correct the list of prior amendment numbers and to transpose the page to landscape format. |
|
| |
|
| By {{letter dated|date=July 29, 2024|text=letter dated July 29, 2024}}, the NRC staff issued Amendment No. 225 and its related safety evaluation for Limerick, Unit 2 in response to the license amendment request from Constellation Energy Generation, LLC (the licensee) dated June 13, 2024 (ML24165A264), as supplemented by letter dated July 19, 2024 (ML24201A166) . The Limerick, Unit 2 technical specification page 3/4 3-11 enclosed in Amendment No. 225 contained inadvertent typographical errors (i.e., the incorrect prior amendment numbers appeared in the footer and the page was transposed from landscape to portrait format). To correct these errors, the NRC staff is re-issuing Limerick, Unit 2 technical specification page 3/4 3-11 to correct the list of prior amendment numbers and to transpose the page to landscape format.
| | The NRC staff determined that these editorial corrections to the technical specifications do not change any of the NRC staffs conclusions in its safety evaluation regarding the acceptability of the changes approved in Amendment No. 225 (the safety evaluation did not address the amendment numbers or page format), nor do the corrections affect the applicable no significant hazards considerations published in the Federal Register on June 25, 2024 (89 FR 53124). |
|
| |
|
| The NRC staff determined that these editorial corrections to the technical specifications do not change any of the NRC staffs conclusions in its safety evaluation regarding the acceptability of the changes approved in Amendment No. 225 (the safety evaluation did not address the amendment numbers or page format), nor do the corrections affect the applicable no significant hazards considerations published in the Federal Register on June 25, 2024 (89 FR 53124).
| | Accordingly, the enclosure to this letter has a copy of the revised and corrected Limerick, Unit 2 technical specification page 3/4 3-11. |
|
| |
|
| Accordingly, the enclosure to this letter has a copy of the revised and corrected Limerick, Unit 2 technical specification page 3/4 3-11.
| | D. Rhoades |
|
| |
|
| D. Rhoades
| | If you have any questions, please contact me at 301-415- 0489 or by email to Audrey.Klett@nrc.gov. |
| | |
| If you have any questions, please contact me at 301- 415- 0489 or by email to Audrey.Klett@nrc.gov. | |
|
| |
|
| Sincerely, | | Sincerely, |
|
| |
|
| /RA/
| | /RA/ |
|
| |
|
| Audrey Klett, Senior Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation | | Audrey Klett, Senior Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation |
Line 49: |
Line 48: |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
|
| |
| Corrected Technical Specification Page | | Corrected Technical Specification Page |
|
| |
|
Line 58: |
Line 56: |
| CORRECTED LIMERICK GENERATING STATION, UNIT 2 TECHNICAL SPECIFICTION PAGE 3/4 3-11 | | CORRECTED LIMERICK GENERATING STATION, UNIT 2 TECHNICAL SPECIFICTION PAGE 3/4 3-11 |
|
| |
|
| ML24220A239 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO NAME AKlett KZeleznock KBernstein DATE 08/07/2024 08/08/2024 08/9/2024 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME HGonzalez AKlett DATE 08/12/2024 08/12/2024}} | | ML24220A239 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO NAME AKlett KZeleznock KBernstein DATE 08/07/2024 08/08/2024 08/9/2024 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME HGonzalez AKlett DATE 08/12/2024 08/12/2024}} |
Letter Sequence Other |
---|
EPID:L-2019-PMP-0058, Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component (Open) |
|
MONTHYEARML23090A1632023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component Project stage: Request ML23145A1972023-06-23023 June 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 255, 256, 257, 258, 259, and 260 Project stage: Other ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L Project stage: Response to RAI ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 Project stage: Other 2023-06-23
[Table View] |
|
---|
Category:Letter
MONTHYEARML24303A0902024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR 05000352/LER-2024-003, Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK1232024-06-18018 June 2024 Core Operating Limits Report Thermal Limit Exceeded for Unit 1 Fuel Bundle GGK123 ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 05000352/LER-2024-001, Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit2024-06-10010 June 2024 Leakage for the Unit 1 `B Outboard Main Steam Isolation Valve Exceeded Technical Specification Limit 05000352/LER-2024-002, Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker2024-06-10010 June 2024 Invalid Actuation Due to a Trip of 1B Reactor Protection System Circuit Breaker ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases 2024-09-06
[Table view] Category:Technical Specifications
MONTHYEARML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML23321A2362023-12-14014 December 2023 Issuance of Amendment Nos. 262 and 224 Adoption of TSTF-477, Revision 3 and Associated Technical Specification Changes ML23089A1242023-05-17017 May 2023 Issuance of Amd Nos. 261 & 223 Alternate Seismic Approach for Risk-Informed Categorization and Treatment of Structures, Systems a Components for NPR and Denial Proposed Alternative Defense in Depth and Pressure Boundary Component ML22272A0372023-01-0303 January 2023 Issuance of Amendment Nos. 258 and 220 Regarding Technical Specifications 3/4.8.1, AC Sources-Operating and 3/4.5.1, ECCS-Operating ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21181A0442021-09-28028 September 2021 Issuance of Amendment Nos. 253 and 215 Technical Specification Changes Related to Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report JAFP-21-0089, Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2021-09-27027 September 2021 Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML21032A2702021-02-22022 February 2021 Issuance of Amendment Nos. 252 and 214, Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, Revision 0, RPV WIC Enhancements ML21013A0052021-02-0404 February 2021 Issuance of Amendments to Adopt Technical Specifications Task Traveler TSTF-568, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20239A7252020-11-30030 November 2020 Issuance of Amendment Nos. 249 and 211 Adopt TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities ML20178A5142020-06-26026 June 2020 TS Change and Relief Requests Related to Safety Relief Valve Testing - Response to Request for Additional Information ML20034F6372020-02-28028 February 2020 Issuance of Amendment Nos. 240 and 203 to Implement TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML19207A0062019-10-0303 October 2019 Issuance of Amendment Nos. 237 and 200 Revise Technical Specifications to Allow Penetration Flow Path Isolation for Inoperable Isolation Actuation Instrumentation ML19078A0182019-05-24024 May 2019 Issuance of Amendment Nos. 235, 198, 14, 325, and 328 to Revise the Emergency Response Organization Staffing Requirements ML19029B2492019-02-12012 February 2019 Correction to Amendment No. 195 Revising Technical Specifications to Lower the Minimum Standby Liquid Control System Pump Flowrate ML19030A1472019-01-30030 January 2019 Supplemental Information Needed for Acceptance of Requested Licensing Action to Adopt Risk-Informed Completion Times in Accordance with TSTF-505, Revision 2 RS-18-020, Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement2018-06-15015 June 2018 Application to Revise Technical Specifications to Modify the APRM Channel Adjustment Surveillance Requirement ML18017A2012018-02-27027 February 2018 Issuance of Amendment Nos. 227 and 190 Revising Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control (CAC Nos. MF9967 and MF9968; EPID L-2017-LLA-0260) ML17200D0962017-07-19019 July 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, Rev. 2. ML17103A0812017-05-16016 May 2017 Issuance of Amendments to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-545 ML16335A0382016-12-29029 December 2016 Issuance of Amendments to Revise Technical Specification Snubber Requirements ML16041A0212016-03-15015 March 2016 Issuance of Amendment Safety Limit Minimum Critical Power Ratio Change ML15356A1402016-01-28028 January 2016 Issuance of Amendments Secondary Containment Access Openings ML15218A5012015-09-15015 September 2015 Issuance of Amendment Nos. 219 and 181 Proposed Change to Add New Limiting Conditions for Operation 3.0.5 and 3.0.6 ML15141A0582015-07-28028 July 2015 Issuance of Amendments Regarding Emergency Action Level Schemes (TAC Nos. MF4232-MF4251) ML15083A4032015-05-11011 May 2015 Issuance of Amendments Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML14344A6812015-01-0707 January 2015 Issuance of Amendments - Main Steam Line Flow-High Isolation Response Time ML14324A8082014-12-29029 December 2014 Issuance of Amendments - Leak Detection System Setpoint and Allowable Value Changes ML14308A1442014-11-0303 November 2014 License Amendment Request Proposed Change to Add New Limiting Conditions for Operations 3.0.5 and 3.0.6 ML0527800342014-10-20020 October 2014 Current Facility Operating License NPF-39, Technical Specifications, Revised 08/15/2018 ML14191B1802014-07-10010 July 2014 Application to Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process ML13214A0922014-03-26026 March 2014 Issuance of Amendments Elimination of Certain Technical Specifications Reporting Requirements ML13100A0202013-04-0909 April 2013 License Amendment Request to Eliminate Certain Technical Specifications Reporting Requirements ML1131802382011-11-10010 November 2011 Response to Request for Additional Information Concerning the License, Amendment Request Associated with the Reactivity Anomalies Surveillance ML1128700802011-10-12012 October 2011 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1117100072011-06-14014 June 2011 License Amendment Request to Include an Alternate Method of Verifying Drywell Unidentified Leakage ML1115401202011-06-0202 June 2011 License Amendment Request - Reactivity Anomalies Surveillance ML1109700662011-04-0606 April 2011 License Amendment Request to Revise Operability Requirements and Actions for RCS Leakage Instrumentation ML1035001802010-12-15015 December 2010 License Amendment Request - Safety Limit Minimum Critical Power Ratio Change ML1030603792010-10-29029 October 2010 Response to Request for Additional Information, License Amendment Request, Proposed Technical Specification Allowed Outage Time Extensions to Support Residual Heat Removal Service Water Maintenance ML1024304662010-08-31031 August 2010 License Amendment Request, Proposed Administrative Changes to Technical Specifications ML1018104342010-06-30030 June 2010 License Amendment Request - Table 3.3.2-2, Item 4e, HPCI Equipment Room Delta Temperature High Isolation Trip Setpoint and Allowable Value Changes ML1008503952010-03-25025 March 2010 Markup of Proposed Operating License, Technical Specifications & Updated Final Safety Analysis Report Pages ML0912800592009-04-17017 April 2009 Changes to Technical Specifications Bases, Including Changes Through 04/09/2009 ML0824703052008-08-28028 August 2008 Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497 ML0821207302008-08-27027 August 2008 Tech Spec Pages for Amendment 154 Increase in Emergency Diesel Generator Day Tank Minimum Fuel Volume ML0817802542008-08-0505 August 2008 Technical Specifications, Limerick Unit 1, Amendment 192, License NPF-39 2024-08-12
[Table view] |
Text
August 12, 2024
Mr. David P. Rhoades Senior Vice President President and Chief Nuclear Officer Constellation Energy Generation, LLC 4300 Winfield Rd.
Warrenville, IL 60555
SUBJECT:
LIMERICK GENERATING STATION, UNIT 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE 3/4 3-11 IN AMENDMENT NO. 225 (EPID L-2019-PMP-0058)
Dear David Rhoades:
The U.S. Nuclear Regulatory Commission (NRC) staff has identified typographical errors in the technical specifications issued in Amendment No. 225 (Agencywide Documents Access and Management System Accession No. ML24204A071) to Renewed Facility Operating License No. NPF-85 for the Limerick Generating Station (Limerick), Unit 2. The NRC staff is issuing this letter to correct the errors per the guidance in the NRC memorandum dated January 16, 1997 (ML103260096), which is derived from the Staff Requirements Memorandum (SRM, ML003754054) for SECY 238 (ML20134M324).
By letter dated July 29, 2024, the NRC staff issued Amendment No. 225 and its related safety evaluation for Limerick, Unit 2 in response to the license amendment request from Constellation Energy Generation, LLC (the licensee) dated June 13, 2024 (ML24165A264), as supplemented by letter dated July 19, 2024 (ML24201A166). The Limerick, Unit 2 technical specification page 3/4 3-11 enclosed in Amendment No. 225 contained inadvertent typographical errors (i.e., the incorrect prior amendment numbers appeared in the footer and the page was transposed from landscape to portrait format). To correct these errors, the NRC staff is re-issuing Limerick, Unit 2 technical specification page 3/4 3-11 to correct the list of prior amendment numbers and to transpose the page to landscape format.
The NRC staff determined that these editorial corrections to the technical specifications do not change any of the NRC staffs conclusions in its safety evaluation regarding the acceptability of the changes approved in Amendment No. 225 (the safety evaluation did not address the amendment numbers or page format), nor do the corrections affect the applicable no significant hazards considerations published in the Federal Register on June 25, 2024 (89 FR 53124).
Accordingly, the enclosure to this letter has a copy of the revised and corrected Limerick, Unit 2 technical specification page 3/4 3-11.
D. Rhoades
If you have any questions, please contact me at 301-415- 0489 or by email to Audrey.Klett@nrc.gov.
Sincerely,
/RA/
Audrey Klett, Senior Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-353
Enclosure:
Corrected Technical Specification Page
cc: Listserv
ENCLOSURE
CORRECTED LIMERICK GENERATING STATION, UNIT 2 TECHNICAL SPECIFICTION PAGE 3/4 3-11
ML24220A239 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA OGC - NLO NAME AKlett KZeleznock KBernstein DATE 08/07/2024 08/08/2024 08/9/2024 OFFICE NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME HGonzalez AKlett DATE 08/12/2024 08/12/2024