ML21147A373: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:July 19, 2021 Dr. David M. Slaughter, President and Reactor Administrator Aerotest Operations, Inc. | ||
3455 Fostoria Way San Ramon, CA 94583 | |||
==SUBJECT:== | |||
AEROTEST OPERATIONS, INC. - CORRECTION OF LETTERS REGARDING CLOSURE OF CONFIRMATORY ACTION LETTER NO. NRR-04-003 AND REVIEW OF PHYSICAL SECURITY PLAN | |||
==Dear Dr. Slaughter:== | |||
By {{letter dated|date=January 7, 2021|text=letter dated January 7, 2021}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21004A079), the U.S. Nuclear Regulatory Commission (NRC) staff notified Aerotest Operations, Inc. (Aerotest) of the approval of the physical security plan (PSP) for the Aerotest Radiography and Research Reactor (ARRR), which Aerotest had submitted by {{letter dated|date=September 28, 2020|text=letter dated September 28, 2020}} (ADAMS Accession No. ML20276A247). By {{letter dated|date=January 28, 2021|text=letter dated January 28, 2021}} (ADAMS Accession No. ML21012A201), as a follow-up to the NRC staffs approval of the ARRR PSP, the NRC staff notified Aerotest that it had closed confirmatory action letter No. NRR-04-003, issued February 17, 2004 (ADAMS Accession No. ML033510264), which had formalized commitments to implement site-specific compensatory measures related to security and safeguards. | |||
The NRC staffs letters dated January 7 and 28, 2021, indicated that the approved PSP, which was submitted by Aerotests {{letter dated|date=September 28, 2020|text=letter dated September 28, 2020}}, was post-dated October 1, 2020. | |||
However, the NRC staff subsequently noted that the correct date of the PSP submitted by {{letter dated|date=September 28, 2020|text=letter dated September 28, 2020}}, is also September 28, 2020. Aerotests NRC-approved PSP is therefore the document entitled Security Plan for ARRR, dated September 28, 2020. This letter corrects the October 1, 2020, date provided in the NRC staffs January 7 and 28, 2021, letters. | |||
D. Slaughter If you have any questions, please contact Mr. Edward Helvenston at 301-415-4067, or by e-mail to Edward.Helvenston@nrc.gov. | |||
Sincerely, Signed by Taylor, Robert on 07/19/21 Robert M. Taylor, Deputy Office Director for New Reactors Office of Nuclear Reactor Regulation Docket No. 50-228 License No. R-98 cc: | |||
California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 | |||
ML21147A373 NRR-106 OFFICE NRR/DANU/UNPL/PM NRR/DANU/UNPO/SS NRR/DANU/UNPO/LA NRR/DANU/UNPO/BC NAME EHelvenston MTakacs NParker TTate DATE 06/17/2021 06/17/2021 6/22/2021 06/22 /2021 OFFICE NRR/DANU/UNPL/BC NRR/DANU/D NRR/DD NAME JBorromeo MShams RTaylor DATE 06/29/2021 06/29/2021 07/19/2021}} |
Latest revision as of 11:42, 19 January 2022
ML21147A373 | |
Person / Time | |
---|---|
Site: | Aerotest |
Issue date: | 07/19/2021 |
From: | Renee Taylor Office of Nuclear Reactor Regulation |
To: | Slaughter D Aerotest |
Helvenston E | |
References | |
NRR-04-003 | |
Download: ML21147A373 (3) | |
Text
July 19, 2021 Dr. David M. Slaughter, President and Reactor Administrator Aerotest Operations, Inc.
3455 Fostoria Way San Ramon, CA 94583
SUBJECT:
AEROTEST OPERATIONS, INC. - CORRECTION OF LETTERS REGARDING CLOSURE OF CONFIRMATORY ACTION LETTER NO. NRR-04-003 AND REVIEW OF PHYSICAL SECURITY PLAN
Dear Dr. Slaughter:
By letter dated January 7, 2021 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21004A079), the U.S. Nuclear Regulatory Commission (NRC) staff notified Aerotest Operations, Inc. (Aerotest) of the approval of the physical security plan (PSP) for the Aerotest Radiography and Research Reactor (ARRR), which Aerotest had submitted by letter dated September 28, 2020 (ADAMS Accession No. ML20276A247). By letter dated January 28, 2021 (ADAMS Accession No. ML21012A201), as a follow-up to the NRC staffs approval of the ARRR PSP, the NRC staff notified Aerotest that it had closed confirmatory action letter No. NRR-04-003, issued February 17, 2004 (ADAMS Accession No. ML033510264), which had formalized commitments to implement site-specific compensatory measures related to security and safeguards.
The NRC staffs letters dated January 7 and 28, 2021, indicated that the approved PSP, which was submitted by Aerotests letter dated September 28, 2020, was post-dated October 1, 2020.
However, the NRC staff subsequently noted that the correct date of the PSP submitted by letter dated September 28, 2020, is also September 28, 2020. Aerotests NRC-approved PSP is therefore the document entitled Security Plan for ARRR, dated September 28, 2020. This letter corrects the October 1, 2020, date provided in the NRC staffs January 7 and 28, 2021, letters.
D. Slaughter If you have any questions, please contact Mr. Edward Helvenston at 301-415-4067, or by e-mail to Edward.Helvenston@nrc.gov.
Sincerely, Signed by Taylor, Robert on 07/19/21 Robert M. Taylor, Deputy Office Director for New Reactors Office of Nuclear Reactor Regulation Docket No. 50-228 License No. R-98 cc:
California Energy Commission 1516 Ninth Street, MS-34 Sacramento, CA 95814 Radiologic Health Branch P.O. Box 997414, MS 7610 Sacramento, CA 95899-7414 Test, Research and Training Reactor Newsletter Attention: Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115