Revision as of 11:55, 26 February 2018
Letter Sequence Request | |
---|---|
CAC:MF9497, (Approved, Closed) | |
MONTHYEARML16354A4242016-12-14014 December 2016
[Table View]License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 Project stage: Request ML17088A7192017-03-29029 March 2017 E-mail from R.Guzman to W.Craft - Millstone Power Station, Unit 2 Verbal Authorization by the NRC Staff - Relief Request No. RR-04-25 Project stage: Acceptance Review ML17090A1102017-03-29029 March 2017 ASME Section XI Relief Request RR-04-25 Project stage: Request ML17135A2962017-05-25025 May 2017 Alternative Relief Request RR-04-25 Boric Acid Pump P-19B Stuffing Box Cover Project stage: Approval 2017-03-29 |
ML17090A110 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 03/29/2017 |
From: | Sartain M D Dominion Nuclear Connecticut |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
17-127, RR-04-25 | |
Download: ML17090A110 (10) | |
Similar Documents at Millstone | |
---|---|
Category:Code Relief or Alternative
MONTHYEARML23188A0432023-07-31031 July 2023
[Table view]Authorization and Safety Evaluation for Alternative Request No. IR-04-11 ML22201A5082022-07-28028 July 2022 Authorization and Safety Evaluation for Alternative Request No. IR-04-09 ML21284A0062021-10-29029 October 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-04 and IR-4-02 ML21174A0202021-08-0202 August 2021 Relief Request for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML21167A3552021-07-16016 July 2021 Authorization and Safety Evaluation for Alternative Request No. RR-05-06 ML20312A0012020-12-10010 December 2020 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML20312A0022020-12-10010 December 2020 Relief Request for Limited Coverage Examinations Performed in the Third 10-Year Inservice Inspection Interval (EPID L-2020-LLR-0027 Through L-2020-LLR-0032) ML20287A4712020-10-20020 October 2020 Proposed Alternative RR-05-05 to the Requirements of the ASME Code Containment Unbonded Post-Tensioning System Inservice Inspection Requirements ML20189A2062020-07-16016 July 2020 Relief Request IR-4-03 Concerning Non-Code Methodology to Demonstrate Structural Integrity of Class 3 Moderate-Energy Piping ML20080K5082020-03-24024 March 2020 Alternative Request RR-05-03 for the Fifth 10-Year Inservice Inspection Interval ML19340A0012019-12-18018 December 2019 Proposed Alternative Request IR-4-01 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML19338G3722019-12-18018 December 2019 Alternative Requests RR-05-01 and RR-05-02 for the Fifth 10-Year Inservice Inspection Interval ML19340A0002019-12-13013 December 2019 Relief Request IR-3-39, Proposed Alternative to ASME Code Weld Preheat Requirements ML19275D2522019-09-24024 September 2019 Alternative Request RR-05-03, Extension of ASME Code Case N-770-2 Volumetric Inspection Frequency for Reactor Coolant Pump Inlet and Outlet Nozzle Dissimilar Metal Butt Welds ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18290A6022018-11-13013 November 2018 Alternative Requests Related to the Fifth and Fourth 10-Year Interval Pump, Valve, and Snubber Inservice Testing Programs, Respectively (EPID L-2018-LLR- 0012 Through EPID L-2018-LLR-0022) ML18252A0032018-09-17017 September 2018 Alternative Requests RR-04-27 and IR-3-38 for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography ML18066A5222018-02-28028 February 2018 Proposed Alternative Requests RR-04-27 and IR-3-38 Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography in Accordance with 10 CFR 50.55(z)(1) ML17132A1872017-05-25025 May 2017 Alternative Relief Requests RR-04-24 and IR-3-30: Reactor Pressure Vessel Threads in Flange ML17135A2962017-05-25025 May 2017 Alternative Relief Request RR-04-25 Boric Acid Pump P-19B Stuffing Box Cover ML17122A3742017-05-0303 May 2017 Alternative Relief Request RR-04-26 Boric Acid Pump P-19B Stuffing Box Cover ML17125A2522017-04-28028 April 2017 ASME Section XI Relief Request RR-04-26 ML17090A1102017-03-29029 March 2017 ASME Section XI Relief Request RR-04-25 ML16363A0892017-01-23023 January 2017 Alternative Relief RR-04-23 and IR-3-28 from the Requirements of ASME Code Section XI Regarding Radiographic Examinations ML16277A6782016-10-18018 October 2016 Alternative Request RR-04-22 to Implement Extended Reactor Vessel Inservice Inspection Interval ML16172A1352016-07-13013 July 2016 Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inservice Inspection Interval ML16038A0012016-02-16016 February 2016 Alternative Request IR-3-27 for Implementation of Extended Reactor Vessel Inservice Inspection Interval ML15257A0052015-09-21021 September 2015 Relief from the Requirements of ASME Code Section XI Regarding Radiographic Examinations ML15216A3632015-07-30030 July 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval ML15216A3592015-07-30030 July 2015 ASME Section XI Inservice Inspection Program Relief Requests for Limited Coverage Examinations Performed in the Fourth 10-Year Inspection Interval ML15082A4092015-04-24024 April 2015 Alternative Use of Weld Overlay as Repair and Mitigation Technique ML14217A2032014-09-0404 September 2014 Relief from the Requirements of the ASME Code Section XI, Requirements for Repair/Replacement of Class 3 Service Water Valves (Tac No. MF1314) ML14163A5862014-07-10010 July 2014 Relief from the Inservice Testing Requirements of American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants ML14091A9732014-04-0404 April 2014 Issuance of Relief Request RR-04-16 Regarding Use of Encoded Phased Array Ultrasonic Examination in Lieu of Radiography ML1130001002011-11-0909 November 2011 Issuance of Relief Request RR-04-12 Regarding the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange ML11234A0772011-08-19019 August 2011 Relief Request RR-04-12 for the Temporary Non-Code Compliant Condition of the Class 3 Service Water System 10 Inch Emergency Diesel Generator Supply Piping Flange ML1118810292011-07-27027 July 2011 Issuance of Relief Request RR-04-04 Regarding Use of Alternative Pressure Testing Requirements ML1118706002011-07-22022 July 2011 Issuance of Relief Request RR-04-05 Regarding Use of Alternative Pressure Testing Requirements ML1106800802011-03-24024 March 2011 Issuance of Relief Request lR-3-14 -- Use of Risk-Informed Inservice Inspection Program Plan ML1014700992010-06-11011 June 2010 Issuance of Relief Request IR-3-05 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix Viii ML1012412192010-05-13013 May 2010 Relief Request IR-3-02 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML1010400422010-04-29029 April 2010 Issuance of Relief Request lR-3-11 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML0935702372010-04-26026 April 2010 Issuance of Relief Request RR-89-67 Regarding the Repair of Reactor Coolant Pump Seal Cooler Return Tubing and Weld ML1011301872010-04-19019 April 2010 ASME Section XI Inservice Inspection Program Relief Request for Limited Coverage Examinations Performed in the Second 10-Year Inspection Interval ML1008407382010-04-15015 April 2010 Issuance of Relief Requests IR-3-13 Regarding Use of American Society of Mechanical Engineering Code, Section XI, 2004 Edition ML1006801182010-04-0606 April 2010 Issuance of Relief Request IR-3-01 Regarding Use of American Society of Mechanical Engineering Code, Section XI, Appendix Viii ML1009002002010-03-30030 March 2010 Relief Requests RR-04-02, Alternative VT-2 Pressure Testing Requirements for the Lower Portion of the Reactor Pressure Vessel, and RR-04-03, Alternative Evaluation Criteria for Code Case N-513-2, Temporary Acceptance of Flaws In.. ML1006404462010-03-12012 March 2010 Issuance Relief ML1005402202010-02-19019 February 2010 Relief Request IR-3-01 Supplemental Information Re Snubber Inspection and Testing for Third 10-Year Interval ML0923901412009-08-24024 August 2009 Relief Request for Millstone Power Station, Unit 3, Relief Request IR-3-04, Response to Request for Additional Information for Alternative Brazed Joint Assessment Methodology 2023-07-31 Category:Letter MONTHYEARIR 05000336/20240032024-11-0707 November 2024
[Table view]Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04 |