| | number = ML22252A035 | | | number = ML23103A264 |
| | issue date = 09/12/2022 | | | issue date = 04/13/2023 |
| | title = PVNGS Units 1, 2, and 3 - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000528/2022401; 05000529/2022401; 05000530/2022401 | | | title = Cyber Security Inspection Report 05000528/2022401 and 05000529/2022401 and 05000530/2022401 |
| | author name = Graves S | | | author name = Taylor N |
| | author affiliation = NRC/RGN-IV/DORS/EB2 | | | author affiliation = NRC/RGN-IV/DORS/EB2 |
| | addressee name = Mclaughlin M | | | addressee name = Mclaughlin M |
Line 9: |
Line 9: |
| | docket = 05000528, 05000529, 05000530 | | | docket = 05000528, 05000529, 05000530 |
| | license number = NPF-041, NPF-051, NPF-074 | | | license number = NPF-041, NPF-051, NPF-074 |
| | contact person = Graves S | | | contact person = |
| | document report number = IR 2022401 | | | document report number = IR 2022401 |
| | document type = Inspection Plan, Letter | | | document type = Letter |
| | page count = 11 | | | page count = 3 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:September 12, 2022 | | {{#Wiki_filter:April 12, 2023 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| PALO VERDE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 - | | PALO VERDE NUCLEAR GENERATING STATION - CYBER SECURITY INSPECTION REPORT 05000528/2022401 AND 05000529/2022401 AND 05000530/2022401 |
| INFORMATION REQUEST FOR THE CYBERSECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000528/2022401; 05000529/2022401; 05000530/2022401
| |
|
| |
|
| ==Dear Mr. McLaughlin:== | | ==Dear Mike McLaughlin:== |
| On December 5, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline inspection in accordance with Inspection Procedure (IP) 71130.10 Cybersecurity, at your Palo Verde Nuclear Generating Station, Units 1, 2, and 3. The inspection objectives are to provide assurance that the digital computer and communication systems and networks associated with safety, security, or emergency preparedness (SSEP) functions are adequately protected against cyberattacks in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 73.54 and your approved cybersecurity plan (CSP), and to verify that any CSP changes and reports have been made in accordance with 10 CFR 50.54(p). | | On December 8, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On March 7, 2023, the NRC inspectors discussed the results of this inspection with Mr. Cary Harbor, Vice President, Nuclear Regulatory & Oversight, and other members of your staff. The results of this inspection are documented in the enclosed report. |
|
| |
|
| Experience has shown that baseline inspections are extremely resource intensive, both for the NRC inspectors and licensee staff. To minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.
| | Five findings of very low security significance (Green) are documented in this report, all of which involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy. |
|
| |
|
| The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should be made available via digital media (CD/DVD) or an online document repository and delivered/available to the regional office no later than October 10, 2022. The inspection team will review this information and, by October 31, 2022, will request the specific items that should be provided for review.
| | If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: |
| | Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde Nuclear Generating Station. |
|
| |
|
| The second group of requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your cyber security program selected for review. This information will be requested for review in the regional office prior to the inspection by November 14, 2022, as identified above. The third group of requested documents consists of additional items that the inspection team will review, or need access to, during the inspection. Please have this information available by the first day of the onsite inspection, December 5, 2022. | | The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.1] - Resources, one [H.5] - Work Management, one [H.9] - Training, and one [P.2] - Evaluation. |
|
| |
|
| The fourth group of information aids the inspection team in tracking issues identified during the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all requested documents are up to date and complete to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
| | If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde Nuclear Generating Station. |
|
| |
|
| The lead inspector for this inspection is Sam Graves. We understand that our regulatory contact for this inspection is Sarah Kane of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 817-200-1102 or via e-mail at samuel.graves@nrc.gov Paperwork Reduction Act Statement This letter contains mandatory information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
| | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. |
| approved these information collections under approval number 3150-0011. The burden to the public for these information collections is estimated to average 40 hour(s) per response. Send comments regarding this information collection to the FOIA, Library and Information Collection Branch, Office of the Chief Information Officer, Mail Stop: T6-A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011)
| |
| OMB, Washington, DC 20503.
| |
|
| |
|
| Public Protection Notification The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
| | The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). |
|
| |
|
| In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | Sincerely, Signed by Taylor, Nicholas on 04/12/23 Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000528; 05000529; and 05000530 License Nos. NPF-41, NPF-51, and NPF-74 Enclosure: |
| | | As stated (U) cc w/o encl: Distribution via LISTSERV ML23094A288(Cover letter w/ enclosure(s)) |
| Sincerely, Signed by Graves, Samuel on 09/12/22 Sam Graves, Senior Reactor Inspector Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000528, 05000529, 05000530 License Nos. NPF-41, NPF-51, NPF-74 Enclosure: Palo Verde Nuclear Generating Station, Units 1, 2, And 3 | | Non-Public Designation Category: MD 3.4 Non-Public (A.3 - A.7 or B.1) |
| | | ADAMS ACCESSION NUMBER: ML23103A264 (Cover letter) |
| ML22252A035 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
| | Entire Report: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE SRI:DORS/EB2 SRI:DORS/EB2 C:DORS/EB2 NAME S. Graves S. Makor N. Taylor SIGNATURE STG STM NHT DATE 04/11/23 04/12/23 04/12/23 |
| By: Yes No Publicly Available Sensitive NRC-002 OFFICE RIV:SRI/DORS/EB2 NAME S. Graves SIGNATURE /RA/
| |
| DATE 9/12/2022
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST Inspection Report: 05000528/2022401; 05000529/2022401; 05000530/2022401 Inspection Dates: Week of December 5, 2022 Inspection Procedure: IP 71130.10, CYBERSECURITY Reference: ML21330A088, Guidance Document for Development of the Request for Information (RFI) and Notification Letter for IP 71130.10 Cyber Security Inspection, Revision 2 NRC Inspectors: Sam Graves, Lead Shiattin Makor 817-200-1102 817-200-1507 samuel.graves@nrc.gov shiattin.Makor@nrc.gov NRC Contractors: Al Konkal Trace Coleman 561-989-0210 301-415-7000 alan.konkal@nrc.gov trace.coleman@nrc.gov I. Information Requested for In-Office Preparation This initial request for information (i.e., Table RFI #1) concentrates on providing the inspection team with information necessary to select appropriate components and cyber security program elements to develop a site-specific inspection plan. The first RFI is used to identify the critical digital assets or systems to be chosen as the sample set required to be inspected by the cyber-security IP. The first RFIs requested information is specified below in Table RFI #1.
| |
| | |
| Please provide the information requested in Table RFI #1 to the regional office by October 10, 2022, or sooner, to facilitate the selection of the specific items for review.
| |
| | |
| The inspection team will examine the documentation from the first RFI and select specific systems and equipment to provide a more focused follow-up request to develop the second RFI.
| |
| | |
| The inspection team will submit the specific systems and equipment list to your staff by October 31, 2022, which will be utilized to evaluate the equipment, defensive architecture, and the areas of the licensees cyber security program for review.
| |
| | |
| Please provide the information requested by the second RFI to the regional office by Enclosure
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST November 14, 2022. All requests for information shall follow the guidance document referenced above. For information requests that have more than ten (10) documents, please provide a compressed (i.e., Zip) file of the documents.
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST The required Table RFI #1 information shall be provided on digital media (CD/DVD)) or an online document repository to the lead inspector by October 10, 2022. Please provide four copies of each media submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. The media (CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
| |
| | |
| Table RFI #1 Section 3, Paragraph Number/Title: IP Ref. Items 1 A list of all Identified Critical Systems and Critical Digital Assets, - Overall highlight/note any additions, deletions, reclassifications due to new guidance from white papers, changes to NEI 10-04, 13-10, etc. since the last cyber security inspection.
| |
| | |
| 2 A list of EP and Security onsite and offsite digital communication systems Overall 3 Network Topology Diagrams to include information and data flow for critical Overall systems in levels 2, 3 and 4 (If available)
| |
| 4 Ongoing Monitoring and Assessment program documentation 03.01(a)
| |
| 5 The most recent Effectiveness Analysis of the Cyber Security Program 03.01(b)
| |
| 6 Vulnerability screening/assessment and scan program documentation 03.01(c)
| |
| 7 Cyber Security Incident response documentation, including incident 03.02(a) and detection, response, and recovery documentation as well as contingency 03.04(b)
| |
| plan development, implementation and including any program documentation that requires testing of security boundary device functionality 8 Device Access and Key Control documentation 03.02(d)
| |
| 9 Password/Authenticator documentation 03.02(d)
| |
| 10 User Account/Credential documentation 03.02(d)
| |
| 11 Portable Media and Mobile Device control documentation, including kiosk 03.02(e)
| |
| security control assessment/documentation 12 Design change/modification program documentation and a list of all cyber- 03.03(a)
| |
| related design changes completed since the last cyber security inspection, including either a summary describing the design change or the 50.59 documentation for the change.
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST 13 Supply Chain Management documentation including any security impact 03.03(a), (b)
| |
| analysis for new acquisitions and (c)
| |
| 14 Configuration Management documentation including any security impact 03.03(a) and analysis performed due to configuration changes since the last inspection (b)
| |
| 15 Cyber Security Plan and any 50.54(p) analysis to support changes to the 03.04(a)
| |
| plan since the last inspection 16 Cyber Security Metrics tracked (if applicable) 03.06 (b)
| |
| 17 Provide documentation describing any cyber security changes to the access Overall authorization program since the last cyber security inspection.
| |
| | |
| 18 Provide a list of all procedures and policies provided to the NRC with their Overall descriptive name and associated number (if available)
| |
| 19 Performance testing report (if applicable) 03.06 (a)
| |
| | |
| In addition to the above information please provide the following:
| |
| (1) Electronic copy of the UFSAR and technical specifications. | |
| | |
| (2) Name(s) and phone numbers for the regulatory and technical contacts.
| |
| | |
| (3) Current management and engineering organizational charts.
| |
| | |
| (4) Implementing and program procedures in a single folder.
| |
| | |
| Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by October 31, 2022, for the second RFI (i.e., RFI
| |
| #2).
| |
| | |
| II. Additional Information Requested to be Available Prior to Inspection.
| |
| | |
| As stated in Section I above, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by October 31, 2022, for the second RFI (i.e., RFI #2). The second RFI will request additional information required to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the cybersecurity inspection. The additional information requested for the specific systems and equipment is identified in Table RFI #2. All requested information shall follow the guidance document referenced above.
| |
| | |
| The Table RFI #2 information shall be provided on digital media (CD/DVD) or an online document repository to the lead inspector by November 14, 2022. Please provide four copies of each media (CD/DVD) submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file. The digital media (CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
| |
| | |
| Table RFI #2 Section 3, IP Ref.
| |
| | |
| Paragraph Number/Title: Items For the system(s) chosen for inspection provide:
| |
| 1 Ongoing Monitoring and Assessment activity performed on the system(s) 03.01(a)
| |
| 2 All Security Control Assessments for the selected system(s) 03.01(a)
| |
| All vulnerability screenings/assessments associated with, or scans 3 03.01(c)
| |
| performed on the selected system(s) since the last cyber security inspection
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST Table RFI #2 Section 3, IP Ref.
| |
| | |
| Paragraph Number/Title: Items Documentation (including configuration files and rules sets) for Network-based Intrusion Detection/Protection Systems (NIDS/NIPS), Host-based 4 03.02(b)
| |
| Intrusion Detection Systems (HIDS), and Security Information and Event Management (SIEM) systems for system(s) chosen for inspection Documentation (including configuration files and rule sets) for intra-security 5 03.02(c)
| |
| level firewalls and boundary devices used to protect the selected system(s)
| |
| Copies of all periodic reviews of the access authorization list for the selected 6 03.02(d)
| |
| systems since the last inspection 7 Baseline configuration data sheets for the selected CDAs 03.03(a)
| |
| Documentation on any changes, including Security Impact Analyses, 8 03.03(b)
| |
| performed on the selected system(s) since the last inspection Copies of the purchase order documentation for any new equipment 9 03.03(c)
| |
| purchased for the selected systems since the last inspection Copies of any reports/assessment for cyber security drills performed since 03.02(a)
| |
| | |
| the last inspection. 03.04(b)
| |
| Copy of the individual recovery plan(s) for the selected system(s) including 03.02(a)
| |
| | |
| documentation of the results the last time the backups were executed. 03.04(b)
| |
| Corrective actions taken as a result of cyber security incidents/issues to 12 include previous NRC violations and Licensee Identified Violations since the 03.04(d)
| |
| last cyber security inspection III. Information Requested to be Available on First Day of Inspection For the specific systems and equipment identified in Section II above, provide the following RFI (i.e., Table Onsite Week) on digital media (CD/DVD) or an online document repository by December 5, 2022, the first day of the inspection. All requested information shall follow the guidance document referenced above.
| |
| | |
| Please provide four copies of each passive digital media (CD/DVD) submitted (i.e., one for each inspector/contactor). The preferred file format for all lists is a searchable Excel spreadsheet file.
| |
| | |
| The digital media (CDs/DVDs) should be indexed and hyper-linked to facilitate ease of use. If you have any questions regarding this information, please call the inspection team leader as soon as possible.
| |
| | |
| Table Onsite Week Section 3, Paragraph Number/Title: Items Any cyber security event reports submitted in accordance with 1 03.04(a)
| |
| 10 CFR 73.77 since the last cyber security inspection Updated Copies of corrective actions taken as a result of cyber security incidents/issues, to include previous NRC violations and 2 03.04(d)
| |
| Licensee Identified Violations since the last cyber security inspection, as well as vulnerability-related corrective actions In addition to the above information please provide the following:
| |
| (1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them:
| |
| a. Updated Final Safety Analysis Report, if not previously provided; b. Original FSAR Volumes; c. Original SER and Supplements; d. FSAR Question and Answers; e. Quality Assurance Plan; f. Technical Specifications, if not previously provided; g. Latest IPE/PRA Report; and (2) Vendor Manuals, Assessments and Corrective Actions:
| |
| a. The most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security Quality Assurance (QA) audit and/or self-assessment.
| |
| | |
| IV. Information Requested To Be Provided Throughout the Inspection (1) Copies of any corrective action documents generated as a result of the inspection teams questions or queries during the inspection.
| |
| | |
| PALO VERDE NUCLEAR GENERATING STATION CYBERSECURITY INSPECTION DOCUMENT REQUEST (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).
| |
| | |
| If you have any questions regarding the information requested, please contact the inspection team leader.
| |
| | |
| 7
| |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARML24295A0362024-10-23023 October 2024 Regulatory Audit Plan in Support of Relief Request No. 71; Resubmittal of Relief Request-30 ML24296B2152024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 03: Alternative Request Allowing Removal of the Lower Acceptance Criteria Threshold from Solenoid-Operated Valves ML24296B2142024-10-22022 October 2024 Transmittal of Valve Relief Request (VRR) - 02: Alternative Request Allowing Normally Closed Valves with a Safety Function to Close to Be Exercise Tested Once Per Refueling Cycle IR 05000528/20244022024-10-22022 October 2024 Security Baseline Inspection Report 05000528/2024402 and 05000529/2024402 and 05000530/2024402 ML24296B2172024-10-18018 October 2024 Submittal of Unit 1 Core Operating Limits Report, Revision 34, Unit 2 Core Operating Limits Report, Revision 26, and Unit 3 Core Operating Limits Report, Revision 3 ML24292A2192024-10-18018 October 2024 Core Operating Limits Report Revision 34, 26 and 33 ML24292A0322024-10-17017 October 2024 Th Refueling Outage Steam Generator Tube Inspection Report ML24285A2562024-10-11011 October 2024 License Renewal - Alloy 600 Management Program Plan Response to Request for Additional Information IR 07200044/20244012024-10-0808 October 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07200044/2024401 ML24269A1542024-09-27027 September 2024 Summary of Presubmittal Meeting with Arizona Public Service Company to Discuss Proposed Life-of-Plant Alternatives for a Pressurizer Thermowell Nozzle Repair at Palo Verde Nuclear Generating Station, Unit 1 ML24262A0972024-09-23023 September 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000529/2024011) ML24241A2542024-08-28028 August 2024 Inservice Inspection Request for Information ML24241A2782024-08-28028 August 2024 License Amendment Request to Revise the Technical Specifications 3.5.1 and 3.5.2 Safety Injection Tank Pressure Bands, and to Use GOTHIC Code ML24240A2682024-08-27027 August 2024 Transmittal of Technical Specification Bases Revision 79 IR 05000528/20240052024-08-22022 August 2024 Updated Inspection Plan for Palo Verde Nuclear Generating Station - Units 1, 2, and 3 (Report 05000528/2024005, 05000529/2024005, 05000530/2024005) 05000530/LER-2024-001-01, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-08-21021 August 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24208A0612024-08-20020 August 2024 Issuance of Amendment Nos. 224, 224, and 224 Regarding Revision to Technical Specifications 3.5.1, 3.5.2 and 3.6.5 IR 05000528/20244042024-08-0808 August 2024 Cybersecurity Inspection Report 05000528/2024404, 05000529/2024404 and 05000530/2024404 ML24213A3232024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 71: Re-Submittal of RR-30 ML24213A3292024-07-31031 July 2024 Transmittal of Relief Request (RR) No. 72: Re-Submittal of RR-39 IR 05000528/20240022024-07-29029 July 2024 Integrated Inspection Report 05000528/2024002 and 05000529/2024002 and 05000530/2024002 ML24173A3302024-07-24024 July 2024 Pressurizer Surge Line Inspection Program ML24159A4702024-07-17017 July 2024 Issuance of Amendment Nos. 223, 223, and 223 Revision to Technical Specifications 3.5.1 and 3.5.2 Using Risk Informed Process for Evaluations ML24198A0662024-07-16016 July 2024 Program Review - Simulator Testing Methodology ML24193A3442024-07-11011 July 2024 Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R24 ML24129A0522024-07-0303 July 2024 Review of the Spring 2023 Steam Generator Tube Inspection Report ML24177A3212024-06-25025 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Transportable Storage Canisters Identification Numbers AMZDFX180, AMZDFX181, AMZDFX182 Vertical Concrete Cask Identification Nu 05000530/LER-2024-002, Invalid Specified System Actuation of Train B Emergency Diesel Generator2024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator IR 05000528/20240042024-06-25025 June 2024 Notification of Inspection (NRC Inspection Report 05000528/2024004, 05000529/2024004, 05000530/2024004) ML24177A3222024-06-25025 June 2024 Invalid Specified System Actuation of Train B Emergency Diesel Generator ML24170A9962024-06-18018 June 2024 Response to Second Request for Additional Information to Revise Technical Specifications (TS) 3.5.1, Safety Injection Tanks (Sits) – Operating, TS 3.5.2, Safety Injection Tanks (Sits) – Shutdown a IR 05000528/20243012024-06-17017 June 2024 NRC Examination Report 05000528/2024301; 05000529/2024301; 05000530/2024301 ML24129A2062024-06-14014 June 2024 Issuance of Amendment Nos. 222, 222, and 222 Revision to Technical Specifications to Adopt TSTF-266-A 05000530/LER-2024-001, Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation2024-06-0505 June 2024 Inoperable Boron Dilution Alarm System(Bdas) with Technical Specification Violation ML24159A0262024-06-0303 June 2024 Annual Report of Guarantee of Payment of Deferred Premium 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater2024-05-23023 May 2024 Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater ML24135A2482024-05-14014 May 2024 Response to Second Request for Additional Information to Proposed Method to Manage Environmentally Assisted Fatigue for the Pressurizer Surge Line ML24164A2582024-05-0909 May 2024 10-PV-2024-04 Post-Exam Comments ML24128A2702024-05-0707 May 2024 Docket Nos. Stn 50-528/529/530 - Response to NRC Regulatory Issue Summary (RIS) 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24129A1482024-05-0707 May 2024 And Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Casks with Applied Changes IR 05000528/20240012024-05-0202 May 2024 Independent Spent Fuel Storage Installation, Integrated Inspection Report 05000528/2024001, 05000529/2024001, 05000530/2024001, 07200044/2024001, and Exercise of Enforcement Discretion ML24119A0022024-04-26026 April 2024 2023 Annual Environmental Operating Report ML24116A2082024-04-24024 April 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report 2023 IR 05000528/20244012024-04-22022 April 2024 Security Baseline Inspection Report 05000528/2024401 and 05000529/2024401 and 05000530/2024401 (Cover Letter) ML24109A0712024-04-22022 April 2024 NRC Initial Operator Licensing Examination Approval 05000528/2024301, 05000529/2024301, and 05000530/2024301 ML24112A0012024-04-19019 April 2024 Core Operating Limits Report, Revision 32 ML24108A1982024-04-16016 April 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Casks with Applied Changes Authorized by an Amended Certificate of Compliance ML24103A2482024-04-12012 April 2024 Emergency Core Cooling System Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for 2023 ML24131A0972024-04-10010 April 2024 Annual Radiological Environmental Operating Report 2023 ML24096A2202024-04-0505 April 2024 Transmittal of Technical Specification Bases Revision 78 2024-09-27
[Table view] |
Text
April 12, 2023
SUBJECT:
PALO VERDE NUCLEAR GENERATING STATION - CYBER SECURITY INSPECTION REPORT 05000528/2022401 AND 05000529/2022401 AND 05000530/2022401
Dear Mike McLaughlin:
On December 8, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Palo Verde Nuclear Generating Station. On March 7, 2023, the NRC inspectors discussed the results of this inspection with Mr. Cary Harbor, Vice President, Nuclear Regulatory & Oversight, and other members of your staff. The results of this inspection are documented in the enclosed report.
Five findings of very low security significance (Green) are documented in this report, all of which involved violations of NRC requirements. We are treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2 of the Enforcement Policy.
If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde Nuclear Generating Station.
The following cross cutting aspects were assigned to findings using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: one [H.1] - Resources, one [H.5] - Work Management, one [H.9] - Training, and one [P.2] - Evaluation.
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Palo Verde Nuclear Generating Station.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely, Signed by Taylor, Nicholas on 04/12/23 Nicholas H. Taylor, Chief Engineering Branch 2 Division of Operating Reactor Safety Docket Nos. 05000528; 05000529; and 05000530 License Nos. NPF-41, NPF-51, and NPF-74 Enclosure:
As stated (U) cc w/o encl: Distribution via LISTSERV ML23094A288(Cover letter w/ enclosure(s))
Non-Public Designation Category: MD 3.4 Non-Public (A.3 - A.7 or B.1)
ADAMS ACCESSION NUMBER: ML23103A264 (Cover letter)
Entire Report: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter Only: Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE SRI:DORS/EB2 SRI:DORS/EB2 C:DORS/EB2 NAME S. Graves S. Makor N. Taylor SIGNATURE STG STM NHT DATE 04/11/23 04/12/23 04/12/23